Attachment 41 - Technical Questions and Answers Volume 5.pdf

PDF 1 MB Posted

Attached to
36C77623B0043 - EHRM Infrastructure Upgrades - Hines, IL - Solicitation Federal contract opportunity
Solicitation number
36C77623B0043
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document contains technical questions and answers regarding a solicitation response for an EHRM infrastructure design project at the Hines VA Medical Center in Chicago, Illinois. The response provides specifications and details for a cold aisle containment system, including general requirements, panel construction, heat activated ceiling panels, aisle doors, and warranty information. Installation execution is also outlined. The related federal contract opportunity is solicitation number 36C77623B0043 for EHRM infrastructure upgrades at the Hines VAMC.

View the file

Other files for this federal contract opportunity

Other files attached to 36C77623B0043 - EHRM Infrastructure Upgrades - Hines, IL - Solicitation, newest first.
File Type Posted
36C77623B0043 0003.pdf PDF
Attachment 42 - Addendum 01.pdf PDF
Attachment 43 - Addendum 02.pdf PDF
36C77623B0043 0002.pdf PDF
Attachment 39 - Technical Questions and Answers Volume 3.pdf PDF
Attachment 40 - Technical Questions and Answers Volume 4.pdf PDF
Official Site Visit Sign in Sheet - 1.pdf PDF
Official Site Visit Sign in Sheet - 3.pdf PDF
Presolicitation - Site Walk Sign in Sheet.pdf PDF
Official Site Visit Sign in Sheet - 2.pdf PDF
36C77623B0043 0001.pdf PDF
Attachment 38 - Technical Questions and Answers Volume 2.pdf PDF
Attachment 37 - Technical Questions and Answers Volume 1.pdf PDF
Attachment 13 - Drawings - 578-701.F.20230531_1.pdf PDF
Attachment 19 - Drawings - 578-701.M.20230531_2.pdf PDF
Attachment 24 - Drawings - 578-701.T2.20230531.pdf PDF
Attachment 25 - Site Self Assessment.pdf PDF
Attachment 26 - Basis of Design.pdf PDF
Attachment 30 - Milestone Schedule.pdf PDF
Attachment 34 - Cx Scope Documents.pdf PDF
Attachment 21 - Drawings - 578-701.T.20230531_1.pdf PDF
Attachment 01 - Revised Specifications.pdf PDF
Attachment 02 - Drawings - 578-701.A.20230531_1.pdf PDF
Attachment 10 - Drawings - 578-701.C.20230531_3.pdf PDF
Attachment 14 - Drawings - 578-701.F.20230531_2.pdf PDF
Attachment 15 - Drawings - 578-701.G.20230531.pdf PDF
Attachment 17 - Drawings - 578-701.H.20230531_2.pdf PDF
Attachment 23 - Drawings - 578-701.T.20230531_3.pdf PDF
Attachment 22 - Drawings - 578-701.T.20230531_2.pdf PDF
Attachment 27 - Cook County - Wage Rates.pdf PDF
Attachment 32 - Calculations.pdf PDF
Attachment 03 - Drawings - 578-701.A.20230531_2.pdf PDF
Attachment 05 - Drawings - 578-701.A.20230531_4.pdf PDF
Attachment 06 - Drawings - 578-701.A.20230531_5.pdf PDF
Attachment 07 - Drawings - 578-701.A.20230531_6.pdf PDF
Attachment 09 - Drawings - 578-701.C.20230531_2.pdf PDF
Attachment 12 - Drawings - 578-701.E.20230531_2.pdf PDF
Attachment 18 - Drawings - 578-701.M.20230531_1.pdf PDF
Attachment 28 - QA-QC Plans.pdf PDF
Attachment 29 - Project BIM Execution Plan.pdf PDF
Attachment 35 - Limitations on Subcontracting - Construction.docx DOCX document
S02 - Solicitation - 36C77623B0043.pdf PDF
Attachment 04 - Drawings - 578-701.A.20230531_3.pdf PDF
Attachment 08 - Drawings - 578-701.C.20230531_1.pdf PDF
Attachment 11 - Drawings - 578-701.E.20230531_1.pdf PDF
Attachment 16 - Drawings - 578-701.H.20230531_1.pdf PDF
Attachment 20 - Drawings - 578-701.S.20230531.pdf PDF
Attachment 31 - Facility Technology Needs Report _FTNR_.pdf PDF
Attachment 33 - Equipment Cut Sheets.pdf PDF
Attachment 36 - Contractor Safety - Environmental Form.docx DOCX document
Show all 50

36C77623B0043 - EHRM Infrastructure Upgrades - Hines, IL - Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hines VA EHRM Infrastructure Design

Solicitation Responses

Volume 04 www.specializedeng.com

Date: 08/18/2023

Project Name: VA Hines EHRM Infrastructure Design Project #: 21081.001

Re: Solicitation Responses

Specialized Engineering Solutions is submitting a solicitation response for the EHRM Infrastructure Design Project at the

Hines VA in Chicago, IL. Refer to the following information:

1. Sheet B01-M401 – Key Note 8: Cold Aisle Enclosure. Please provide informa4on for what is desired for an enclosure.

Note refers to architectural drawings. Sheet B01-AE420 is unreadable. All words and le5ers are being displayed with symbols or are missing en4rely. Please reissue B01-AE420.

Response: An updated copy of Sheet B01-AE420 is being provided. Addi onally, provide the following specifics for the cold aisle enclosure.

Example Image of a cold aisle system with two rows of equipment. Where a single row of equipment exists, the wall opposite of the equipment row would be a glazed wall panel system. Example:

Hines VA EHRM Infrastructure Design Solicitation Responses Volume 03

Cold Aisle Panel System Specification:

General:

1. Provide cold aisle containment system in locations indicated per plans. Provide manufacturer IMS AMCO or equal.

2. Provide components assembled in United States.

3. Provide full cold aisle containment submittal for design team review prior to purchase. Installing contractor shall field verify existing conditions including final rack locations, all pertinent dimensions, equipment clearances, etc.

4. Cold aisle containment system shall not impede access to rack mounted components.

5. Provide required components to enclose the cold aisle and isolate from the rest of the space. The cold aisle containment enclosure system shall include a frame with supported enclosure system to contain cold IT equipment supply air. The enclosure par44on wall shall be in the plane with the face of the IT cabinets, extending to height of cabinets to completely seal the cold aisle. Ver4cal Panels installed in the plane with the face of cabinet shall be hinged.

6. Containment system may use the structural floor for moun4ng of the enclosure walls.

7. Flexible bulb gaske4ng material shall be provided to ensure a 4ght seal between the ceiling structure and the containment system. Bulb gaske4ng to be provided between the containment and the cabinet.

8. Provide full height filler panels for any cabinets not installed or omi5ed. The containment system shall accommodate replacing filler panels with IT equipment cabinets without modifica4on. Filler Panel frame and construc4on shall match the rigid containment wall panel construc4on and color.

9. Per UL723 and ASTM E84, the system shall not exceed the following surface burning characteris4cs:

10. Smoke development index acceptable range: 0 to 450

11. Flame spread index: less than 2.5 inches per minute

12. Shall meet all requirements for FM Global Data Sheet 5-32 Requirements.

13. All components of the system shall be suitable for installa4on within a data center opera4ng space.

Containment Panel Construction:

1. System shall consist of aluminum extruded frame surrounding 4.5 mm polycarbonate panels. Aluminum extrusions shall have a center channel for affixing moun4ng equipment and securing adjacent panels.

2. Hard wall panels shall be provided for the en4re length of the row.

3. Height of panels shall be coordinated with the cabinet. Hard wall panels shall be easily removable through mechanical fasteners to allow access to the non-contained area.

4. Frames to be anodized clear finish.

5. Provide filler panels and seal all seams between panels, cabinets, and ceiling to create a sealed enclosure to block bypass air.

6. Panel materials shall be UL tested, meet ASTME84, and be acceptable with all local codes.

7. System shall not interfere with the cabinet door sealing or travel.

8. Paneling material shall have excellent UV stability and shall have at a minimum a verifiable 10 year track record with no UV degrada4on.

9. Panel penetra4ons for cables, electrical power distribu4on, or cable tray shall be sealed with Brush.

Heat Activated Ceiling Panel:

1. Provide Containment solu4on to accommodate various height cabinets, in-row cooling units, and/or in-row UPS systems.

2. Ceiling panels shall be fabricated of extruded aluminum frame surrounding 3.8mm clear polyvinyl chloride material.

3. Panels shall span across the aisle width and shall overlap the top of the cabinet by 1”-6”, field verified so to allow exis4ng condi4ons to remain.

4. Panel materials shall be UL-R4036 rated for use under 165°F systems and be acceptable with all local codes. Panels shall be ac4vated at 135°F.

5. Panel material shall also meet or exceed ASTME84 Flame Spread

Hines VA EHRM Infrastructure Design Solicitation Responses Volume 03

Aisle Doors:

1. Doors shall be made from 6560 T-6 temper aluminum frames and have full height 4.5 mm polycarbonate panels viewing panels. Door assembly height shall match cabinet/aisle height.

2. Door shall provide minimum [42] inches clear opening.

3. Door shall be single swing open/ close.

4. Door to have manual mechanism. Doors shall seal 4ght together when closed.

5. Doors to include all hardware for moun4ng to cabinets and floor system.

6. Brush/rubber material shall be used to minimize air leakage while door is in a closed posi4on. Brush/ rubber shall seal against frame.

7. Door frame shall seal 4ghtly to the cabinets and shall have gaske4ng material to prevent air leakage between the cabinets and frame.

Warranty:

1. 10 years from date of owner acceptance

Execu4on:

1. Refer to project Drawings for communica4ons equipment room layout and equipment placement.

2. Communica4ons equipment rooms must be free from dust, dirt, and other foreign materials before installa4on of any termina4on hardware or termina4on of copper or fiber op4c cables.

3. Door to room must be closed during termina4on if area outside room is not dust-free.

4. Provide all components of the aisle containment enclosure from a single manufacturer and for a complete installa4on.

5. Installa4on shall be coordinated by installers for interface with Fire Alarm System and/or VESDA for monitoring or ini4a4on of panel opening upon event.

6. Installa4on shall be coordinated by installers for alignment with Fire Sprinkler System (wet and dry) heads.

7. Installa4on shall be coordinated by contractor to align containment systems and components with supply and return air grilles.

8. Installing contractor to coordinate with ceiling and flooring installa4on teams to align with floor and or ceiling grid for airflow and other systems (lights, sprinkler heads, fire/ smoke detectors, overhead cable tray, overhead power systems, etc.).

9. Install the enclosure system using the manufacturer’s installa4on instruc4ons. System frame must be secured to the floor. The enclosure must be field fi5ed to match height requirements of the cabinets.

10. Install aisle containment door using manufacturer’s installa4on instruc4ons. Door shall be secured to the frame that supports the overhead panels. Installers shall use floor installa4on hardware as provided by the manufacturer. Should addi4onal hardware be required beyond what the manufacturer provided, installer shall provide.