This solicitation is for electronic health record modernization infrastructure upgrades at the VA medical center in Hines, Illinois. The solicitation seeks mechanical, electrical, and plumbing construction services to upgrade mechanical infrastructure including HVAC, plumbing, and electrical systems in various areas of the facility. Key work includes installing new HVAC equipment, upgrading mechanical systems in telecom and server rooms, replacing plumbing and adding new drainage systems. The response deadline is August 14, 2023, with construction to be completed by May 31, 2024. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
36C77623B0043 - EHRM Infrastructure Upgrades - Hines, IL - Solicitation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 01
Date: 08/14/2023
Project Name: VA Hines EHRM Infrastructure Design Phase II Project #: 21081.001
Telecommunication Specification Items:
1. The following color coding has been added to section 271000 – STRUCTURED CABLING:
A. 2.3 CABLE COLOR CODING
1. Horizontal Cabling:
a. Data Cabling – A side Blue, B side Yellow
b. VA WAP Cabling – Green
c. Analog Voice Cabling – Gray
d. Guest Wifi Cabling – Orange
e. Biomed and Nurse Call – White
f. Surveillance – Purple
g. Access Control
h. Fire Alarm – Red
B. Backbone Cabling:
1. Analog Copper – Gray
2. OM3 Multimode – Aqua
3. OM4 Mutlimode Fiber – Violet
4. OS1 and OS2 Singlemode Fiber – Yellow
Electrical Drawing Items:
1. The following sheet(s) has been modified:
A. Sheet EI402: ELECTRICAL DETAILS
1. Led Luminaire Schedule:
a. Light fixture XM1 is a stand along battery egress light, Lithonia model ELM6L or equal fixture by Sure- Lites or McPhilben.
Mechanical Drawing Items:
2. The following sheets are reissued in their entirety:
A. Sheet B01-M101A: FIRST LEVEL FLOOR PLAN – SECTION A – MECHANICAL
1. Added a thermostat to the UPS room.
B. Sheet B01-M101B: FIRST LEVEL FLOOR PLAN – SECTION B – MECHANICAL
1. Added a thermostat to the UPS room.
www.specializedeng.com
VA Hines EHRM Infrastructure Design Phase II SES Project #21081.001
Addendum 01 Page 2 of 2 08/14/2023
C. Sheet B01-M101D: FIRST LEVEL FLOOR PLAN – SECTION D – MECHANICAL
1. Added a thermostat to the UPS room.
D. Sheet B200-M000B: BASEMENT LEVEL FLOOR PLAN – SECTION B – MECHANICAL
1. Added a thermostat to the UPS room.
E. Sheet M501: MASTER MECHANICAL CONTROLS
1. Clarified Sequence of Controls for TR Racks.
Submitted By: Jeremy Klima jdm
H T
T
B01-M101A
SSCU-1-A217 SSCU-1-A317 SSCU-1-A419
(TYP) 4
TR
A117
B01-M101A
UPS
A113
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
A
B
C
D
E
M500
(TYP)
TENANT SPACE
PLAY ROOM
A117
TENANT SPACE
PLAY ROOM
A113
6 7 8
C
D
SS-1-A117
REFS/L UP
TR
A117
UPS
A113
H-1-A1177
12"x8"
D2
6"x6"
D2
6 7 8
C
D
SS-1-A113
(TYP) 4
LV-1-A113
EF-1-A113
M500
M500
M500
M500
M500
SSCU-1-A117SSCU-1-A113
1 1/2" SAN UP
1/2" NPW UP
2" SAN UP
CP-1-A1173/4" PC
2" SAN
2" STANDPIPE
1 1/2" V
6"x6"
D2
N
A B C D E F G
TENANT
SPACE
PANTRY
A114
TENANT SPACE
STORAGE
A108A
COMMON SPACE
CORRIDOR
RCC101R
DIRECTOR'S
SUITE
OFFICE
A148A
DIRECTOR'S
SUITE
OFFICE
A142C
TENANT
SPACE
MECHANICAL
ROOM
A134
DIRECTOR'S
SUITE
OFFICE
A142D
TENANT
SPACE
TOILET
A104
TENANT
SPACE PLAY
ROOM
A102
TENANT
SPACE PLAY
ROOM
A101
TENANT
SPACE PLAY
ROOM
A103
TENANT
SPACE
OFFICE
A105
TENANT
SPACE PLAY
ROOM
A109
TENANT
SPACE
TOILET
A107
TENANT
SPACE
STORAGE
A147
MEDICAL
ADMIN
BENI-TRAVEL
A143
SPACE
UNDER
CONSTRUCTION
A141
TENANT
SPACE
STORAGE
A139
TENANT
SPACE
OFFICE
A133A
TENANT
SPACE
OFFICE
A133
TENANT
SPACE
OFFICE
A129A
TENANT
SPACE
STORAGE
A125
TENANT
SPACE
VESTIBULE
VA1
VERTICAL
SPACE
ELEVATOR
RCC168R
TENANT
SPACE
PLAYROOM
A119
TENANT
SPACE PLAY
ROOM
A128
TENANT
SPACE
MECHANICAL
ROOM
A106
TENANT
SPACE PLAY
ROOM
A110
TENANT
SPACE
KITCHEN
A116 TENANT
SPACE PLAY
ROOM
A118
TENANT
SPACE
TOILET
A122
VERTICAL SPACE
STAIR
RCC167R
TENANT
SPACE
STORAGE
A150
VERTICAL
SPACE
ELEVATOR
A148B
DIRECTOR'S
SUITE COPY
ROOM
A148B
DIRECTOR'S
SUITE
OFFICE
A142B
DIRECTOR'S
SUITE
OFFICE
A142A
DIRECTOR'S
SUITE
OFFICE
A142
TENANT
SPACE
TOILET
A140
TENANT
SPACE
TOILET
A138
TENANT SPACE
MECHANICAL ROOM
A136
TENANT
SPACE
TEACHER'S
LOUNGE
A132
COMMON SPACE
CORRIDOR
RCC103R
COMMON
SPACE
CORRIDOR
RCC104R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 21081
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 05/31/2023
B
IM
/2
V
A H in e s E
H R
M I n fr a s tr u c tu re D e s ig n P h a s e I
I/
-7
.B
.M T
R
.r v t
/1
/2
:4
:4
P
M
B01-M101A
FIRST LEVEL FLOOR PLAN -
SECTION A - MECHANICAL
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
5000 5TH AVE, HINES, IL 60141
578-21-701
05/31/2023 JMM RJH
N
SCALE: 1/16" = 1'-0"B01-M101A
1 FIRST LEVEL FLOOR PLAN - SECTION A - MECHANICAL
0' 16' 32'8'4'
SCALE: 1/4" = 1'-0"B01-M101A
2 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - TR-A117
SCALE: 1/4" = 1'-0"B01-M101A
3 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL - TR-A117
0' 4' 8' 12'2'0' 4' 8' 12'2'
NOT TO SCALE
KEY PLAN
SHEET NOTES:
1. REMOVE PLENUM RETURN GRILLE IN ITS ENTIRETY.
2. REMOVE SUPPLY DIFFUSERS AND ASSOCIATED DUCTWORK AS SHOWN.
3. REMOVE RADIATOR AND ASSOCIATED PIPING TO NEAREST ACTIVE MAIN AND CAP.
4. ROUTE REFRIGERANT SUCTION AND LIQUID LINES FROM CONDENSING UNIT TO CORRESPONDING DUCT-
FREE SYSTEM. SIZE LINES ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL
ACCESSORIES REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM.
5. PROVIDE WATER BUG AT FLOOR TO ALARM TO DDC WHEN ACTIVATED.
6. CONTRACTOR TO VERIFY AND MATCH EXISTING SA DUCT SIZE.
7. ROUTE 1-1/4” CONDENSATE DRAIN FROM HUMIDIFIER TO CONDENSATE PUMP.
8. REMOVE SANITARY PIPING TO NEAREST ACTIVE MAIN AND CAP.
9. REMOVE DCW, DHW, AND DHWC PIPING AS SHOWN AND CAP.
10. CONNECT 2" SANITARY INTO EXISTING 4" SANITARY RISER. FIELD CONFIRM LOCATION OF EXISTING RISER.
11. ROUTE 3/4” CD FROM SS-1-A117 AND COMBINE WITH 3/4" CD FROM SS-1-A113. CONTINUE TO 2" STANDPIPE
WITH AIR GAP FITTING.
GENERAL NOTES:
1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
5. WHETHER INDICATED BY OTHER PLAN NOTES OR NOT, PROVIDE A DRAIN PAN UNDER ALL EXISTING OR NEW HORIZONTAL PLUMBING OR MECHANICAL PIPING LOCATED IN TR ROOMS, SERVER ROOMS OR ENTRANCE ROOMS. DRAIN PANS TO BE PROVIDED WITH WATER BUG SENSORS WITH ALARM TO THE DDC.
DRAIN PANS ARE NOT REQUIRED UNDER REFRIGERANT PIPING. DRAIN PANS TO BE SUPPORTED FROM
STRUCTURE. SUSPENDING DRAIN PANS FROM OTHER BUILDING SYSTEMS IS NOT ALLOWED.
6. ALL EXTERIOR ANCHORS FASTENED TO THE BUILDING SHALL BE LOCATED AT THE MORTAR JOINTS.
ANCHORING INTO THE BRICK SURFACE IS NOT ALLOWED AT HINES.
Revisions: Date:
Addendum 01 08/14/2023
T H
B01-M101B
B01-M101B
(TYP) 5
SSCU-1-B129 SSCU-1-B227 SSCU-1-B323 SSCU-1-B423
TR
B129
UPS
B132
B01-M101B
B01-M101B
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
A
B
C
D
E
SSCU-1-B132
M500
(TYP)
GERIATRICS TOILET
B129
26 27
D
(TYP) 5
REFS/L UP
TR
B129
SS-1-B129
H-1-B1297
REFS/L UP
26 27
D
CP-1-B129
TF-1-B129 75
G1
F-1-B129
24x129
2" SAN UP
M500
M500
M500
M500
3/4" NPW UP
4" SAN UP/DN
2" SAN
3/4" PC
3/4" NPW
1/2" NPW
1 1/2" V UP
3/4" PC8
N
A B C D E F G
FISCAL
STORAGE
B102
TENANT
SPACE
STORAGE
B116A
GERIATRICS
COPY ROOM
B128
VERTICAL
SPACE
ELEVATOR
RCC171R
GERIATRICS
STAFF
ROOM
B146A
MEDICAL
ADMIN
STORAGE
B158
COMMON SPACE
CORRIDOR
RCC109R
GERIATRICS
MECHANICAL
ROOM
B138A GERIATRICS
OFFICE
B140
GERIATRICS
OFFICE
B142
GERIATRICS
CONFERENCE
ROOM
B146
GERIATRICS
STORAGE
B148
GERIATRICS
TOILET
B152
MEDICAL
ADMIN
STORAGE
B158A MEDICAL
ADMIN
OFFICE
B160
MEDICAL
ADMIN
OFFICE
B162
FISCAL
OFFICE
B106
FISCAL
OFFICE
B110
FISCAL
OFFICE
B114
GERIATRICS
OFFICE
B115
TENANT
SPACE
B116
TENANT
SPACE
OFFICE
B118
GERIATRICS
OFFICE
B122
TENANT
SPACE
OFFICE
B103
TENANT
SPACE
OFFICE
B121
TENANT
SPACE
OFFICE
B119
TENANT
SPACE
OFFICE
B117
TENANT
SPACE
OFFICE
B113
TENANT
SPACE
OFFICE
B109
TENANT
SPACE
OFFICE
B107
GERIATRICS
H.A.C.
B127
GERIATRICS
TOILET
B123
COMMON
SPACE
CORRIDOR
RCC107R
TENANT
SPACE
OFFICE
B161A
NUTRITION/FOOD
OFFICE
B159
DIRECTOR'S
SUITE
OFFICE
B155
GERIATRICS
STORAGE
B153
GERIATRICS
OFFICE
B151
GERIATRICS
OFFICE
B147
GERIATRICS
OFFICE
B145
GERIATRICS
OFFICE
B143
GERIATRICS
OFFICE
B141
GERIATRICS
OFFICE
B139
GERIATRICS
OFFICE
B135A
GERIATRICS
MAIN
OFFICE
B135
GERIATRICS
OFFICE
B149
TENANT
SPACE
CONFERENCE
ROOM
B101
FISCAL
STORAGE
B100
FISCAL
OFFICE
B104
VERTICAL
SPACE
STAIR
RCC170R
COMMON SPACE
CORRIDOR
RCC106R
GERIATRICS
OFFICE
B136
GERIATRICS
OFFICE
B134
GERIATRICS
STORAGE
B138
GERIATRICS
OFFICE
B136A
COMMON
SPACE
RCC187R
COMMON
SPACE
CORRIDOR
RCC110R
COMMON
SPACE
CORRIDOR
RCC104R
GERIATRICS
MECHANICAL ROOM
B132
28 29
A
B
UPS
B132
28 29
A
B
SS-1-B132
SSCU-1-B132
8 LV-1-B132
EF-1-B132
CP-1-B132
M500
M500
M500
M500
TF-1-B132
G1
24x12 RA
F-1-B132
3/4" CD
3/4" PC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 21081
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 05/31/2023
B
IM
/2
V
A H in e s E
H R
M I n fr a s tr u c tu re D e s ig n P h a s e I
I/
-7
.B
.M T
R
.r v t
/1
/2
:4
:4
P
M
B01-M101B
FIRST LEVEL FLOOR PLAN -
SECTION B - MECHANICAL
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
5000 5TH AVE, HINES, IL 60141
578-21-701
05/31/2023 JMM RJH
SCALE: 1/16" = 1'-0"B01-M101B
1 FIRST LEVEL FLOOR PLAN - SECTION B - MECHANICAL
SCALE: 1/4" = 1'-0"B01-M101B
2 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - TR-B129
SCALE: 1/4" = 1'-0"B01-M101B
3 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL - TR-B129
N
0' 16' 32'8'4'
0' 4' 8' 12'2'0' 4' 8' 12'2'
NOT TO SCALE
KEY PLAN
SHEET NOTES:
1. DEMO EXHAUST GRILLE AND DUCTWORK AS SHOWN.
2. REMOVE RADIATOR AND ASSOCIATED PIPING TO NEAREST ACTIVE MAIN AND CAP.
3. REMOVE PLUMBING FIXTURE AND ASSOCIATED PIPING TO NEAREST ACTIVE MAIN AND CAP.
4. REMOVE SANITARY PIPING AND CAP AT NEAREST ACTIVE MAIN.
5. ROUTE REFRIGERANT SUCTION AND LIQUID LINES FROM CONDENSING UNIT TO CORRESPONDING DUCT-
FREE SYSTEM. SIZE LINES ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL
ACCESSORIES REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM.
6. PROVIDE WATER BUG AT FLOOR TO ALARM TO DDC WHEN ACTIVATED.
7. ROUTE DRAIN LINE FROM HUMIDIFIER TO CONDENSATE PUMP.
8. ROUTE 1/2" PUMPED CONDENSATE DRAIN LINE AS SHOWN AND CONNECT INTO THE TOP OF THE NEW 2" SAN
LINE.
9. ROUTE 3/4" CONDENSATE DRAIN FROM SPLIT SYSTEM AND CONNECT INTO 1-1/4” DRAIN LINE INTO
CONDENSATE PUMP.
10. PROVIDE NEW 3/4" DCW TAP FROM EXISTING COLD WATER LINE IN SHAFT AND PROVIDE WITH 5 MICRON
INLINE SEDIMENT PREFILTER WITH MINIMUM 5 GPM CAPACITY AND 3/4" DOUBLE CHECK VALVE ASSEMBLY MOUNTED AT 3'-0" ABOVE FINISHED FLOOR. ROUTE 3/4" NCW AS SHOWN TO NEW RISER SERVING HUMIDIFIERS IN TR ROOMS. PREFILTER RATED FOR 125 PSI MAXIMUM PRESSURE, COORDINATE MODEL AND
FILTER TYPE WITH VA HINES CURRENT STOCK UNIT.
11. CONNECT 2" SANITARY LINE INTO EXISTING 4 INCH SANITARY LINE IN WALL.
GENERAL NOTES:
SCALE: 1/4" = 1'-0"B01-M101B
5 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - UPS B132
0' 4' 8' 12'2' SCALE: 1/4" = 1'-0"B01-M101B
6 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL - UPS B132
0' 4' 8' 12'2'
Revisions: Date:
Addendum 01 08/14/2023
1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
5. WHETHER INDICATED BY OTHER PLAN NOTES OR NOT, PROVIDE A DRAIN PAN UNDER ALL EXISTING OR NEW HORIZONTAL PLUMBING OR MECHANICAL PIPING LOCATED IN TR ROOMS, SERVER ROOMS OR ENTRANCE ROOMS. DRAIN PANS TO BE PROVIDED WITH WATER BUG SENSORS WITH ALARM TO THE DDC.
DRAIN PANS ARE NOT REQUIRED UNDER REFRIGERANT PIPING. DRAIN PANS TO BE SUPPORTED FROM
STRUCTURE. SUSPENDING DRAIN PANS FROM OTHER BUILDING SYSTEMS IS NOT ALLOWED.
6. ALL EXTERIOR ANCHORS FASTENED TO THE BUILDING SHALL BE LOCATED AT THE MORTAR JOINTS.
ANCHORING INTO THE BRICK SURFACE IS NOT ALLOWED AT HINES.
TH
T
T
B01-M101D
B01-M101D
TR
D146
56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73
A
B
C
D
E
UPS
D144
LV-1-D144
8x6 EA
M500
M500
3/4" NPW
67 68
B
C
11 5
TR
D146
H-1-D146
REFS/L UP
SS-1-D146
D19
6"x6"
D2
67 68
B
C
SS-1-D144
EF-1-D144
UPS
D144
M500
M500
M500
M500
RELOCATED
THERMOSTAT
6"x6"
D2
6"x6"
D2
2" SAN UP
2" SAN DN
2" STANDPIPE
N
A B C D E F G
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 21081
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 05/31/2023
B
IM
/2
V
A H in e s E
H R
M I n fr a s tr u c tu re D e s ig n P h a s e I
I/
-7
.B
.M T
R
.r v t
/1
/2
:4
:4
P
M
B01-M101D
FIRST LEVEL FLOOR PLAN -
SECTION D - MECHANICAL
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
5000 5TH AVE, HINES, IL 60141
578-21-701
05/31/2023 JMM RJH
SCALE: 1/16" = 1'-0"B01-M101D
1 FIRST LEVEL FLOOR PLAN - SECTION D - MECHANICAL
SCALE: 1/4" = 1'-0"B01-M101D
2 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - TR-D146 AND UPS D144
SCALE: 1/4" = 1'-0"B01-M101D
3 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL - TR-D146 AND UPS D144
N
0' 16' 32'8'4'
0' 4' 8' 12'2'0' 4' 8' 12'2'
NOT TO SCALE
KEY PLAN
SHEET NOTES:
1. ROUTE REFRIGERANT SUCTION AND LIQUID LINES FROM CONDENSING UNIT TO CORRESPONDING DUCT-
FREE SYSTEM. SIZE LINES ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL
ACCESSORIES REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM.
2. PROVIDE WATER BUG AT FLOOR TO ALARM TO DDC WHEN ACTIVATED.
3. ROUTE DRAIN FROM HUMIDIFIER AND DISCHARGE INTO HUMIDIFIER DRAIN RESERVOIR AS INDICATED IN
DETAIL 5/M500.
4. REMOVE SUPPLY DIFFUSER,ASSOCIATED DUCTWORK, AND EQUIPMENT AS SHOWN.
5. REMOVE RETURN GRILLE AND ASSOCIATED DUCTWORK AS SHOWN.
6. REMOVE SUPPLY DUCTWORK AS SHOWN.
7. ROUTE 3/4” CONDENSATE DRAIN FROM SPLIT SYSTEM, COMBINE WITH HUMIDIFIER AND SPLIT SYSTEM
DRAINS AND CONTINUE AS 1-1/2” LINE TO STANDPIPE WITH AIR GAP FITTING.
8. CONNECT INTO EXISTING DOMESTIC WATER LINE IN HOUSEKEEPING ROOM WITH 3/4" CONNECTION. IN
HOUSEKEEPING ROOM, PROVIDE WITH 5 MICRON INLINE SEDIMENT PREFILTER WITH MINIMUM 5 GPM CAPACITY AND 3/4" DOUBLE CHECK VALVE ASSEMBLY MOUNTED AT 3'-0" ABOVE FINISHED FLOOR. ROUTE 3/4" NCW AS SHOWN TO NEW RISER SERVING HUMIDIFIERS IN TR ROOMS. PREFILTER RATED FOR 125 PSI MAXIMUM PRESSURE, COORDINATE MODEL AND FILTER TYPE WITH VA HINES CURRENT STOCK UNIT.
9. CONTRACTOR TO VALIDATE EXISTING AIRFLOW AND REBALANCE TO MATCH EXISTING AIRFLOW.
10. ROUTE 3/4" CONDENSATE DRAIN FROM SPLIT SYSTEM AND CONNECT INTO 1-1/2” DRAIN LINE TO STANDPIPE
WITH AIR GAP FITTING.
11. REMOVE EXISTING SINK. REMOVE DCW, DHW, AND V PIPING TO NEAREST ACTIVE MAIN AND CAP. REMOVE
SAN TO POINT BELOW FLOOR AND CAP.
12. RELOCATE EXISTING PNEUMATIC THERMOSTAT TO LOCATION INDICATED ON NEW WORK PLAN. MODIFY
EXISTING PNEUMATIC TUBING AS REQUIRED.
13. RELOCATE EXISTING DUAL DUCT BOX AND MODIFY EXISTING DUCTWORK AS REQUIRED TO ACCOMMODATE
NEW WALL. LOCATE TO MAINTAIN ALL REQUIRED ACCESS TO DUAL DUCT BOX.
14. ROUTE 2" SANITARY DOWN. CONNECT TO EXISTING 4" SANITARY IN TUNNEL BELOW.
15. ROUTE 1-1/4” CONDENSATE DRAIN FROM HUMIDIFIER, COMBINE WITH SPLIT SYSTEM DRAINS AND CONTINUE
AS 1-1/2” LINE TO STANDPIPE WITH AIR GAP FITTING.
GENERAL NOTES:
Revisions: Date:
Addendum 01 08/14/2023
1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
5. WHETHER INDICATED BY OTHER PLAN NOTES OR NOT, PROVIDE A DRAIN PAN UNDER ALL EXISTING OR NEW HORIZONTAL PLUMBING OR MECHANICAL PIPING LOCATED IN TR ROOMS, SERVER ROOMS OR ENTRANCE ROOMS. DRAIN PANS TO BE PROVIDED WITH WATER BUG SENSORS WITH ALARM TO THE DDC.
DRAIN PANS ARE NOT REQUIRED UNDER REFRIGERANT PIPING. DRAIN PANS TO BE SUPPORTED FROM
STRUCTURE. SUSPENDING DRAIN PANS FROM OTHER BUILDING SYSTEMS IS NOT ALLOWED.
TH
T T
UPS-1
B040-1
B200-M100B
B200-M100B x15 x14 x13 x12 x11 x10 x9 x8 xH xG xF xE xD xC xB xA
B200-M100B
B200-M100B
TR
B011A
N
A
BC
D x8 xC x8 xC
H-200-B011
2" CWR DN
2" CWS DN
TR
B011A
CP-200-B011A
6"x6"
D3
BCU-200-B11A
B200-M600
M500
SURGICAL OFFICE
B019B
SURGICAL OFFICE
B019C
EMS SOILED
UTILITY
B017
EMS TOILET
B016B
SURGICAL
CONFERENCE
ROOM
B018
SURGICAL
PATIENT HOLDING
B016
LINEN SERVICE
B006B
EMS TOILET-1
B014A-1
SURGICAL
LOCKER ROOM
B010
EMS TOILET
B010A
SURGICAL OFFICE
B009
SURGICAL
LOUNGE
B011
COMMON SPACE
CORRIDOR
RCCB12R
EMS TOILET
B020A
SURGICAL EXAM
B022A
SURGICAL
RECEPTION
B020
SURGICAL EXAM
B022C
SURGICAL EXAM
B022B
SURGICAL EXAM
B022D
SURGICAL EXAM
B022E
SURGICAL EXAM
B022F
EMS TOILET
B022I
SURGICAL UTILITY
B023D
SURGICAL
URODYNAMIC LAB
B022H
EMS TOILET
B023C
EMS TOILET
B024A
EMS H.A.C.
B024F
SURGICAL
DECONTAMINATION
ROOM
B025A
SURGICAL
LOCKER ROOM
B024E
SURGICAL
LOCKER ROOM
B024D
SURGICAL
DRESSING ROOM
B024C
SURGICAL
DRESSING ROOM
B024B
SURGICAL
LOCKER ROOM
B024
EMS SOILED
UTILITY
B025B
SURGICAL
PROCEDURE
ROOM
B027
SURGICAL CLEAN
ROOM
B029B
COMMON SPACE
CORRIDOR
RCCB17R
SURGICAL
PROCEDURE
ROOM
B029
SURGICAL
PROCEDURE
ROOM
B028
EMS H.A.C.-1
B030-1
EMS TOILET
B032
OI&T COMPUTER
ROOM
B037B
ENGINEERING
ELECTRICAL
CLOSET
B037D
COMMON SPACE
CORRIDOR
RCCB16R
SURGICAL EXAM
B022G
VESTIBULE
B038G
STAFF LOUNGE
B038H
WORK ROOM
B039F EXAM 3
B039I
EXAM 6
B039L
EKG/HOLTER
B038E
TOILET-1
B138T-1
OFFICE
B039B
EXAM 2
B039H
EXAM 5
B039K
EXAM 4
B039J
EKG/HOLTER
B038F
PASSAGE
B039E
REC
B039A
NURSING SVC
ADMIN WHEEL
CHAIR STORAGE
B031
EMS TOILET
C021
ENGINEERING
ELVATOR
MACHINE ROOM
B033
COMMON SPACE
CORRIDOR
RCCB18R
OI&T
COMMUNICATIONS
B040A
EXAM 1
B039G
OI&T
COMMUNICATIONS
B040
PASSAGE
B038
MUSE
B038D
ENGINEERING ELECTRICAL CLOSET
B037A
VERTICAL SPACE
STAIR
RCCB30C
SURGICAL
ANESTHESIA
STORAGE
B037
EKG
B039D
TOILET
B039C WAITING
B039
COMMON SPACE
CORRIDOR
RCCB21R
SURGICAL
RECOVERY
B023
SURGICAL
STORAGE
B026
EMS TOILET
B023B
SURGICAL
ANESTHESIA
STORAGE
B036
EMS TOILET
B020B
COMMON SPACE
CORRIDOR
RCCB15R
COMMON SPACE
CORRIDOR
RCCB29R
SURGICAL
RCCB28R
SURGICAL OFFICE
B019
SURGICAL
ANESTHESIA
WORK ROOM
B003
EMS H.A.C.
B006
COMMON SPACE
CORRIDOR
RCCB11R
SURGICAL BLOOD
GAS ANALYSIS
B008A
SURGICAL
LOCKER ROOM
B014
COMMON SPACE
CORRIDOR
RCCB14R
SURGICAL COPY
ROOM
B012
SURGICAL OFFICE
B036A
UPS-1
B040-1 x12 xF xE
2" CWR UP/DN
2" CWS UP/DN
BCU-200-B040-1B200-M600
10"x6"
D3
6"x10"
GE7
x12 xF xE x9 x8 xB
150150
175 175 x9 x8 xB
6"x6"
D3
175175
B200-M600
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 21081
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 05/31/2023
B
IM
/2
V
A H in e s E
H R
M I n fr a s tr u c tu re D e s ig n P h a s e
I I/
-7
.B
.M
T
R
.r v t
/1
/2
:4
:2
P
M
B200-M100B
BASEMENT LEVEL FLOOR PLAN -
SECTION B - MECHANICAL
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
5000 5TH AVE, HINES, IL 60141
578-21-701
05/31/2023 JMM RJH
SCALE: 1/16" = 1'-0"B200-M100B
1 BASEMENT LEVEL FLOOR PLAN - SECTION B - MECHANICAL
NOT TO SCALE
KEY PLAN
N
0' 4' 8' 12'2'SCALE: 1/4" = 1'-0"B200-M100B
2 BASEMENT LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - TR-B011
SCALE: 1/4" = 1'-0"B200-M100B
3 BASEMENT LEVEL FLOOR PLAN - ENLARGED MECHANICAL - TR-B011
0' 4' 8' 12'2'
SHEET NOTES:
1. PROVIDE WATER BUG AT FLOOR TO ALARM TO DDC WHEN ACTIVATED.
2. REMOVE SUPPLY DIFFUSER AND ASSOCIATED DUCTWORK AS SHOWN.
3. REMOVE RETURN GRILLE AND ASSOCIATED DUCTWORK TO MAIN.
4. BOTTOM OF NEW EQUIPMENT SHALL BE 1'-4" AFF. PROVIDE BASIS OF DESIGN CLEARANCES PER
MANUFACTURER RECOMMENDATIONS.
5. ROUTE 1" PUMPED CONDENSATE DRAIN LINES TO LOCATION SHOWN. TERMINATE WITH AIR GAP.
6. TAP OFF EXISTING DCW LINE WITH 1/2" RPZ BACKFLOW PREVENTER. EXTEND 1/2" DCW DOWNSTREAM OF
BACKFLOW PREVENTER TO HUMIDIFIER. PROVIDE AIR GAP FITTING ON BACKFLOW PREVENTER AND ROUTE
TO DRAIN.
7. ROUTE 3/4” GRAVITY CONDENSATE DRAIN LINE FROM SS-200-B011. CONTINUE DRAIN LINE AS SHOWN ON PLANS, COMBINE WITH HUMIDIFIER DRAIN AND CONTINUE AS 1” CONDENSATE DRAIN LINE DOWN TO CP-200- B011.
8. REMOVE VENT PIPING AS SHOWN.
9. REMOVE DCW PIPING AS SHOWN.
10. REBALANCE DIFFUSER/GRILLE TO CFM INDICATED.
GENERAL NOTES:
0' 8' 16'4' 32'
SCALE: 1/4" = 1'-0"B200-M100B
5 BASEMENT LEVEL FLOOR PLAN - ENLARGED MECHANICAL - UPS-B040-1
SCALE: 1/4" = 1'-0"B200-M100B
6 BASEMENT LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - UPS-B040-1
0' 4' 8' 12'2'0' 4' 8' 12'2'
SCALE: 1/4" = 1'-0"B200-M100B
7 BASEMENT LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - LOCKER ROOM
0' 4' 8' 12'2' SCALE: 1/4" = 1'-0"B200-M100B
8 BASEMENT LEVEL FLOOR PLAN - ENLARGED MECHANICAL - LOCKER ROOM
0' 4' 8' 12'2'
Revisions: Date:
Addendum 03 07/14/2023
1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
5. WHETHER INDICATED BY OTHER PLAN NOTES OR NOT, PROVIDE A DRAIN PAN UNDER ALL EXISTING OR NEW HORIZONTAL PLUMBING OR MECHANICAL PIPING LOCATED IN TR ROOMS, SERVER ROOMS OR ENTRANCE ROOMS. DRAIN PANS TO BE PROVIDED WITH WATER BUG SENSORS WITH ALARM TO THE DDC.
DRAIN PANS ARE NOT REQUIRED UNDER REFRIGERANT PIPING. DRAIN PANS TO BE SUPPORTED FROM
STRUCTURE. SUSPENDING DRAIN PANS FROM OTHER BUILDING SYSTEMS IS NOT ALLOWED.
FANMOTOR
CONTROLLER
TEMPERATURE
CONTROL WIRING
(TYP)
01 02
SEQUENCE OF OPERATION
TRANSFER FANS (TF-##-####)
EACH FAN HAS A CURRENT STATUS SWITCH TO PROVE FAN OPERATION. IF THE CURRENT STATUS SWITCH DOES NOT PROVE OPERATION, SEND AND ALARM TO
THE USER INTERFACE.
FAN SHALL RUN CONTINUOUSLY TO PRESSURIZE THE TELECOM ROOM.
PROVIDE DIFFERENTIAL PRESSURE SENSOR ACROSS FILTER BANK. ALARM USER INTERFACE WHEN PRESSURE DROP EXCEEDS 0.2" W.C. (ADJUSTABLE).
GENERAL NOTES
1. SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF CONTROLLER.
2. CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 24 INCHES.
REMARKS:
1. E = ELECTRIC P = PNEUMATIC O = BY OTHERS S = REFERENCED POINT FROM HARDWARE ELSEWHERE ON DDC NETWORK
2. A = ANALOG B = BINARY
3. I = INPUT O = OUTPUT
4. G = GENERAL C = CRITICAL H = HIGH LIMIT L = LOW LIMIT F = FAILURE
5. T = TRENDING E = EVENT HISTORY A = ARCHIVE TT = TOTALIZATION G = GRAPHICAL POINT
DP
C
C
C W
R
C W
S
CONTROLLER
MOTOR
FAN
SPACE BOUNDARY
TEMPERATURE
CONTROL WIRING
(TYP)
01 02
03 04
T
SEQUENCE OF OPERATION
EACH ZONE HAS A FAN COIL UNIT WITH A CHILLED WATER COOLING COIL, COOLING COIL CONTROL VALVE, AND DIRECT DIGITAL CONTROLLER. INSTALL A WALL MOUNTED TEMPERATURE SENSOR TO MAINTAIN SPACE TEMPERATURE OF 75°F (ADJUSTABLE). SEE DRAWINGS FOR TEMPERATURE SENSOR REQUIREMENTS.
ABOVE SETPOINT, THE FAN COIL UNIT FAN SHALL RUN CONTINUOUSLY AND THE COOLING COIL CONTROL VALVE SHALL BE FULLY OPEN.
ON A FALL IN SPACE TEMPERATURE THE FAN COIL UNIT SHALL CYCLE OFF AND THE COOLING COIL CONTROL VALVE SHALL CLOSE. IF SPACE TEMPERATURE RISES ABOVE
90°F (ADJUSTABLE), SEND ALARM TO THE OPERATOR INTERFACE.
GENERAL NOTES
1. SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF CONTROLLER.
2. CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 24 INCHES.
3. MOUNT ALL ROOM SENSORS AT 48" ABOVE FINISHED FLOOR. COORDINATE LOCATION WITH NEARBY DEVICES SUCH AS LIGHT SWITCHES.
REMARKS:
1. E = ELECTRIC P = PNEUMATIC O = BY OTHERS S = REFERENCED POINT FROM HARDWARE ELSEWHERE ON DDC NETWORK
2. A = ANALOG B = BINARY
3. I = INPUT O = OUTPUT
4. G = GENERAL C = CRITICAL H = HIGH LIMIT L = LOW LIMIT F = FAILURE
5. T = TRENDING E = EVENT HISTORY A = ARCHIVE TT = TOTALIZATION G = GRAPHICAL POINT
01 02
SS-#-####-1 SS-#-####-2
T TELECOM ROOM / UPS ROOM
03 04
SPLIT SYSTEM DX AIR:
• CONSISTS OF WALL MOUNTED BLOWER EVAPORATOR UNIT, ROOF/GRADE MOUNTED
CONDENSING UNIT, THERMOSTAT PROVIDED BY MANUFACTURER, AND TEMPERATURE SENSOR
PROVIDED BY CONTROLS CONTRACTOR.
• CYCLE CONDENSING UNIT AND INDOOR UNIT IN UNISON TO MAINTAIN SPACE TEMPERATURE
SETPOINT OF 75 DEF °F (ADJUSTABLE). SPACE TEMPERATURE SHALL BE MONITORED THROUGH
DDC. SEND AN ALARM TO THE OPERATOR INTERFACE IF THE SPACE TEMPERATURE EXCEEDS 90°F
(ADJUSTABLE).
• WHERE TWO SPLIT SYSTEMS SERVE THE SAME TELECOM ROOM, THE TEMPERATURE SETPOINT
FOR EACH UNIT SHALL BE CYCLED WEEKLY.
1. WEEK 1:
A. UNIT "1" SHALL BE SET TO MAINTAIN A SPACE TEMPERATURE SETPOINT OF 75° F
(ADJUSTABLE).
B. UNIT "2" SHALL BE SET TO MAINTAIN A SPACE TEMPERATURE SETPOINT OF 80° F
(ADJUSTABLE).
2. WEEK 2:
A. UNIT "1" SHALL BE SET TO MAINTAIN A SPACE TEMPERATURE SETPOINT OF 80° F
(ADJUSTABLE).
B. UNIT "2" SHALL BE SET TO MAINTAIN A SPACE TEMPERATURE SETPOINT OF 75° F
(ADJUSTABLE).
06 07
HUMIDIFIER
H TELECOM ROOM / UPS ROOM
TELECOM ROOMS WITH STAND ALONE HUMIDIFIERS CONTROL:
• HUMIDIFIER TO OPERATE TO MAINTAIN ROOM HUMIDISTAT (HUMIDISTAT AND HUMIDIFIER
CONTROL PROVIDED BY THE HUMIDIFIER MANUFACTURER) SETPOINT. PROVIDE A ROOM
HUMIDITY SENSOR (BY CONTROLS CONTRACTOR) TO MONITOR ROOM HUMIDITY. IF ROOM
HUMIDITY FALLS BELOW 20% RH OR RISES ABOVE 70% RH FOR MORE THAN THIRTY MINUTES,
SEND AN ALARM THROUGH DDC SYSTEM.
• EACH HUMIDIFIER TO BE PROVIDED WITH MEANS AND CONTROL TO COOL CONDENSATE TO A
MAXIMUM OF 140°F. CONDENSATE COOLER AND CONTROL TO BE PROVIDED AS PART OF
HUMIDIFIER EQUIPMENT. PROVIDE A TEMPERATURE SENSOR IN THE DISCHARGE DRAIN LINE
DOWNSTREAM OF THE HUMIDIFIER. WHERE HUMIDIFIERS HAVE A CONDENSATE RETURN PUMP
LOCATE THE SENSOR IN THE CONDENSATE SUMP. PROVIDE A CONTACT SWITCH INTEGRATED
WITH THE TEMPERATURE SENSOR AND HUMIDIFIER CONTROLS TO SHUT DOWN HUMIDIFIER
OPERATION AND ALARM THROUGH THE DDC SYSTEM IF TEMPERATURE IN THE DISCHARGE LINE
OR SUMP EXCEEDS 140°F.
• WHERE HUMIDIFIERS ARE SERVED BY A CONDENSATE RETURN PUMP, THE CONDENSATE PUMP IS
TO HAVE A HIGH-LEVEL SWITCH PROVIDED BY THE CONDENSATE PUMP MANUFACTURER.
PROVIDE A CONTACT TO INTEGRATE THE HIGH-LEVEL SWITCH WITH THE DDC SYSTEM AS WELL AS THE HUMIDIFIER CONTROLLER. IF THE HIGH-LEVEL SWITCH IS ACTIVATED THE HUMIDIFIER SHALL
SHUT DOWN AND AN ALARM SHALL BE SENT THROUGH THE DDC SYSTEM.
TO DRAIN
08 10
SS-#-####-1 SS-#-####-2
TELECOM ROOM / UPS ROOM
CONDENSATE RETURN PUMPS SERVING TR ROOM COOLING UNITS:
• THE CONDENSATE PUMP IS TO HAVE A HIGH-LEVEL SWITCH PROVIDED BY THE CONDENSATE
PUMP MANUFACTURER. PROVIDE A CONTACT TO INTEGRATE THE HIGH-LEVEL SWITCH WITH THE
DDC SYSTEM AS WELL AS THE COOLING UNIT (COOLING UNITS IF THE CONDENSATE PUMP SERVES
MORE THAN ONE UNIT) CONTROLS. IF THE HIGH-LEVEL SWITCH IS ACTIVATED THE COOLING
UNIT(S) SHALL SHUT DOWN AND AN ALARM SHALL BE SENT THROUGH DDC SYSTEM.
WATER BUG ALARMS:
• WATER BUG ALARMS ARE TO BE PLACED AT THE FLOOR LEVEL OF ALL TELECOM ROOMS AND
ENTRANCE ROOMS.
• WITH THE EXCEPTION OF FIRE PROTECTION PIPING, WATER BUG ALARMS ARE TO ALSO BE
PLACED IN DRAIN PANS INSTALLED BELOW HORIZONTAL PIPING WITHIN THE CONFINES OF THE
VARIOUS ROOMS.
• WHEN WATER IS SENSED BY A WATER BUG AN ALARM IS TO BE SENT THROUGH THE DDC SYSTEM.
• REFER TO PLANS AND ASSOCIATED PLAN NOTES FOR ADDITIONAL INFORMATION TO CONFIRM
WATER BUG QUANTITIES.
CONDENSATE PUMP 11
REMARKS:
1. E = ELECTRIC P = PNEUMATIC O = BY OTHERS S = REFERENCED POINT FROM HARDWARE ELSEWHERE ON DDC NETWORK
2. A = ANALOG B = BINARY
3. I = INPUT O = OUTPUT
4. G = GENERAL C = CRITICAL H = HIGH LIMIT L = LOW LIMIT F = FAILURE
5. T = TRENDING E = EVENT HISTORY A = ARCHIVE TT = TOTALIZATION G = GRAPHICAL POINT
RACK MONITORING SYSTEM
CONNECTED TO
DDC SYSTEM
SN
RACK
TH
T
T
1 FT MAX FROM
TOP OF RACK
APPROXIMATE
CENTER OF RACK
1 FT MAX FROM
BOTTOM OF RACK
(3) TEMPERATURE PROBES,
AND (1) HUMIDITY PROBE
PER SENSOR. LOCATED AT
TOP, MIDDLE, AND BOTTOM
OF FRONT FACE OF RACK.
TR RACKS:
• PROVIDE DEWPOINT SENSORS AT THE ENTRANCE OF EACH TR OR TE ROOM RACK. ALARM TO
BUILDING MANAGEMENT SYSTEM IF DEWPOINT TEMPERATURE EXCEEDS 82 DEGF (ADJUSTABLE).
• HUMIDITY SENSOR AND MIDDLE TEMPERATURE SENSOR MOUNTED ON INSIDE OF FRONT CABINET
DOOR.
• HIGH AND LOW TEMPERATURE SENSORS TO BE LOCATED ON INSIDE OF REAR CABINET DOOR.
FANMOTOR
CONTROLLER
ACTUATOR
TEMPERATURE
CONTROL WIRING
(TYP)
01 02
03 04
SEQUENCE OF OPERATION
EACH FAN HAS AN ISOLATION DAMPER WITH END SWITCH AND CURRENT STATUS SWITCH TO PROVE FAN OPERATION. IF THE ISOLATION DAMPER DOES NOT PROVE OPEN, SEND AN ALARM TO THE USER INTERFACE. IF THE CURRENT STATUS SWITCH DOES NOT PROVE OPERATION, SEND AND ALARM TO THE USER
INTERFACE.
FAN SHALL RUN CONTINUOUSLY TO MAINTAIN MINIMUM 1 CFM/SF EXHAUST FROM UPS ROOM. DAMPER SHALL CLOSE UPON LOSS OF POWER TO THE FAN.
GENERAL NOTES
1. SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF CONTROLLER.
2. CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 24 INCHES.
REMARKS:
1. E = ELECTRIC P = PNEUMATIC O = BY OTHERS S = REFERENCED POINT FROM HARDWARE ELSEWHERE ON DDC NETWORK
2. A = ANALOG B = BINARY
3. I = INPUT O = OUTPUT
4. G = GENERAL C = CRITICAL H = HIGH LIMIT L = LOW LIMIT F = FAILURE
5. T = TRENDING E = EVENT HISTORY A = ARCHIVE TT = TOTALIZATION G = GRAPHICAL POINT
01 02
EXISTING CRAC
T MCR G225-2
04 05
MCR – CONTROLS UPGRADE (PLAN NAME: NUCLEAR MEDICINE OFFICE G225-2)
THE EXISTING MCR ROOM IS COMPOSED OF THREE LIEBERT MODEL DS070 CRAC UNITS WITH
INDIVIDUAL CONTROLS. PROVIDE LIBERT ICOM CONTROLS UPGRADE FOR THESE UNITS TO ALLOW
PARALLEL OPERATION AND CONTROL OF THESE UNITS. ICOM CONTROLS TO COMMUNICATE WITH
EXISTING BUILDING MANAGEMENT SYSTEM AND VA HINES OIT FOR REMOTE MONITORING AND
ALARMS.
THE UNITS SHALL BE STAGED IN OPERATION. RETURN ISOLATION DAMPERS ON RETURN DUCTS TO
CRAC UNITS SHALL OPEN UPON CALL FOR CRAC UNIT OPERATION. PROVIDE END SWITCH ON
DAMPERS. WHEN END SWITCH PROVES DAMPER OPEN THE CRAC UNIT SHALL BE ALLOWED TO
START. IF END SWITCH DOES NOT CONTACT ON A CALL TO OPEN, SEND AN ALARM.
THE CRAC UNITS SHALL OPERATE IN A LEAD LAG FASHION. CRAC UNITS 1 AND 2 SHALL BE STAGED ON FIRST AS LEAD UNITS, AND SHALL OPERATE IN PARALLEL TO MEET LOAD CONDITIONS. UNIT FANS
AND COMPRESSORS SHALL MODULATE TO MEET DESIGN LOAD. IF LOAD CANNOT BE MET BY THE
TWO ON LINE UNITS LAG CRAC UNIT 3 SHALL COME ON LINE AND THE THREE CRAC UNITS SHALL
OPERATE IN PARALLEL TO MEET THE LOAD.
EVERY TWO WEEKS (ADJUSTABLE) THE UNITS SHALL CYCLE THROUGH LEAD- LAG UNITS. AFTER TWO
WEEKS CRAC UNITS 2 AND 3 WILL BE LEAD AND CRAC UNIT ONE WILL BE LAG AND SO ON.
PROVIDE ALARM IF RETURN AIR TEMPERATURE TO AN ON-LINE CRAC UNIT EXCEEDS 85 DEF °F
(ADJUSTABLE)
REMARKS:
1. E = ELECTRIC P = PNEUMATIC O = BY OTHERS S = REFERENCED POINT FROM HARDWARE ELSEWHERE ON DDC NETWORK
2. A = ANALOG B = BINARY
3. I = INPUT O = OUTPUT
4. G = GENERAL C = CRITICAL H = HIGH LIMIT L = LOW LIMIT F = FAILURE
5. T = TRENDING E = EVENT HISTORY A = ARCHIVE TT = TOTALIZATION G = GRAPHICAL POINT
EXISTING CRAC
E X
IS
T
IN
G
C R
A C
03 06
11 12
EXISTING CRAC
T MAIN SERVER ROOM G301A
14 15
MAIN SERVER ROOM G301A CONTROLS UPGRADE
THE EXISTING MCR ROOM IS COMPOSED OF TWO LIEBERT MODEL DS035 CRAC UNITS WITH
INDIVIDUAL CONTROLS. PROVIDE LIBERT ICOM CONTROLS UPGRADE FOR THESE UNITS TO ALLOW
PARALLEL OPERATION AND CONTROL OF THESE UNITS. ICOM CONTROLS TO COMMUNICATE WITH
EXISTING BUILDING MANAGEMENT SYSTEM AND VA HINES OIT FOR REMOTE MONITORING AND
ALARMS.
THE UNITS SHALL BE STAGED IN OPERATION. RETURN ISOLATION DAMPERS ON RETURN DUCTS TO
CRAC UNITS SHALL OPEN UPON CALL FOR CRAC UNIT OPERATION. PROVIDE END SWITCH ON
DAMPERS. WHEN END SWITCH PROVES DAMPER OPEN THE CRAC UNIT SHALL BE ALLOWED TO
START. IF END SWITCH DOES NOT CONTACT ON A CALL TO OPEN, SEND AN ALARM.
THE CRAC UNITS SHALL OPERATE IN A LEAD LAG FASHION. CRAC UNIT 4 SHALL BE STAGED ON FIRST AS LEAD UNIT. UNIT FANS AND COMPRESSORS SHALL MODULATE TO MEET DESIGN LOAD. IF LOAD CANNOT BE MET BY THE LEAD UNIT, LAG CRAC UNIT 5 SHALL COME ON LINE AND THE TWO CRAC
UNITS SHALL OPERATE IN PARALLEL TO MEET THE LOAD.
EVERY TWO WEEKS (ADJUSTABLE) THE UNITS SHALL CYCLE THROUGH LEAD- LAG UNITS. AFTER TWO
WEEKS CRAC UNITS 5 WILL BE LEAD AND CRAC UNIT 4 WILL BE LAG.
PROVIDE ALARM IF RETURN AIR TEMPERATURE TO AN ON-LINE CRAC UNIT EXCEEDS 85 DEF °F
(ADJUSTABLE)
EXISTING CRAC
13 16
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project : 21081
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 05/31/2023
B
IM
/2
V
A H in e s E
H R
M I n fr a s tr u c tu re D e s ig n P h a s e I
I/
-7
.B
.M T
R
.r v t
/1
/2
:0
:4
P
M
M501
MASTER MECHANICAL CONTROLS ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES
5000 5TH AVE, HINES, IL 60141
578-21-701
05/31/2023 JMM RJH
SCALE: NO SCALEM501
1 TRANSFER FAN CONTROL (TF-##-####)
SCALE: NO SCALEM501
2 FAN COIL UNIT - 2 PIPE COOLING ONLY - CYCLED FAN OPERATION
DIRECT DIGITAL CONTROL POINTS LIST - FAN COIL UNIT - 2 PIPE COOLING ONLY - CYCLED FAN
OPERATION
POINT
ID POINT DESCRIPTION
SOURCE
(1)
TYPE
(2)
I/O (3)
SETPOINT
ADJUSTMENT
ALARMS
(4)
APPLICATIONS
(5) UNITS
01 FAN COIL UNIT FAN STATUS E B I NO - T, A, G ON / OFF
02 FAN COIL UNIT FAN START/STOP E B O NO - - -
03 SPACE TEMPERATURE SETPOINT E A I YES - T, A, G DEGREES F
04 SPACE TEMPERATURE E A I NO G, H, L T, A, G DEGREES F
05 HEATING COIL CONTROL VALVE E A O NO - - -
SCALE: NO SCALEM501
3 TELECOM ROOM / UPS ROOM CONTROLS
DIRECT DIGITAL CONTROL POINTS LIST - TELECOM ROOM / UPS ROOM
POINT
ID POINT DESCRIPTION
SOURCE
(1)
TYPE
(2) I/O (3)
SETPOINT
ADJUSTMENT
ALARMS
(4)
APPLICATIONS
(5) UNITS
01 SPLIT SYSTEM DX AIR CONDITIONING SYSTEMS STATUS E B I NO G E, A ON / OFF
02 SPLIT SYSTEM DX AIR CONDITIONING SYSTEMS CONDENSATE ALARM E B I NO G E, A NORMAL / ALARM
03 SPLIT SYSTEM DX AIR CONDITIONING SYSTEMS STATUS E B I NO G E, A ON / OFF
04 SPLIT SYSTEM DX AIR CONDITIONING SYSTEMS CONDENSATE ALARM E B I NO G E, A NORMAL / ALARM
05 SPACE TEMPERATURE SENSOR E A I NO H T, A, G DEGREES F
06 HUMIDIFIER STATUS E B I NO G E, A ON / OFF
07 HUMIDIFIER FAULT ALARM E B I NO G E, A NORMAL / ALARM
08 DRAIN WATER TEMPERATURE SENSOR E A I NO H T, A, G DEGREES F
09 SPACE RELATIVE HUMIDITY E A I NO H T, A, G % RELATIVE HUMIDITY
10 CONDENSATE HIGH LIMIT SWITCH E B I NO G E, A NORMAL / ALARM
11 WATER BUG ALARM E B I NO G E, A NORMAL / ALARM
12 RACK TEMPERATURE SENSOR E A I NO H T, A, G DEGREES F
13 RACK RELATIVE HUMIDITY E A I NO H T, A, G % RELATIVE HUMIDITY
14 RACK TEMPERATURE SENSOR E A I NO H T, A, G DEGREES F
15 RACK TEMPERATURE SENSOR E A I NO H T, A, G DEGREES F
SCALE: NO SCALEM501
4 UPS ROOM EXHAUST FAN CONTROL (EF-##-####)
DIRECT DIGITAL CONTROL POINTS LIST - UPS ROOM EXHAUST FAN CONTROL
POINT
ID POINT DESCRIPTION
SOURCE
(1)
TYPE
(2) I/O (3)
SETPOINT
ADJUSTMENT
ALARMS
(4)
APPLICATIONS
(5) UNITS
01 EXHAUST FAN STATUS E B I NO G, F E, A, G ON / OFF
02 EXHAUST FAN START/STOP E B O NO - - -
03 EXHAUST FAN ISOLATION DAMPER ACTUATOR E A O NO - T, A, G -
04 EXHAUST FAN ISOLATION DAMPER POSITION E B I NO F T, A, G OPEN / CLOSED
DIRECT DIGITAL CONTROL POINTS LIST - TRANSFER FAN CONTROL
POINT
ID POINT DESCRIPTION
SOURCE
(1)
TYPE
(2) I/O (3)
SETPOINT
ADJUSTMENT
ALARMS
(4)
APPLICATIONS
(5) UNITS
01 EXHAUST FAN STATUS E B I NO G, F E, A, G ON / OFF
02 EXHAUST FAN START/STOP E B O NO - - -
03 FILTER DIFFERENTIAL PRESSURE E A I NO F T, A, G INCHES W.C.
Revisions: Date:
Addendum 01 08/14/2023
SCALE: NO SCALEM501
5 EXISTING SERVER ROOM CONTROL UPGRADES
DIRECT DIGITAL CONTROL POINTS LIST - EXISTING SERVER ROOMS
POINT
ID POINT DESCRIPTION
SOURCE
(1)
TYPE
(2) I/O (3)
SETPOINT
ADJUSTMENT
ALARMS
(4)
APPLICATIONS
(5) UNITS
01 CRAC SYSTEM STATUS E B I NO G E, A ON / OFF
02 CRAC SYSTEM ICOM CONTROLS E A I NO G E, A -
03 RETURN AIR DAMPER POSITION E B I NO G E, A OPEN / CLOSED
04 CRAC SYSTEM STATUS E B I NO G E, A ON / OFF
05 CRAC SYSTEM ICOM CONTROLS E A I NO G E, A -
06 RETURN AIR DAMPER POSITION E B I NO G E, A OPEN / CLOSED
07 CRAC SYSTEM STATUS E B I NO G E, A ON / OFF
08 CRAC SYSTEM ICOM CONTROLS E A I NO G E, A -
09 RETURN AIR DAMPER POSITION E B I NO G E, A OPEN / CLOSED
10 EXISTING SPACE TEMPERATURE SENSOR E A I NO H T, A, G DEGREES F
11 CRAC SYSTEM STATUS E B I NO G E, A ON / OFF
12 CRAC SYSTEM ICOM CONTROLS E A I NO G E, A -
13 RETURN AIR DAMPER POSITION E B I NO G E, A OPEN / CLOSED
14 CRAC SYSTEM STATUS E B I NO G E, A ON / OFF
15 CRAC SYSTEM ICOM CONTROLS E A I NO G E, A -
16 RETURN AIR DAMPER POSITION E B I NO G E, A OPEN / CLOSED
17 EXISTING SPACE TEMPERATURE SENSOR E A I NO H T, A, G DEGREES F
| 2023-08-14 Addendum #1 MECH |
| B01-M101A - FIRST LEVEL FLOOR PLAN - SECTION A - MECHANICAL |
| B01-M101B - FIRST LEVEL FLOOR PLAN - SECTION B - MECHANICAL |
| B01-M101D - FIRST LEVEL FLOOR PLAN - SECTION D - MECHANICAL |
2023-08-09 - Addendum 01
File details come from the government source that posted it. Updated .