Attachment 18 - Drawings - 578-701.M.20230531_1.pdf

PDF 16 MB Posted

Attached to
36C77623B0043 - EHRM Infrastructure Upgrades - Hines, IL - Solicitation Federal contract opportunity
Solicitation number
36C77623B0043
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details on a federal contract opportunity for infrastructure upgrades at a Veterans Affairs facility in Hines, Illinois. The solicitation number is 36C77623B0043 and is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The related file is a set of drawings for the project titled "Attachment 18 - Drawings - 578-701.M.20230531_1.pdf" and is 16MB in size. The opportunity is for upgrading EHRM infrastructure at the Hines facility and responses are due by the date specified in the Special Notice solicitation issued by the VA Technology Acquisition Center in Austin, Texas. Award timing and any other contractual terms are not provided in this high-level overview.

View the file

Other files for this federal contract opportunity

Other files attached to 36C77623B0043 - EHRM Infrastructure Upgrades - Hines, IL - Solicitation, newest first.
File Type Posted
Attachment 44 - Technical Questions and Answers Volume 6.pdf PDF
36C77623B0043 0003.pdf PDF
36C77623B0043 0002.pdf PDF
Attachment 39 - Technical Questions and Answers Volume 3.pdf PDF
Attachment 40 - Technical Questions and Answers Volume 4.pdf PDF
Attachment 41 - Technical Questions and Answers Volume 5.pdf PDF
Attachment 42 - Addendum 01.pdf PDF
Attachment 43 - Addendum 02.pdf PDF
Presolicitation - Site Walk Sign in Sheet.pdf PDF
Official Site Visit Sign in Sheet - 2.pdf PDF
Official Site Visit Sign in Sheet - 1.pdf PDF
36C77623B0043 0001.pdf PDF
Attachment 37 - Technical Questions and Answers Volume 1.pdf PDF
Attachment 38 - Technical Questions and Answers Volume 2.pdf PDF
Attachment 13 - Drawings - 578-701.F.20230531_1.pdf PDF
Attachment 19 - Drawings - 578-701.M.20230531_2.pdf PDF
Attachment 24 - Drawings - 578-701.T2.20230531.pdf PDF
Attachment 25 - Site Self Assessment.pdf PDF
Attachment 26 - Basis of Design.pdf PDF
Attachment 30 - Milestone Schedule.pdf PDF
Attachment 34 - Cx Scope Documents.pdf PDF
Attachment 21 - Drawings - 578-701.T.20230531_1.pdf PDF
S02 - Solicitation - 36C77623B0043.pdf PDF
Attachment 04 - Drawings - 578-701.A.20230531_3.pdf PDF
Attachment 08 - Drawings - 578-701.C.20230531_1.pdf PDF
Attachment 11 - Drawings - 578-701.E.20230531_1.pdf PDF
Attachment 16 - Drawings - 578-701.H.20230531_1.pdf PDF
Attachment 20 - Drawings - 578-701.S.20230531.pdf PDF
Attachment 31 - Facility Technology Needs Report _FTNR_.pdf PDF
Attachment 33 - Equipment Cut Sheets.pdf PDF
Attachment 36 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 01 - Revised Specifications.pdf PDF
Attachment 02 - Drawings - 578-701.A.20230531_1.pdf PDF
Attachment 10 - Drawings - 578-701.C.20230531_3.pdf PDF
Attachment 14 - Drawings - 578-701.F.20230531_2.pdf PDF
Attachment 15 - Drawings - 578-701.G.20230531.pdf PDF
Attachment 17 - Drawings - 578-701.H.20230531_2.pdf PDF
Attachment 23 - Drawings - 578-701.T.20230531_3.pdf PDF
Attachment 22 - Drawings - 578-701.T.20230531_2.pdf PDF
Attachment 27 - Cook County - Wage Rates.pdf PDF
Attachment 32 - Calculations.pdf PDF
Attachment 03 - Drawings - 578-701.A.20230531_2.pdf PDF
Attachment 05 - Drawings - 578-701.A.20230531_4.pdf PDF
Attachment 06 - Drawings - 578-701.A.20230531_5.pdf PDF
Attachment 07 - Drawings - 578-701.A.20230531_6.pdf PDF
Attachment 09 - Drawings - 578-701.C.20230531_2.pdf PDF
Attachment 12 - Drawings - 578-701.E.20230531_2.pdf PDF
Attachment 28 - QA-QC Plans.pdf PDF
Attachment 29 - Project BIM Execution Plan.pdf PDF
Attachment 35 - Limitations on Subcontracting - Construction.docx DOCX document
Show all 50

36C77623B0043 - EHRM Infrastructure Upgrades - Hines, IL - Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR REQUIREMENTS FOR THE

DEMOLITION OF, OR ADDITION TO, ANY PORTION

OF AIR, PLUMBING OR HYDRONIC SYSTEMS.

COVER SHEET NOTES:

THE FOLLOWING SHALL APPLY TO ALL MECHANICAL SYSTEMS AFFECTED BY CONSTRUCTION ACTIVITIES. SYSTEMS INCLUDED BUT ARE NOT LIMITED TO HVAC, EXHAUST, EQUIPMENT, DUCTWORK, DUCTWORK ACCESSORIES, HYDRONICS, COILS, FILTERS, PLUMBING, TEMPERATURE CONTROLS, LIFE

SAFETY CONTROLS AND PRESSURIZATION CONTROLS.

1. AIR QUALITY, QUANTITY AND PRESSURE RELATIONSHIPS SHALL COMPLY WITH THE LATEST, ANSI/ASHRAE/ASHE STANDARD 170

REQUIREMENTS.

2. COMPLY WITH THE FACILITY'S INFECTIOUS CONTROL RISK ASSESSMENT (ICRA) REQUIREMENTS.

3. MAINTAIN EXISTING AIR QUALITY REQUIREMENTS, AIR PRESSURIZATION AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS

DURING ANY RENOVATION OR CONSTRUCTION.

4. DETERMINE AND VERIFY THE AREAS SERVED BY THE AFFECTED SYSTEMS.

5. TAKE AIR AND OR/ WATER BALANCE READINGS OF THE SYSTEMS BEING AFFECTED.

6. IF THERE ARE SPACES BEING SERVED OUTSIDE OF THE DEMOLITION OR ADDITION AREA, THE FOLLOWING PROCEDURES MUST BE TAKEN:

a. TAKE AIR AND/OR WATER BALANCE READINGS AS NEEDED TO QUANTIFY THE AIR AND/OR WATER FLOWS DELIVERED TO THE

SYSTEMS OUTSIDE THE AFFECTED AREA.

b. DURING DEMOLITION, TAKE ALL NECESSARY MEASURES TO MAINTAIN THE CORRECT AIR AND/OR WATER FLOWS TO THE SYSTEMS

THAT ARE REMAINING.

c. AFTER THE COMPLETION OF DEMOLITION, VERIFY THAT AIR AND/OR WATER FLOWS ARE CORRECT.

d. AFTER COMPLETING ANY ADDITIONS TO THE SYSTEM, VERIFY THAT AIR AND/OR WATER FLOWS ARE CORRECT.

7. THE CONTRACTOR IS TO PROVIDE TEMPORARY AIR/AND OR WATER SYSTEMS AS NEEDED TO MAINTAIN PROPER TEMPERATURE AND

PRESSURE RELATIONSHIPS OF SPACES REQUIRED TO BE OCCUPIED DURING CONSTRUCTION.

8. ALL TEMPORARY AIR SUPPLY SYSTEMS MUST UTILIZE FINAL FILTERS THAT ARE A MINIMUM OF 90% EFFICIENT (MERV 14). FINAL FILTERS

MUST BE DOWNSTREAM OF ALL AIR SUPPLY COMPONENTS.

ABBREVIATION

GENERAL ABBREVIATIONS

DESCRIPTION ABBREVIATION DESCRIPTION

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

AD ACCESS DOOR/PANEL

AFF ABOVE FINISHED FLOOR

AMB AMBIENT

DIA DIAMETER

DN DOWN

E EXISTING

EC ELECTRICAL CONTRACTOR

EFF EFFICIENCY

GC GENERAL CONTRACTOR

FPM FEET PER MINUTE

FPS FEET PER SECOND

L LENGTH

LF LINEAR FEET

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

MFR MANUFACTURER

MIN MINIMUM

NIC NOT IN CONTRACT

NTS NOT TO SCALE

PC PLUMBING CONTRACTOR

PSIG POUNDS PER SQUARE INCH GAUGE

RPM REVOLUTIONS PER MINUTE

SHT SHEET

TOB TOP OF BEAM

GPM GALLONS PER MINUTE

TOS TOP OF STEEL

BOB BOTTOM OF BEAM

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

UNION

Y STRAINER WITH BLOWDOWN

ELBOW UP

ELBOW DOWN

TEE UP

PIPING

- SOLID LINE INDICATES SYSTEM SUPPLY

-- DASHED LINE INDICATES SYSTEM RETURN

NUMBER INDICATES NOMINAL DIAMETER IN INCHES,

LETTER(S) INDICATES SYSTEM.

REFER TO ABBREVIATIONS FOR SYSTEM TYPE.

GENERAL MECHANICAL SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

# SHEET NOTE

DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS

AND IS USED TO DESCRIBE WORK THAT IS TOO LENGTHY TO PLACE ON PLAN.

DIAMETER

DENOTES CONNECTION OF NEW WORK TO

EXISTING SYSTEM

PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.

ARROW INDICATES DOWNWARD PIPE SLOPE

#/# INDICATES SLOPE IN INCHES PER FOOT

WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR REQUIREMENTS

ARROW INDICATES DIRECTION OF FLOW IN PIPING

ISOLATION VALVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

CHECK VALVE

ARROW INDICATES DIRECTION OF NORMAL FLOW

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

PIPE IN SLEEVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

CIRCUIT SETTER, AUTOFLOW, ETC.

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

PRESSURE GAUGE

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIESTHERMOMETER - HORIZONTAL PIPE

TEE DOWN

TEE HORIZONTAL

PIPE REDUCER

INDICATES POINT WHERE PIPING CHANGES FROM ONE SIZE TO ANOTHER.

SMALL POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION.

REQUIRED SERVICE CLEARANCE FOR EQUIPMENT

CONTINUATION

FIRST SYMBOL APPLIES TO ROUND DUCT AND PIPING.

SECOND SYMBOL APPLIES TO RECTANGULAR AND OVAL DUCT.

PLUMBING SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

AIR VENT

AUTOMATIC FLOW CONTROL VALVE

# INDICATES FLOW TO BE BALANCED IN GPM

BACKFLOW PREVENTER

CALIBRATED BALANCING VALVE

VALVE - THROTTLING SERVICE

VALVE - SHUTOFF SERVICE

P/T PORT

PIPE CAP

PIPE CONTINUATION

PRESSURE GAUGE STEAM REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

PRESSURE REDUCING VALVE

PUMP

RELIEF VALVE

S SENSOR

SUCTION DIFFUSER

THERMOMETER - VERTICAL PIPE REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

VACUUM BREAKER

Y STRAINER

STEAM TRAP

CC CONTROLS CONTRACTOR

PIPING

- SINGLE DASH INDICATES DOMESTIC COLD WATER

- DOUBLE DASH INDICATES DOMESTIC HOT WATER

- TRIPLE DASH INDICATES HOT WATER

CIRCULATING

- SOLID INDICATES SANITARY ABOVE FLOOR

- CONTINUOUS DASHED INDICATES VENT

- LONG DASHED LINES INDICATE SANITARY BELOW

FLOOR

NUMBER INDICATES NOMINAL DIAMETER IN INCHES,

LETTER(S) INDICATES SYSTEM.

REFER TO ABBREVIATIONS FOR SYSTEM TYPE.

C.O.

C.O.

ROOF DRAIN

TAG INDICATES DRAIN SIZE IN INCHES AND AREA

OF ROOF DRAINED IN SQUARE FEET

REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.

#"RD

# SF

WALL DISCHARGE (DOWNSPOUT NOZZLE)

TAG INDICATES DRAIN SIZE IN INCHES AND AREA

OF ROOF DRAINED IN SQUARE FEET

REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.

#"DSN

# SF

FD-# FLOOR DRAIN REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.

CLEANOUT

CIRCLE INDICATES UP TO FLOOR OR WALL CLEANOUT.

LINE INDICATES END OF PIPE CLEANOUT LOCATED ABOVE A CEILING.

DOUBLE GRADE CLEANOUT REFER TO DETAILS FOR ADDITIONAL REQUIREMENTS.

ABBREVIATION

PLUMBING ABBREVIATIONS

DESCRIPTION

CHEMICAL VENTCV

CHEMICAL WASTECW

BOTTLE/GLASS FILLERBF

ABBREVIATION DESCRIPTION

DOMESTIC HOT WATERDHW

DOMESTIC HOT WATER CIRCULATIONDHWC

LAVATORYL

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

BACK FLOW PREVENTERBFP

BATH TUBBT

COMPRESSED AIR (NON-MEDICAL)CA

PROPANELPG

LEAVING WATER TEMPERATURELWT

BTU (1000'S)MBH

CONDENSATE DRAINCD

CLEANOUTCO

CONDENSATE PUMPCP

MOP SINKMS

NORMALLY CLOSEDNC

NORMALLY OPENNO

CLINICAL SINKCS

DOMESTIC COLD WATERDCW

DRINKING FOUNTAINDF

NON-POTABLE WATERNPW

POST INDICATOR VALVEPIV

PRESSURE REDUCING VALVEPRVDOUBLE GRADE CLEANOUTDGCO

DEIONIZED WATERDI

DEIONIZED WATER CIRCULATINGDIC

ROOF DRAINRD

REVERSE OSMOSIS WATERRO

DEIONIZED HOT WATERDIH

RPZ

S

REDUCED PRESSURE ZONE (BACK FLOW PREVENTER)

SINK

DEIONIZED HOT WATER CIRCULATINGDIHC

DISTILLED WATERDIS

DISTILLED WATER CIRCULATINGDISC

SANITARY SEWERSAN

DOMESTIC SOFT COLD WATERSCW

DOMESTIC SOFT HOT WATERSHW

DIALYSIS WATER RETURNDR

DIALYSIS WATER SUPPLYDS

DRAIN TILEDT

DOMESTIC SOFT HOT WATER CIRCULATINGSHWC

SEWAGE EJECTORSE

SHOWERSH

EMERGENCY EYE WASHEEW

EMERGENCY SHOWERES

EMERGENCY SHOWER AND EYE WASH COMBOESEW

STORM OVERFLOWSO

SUMP PUMPSP

SERVICE SINKSS

EXPANSION TANKET

ELECTRIC WATER COOLEREWC

ENTERING WATER TEMPERATUREEWT

STORM SEWERST

TEMPERATURETEMP

URINALUR

FILTERF

FLOOR CLEANOUTFCO

FLOOR DRAINFD

VENTV

VENT THROUGH ROOFVTR

FLOOR SINKFS

WB

WC

WALL BOX

WATER CLOSET

NATURAL GASG

WALL CLEANOUTWCO

GRADE CLEANOUTGCO

HUB DRAINHD

WATER HEATERWH

WATER SOFTENERWS

HORSEPOWERHP

WPD

YCO

WATER PRESSURE DROP

YARD CLEANOUTGREASE VENTGV

HOSE BIBHB

GREASE WASTEGW

DOWN SPOUT NOZZLEDSN

MEDICAL GAS SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

CARBON DIOXIDE OUTLET (CO2)

ALARM / CONTROL PANEL (MASTER OR

AREA)

ZONE VALVE BOX

# OF CIRCLES/PIPES INDICATES NUMBER OF

VALVES; ARROW INDICATES VALVE ACCESS SIDE

REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

REFER TO ABBREVIATIONS FOR TYPE

REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

EMERGENCY OXYGEN CONNECTION REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

ISOLATION VALVE

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM.

LOCATE ABOVE CEILING AND PROVIDE WITH LOCKABLE HANDLE.

SENSING LOCATION XXXX

MEDICAL AIR OUTLET (MA) REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

NITROUS OXIDE OUTLET (N20) REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

NITROGEN OUTLET (N2) REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

OXYGEN OUTLET (O2) REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

SLIDE REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

VACUUM OUTLET (VAC) REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

WAGD OUTLET REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

INSTRUMENT AIR OUTLET (IA) REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

HELIUM AIR OUTLET (HE) REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION

ABBREVIATION

LABORATORY AND MEDICAL GAS ABBREVIATIONS

DESCRIPTION

MEDICAL COMPRESSED AIRA

MEDICAL COMPRESSED AIR INTAKEA INTAKE

AREA ALARM PANELAAP

ABBREVIATION DESCRIPTION

LABORATORY VACUUMLV

LABORATORY VACUUM EXHAUSTLV EXHAUST

MEDICAL AIR COMPRESSORMAC

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

COMPRESSED AIR (NON-MEDICAL)CA

MEDICAL CARBON DIOXIDECO

DENTAL AIRDA

MASTER ALARM PANELMAP

MEDICAL VACUUM PUMPMVP

MEDICAL NITROGENN

DENTAL AIR INTAKEDA INTAKE

DENTAL VACUUMDV

DENTAL VACUUM EXHAUSTDV EXHAUST

MEDICAL NITROUS OXIDEN O

MEDICAL OXYGENO

PRESSURE REDUCING VALVEPRV

EMERGENCY OXYGEN CONNECTIONEOC

MEDICAL HELIUMHE

HORSEPOWERHP

MEDICAL VACUUMVAC

MEDICAL VACUUM EXHAUSTVAC EXHAUST

VALVE BOXVB

INSTRUMENT AIRIA

INSTRUMENT AIR INTAKEIA INTAKE

LABORATORY AIR LA

MEDICAL WASTE ANESTHESIA GAS DISPOSALWAGD

WATER COLUMNWC

LABORATORY AIR INTAKELA INTAKE

RECTANGULAR DUCTWORK

W = DIMENSION IN VIEW (INCHES)

H = DIMENSION PERPENDICULAR TO VIEW (INCHES)

ROUND DUCTWORK

D = DUCT DIAMETER

TURNING VANES

FLEXIBLE PIPING

WxH

D"Ø

HVAC SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

W/H

FLAT OVAL DUCTWORK

W = DIMENSION IN VIEW (INCHES)

H = DIMENSION PERPENDICULAR TO VIEW (INCHES)

REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION AND REQUIREMENTS.

REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION AND REQUIREMENTS.

REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION AND REQUIREMENTS.

REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

DUCT CROSS SECTION - SUPPLY

DUCT CROSS SECTION - RETURN

DUCT CROSS SECTION - EXHAUST

CROSS SECTION INDICATES DUCT EXTENDING PERPENDICULAR TO THE PAGE. IN

PLAN VIEW THIS INDICATES A DUCT RISE OR DROP TO ANOTHER LEVEL. SOLID

INTERIOR LINE INDICATES EXTENSION UP. DASHED INTERIOR LINE INDICATES

EXTENSION DOWN.

MANUAL BALANCE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE MANUAL BALANCE DAMPERS IN AN

ACCESSIBLE LOCATION AND AS CLOSE TO THE MAIN DUCT AS POSSIBLE.

CONTROL DAMPER

FIRE/SMOKE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE

LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.

DIFFUSER

REFER TO SPECIFICATIONS FOR TYPE.

FLEXIBLE DUCT

REFER TO SPECIFICATIONS FOR TYPE. REFER TO DETAILS FOR INSTALLATION

REQUIREMENTS. MAXIMUM LENGTH SHALL BE 48 INCHES UNLESS NOTED OTHERWISE

ON THE PLANS OR IN THE SPECIFICATIONS.

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - NO COIL

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - HOT WATER COIL

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - ELECTRIC COIL

VB-#

### CFM

VAV BOX TAG

# = REFERENCE NUMBER IN SCHEDULE

### = AIRFLOW IN CFM

REFER TO VARIABLE VOLUME BOX SCHEDULE FOR TYPES AND SIZING. AIRFLOW

LISTED IS NOMINAL DESIGN CFM AND GPM. FINAL VALUES ARE TO BE DETERMINED BY

TESTING AND BALANCING CONTRACTOR AND PROGRAMMED BY CONTROLS

CONTRACTOR.

VB-#

#.# GPM

VAV BOX TAG

# = REFERENCE NUMBER IN SCHEDULE

#.# = WATER FLOW RATE IN GPM

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - DUAL DUCT

D#

DIFFUSER TAG

D = TYPE # = TYPE NUMBER

### = AIRFLOW IN CFM

REFER TO DIFFUSER SCHEDULE FOR TYPE DESCRIPTIONS AND SIZING. BALANCE TO

AIRFLOW LISTED. WHEN TYPE IS NOT GIVEN AND ONLY CFM IS DESIGNATED, PROVIDE

D1 FOR SUPPLY OR G1 FOR RETURN/EXHAUST.

FLOW ARROW ARROW INDICATES DIRECTION OF AIRFLOW FROM DIFFUSERS WITH ADJUSTABLE

THROWS.

DIFFUSER BLANK OFF SHADED AREA INDICATES QUADRANT OF DIFFUSER TO BE PROVIDED WITH BLANK OFF

PANEL.

RETURN GRILLE

EXHAUST GRILLE

WALL REGISTER / GRILLE

DUCT MOUNTED REGISTER / GRILLE

LINEAR SLOT

REFER TO VARIABLE VOLUME BOX SCHEDULE FOR TYPES AND SIZING. AIRFLOW

LISTED IS NOMINAL DESIGN CFM AND GPM. FINAL VALUES ARE TO BE DETERMINED BY

TESTING AND BALANCING CONTRACTOR AND PROGRAMMED BY CONTROLS

CONTRACTOR.

SMOKE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE

LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.

ABBREVIATION

HVAC ABBREVIATIONS

DESCRIPTION

AIR BLENDERAB

AIR CONDITIONING UNIT (SPLIT SYSTEM INDOOR UNIT)AC

AIR HANDLING UNITAHU

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

BOILER FEED UNITBFU

BOILERBLR

CONSTANT AIR VOLUME BOXCAV

COOLING COILCC

CONDENSATE DRAINCD

CUBIC FEET PER MINUTECFM

CHILLERCH

CONDENSATE PUMPCP

CONDENSER WATER RETURNCR

CONDENSER WATER SUPPLYCS

COOLING TOWERCT

CONDENSING UNITCU

CABINET UNIT HEATERCUH

CHILLED WATER RETURNCWR

CHILLED WATER SUPPLYCWS

DIFFUSERD

DUAL DUCTDD

DIRECT EXPANSIONDX

EXHAUST AIREA

ENTERING AIR TEMPERATUREEAT

EXHAUST FANEF

EFFICIENCYEFF

ENERGY RECOVERY COILERC

ENERGY RECOVERY WHEELERW

EXPANSION TANKET

ENTERING WATER TEMPERATUREEWT

FILTER BANK (CONSISTING OF ONE OR MORE FILTERS)FB

FAN COIL UNITFCU

FLOW MEASURING STATIONFMS

FUEL OIL RETURNFOR

FUEL OIL SUPPLYFOS

FUEL OIL VENTFOV

FIRE DAMPERFRD

FIRE SMOKE DAMPERFSD

FINNED TUBE RADIATORFTR

GRILLEG

GLYCOL CHILLED WATER RETURNGCWR

GLYCOL CHILLED WATER SUPPLYGCWS

GRAVITY EXHAUSTGE

GLYCOL HEATING HOT WATER RETURNGHWR

GLYCOL HEATING HOT WATER SUPPLYGHWS

GRAVITY INTAKEGI

HEATING COILHC

PRESSURE/TEMPERATURE TEST PORT

TEMPERATURE CONTROL SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

WALL MOUNTED CONTROL DEVICE

# INDICATES TYPE

REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION.

T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON MONOXIDE, ETC.)

OCCUPANCY SENSOR

REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. WHEN SENSOR IS

NOT SHOWN ON ELECTRICAL DRAWINGS IT SHALL BE PROVIDED AND INSTALLED BY

THE TEMPERATURE CONTROLS CONTRACTOR.

DUCT, PIPE, OR CEILING MOUNTED CONTROL

SENSOR

REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON DIOXIDE, ETC.)

CONTROL VALVE (3-WAY)

CONTROL VALVE (2-WAY)

REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

F/S FLOW MEASURING STATION REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

FIRE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE

LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.

CD

FD

SD

FS

DAMPER SHALL BE SAME SIZE AS DUCT UNLESS NOTED OTHERWISE. REFER TO

SEQUENCES, SCHEMATICS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND

REQUIREMENTS.

REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

FLOW SWITCHF

ABBREVIATION DESCRIPTION

HORSEPOWERHP

HIGH PRESSURE STEAM CONDENSATEHPC

HIGH PRESSURE STEAM SUPPLY (86 PSIG AND ABOVE)HPS

HEAT RECOVERY CHILLERHRC

HUMIDIFIERHUM

HEATING HOT WATER RETURNHWR

HEATING HOT WATER SUPPLYHWS

LOW PRESSURE STEAM CONDENSATELPC

LOW PRESSURE STEAM SUPPLY (0-12 PSIG)LPS

LOUVERLV

LEAVING WATER TEMPERATURELWT

BTU (1000'S)MBH

MANUAL DAMPERMD

MOTOR OPERATED DAMPERMOD

MEDIUM PRESSURE STEAM CONDENSATEMPC

MEDIUM PRESSURE STEAM SUPPLY (13-85 PSIG)MPS

NORMALLY CLOSED, NOISE CRITERIANC

NORMALLY OPEN, NUMBERNO

OUTDOOR AIROA

PUMPP

PUMPED CONDENSATEPC

PRESSURE REDUCING VALVEPRV

PUMPED STEAM CONDENSATEPSC

REGISTERR

RETURN AIRRA

RELIEF AIRREA

REFRIGERANT DX LIQUIDREFL

REFRIGERANT DX SUCTION GASREFS

RETURN FANRF

RELATIVE HUMIDITYRH

ROOF TOP UNITRTU

SUPPLY AIRSA

SMOKE DAMPERSD

SUPPLY FANSF

STATIC PRESSURESP

STEAMSTM

TEMPERATURETEMP

TRANSFERTR

UNIT HEATERUH

VARIABLE AIR VOLUME BOXVAV

VENT THROUGH ROOFVTR

WET BULB TEMPERATUREWB

WATER COLUMNWC

WATER PRESSURE DROPWPD

WATER SOURCE HEAT PUMP RETURNWSHPR

WATER SOURCE HEAT PUMP SUPPLYWSHPS

MECHANICAL GENERAL NOTES:

A. THESE NOTES APPLY TO ALL SHEETS CONTAINING HVAC, PIPING, PLUMBING, MEDICAL GAS, AND TEMPERATURE CONTROLS, AND FIRE PROTECTION WORK. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. WHERE A DISCREPANCY EXISTS BETWEEN THESE PLANS AND THE PROJECT SPECIFICATIONS, THE SPECIFICATION REQUIREMENTS SHALL TAKE PRECEDENCE OVER THE DRAWINGS.

B. VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL. BE ADVISED THAT LOCATIONS SHOWN ARE APPROXIMATE. AN ATTEMPT HAS BEEN MADE TO SHOW ALL PIPING, FIXTURES, DUCTWORK, AND OUTLETS. CONTRACTOR SHALL VISIT THE SITE TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS NEED TO BE REMOVED IN THE DEMOLITION AREA UNLESS NOTED ON THE DRAWINGS. IF DEVIATION BETWEEN EXISTING CONDITIONS AND NEW WORK IS FOUND, CONTRACTOR SHALL NOTIFY

ENGINEER.

C. IT IS MANDATORY THAT THE EXISTING BUILDING REMAIN IN CONTINUOUS AND NON-INTERRUPTED OPERATION DURING THE CONSTRUCTION OF THE ADDITIONS AND REMODELING/ALTERATION OF THE EXISTING BUILDING. SERVICES TO THE EXISTING BUILDING SHALL BE KEPT ON CONTINUOUS OPERATION EXCEPT DURING SCHEDULED SHUTDOWNS FOR EXTENSION OR MODIFICATION. PLAN TO COMPLETE SHUTDOWNS DURING OFF HOURS TO MINIMIZE IMPACT TO THE OWNER. COORDINATE SHUTDOWNS WITH THE OWNER A MINIMUM OF 14 DAYS PRIOR TO WORK. PROVIDE TEMPORARY SERVICES WHERE NECESSARY TO ACCOMPLISH ANY SHUTDOWN. THIS INCLUDES BUT IS NOT LIMITED TO STAFFING AND EQUIPMENT FOR FIRE WATCHES, PROVISIONS FOR BOTTLED WATER, AND TEMPORARY HEATING OR COOLING EQUIPMENT.

TEMPORARY MEASURES SHALL NOT BE REMOVED UNTIL THE PERMANENT SYSTEMS ARE OPERATIONAL AND HAVE PASSED ALL REQUIRED

TESTING.

D. REFER TO THE SPECIFICATIONS AND ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS. DURING EACH PHASE THE CONTRACTOR SHALL COMPLETE ALL WORK LOCATED WITHIN THE BOUNDARY OF THAT PHASE. ANY WORK AND THAT MUST BE COMPLETED IN THE AREA AFTER THAT AREA HAS BEEN TURNED OVER TO THE OWNER SHALL BE IDENTIFIED AT THE BEGINNING OF THE PHASE FOR EVALUATION AND ACCEPTANCE OF

THE OWNER.

E. CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN DEMOLITION, REMOVAL, CAPPING, STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND

REFINISHING SHALL MATCH THE EXISTING CONSTRUCTION AS NEARLY AS POSSIBLE.

F. EXCEPT WHERE OTHERWISE SHOWN OR NOTED ON THE DRAWINGS AS "TO BE RETAINED, RELOCATED", ALL EXISTING EQUIPMENT AND MATERIAL IN AREAS TO BE REMODELED/ALTERED SHALL BE REMOVED WHERE THEY INTERFERE WITH PROPOSED NEW CONSTRUCTION AND/OR

WITH PROPOSED USAGE OF SPACE BY OWNER AS FOLLOWS:

a. REMOVE ANY PIPING PROTRUDING ABOVE FINISHED FLOOR OR THROUGH WALL AND CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE

MAIN WITH MATERIAL TO MATCH EXISTING.

b. REMOVE ALL FIXTURES, CARRIERS, SUPPLY AND WASTE AND VENT PIPING, STEAM, HEATING HOT WATER, HVAC SUPPLY, RETURN AND EXHAUST AS NOTED. CAP WITHIN 3 PIPE DIAMETERS OF NEAREST ACTIVE MAIN. SUPPLY AND RETURN MAINS ON PIPING SYSTEMS

CONVEYING WATER OR GASES SHALL BE VALVED AND CAPPED

c. IN REMODELED/ALTERED AREAS, ANY PIPING OR DUCTWORK PASSING THROUGH THE REMODELED AREAS TO SERVE (OR BEING SERVED FROM EXISTING ADJACENT, REMOTE, OR SURROUNDING AREAS THAT ARE TO REMAIN) SHALL BE RETAINED AND KEPT OPERATIONAL AND SHALL BE REROUTED IN ALL CASES WHERE THEY INTERFERE WITH ANY NEW WORK OR USAGE TO BE ACCOMPLISHED IN THE

REMODELED AREA.

d. REMOVE UNUSED OR ABANDONED HANGERS AND PATCH ABANDONED PENETRATIONS TO MATCH EXISTING.

e. PENETRATIONS THROUGH EXISTING WALLS AND FLOORS FORMERLY OCCUPIED BY REMOVED PIPING OR DUCTWORK SHALL BE PATCHED

TO MATCH EXISTING CONSTRUCTION.

f. RE-SUPPORT ANY PIPING AND DUCTWORK THAT WAS SUPPORTED FROM BUILDING ELEMENTS REMOVED AS PART OF THE WORK.

g. MAINTAIN CONTROL WIRING OR PNEUMATIC TUBING REQUIRED FOR THE CONTINUED PROPER OPERATION OF THE BUILDING

AUTOMATION SYSTEM.

G. ALL EXISTING EQUIPMENT BEING REMOVED WILL BE HANDED OVER TO OWNER FOR FIRST RIGHT OF SALVAGE. IF OWNER REFUSES SALVAGE

ITEMS, REMOVING CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL.

H. CONTRACTOR SHALL REFER TO THE DRAWINGS OF ALL TRADES TO FAMILIARIZE THEMSELVES WITH EXTENT OF WORK INCLUDING BUT NOT

LIMITED TO WHERE NEW PARTITIONING IS BEING INSTALLED, WHERE EXISTING PARTITIONING IS BEING REMOVED, WHERE CEILINGS ARE BEING

REMOVED AND/OR REPLACED, ETC.

I. THESE DRAWINGS ARE NECESSARILY DIAGRAMMATIC IN NATURE. NOT ALL FITTINGS, OFFSETS, VENTS OR DRAINS ARE SHOWN. THE CONTRACTOR SHALL INCLUDE ALL FITTINGS, OFFSETS, VENTS, DRAINS, AND DEVICES REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING

SYSTEM.

J. PERFORM AIR AND FLUID BALANCE PRE-TEST ON ALL DISTRIBUTION EQUIPMENT AND ALL AIR OUTLETS IN THE AREA PRIOR TO COMMENCING

WORK. SUBMIT PRE-TEST INFORMATION TO OWNER/ENGINEER.

K. PROVIDE ACCESS DOORS IN DUCTWORK AND/OR ARCHITECTURAL ELEMENTS WHERE REQUIRED TO ACCESS ALL EQUIPMENT REQUIRING MAINTENANCE AND ADJUSTMENT. THIS EQUIPMENT INCLUDES BUT IS NOT LIMITED TO SENSORS, DAMPERS, ACTUATORS, CONTROL DEVICES, VALVES, ETC. ACCESS DOORS SHALL BE SIZED TO PROVIDE APPROPRIATE ACCESS BASED ON HEIGHT OF ACCESS REQUIRED AND ACTIVITY.

INSTALL SUCH THAT ACCESS DOOR IS FULLY OPERABLE WITHOUT THE REMOVAL OF ARCHITECTURAL ELEMENTS SUCH AS CEILING RUNNERS, SUPPORTS, ETC. INSTALL IN A LOCATION SUCH THAT STEPPING OR LEANING OVER PERMANENT EQUIPMENT OR FURNITURE IS NOT REQUIRED.

WHERE ACCESS DOORS ARE REQUIRED IN ARCHITECTURAL ELEMENTS THAT PROVIDE A FIRE AND/OR SMOKE RATING, ACCESS DOOR SHALL

MAINTAIN THE REQUIRED RATING.

L. SEAL ALL WALL PENETRATIONS (DUCTWORK, PIPING, CONTROLS, CONDUITS, ETC.) WITH NON-COMBUSTIBLE MATERIAL. SEAL PENETRATIONS INTO ROOMS THAT REQUIRE PRESSURE CONTROL OR SOUND ISOLATION. WITH NON-COMBUSTIBLE MATERIAL AND CAULK.

M. REMOVAL AND REINSTALLATION OF CEILINGS REQUIRED FOR THE COMPLETION OF WORK IS THE RESPONSIBILITY OF THE CONTRACTOR.

CONTRACTOR SHALL REPAIR OR REPLACE ALL DAMAGED CEILING COMPONENTS TO MATCH EXISTING. WHERE AN IDENTICAL MATCH IS NO LONGER AVAILABLE, CONTRACTOR SHALL PROVIDE A SIMILAR REPLACEMENT UPON APPROVAL FROM THE OWNER.

N. FLEXIBLE DUCTWORK SHALL HAVE A MAXIMUM LENGTH OF 48" REGARDLESS OF LENGTH SHOWN ON DRAWINGS. FLEX DUCT INSTALLATION SHALL BE AT TERMINAL ENDS ONLY. CONNECTIONS AT VAV BOX INLETS SHALL BE SOLID HARD DUCT. THE DUCTWORK AT ANY FIRE AND/OR FIRE

SMOKE DAMPER SHALL BE HARD DUCT.

O. LOCATE PIPING AND DUCTWORK IN EXTERIOR BUILDING WALLS ON THE WARM SIDE OF THE BUILDING AND VAPOR BARRIER. COORDINATE INSTALLATION OF BUILDING INSULATION TO RUN CONTINUOUS BETWEEN PIPING AND BUILDING WALL.

P. SUPPORT ALL DUCTWORK, PIPING AND EQUIPMENT FROM BUILDING STRUCTURE MEMBERS. ROUTE DUCT MAINS TIGHT TO STRUCTURE UNLESS NOTED OTHERWISE. HOLD PIPING TIGHT TO BOTTOM OF STRUCTURAL MEMBERS OR RUN THROUGH JOIST WEBS IF POSSIBLE. DO NOT USE WIRE OR PERFORATED METAL TO SUPPORT PIPING. DO NOT SUPPORT PIPING FROM OTHER PIPING, DUCTWORK, AND/OR ELECTRICAL CONDUITS. SUPPORT FROM BOTTOM CHORD OF BAR JOISTS ONLY AT PANEL POINTS. ALL COMPONENTS REQUIRING MAINTENANCE SHALL BE SUPPORTED IN SUCH A MANNER AS TO BE READILY ACCESSIBLE WITHOUT REMOVAL OF THE CEILING SYSTEM AND TO ALLOW FOR REMOVAL

FROM THE SYSTEM WHEN SUCH REMOVAL IS REQUIRED FOR MAINTENANCE.

Q. PROVIDE CONSTRUCTION FILTERS ON AIR MOVING EQUIPMENT SERVING THE CONSTRUCTION AREA AS WELL AS ALL RETURN/EXHAUST DUCT PENETRATIONS COMING FROM THE CONSTRUCTION AREA. AT THE COMPLETION OF WORK, REMOVE ALL TEMPORARY AND CONSTRUCTION

FILTERS AND PROVIDE NEW FILTERS FOR ALL AIR MOVING EQUIPMENT.

R. PROTECT ALL DUCTWORK AND PIPING DURING CONSTRUCTION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. AT A MINIMUM, DUCTWORK AND PIPING ENDS SHALL BE COVERED AND SEALED TO PREVENT THE COLLECTION OF DUST AND DEBRIS. CLEAN ALL INTERIOR SURFACES PRIOR TO INSTALLATION AND PROTECT ONCE INSTALLED. MEDICAL GAS PIPING SHALL BE PROTECTED IN ACCORDANCE WITH NFPA

99 REQUIREMENTS.

S. AT THE COMPLETION OF WORK, CLEAN ALL STRAINERS PROVIDED AS A PART OF THE WORK AS WELL AS PRIMARY SYSTEM STRAINERS LOCATED AT PUMPS WHERE SYSTEMS WERE EXTENDED. ON EXISTING EQUIPMENT, COORDINATE WORK WITH OWNER.

T. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL PIPING, EQUIPMENT AND DUCTWORK

INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

U. REFER TO SCHEDULES FOR SIZES OF FINAL RUNOUTS TO EQUIPMENT, FIXTURES, DIFFUSERS, GRILLES, AND TERMINAL DEVICES. FINAL RUNOUT SIZES LISTED SHALL BE USED TO WITHIN 10 EQUIVALENT DIAMETERS OF FINAL CONNECTION POINT. FINAL PIPING CONNECTION TO EQUIPMENT SHALL MATCH EQUIPMENT CONNECTION SIZE, PROVIDE TRANSITIONS AS REQUIRED. REFER TO DETAILS, DIAGRAMS AND SCHEMATICS FOR

ADDITIONAL FINAL CONNECTION REQUIREMENTS.

V. FOR DUCTWORK PENETRATING A ONE HOUR FIRE RATED WALL WHERE A FIRE DAMPER IS NOT SHOWN, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. THE SYSTEM SHALL BE FIRE TESTED PER ASTM E119 AND COMPLY WITH EXCEPTION 1 OF 2018 IBC PART 717.5.2. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER'S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO A ONE HOUR FIRE RATED WALL, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS.

REFER TO THE ARCHITECTURAL LIFE SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS. ALL DUCTWORK PENETRATIONS SHALL BE INSPECTED BY AN APPROVED THIRD PARTY INSPECTION AGENCY IN ACCORDANCE WITH ASTM E2174. THE INSPECTION AGENCY SHALL BE PROCURED BY THE CONTRACTOR. DOCUMENTATION OF APPROVED INSPECTION SHALL BE INCLUDED WITH PROJECT CLOSEOUT

DOCUMENTATION.

W. FIRE ALARM CONTRACTOR SHALL PROVIDE A DUCT SMOKE DETECTOR FOR EACH SMOKE OR FIRE/SMOKE DAMPER AS REQUIRED BY CODE.

MECHANICAL CONTRACTOR SHALL COORDINATE THE LOCATION OF EACH DUCT SMOKE DETECTOR AND SHALL INSTALL THEM IN THE DUCT.

X. FOR ALL PIPING, CONDUIT, AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER'S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project : 21081

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 05/31/2023

B

IM

/2

V

A H in e s E

H R

M I n fr a s tr u c tu re D e s ig n P h a s e I

I/

-7

.B

.M T

R

.r v t

-0

-2

:4

:4

M000

MECHANICAL SYMBOLS AND

ABBREVIATIONS

ELECTRONIC HEALTH RECORD

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

5000 5TH AVE, HINES, IL 60141

578-21-701

05/31/2023 JMM RJHRevisions: Date:

N

A B C D E F G

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project : 21081

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 05/31/2023

B

IM

/2

V

A H in e s E

H R

M I n fr a s tr u c tu re D e s ig n P h a s e I

I/

-7

.B

.M T

R

.r v t

-0

-2

:4

:3

B01-M101

FIRST LEVEL FLOOR PLAN -

OVERALL - MECHANICAL

ELECTRONIC HEALTH RECORD

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

5000 5TH AVE, HINES, IL 60141

578-21-701

05/31/2023 JMM RJH

GENERAL NOTES:

NOT TO SCALE

KEY PLAN

N

SCALE: 1" = 60'-0"B01-M101

1 FIRST LEVEL FLOOR PLAN - OVERALL - MECHANICAL

0' 30 60' 120'

Revisions: Date:

1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

5. WHETHER INDICATED BY OTHER PLAN NOTES OR NOT, PROVIDE A DRAIN PAN UNDER ALL EXISTING OR NEW HORIZONTAL PLUMBING OR MECHANICAL PIPING LOCATED IN TR ROOMS, SERVER ROOMS OR ENTRANCE ROOMS. DRAIN PANS TO BE PROVIDED WITH WATER BUG SENSORS WITH ALARM TO THE DDC.

DRAIN PANS ARE NOT REQUIRED UNDER REFRIGERANT PIPING. DRAIN PANS TO BE SUPPORTED FROM

STRUCTURE. SUSPENDING DRAIN PANS FROM OTHER BUILDING SYSTEMS IS NOT ALLOWED.

6. ALL EXTERIOR ANCHORS FASTENED TO THE BUILDING SHALL BE LOCATED AT THE MORTAR JOINTS.

ANCHORING INTO THE BRICK SURFACE IS NOT ALLOWED AT HINES.

H T

B01-M101A

SSCU-1-A217 SSCU-1-A317 SSCU-1-A419

(TYP) 4

TR

A117

B01-M101A

UPS

A113

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A

B

C

D

E

M500

(TYP)

TENANT SPACE

PLAY ROOM

A117

TENANT SPACE

PLAY ROOM

A113

6 7 8

C

D

NOT USED B01-M601 SS-1-A117

REFS/L UP

TR

A117

UPS

A113

H-1-A1177

12"x8"

D2

6"x6"

D2

6 7 8

C

D

SS-1-A113

(TYP) 4

LV-1-A113

EF-1-A113

M500

M500

M500

M500

M500

SSCU-1-A117SSCU-1-A113

1 1/2" SAN UP

1/2" NPW UP

2" SAN UP

CP-1-A1173/4" PC

2" SAN

2" STANDPIPE

1 1/2" V

N

A B C D E F G

TENANT

SPACE

PANTRY

A114

TENANT SPACE

STORAGE

A108A

COMMON SPACE

CORRIDOR

RCC101R

DIRECTOR'S

SUITE

OFFICE

A148A

DIRECTOR'S

SUITE

OFFICE

A142C

TENANT

SPACE

MECHANICAL

ROOM

A134

DIRECTOR'S

SUITE

OFFICE

A142D

TENANT

SPACE

TOILET

A104

TENANT

SPACE PLAY

ROOM

A102

TENANT

SPACE PLAY

ROOM

A101

TENANT

SPACE PLAY

ROOM

A103

TENANT

SPACE

OFFICE

A105

TENANT

SPACE PLAY

ROOM

A109

TENANT

SPACE

TOILET

A107

TENANT

SPACE

STORAGE

A147

MEDICAL

ADMIN

BENI-TRAVEL

A143

SPACE

UNDER

CONSTRUCTION

A141

TENANT

SPACE

STORAGE

A139

TENANT

SPACE

OFFICE

A133A

TENANT

SPACE

OFFICE

A133

TENANT

SPACE

OFFICE

A129A

TENANT

SPACE

STORAGE

A125

TENANT

SPACE

VESTIBULE

VA1

VERTICAL

SPACE

ELEVATOR

RCC168R

TENANT

SPACE

PLAYROOM

A119

TENANT

SPACE PLAY

ROOM

A128

TENANT

SPACE

MECHANICAL

ROOM

A106

TENANT

SPACE PLAY

ROOM

A110

TENANT

SPACE

KITCHEN

A116 TENANT

SPACE PLAY

ROOM

A118

TENANT

SPACE

TOILET

A122

VERTICAL SPACE

STAIR

RCC167R

TENANT

SPACE

STORAGE

A150

VERTICAL

SPACE

ELEVATOR

A148B

DIRECTOR'S

SUITE COPY

ROOM

A148B

DIRECTOR'S

SUITE

OFFICE

A142B

DIRECTOR'S

SUITE

OFFICE

A142A

DIRECTOR'S

SUITE

OFFICE

A142

TENANT

SPACE

TOILET

A140

TENANT

SPACE

TOILET

A138

TENANT SPACE

MECHANICAL ROOM

A136

TENANT

SPACE

TEACHER'S

LOUNGE

A132

COMMON SPACE

CORRIDOR

RCC103R

COMMON

SPACE

CORRIDOR

RCC104R

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project : 21081

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 05/31/2023

B

IM

/2

V

A H in e s E

H R

M I n fr a s tr u c tu re D e s ig n P h a s e I

I/

-7

.B

.M T

R

.r v t

-0

-2

:4

:4

B01-M101A

FIRST LEVEL FLOOR PLAN -

SECTION A - MECHANICAL

ELECTRONIC HEALTH RECORD

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

5000 5TH AVE, HINES, IL 60141

578-21-701

05/31/2023 JMM RJH

N

SCALE: 1/16" = 1'-0"B01-M101A

1 FIRST LEVEL FLOOR PLAN - SECTION A - MECHANICAL

0' 16' 32'8'4'

SCALE: 1/4" = 1'-0"B01-M101A

2 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - TR-A117

SCALE: 1/4" = 1'-0"B01-M101A

3 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL - TR-A117

0' 4' 8' 12'2'0' 4' 8' 12'2'

NOT TO SCALE

KEY PLAN

SHEET NOTES:

1. REMOVE PLENUM RETURN GRILLE IN ITS ENTIRETY.

2. REMOVE SUPPLY DIFFUSERS AND ASSOCIATED DUCTWORK AS SHOWN.

3. REMOVE RADIATOR AND ASSOCIATED PIPING TO NEAREST ACTIVE MAIN AND CAP.

4. ROUTE REFRIGERANT SUCTION AND LIQUID LINES FROM CONDENSING UNIT TO CORRESPONDING DUCT-

FREE SYSTEM. SIZE LINES ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL

ACCESSORIES REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM.

5. PROVIDE WATER BUG AT FLOOR TO ALARM TO DDC WHEN ACTIVATED.

6. CONTRACTOR TO VERIFY AND MATCH EXISTING SA DUCT SIZE.

7. ROUTE 1-1/4” CONDENSATE DRAIN FROM HUMIDIFIER TO CONDENSATE PUMP.

8. REMOVE SANITARY PIPING TO NEAREST ACTIVE MAIN AND CAP.

9. REMOVE DCW, DHW, AND DHWC PIPING AS SHOWN AND CAP.

10. CONNECT 2" SANITARYU INTO EXISTING 4" SANITARY RISER. FIELD CONFIRM LOCATION OF EXISTING RISER.

11. ROUTE 3/4” CD FROM SS-1-A117 AND COMBINE WITH 3/4" CD FROM SS-1-A113. CONTINUE TO 2" STANDPIPE

WITH AIR GAP FITTING.

GENERAL NOTES:

1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

5. WHETHER INDICATED BY OTHER PLAN NOTES OR NOT, PROVIDE A DRAIN PAN UNDER ALL EXISTING OR NEW HORIZONTAL PLUMBING OR MECHANICAL PIPING LOCATED IN TR ROOMS, SERVER ROOMS OR ENTRANCE ROOMS. DRAIN PANS TO BE PROVIDED WITH WATER BUG SENSORS WITH ALARM TO THE DDC.

DRAIN PANS ARE NOT REQUIRED UNDER REFRIGERANT PIPING. DRAIN PANS TO BE SUPPORTED FROM

STRUCTURE. SUSPENDING DRAIN PANS FROM OTHER BUILDING SYSTEMS IS NOT ALLOWED.

6. ALL EXTERIOR ANCHORS FASTENED TO THE BUILDING SHALL BE LOCATED AT THE MORTAR JOINTS.

Revisions: Date:

T H

B01-M101B

B01-M101B

(TYP) 5

SSCU-1-B129 SSCU-1-B227 SSCU-1-B323 SSCU-1-B423

TR

B129

UPS

B132

B01-M101B

B01-M101B

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

A

B

C

D

E

SSCU-1-B132

M500

(TYP)

GERIATRICS TOILET

B129

26 27

D

(TYP) 5

REFS/L UP

TR

B129

SS-1-B129

H-1-B1297

REFS/L UP

26 27

D

CP-1-B129

TF-1-B129 75

G1

F-1-B129

24x129

2" SAN UP

M500

M500

M500

M500

3/4" NPW UP

4" SAN UP/DN

2" SAN

3/4" PC

3/4" NPW

1/2" NPW

1 1/2" V UP

3/4" PC8

N

A B C D E F G

FISCAL

STORAGE

B102

TENANT

SPACE

STORAGE

B116A

GERIATRICS

COPY ROOM

B128

VERTICAL

SPACE

ELEVATOR

RCC171R

GERIATRICS

STAFF

ROOM

B146A

MEDICAL

ADMIN

STORAGE

B158

COMMON SPACE

CORRIDOR

RCC109R

GERIATRICS

MECHANICAL

ROOM

B138A GERIATRICS

OFFICE

B140

GERIATRICS

OFFICE

B142

GERIATRICS

CONFERENCE

ROOM

B146

GERIATRICS

STORAGE

B148

GERIATRICS

TOILET

B152

MEDICAL

ADMIN

STORAGE

B158A MEDICAL

ADMIN

OFFICE

B160

MEDICAL

ADMIN

OFFICE

B162

FISCAL

OFFICE

B106

FISCAL

OFFICE

B110

FISCAL

OFFICE

B114

GERIATRICS

OFFICE

B115

TENANT

SPACE

B116

TENANT

SPACE

OFFICE

B118

GERIATRICS

OFFICE

B122

TENANT

SPACE

OFFICE

B103

TENANT

SPACE

OFFICE

B121

TENANT

SPACE

OFFICE

B119

TENANT

SPACE

OFFICE

B117

TENANT

SPACE

OFFICE

B113

TENANT

SPACE

OFFICE

B109

TENANT

SPACE

OFFICE

B107

GERIATRICS

H.A.C.

B127

GERIATRICS

TOILET

B123

COMMON

SPACE

CORRIDOR

RCC107R

TENANT

SPACE

OFFICE

B161A

NUTRITION/FOOD

OFFICE

B159

DIRECTOR'S

SUITE

OFFICE

B155

GERIATRICS

STORAGE

B153

GERIATRICS

OFFICE

B151

GERIATRICS

OFFICE

B147

GERIATRICS

OFFICE

B145

GERIATRICS

OFFICE

B143

GERIATRICS

OFFICE

B141

GERIATRICS

OFFICE

B139

GERIATRICS

OFFICE

B135A

GERIATRICS

MAIN

OFFICE

B135

GERIATRICS

OFFICE

B149

TENANT

SPACE

CONFERENCE

ROOM

B101

FISCAL

STORAGE

B100

FISCAL

OFFICE

B104

VERTICAL

SPACE

STAIR

RCC170R

COMMON SPACE

CORRIDOR

RCC106R

GERIATRICS

OFFICE

B136

GERIATRICS

OFFICE

B134

GERIATRICS

STORAGE

B138

GERIATRICS

OFFICE

B136A

COMMON

SPACE

RCC187R

COMMON

SPACE

CORRIDOR

RCC110R

COMMON

SPACE

CORRIDOR

RCC104R

GERIATRICS

MECHANICAL ROOM

B132

28 29

A

B

UPS

B132

28 29

A

B

SS-1-B132

SSCU-1-B132

8 LV-1-B132

EF-1-B132

CP-1-B132

M500

M500

M500

M500

TF-1-B132

G1

24x12 RA

F-1-B132

3/4" CD

3/4" PC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project : 21081

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 05/31/2023

B

IM

/2

V

A H in e s E

H R

M I n fr a s tr u c tu re D e s ig n P h a s e I

I/

-7

.B

.M T

R

.r v t

-0

-2

:4

:4

B01-M101B

FIRST LEVEL FLOOR PLAN -

SECTION B - MECHANICAL

ELECTRONIC HEALTH RECORD

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

5000 5TH AVE, HINES, IL 60141

578-21-701

05/31/2023 JMM RJH

SCALE: 1/16" = 1'-0"B01-M101B

1 FIRST LEVEL FLOOR PLAN - SECTION B - MECHANICAL

SCALE: 1/4" = 1'-0"B01-M101B

2 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - TR-B129

SCALE: 1/4" = 1'-0"B01-M101B

3 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL - TR-B129

N

0' 16' 32'8'4'

0' 4' 8' 12'2'0' 4' 8' 12'2'

NOT TO SCALE

KEY PLAN

SHEET NOTES:

1. DEMO EXHAUST GRILLE AND DUCTWORK AS SHOWN.

2. REMOVE RADIATOR AND ASSOCIATED PIPING TO NEAREST ACTIVE MAIN AND CAP.

3. REMOVE PLUMBING FIXTURE AND ASSOCIATED PIPING TO NEAREST ACTIVE MAIN AND CAP.

4. REMOVE SANITARY PIPING AND CAP AT NEAREST ACTIVE MAIN.

5. ROUTE REFRIGERANT SUCTION AND LIQUID LINES FROM CONDENSING UNIT TO CORRESPONDING DUCT-

FREE SYSTEM. SIZE LINES ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL

ACCESSORIES REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM.

6. PROVIDE WATER BUG AT FLOOR TO ALARM TO DDC WHEN ACTIVATED.

7. ROUTE DRAIN LINE FROM HUMIDIFIER TO CONDENSATE PUMP.

8. ROUTE 1/2" PUMPED CONDENSATE DRAIN LINE AS SHOWN AND CONNECT INTO THE TOP OF THE NEW 2" SAN

LINE.

9. ROUTE 3/4" CONDENSATE DRAIN FROM SPLIT SYSTEM AND CONNECT INTO 1-1/4” DRAIN LINE INTO

CONDENATE PUMP.

10. PROVIDE NEW 3/4" DCW TAP FROM EXISTING COLD WATER LINE IN SHAFT AND PROVIDE WITH 5 MICRON

INLINE SEDIMENT PREFILTER WITH MINIMUM 5 GPM CAPACITY AND 3/4" DOUBLE CHECK VALVE ASSEMBLY MOUNTED AT 3'-0" ABOVE FINISHED FLOOR. ROUTE 3/4" NCW AS SHOWN TO NEW RISER SERVING HUMIDIFIERS IN TR ROOMS. PREFILTER RATED FOR 125 PSI MAXIMUM PRESSURE, COORDINATE MODEL AND

FILTER TYPE WITH VA HINES CURRENT STOCK UNIT.

11. CONNECT 2" SANITARY LINE INTO EXISTING 4 INCH SANITARY LINE IN WALL.

GENERAL NOTES:

SCALE: 1/4" = 1'-0"B01-M101B

5 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - UPS B132

0' 4' 8' 12'2' SCALE: 1/4" = 1'-0"B01-M101B

6 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL - UPS B132

0' 4' 8' 12'2'

Revisions: Date:

1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

5. WHETHER INDICATED BY OTHER PLAN NOTES OR NOT, PROVIDE A DRAIN PAN UNDER ALL EXISTING OR NEW HORIZONTAL PLUMBING OR MECHANICAL PIPING LOCATED IN TR ROOMS, SERVER ROOMS OR ENTRANCE ROOMS. DRAIN PANS TO BE PROVIDED WITH WATER BUG SENSORS WITH ALARM TO THE DDC.

DRAIN PANS ARE NOT REQUIRED UNDER REFRIGERANT PIPING. DRAIN PANS TO BE SUPPORTED FROM

STRUCTURE. SUSPENDING DRAIN PANS FROM OTHER BUILDING SYSTEMS IS NOT ALLOWED.

HT

T

T

T

B01-M101C

B01-M101C

TR

C132C

UPS

C138C

B01-M101C

B01-M101C

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

A

B

C

D

E

SSCU-1-C138C

REFS/L UP

47 48

B

C 1

TR

C132C

H-1-C132C3

SS-1-C132C

47 48

B

C

CP-1-C132C

6"x6"

D2

6 7

3" SAN UP/DN

M500

M500

4" SAN UP/DN

REFS/L UP

2" SAN

2" SAN UP

1/2" NPW UP

1 1/2" CD

N

A B C D E F G

DIRECTOR'S

SUITE

OFFICE

C115B

DIRECTOR'S

SUITE

OFFICE

C115

COMMON

SPACE

RCC186R

NURSING

SVC ADMIN

OFFICE

C108A

NURSING SVC ADMIN

BREAK ROOM

C108D NURSING

SVC ADMIN

TOILET

C108F

UNASSIGNED VACANT

SPACE VACANT

C124A

MEDICAL

ADMIN

REPRODUCTION

EQPT

C1253

VERTICAL

SPACE

ELEVATOR

RCC173R

MEDICAL ADMIN

ELECTRICAL CLOSET

C161

MEDICAL

ADMIN

STORAGE

C126C

MEDICAL

ADMIN

OFFICE

C132A

MEDICAL

ADMIN TEL

CLOSET

C132B SOCIAL

WORK

OFFICE

C134

SOCIAL

WORK

OFFICE

C134A

ENVIRONMENTAL

MGMT LINEN

CLOSET

C136

ENVIRONMENTAL

MGMT H.A.C.

C140

ENVIRONMENTAL

MGMT

TOILET

C144

MEDICAL

ADMIN

TRANSPORT

C130

MEDICAL

ADMIN

REPRODUCTION

C126A

COMMON

SPACE

CORRIDOR

RCC121R

TENANT

SPACE

OFFICE

RCC111R

TENANT

SPACE

STORAGE

RCC112R

TENANT

SPACE

STORAGE

RCC113R

ENVIRONMENTAL

MGMT

STORAGE

C138B

TENANT

SPACE

LOUNGE

RCC114R

TENANT SPACE

STORAGE

RCC115R

NURSING

SVC ADMIN

OFFICE

C172

TENANT SPACE

STORAGE

RCC116R

MEDICAL

ADMIN

BREAK

ROOM

C100

UNASSIGNED

VACANT

SPACE

STORAGE

C107

MEDICAL

ADMIN

OFFICE

C105

NUTRITION/FOOD

OFFICE

C103

TENANT

SPACE

OFFICE

B161

ENGINEERING

MECHANICAL

ROOM

C109

DIRECTOR'S

SUITE

OFFICE

C115A

DIRECTOR'S

SUITE

OFFICE

C117

ENVIRONMENTAL

MGMT

TOILET

C121

ENVIRONMENTAL

MGMT

TOILET

C119

MEDICAL

ADMIN

OFFICE

C125

SOCIAL

WORK

OFFICE

C141

SOCIAL

WORK

OFFICE

C139

SOCIAL

WORK

OFFICE

C137

SOCIAL

WORK

OFFICE

C135

SOCIAL

WORK

OFFICE

C133

SOCIAL

WORK

OFFICE

C131

SOCIAL

WORK

OFFICE

C129

VSO/VET

ASSISTANCE

OFFICE

D101

VSO/VET

ASSISTANCE

OFFICE

C143

MEDICAL

ADMIN

REPRODUCTION

C126

TENANT

SPACE

C124

TENANT

SPACE

TELLER

RCC117R

DIRECTOR'S

SUITE

OFFICE

C113

ENGINEERING

STORAGE

C104

ENGINEERING

STORAGE

C102

COMMON

SPACE

RCC185R

DIRECTOR'S

SUITE

OFFICE

C114

ENVIRONMENTAL

MGMT TOILET

C112

NURSING

SVC ADMIN

OFFICE

C108E

NURSING

SVC ADMIN

OFFICE

C108

COMMON SPACE

CORRIDOR

RCC118R

ENGINEERING

STORAGE

C124C

COMMON

SPACE

CORRIDOR

RCC119R

NURSING

SVC ADMIN

OFFICE

C108C

VERTICAL

SPACE

STAIR

RCC172R

NURSING

SVC ADMIN

ESCORT/TRANSPORT

C116

NURSING

SVC ADMIN

ESCORT/TRANSPORT

C118

VOLUNTARY

SERVICE

STORAGE

C138A

ENGINEERING

OFFICE-1

C138-1

VERTICAL

SPACE

ELEVATOR

RCC174R

COMMON

SPACE

CORRIDOR

RCC126R

SOCIAL

WORK

OFFICE

D102A

SOCIAL

WORK

SUPPLY

CLOSET

D102C

MEDICAL

ADMIN MAIL

ROOM

C128

COMMON SPACE

CORRIDOR

RCC120R

VOLUNTARY

SERVICE VACANT

C142

ENVIRONMENTAL

MGMT TOILET

C144

B

C

UPS

C138C

ENVIRONMENTAL

MGMT TOILET

C144

B

C

SS-1-C138C

LV-1-C138C

EF-1-C138C

CP-1-C138C

M500

M500

M500

D3

12"x8"10

3/4" PC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project : 21081

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 05/31/2023

B

IM

/2

V

A H in e s E

H R

M I n fr a s tr u c tu re D e s ig n P h a s e I

I/

-7

.B

.M T

R

.r v t

/1

/2

:3

:3

A

M

B01-M101C

FIRST LEVEL FLOOR PLAN -

SECTION C - MECHANICAL

ELECTRONIC HEALTH RECORD

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

5000 5TH AVE, HINES, IL 60141

578-21-701

05/31/2023 JMM RJH

SCALE: 1/16" = 1'-0"B01-M101C

1 FIRST LEVEL FLOOR PLAN - SECTION C - MECHANICAL

SCALE: 1/4" = 1'-0"B01-M101C

2 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - TR-C132C

SCALE: 1/4" = 1'-0"B01-M101C

3 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL - TR-C132C

N

0' 16' 32'8'4'

0' 4' 8' 12'2' 0' 4' 8' 12'2'

NOT TO SCALE

KEY PLAN

SHEET NOTES:

1. ROUTE REFRIGERANT SUCTION AND LIQUID LINES FROM CONDENSING UNIT TO CORRESPONDING DUCT-

FREE SYSTEM. SIZE LINES ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL

ACCESSORIES REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM.

2. PROVIDE WATER BUG AT FLOOR TO ALARM TO DDC WHEN ACTIVATED.

3. ROUTE DRAIN FROM HUMIDIFIER AND DISCHARGE INTO HUMIDIFIER DRAIN RESERVOIR AS INDICATED IN

DETAIL 5/M500.

4. REMOVE SUPPLY DIFFUSER AND ASSOCIATED DUCTWORK AS SHOWN.

5. ROUTE 3/4" PUMPED CONDENSATE DRAIN LINE AS SHOWN AND CONNECT INTO THE TOP OF NEW 2" SAN LINE.

6. ROUTE 3/4” CONDENSATE DRAIN FROM SPLIT SYSTEM, COMBINE WITH HUMIDIFIER DRAIN AND CONTINUE AS

1-1/2” LINE TO STANDPIPE WITH AIR GAP FITTING.

7. BOTTOM OF NEW EQUIPMENT SHALL BE 7'-3" AFF.

8. CONNECT NEW 2" TO SANITARY INTO EXISTING 3" SANITARY RISER.

9. REMOVE RADIATOR, THERMOSTAT, AND ASSOCIATED PIPING TO NEAREST ACTIVE MAIN AND CAP.

10. REMOVE EXISTING TOILET AND LAVATORY WITHIN EXISTING RESTROOM. REMOVE ASSOCIATED DCW, DHW, AND V PIPING TO NEAREST ACTIVE MAIN AND CAP. REMOVE ASSOCIATED SAN PIPING TO POINT BELOW

FLOOR AND CAP.

GENERAL NOTES:

SCALE: 1/4" = 1'-0"B01-M101C

5 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - UPS-C138C

0' 4' 8' 12'2'

SCALE: 1/4" = 1'-0"B01-M101C

6 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL - UPS C138C

0' 4' 8' 12'2'

Revisions: Date:

1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

5. WHETHER INDICATED BY OTHER PLAN NOTES OR NOT, PROVIDE A DRAIN PAN UNDER ALL EXISTING OR NEW HORIZONTAL PLUMBING OR MECHANICAL PIPING LOCATED IN TR ROOMS, SERVER ROOMS OR ENTRANCE ROOMS. DRAIN PANS TO BE PROVIDED WITH WATER BUG SENSORS WITH ALARM TO THE DDC.

DRAIN PANS ARE NOT REQUIRED UNDER REFRIGERANT PIPING. DRAIN PANS TO BE SUPPORTED FROM

STRUCTURE. SUSPENDING DRAIN PANS FROM OTHER BUILDING SYSTEMS IS NOT ALLOWED.

TH

T

B01-M101D

B01-M101D

TR

D146

56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73

A

B

C

D

E

UPS

D144

LV-1-D144

8x6 EA

M500

M500

3/4" NPW

67 68

B

C

11 5

TR

D146

H-1-D146

REFS/L UP

SS-1-D146

D19

6"x6"

D2

67 68

B

C

SS-1-D144

EF-1-D144

UPS

D144

M500

M500

M500

M500

RELOCATED

THERMOSTAT

6"x6"

D2

6"x6"

D2

2" SAN UP

2" SAN DN

2" STANDPIPE

N

A B C D E F G

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project : 21081

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project : 05/31/2023

B

IM

/2

V

A H in e s E

H R

M I n fr a s tr u c tu re D e s ig n P h a s e I

I/

-7

.B

.M T

R

.r v t

-0

-2

:4

:0

B01-M101D

FIRST LEVEL FLOOR PLAN -

SECTION D - MECHANICAL

ELECTRONIC HEALTH RECORD

MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

5000 5TH AVE, HINES, IL 60141

578-21-701

05/31/2023 JMM RJH

SCALE: 1/16" = 1'-0"B01-M101D

1 FIRST LEVEL FLOOR PLAN - SECTION D - MECHANICAL

SCALE: 1/4" = 1'-0"B01-M101D

2 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL DEMOLITION - TR-D146 AND UPS D144

SCALE: 1/4" = 1'-0"B01-M101D

3 FIRST LEVEL FLOOR PLAN - ENLARGED MECHANICAL - TR-D146 AND UPS D144

N

0' 16' 32'8'4'

0' 4' 8' 12'2'0' 4' 8' 12'2'

NOT TO SCALE

KEY PLAN

SHEET NOTES:

1. ROUTE REFRIGERANT SUCTION AND LIQUID LINES FROM CONDENSING UNIT TO CORRESPONDING DUCT-

FREE SYSTEM. SIZE LINES ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL

ACCESSORIES REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM.

2. PROVIDE WATER BUG AT FLOOR TO ALARM TO DDC WHEN ACTIVATED.

3. ROUTE DRAIN FROM HUMIDFIER AND DISCHARGE INTO HUMIDIFIER DRAIN RESERVOIR AS INDICATED IN

DETAIL 5/M500.

4. REMOVE SUPPLY DIFFUSER,ASSOCIATED DUCTWORK, AND EQUIPMENT AS SHOWN.

5. REMOVE RETURN GRILLE AND ASSOCIATED DUCTWORK AS SHOWN.

6. REMOVE SUPPLY DUCTWORK AS SHOWN.

7. ROUTE 3/4” CONDENSATE DRAIN FROM SPLIT SYSTEM, COMBINE WITH HUMIDIFIER AND SPLIT SYSTEM

DRAINS AND CONTINUE AS 1-1/2” LINE TO STANDPIPE WITH AIR GAP FITTING.

8. CONNECT INTO EXISTING DOMESTIC WATER LINE IN HOUSEKEEPING ROOM WITH 3/4" CONNECTION. IN

HOUSEKPEEING ROOM, PROVIDE WITH 5 MICRON INLINE SEDIMENT PREFILTER WITH MINIMUM 5 GPM CAPACITY AND 3/4" DOUBLE CHECK VALVE ASSEMBLY MOUNTED AT 3'-0" ABOVE FINISHED FLOOR. ROUTE 3/4" NCW AS SHOWN TO NEW RISER SERVING HUMIDIFIERS IN TR ROOMS. PREFILTER RATED FOR 125 PSI MAXIMUM PRESSURE, COORDINATE MODEL AND FILTER TYPE WITH VA HINES CURRENT STOCK UNIT.

9. CONTRACTOR TO VALIDATE EXISTING AIRFLOW AND REBALANCE TO MATCH EXISTING AIRFLOW.

10. ROUTE 3/4" CONDENSATE DRAIN FROM SPLIT SYSTEM AND CONNECT INTO 1-1/2” DRAIN LINE TO STANDPIPE

WITH AIR GAP FITTING.

11. REMOVE EXISTING SINK. REMOVE DCW, DHW, AND V PIPING TO NEAREST ACTIVE MAIN AND CAP. REMOVE

SAN TO POINT BELOW FLOOR AND CAP.

12. RELOCATE EXISTING PNEUMATIC THERMOSTAT TO LOCATION INDICATED ON NEW WORK PLAN. MODIFY

EXISTING PNEUMATIC TUBING AS REQUIRED.

13. RELOCATE EXISTING DUAL DUCT BOX AND MODIFY EXISTING DUCTWORK AS REQUIRED TO ACCOMMODATE

NEW WALL. LOCATE TO MAINTAIN ALL REQUIRED ACCESS TO DUAL DUCT BOX.

14. ROUTE 2" SANITARY DOWN. CONNECT TO EXISTING 4" SANITARY IN TUNNEL BELOW.

15. ROUTE 1-1/4” CONDENSATE DRAIN FROM HUMIDIFIER, COMBINE WITH SPLIT SYSTEM DRAINS AND CONTINUE

AS 1-1/2” LINE TO STANDPIPE WITH AIR GAP FITTING.

GENERAL NOTES:

Revisions: Date:

1. COVER SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

5. WHETHER INDICATED BY OTHER PLAN NOTES OR NOT, PROVIDE A DRAIN PAN UNDER ALL EXISTING OR NEW HORIZONTAL PLUMBING OR MECHANICAL PIPING LOCATED IN TR ROOMS, SERVER ROOMS OR ENTRANCE ROOMS.