This document contains calculations and cooling load estimates for electronic equipment rooms in various buildings at the Hines VA Medical Center in Hines, Illinois. It specifies the number of data racks, equipment power loads, and required cooling capacity in kilowatts or tons for over 100 electronic equipment rooms across multiple buildings on the campus. The related federal contract opportunity is solicitation number 36C77623B0043 seeking offers to upgrade critical infrastructure including the electronic health records management systems in the equipment rooms described, to improve patient services. Offerors should reference the detailed equipment room specifications and cooling requirements provided to accurately prepare proposals for the infrastructure upgrade work being solicited.
View the file
Other files for this federal contract opportunity
Show all 50
36C77623B0043 - EHRM Infrastructure Upgrades - Hines, IL - Solicitation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 12
Calculations
Building Floor Wing Room # of Racks kW/rack Tot. kW UPS APPROACH CENTRALIZED UPS
*with 20% spare capacity
1 1st Floor A UPS 8 5 40 CENTRALIZED UPS UPS - Green A (BLDG 1-A) 50 kW total
1 1st Floor B UPS 8 5 40 CENTRALIZED UPS UPS - Green B (BLDG 1-B) 50 kW total
1 1st Floor C UPS 8 5 40 CENTRALIZED UPS UPS - Green C (BLDG 1-C) 50 kW total
1 1st Floor D UPS 8 5 40 CENTRALIZED UPS UPS - Green D (BLDG 1-D) 50 kW total
1 4th Floor F UPS 8 5 40 CENTRALIZED UPS UPS - Green F (BLDG 1-F) 50 kW total
1 1st Floor G UPS 8 5 40 CENTRALIZED UPS UPS - Green G (BLDG 1-G) 50 kW total
200 B N/A UPS 23 2.5 57.5 CENTRALIZED UPS UPS A - ORANGE 72 kW total
B N/A UPS 23 2.5 57.5 CENTRALIZED UPS UPS B - ORANGE 72 kW total
200 16 N/A UPS 28 2.5 70 CENTRALIZED UPS 75 kW UPS Selection
16 N/A UPS 28 2.5 70 CENTRALIZED UPS UPS A - ORANGE 88 kW total
UPS B - ORANGE 88 kW total
90 kW UPS Selection
228 Basement N/A UPS 22 2.5 55 UPS A -Yellow 69 kW total
228 Basement N/A UPS 22 2.5 55 CENTRALIZED UPS UPS B - Yellow 69 kW total
75 kW UPS Selection
VA
ESTIMATED CONNECTED LOADS & UPS APPROACH
Estimated UPS sizes *
HINES - EHRM UPGRADE PROJECT
VA Hines
TR Listing
Building Floor TR # Room # Total Ports Total Racks Follow‐Up Notes
1 1A TR‐01‐1‐1 A117 263 2
1 1B TR‐01‐1‐2 B129 470 2
1 1C TR‐01‐1‐3 C132C 437 2
1 1D TR‐01‐1‐4 D146 531 2
1 1F TR‐01‐1‐5 F108L 353 2
1 1G TR‐01‐1‐6 RCC157R 191 2
1 2A TR‐01‐2‐1 A217 313 2
1 2B TR‐01‐2‐2 B227 432 2
1 2C TR‐01‐2‐3 C228 291 2
1 2D TR‐01‐2‐4 D250A 388 2
1 2F TR‐01‐2‐5 F225 468 2
1 2G TR‐01‐2‐6 G227 236 2
1 3A TR‐01‐3‐1 A317 306 2
1 3B TR‐01‐3‐2 B323 329 2
1 3C TR‐01‐3‐3 C330D 438 2
1 3D TR‐01‐3‐4 D351 531 2
1 3F TR‐01‐3‐5 F321D 576 3
1 3G TR‐01‐3‐6 G327 401 2
1 4A TR‐01‐4‐1 A419 94 2
1 4B TR‐01‐4‐2 B423 182 2
1 4C TR‐01‐4‐3 C420A 227 2
1 4D TR‐01‐4‐4 D423A 511 2
1 4F TR‐01‐4‐5 F401B 594 3
1 4G TR‐01‐4‐6 G422 431 2
2 B TR‐02‐0‐1 22 190 1
2 1 TR‐02‐1‐1 106 305 2
2 2 TR‐02‐2‐1 210C 449 2
3 1 TR‐03‐1‐1 109A 75 1
4 1 TR‐04‐1‐1 107 219 1
7 1 TR‐07‐1‐1 Moved to 2nd floor
7 2 TR‐07‐2‐1 210B 134 1
8 1 TR‐08‐1‐1 109 87 1
9 1 TR‐09‐1‐1 101E 211 1
12 2 TR‐12‐2‐1 203 260 1 Updated room number
13 2 TR‐13‐2‐1 2 308 2
16 1 TR‐16‐1‐1 Moved to 2nd floor
16 2
TR‐16‐2‐1 207
413 2
413 ports includes 1st and 3rd floors with the
2nd floor
16 3 TR‐16‐3‐1 Moved to 2nd floor
17 1 TR‐17‐1‐1 118 Moved to 2nd floor
17 2
TR‐17‐2‐1 211
949 4
949 ports includes 1st and 3rd floors with the
2nd floor
17 3 TR‐17‐3‐1 310 Moved to 2nd floor
18 1 TR‐18‐1‐1 129 Moved to 3rd floor
18 2 TR‐18‐2‐1 207 Moved to 3rd floor
18 3 TR‐18‐3‐1 323 328 2
328 ports from 1st and 2nd floors, does not include 3rd floor. Currently 1 rack but will need 2
20 1 TR‐20‐1‐1 n/a 1
20 2 TR‐20‐2‐1 n/a 3
05/31/2023
VA Hines
TR Listing
Building Floor TR # Room # Total Ports Total Racks Follow‐Up Notes
33 1 TR‐33‐1‐1 No TR, covered by Building 07
45 1 TR‐45‐1‐1 102 142 1
48 1 TR‐48‐1‐1 132 1
48 2 TR‐48‐2‐1 18 ports included in 1st floor
100 1 TR‐100‐1‐1 17 107 1 TE
113 1 TR‐113‐1‐1 A138 524 3
113 2 TR‐113‐2‐1 A233A 767 3
128 1A TR‐128‐1‐1 C107 566 3 4 racks if (1) TR room for building
128 1B TR‐128‐1‐2 B138 504 3
200 BB TR‐200‐0‐1 B011 510 2
200 BC TR‐200‐0‐2 C032B 372 2
200 BD TR‐200‐0‐3 D008 365 2
200 1A TR‐200‐1‐1 A123E 922 4 Move TR to two offices north
200 1C TR‐200‐1‐2 B105A 818 3 3 racks ‐ 1 p/p of growth
200 1D TR‐200‐1‐3 D129A/D127 877 4
200 2A TR‐200‐2‐1 D2312A 532 2 2 racks ‐ plan on 3rd?
200 2C TR‐200‐2‐2 C2216A 346 2
200 2D TR‐200‐2‐3 D2463 335 2
200 3 TR‐200‐3‐1 3127 527 2 2 racks ‐ left room for 3rd rack next to wall
200 4 TR‐200‐4‐1 4112 505 2 2 racks ‐ left room for 3rd rack next to wall
200 5 TR‐200‐5‐1 564 464 2 2 racks ‐ left room for 3rd rack next to wall
200 6 TR‐200‐6‐1 672 440 2 2 racks ‐ left room for 3rd rack next to wall
200 7 TR‐200‐7‐1 772 456 2 2 racks ‐ left room for 3rd rack next to wall
200 8 TR‐200‐8‐1 858 515 2 2 racks ‐ left room for 3rd rack next to wall
200 9 TR‐200‐9‐1 953 597 3
200 10 TR‐200‐10‐1 1072 493 2 2 racks ‐ left room for 3rd rack next to wall
200 11 TR‐200‐11‐1 1161 433 2 2 racks ‐ left room for 3rd rack next to wall
200 12 TR‐200‐12‐1 1272 426 2 2 racks ‐ left room for 3rd rack next to wall
200 13 TR‐200‐13‐1 1372A 373 2 2 racks ‐ left room for 3rd rack next to wall
200 14 TR‐200‐14‐1 1472 444 2 2 racks ‐ left room for 3rd rack next to wall
200 15 TR‐200‐15‐1 1572 63 2 2 racks ‐ left room for 3rd rack next to wall
205 1 TR‐205‐1‐1 118B 119 1
217 1B TR‐217‐1‐1 1A115A 630 3
217 2B TR‐217‐2‐1 2A26A 594 3
220 1A TR‐220‐1‐1 107C 317 2
220 2 TR‐220‐2‐1 203A 169 1
221 1B TR‐221‐1‐1 A107B 296 2
228 B TR‐228‐0‐1 B1012 268 2
228 1B TR‐228‐1‐1 1030 482 2
228 1C TR‐228‐1‐2 1088 313 2
228 2B TR‐228‐2‐1 2025 194 2
228 2C TR‐228‐2‐2 2080 218 2
228 3B TR‐228‐3‐1 3025 344 2
228 3C TR‐228‐3‐2 3080 336 2
228 4B TR‐228‐4‐1 4025 231 2
228 4C TR‐228‐4‐2 4080 246 2
228 5B TR‐228‐5‐1 5019B 354 2
228 5C TR‐228‐5‐2 5044A 273 2
JCBOC 1 TR‐BJC‐1‐1 1014 954 4 Stand alone facility
05/31/2023
VA Hines Medical Center EHRM upgrades
TR Room Cooling loads
Building Floor TR # Room # Total Racks MBH UNIT MBH (MIN) # OF UNITS
1 1A TR-01-1-1 A117 2 24 30 1
1 1B TR-01-1-2 B129 2 24 30 1
1 1C TR-01-1-3 C132C 2 24 30 1
1 1D TR-01-1-4 D146 2 24 30 1
1 1F TR-01-1-5 F108L 2 24 30 1
1 1G TR-01-1-6 RCC157R 2 24 30 1
1 2A TR-01-2-1 A217 2 24 30 1
1 2B TR-01-2-2 B227 2 24 30 1
1 2C TR-01-2-3 C228 2 24 30 1
1 2D TR-01-2-4 D250A 2 24 30 1
1 2F TR-01-2-5 F225 2 24 30 1
1 2G TR-01-2-6 G227 2 24 30 1
1 3A TR-01-3-1 A317 2 24 30 1
1 3B TR-01-3-2 B323 2 24 30 1
1 3C TR-01-3-3 C330D 2 24 30 1
1 3D TR-01-3-4 D351 2 24 30 1
1 3F TR-01-3-5 F321D 3 29 24 2
1 3G TR-01-3-6 G327 2 24 30 1
1 4A TR-01-4-1 A419 2 24 30 1
1 4B TR-01-4-2 B423 2 24 30 1
1 4C TR-01-4-3 C420A 2 24 30 1
1 4D TR-01-4-4 D423A 2 24 30 1
1 4F TR-01-4-5 F401B 3 29 24 2
1 4G TR-01-4-6 G422 2 24 30 1
2 B TR-02-0-1 22 1 17 24 1
2 1 TR-02-1-1 106 2 24 30 1
2 2 TR-02-2-1 210C 2 24 30 1
3 1 TR-03-1-1 109A 1 17 24 1
4 1 TR-04-1-1 107 1 17 24 1
7 2 TR-07-2-1 210B 1 17 24 1
8 1 TR-08-1-1 109 1 17 24 1
9 1 TR-09-1-1 101E 1 17 24 1
12 2 TR-12-2-1 203 1 17 24 1
13 2 TR-13-2-1 2 2 24 30 1
16 2 TR-16-2-1 207 2 24 30 1
17 2 TR-17-2-1 211 4 34 30 2
18 3 TR-18-3-1 323 2 24 30 1
45 1 TR-45-1-1 102 1 17 24 1
48 1 TR-48-1-1 1 17 24 1
100 1 TR-100-1-1 17 1 17 24 1
113 1 TR-113-1-1 A138 3 29 24 2
113 2 TR-113-2-1 A233A 3 29 24 2
128 1A TR-128-1-1 C107 4 34 30 2
200 BB TR-200-0-1 B011 2 24 30 1
200 BC TR-200-0-2 C032B 2 24 30 1
200 BD TR-200-0-3 D008 2 24 30 1
200 1A TR-200-1-1 A123E 4 34 30 2
200 1C TR-200-1-2 B105A 3 29 24 2
200 1D TR-200-1-3 D129A/D127 4 34 30 2
200 2A TR-200-2-1 D2312A 2 24 30 1
200 2C TR-200-2-2 C2216A 2 24 30 1
200 2D TR-200-2-3 D2463 2 24 30 1
200 3 TR-200-3-1 3127 2 24 30 1
200 4 TR-200-4-1 4112 2 24 30 1
200 5 TR-200-5-1 564 2 24 30 1
200 6 TR-200-6-1 672 2 24 30 1
TABLE M1 - NSC ROOM COOLING LOADS
COOLING
VA Hines Medical Center EHRM upgrades
TR Room Cooling loads
Building Floor TR # Room # Total Racks MBH UNIT MBH (MIN) # OF UNITS
TABLE M1 - NSC ROOM COOLING LOADS
COOLING
200 7 TR-200-7-1 772 2 24 30 1
200 8 TR-200-8-1 858 2 24 30 1
200 9 TR-200-9-1 953 2 24 30 1
200 10 TR-200-10-1 1072 2 24 30 1
200 11 TR-200-11-1 1161 2 24 30 1
200 12 TR-200-12-1 1272 2 24 30 1
200 13 TR-200-13-1 1372A 2 24 30 1
200 14 TR-200-14-1 1472 2 24 30 1
200 15 TR-200-15-1 1572 2 24 30 1
205 1 TR-205-1-1 118B 1 17 24 1
217 1B TR-217-1-1 1A115A 3 29 24 2
217 2B TR-217-2-1 2A26A 3 29 24 2
220 1A TR-220-1-1 107C 2 24 30 1
220 2 TR-220-2-1 203A 1 17 24 1
221 1B TR-221-1-1 A107B 2 24 30 1
228 B TR-228-0-1 B1012 2 24 30 1
228 1B TR-228-1-1 1030 2 24 30 1
228 1C TR-228-1-2 1088 2 24 30 1
228 2B TR-228-2-1 2025 2 24 30 1
228 2C TR-228-2-2 2080 2 24 30 1
228 3B TR-228-3-1 3025 2 24 30 1
228 3C TR-228-3-2 3080 2 24 30 1
228 4B TR-228-4-1 4025 2 24 30 1
228 4C TR-228-4-2 4080 2 24 30 1
228 5B TR-228-5-1 5019B 2 24 30 1
228 5C TR-228-5-2 5044A 2 24 30 1
JCBOC B TR-BJC-0-1 001 2 24 30 1
JCBOC 1 TR-BJC-1-1 1014 4 34 30 2