Attachment 21 - AF Form 3000.pdf

Air Force Form PDF 2 MB Posted

Attached to
Repair Taxiway Mike & Delta
Solicitation number
FA4855-21-R-0008
Issued by

About this file

This document is an AF Form 3000 used by contractors to submit material approval submittals to the Air Force for government approval in accordance with contract provisions. The form is to be prepared in four copies and signed by the contractor, with appropriate attachments identifying materials to be approved by item number and including any required data and documentation. Submittals are numbered consecutively by contract and include the contract number for identification purposes, and can indicate resubmissions with previous submission numbers. The material approval submittal process is for incorporating items like shop drawings, equipment data, literature, and material samples into contract work as required.

The related federal contract opportunity is a solicitation from the Air Force Special Operations Command to reconstruct sections of Taxiways Mike and Delta at Cannon Air Force Base in New Mexico. The work involves removing and replacing asphalt and concrete sections over approximately 202,000 total square feet on the two taxiways. Phase one covers work on Taxiway Mike, and phase two is for Taxiway Delta. The reconstruction work stems from a 2015 pavement assessment identifying needed repairs.

View the file

Other versions and copies of AF Form 3000

File Revision Posted Attached to
Attachment D AF Form 3000.pdf Revision not stated Robins AFB Paving Multi-Award IDIQ
SOW App 001 AF IMT 3000 Submittal.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
G_23 05 93-1 TAB Shops - AF FORM 3000 Submittal_JV.pdf Revision not stated ASOG Complex EMCS Camp Murray, WA
AF IMT 3000 - Material Approval Submittal.pdf Revision not stated Repair Airfield Pavement Spalling
12 AF Form 3000.pdf Same revision and size as this file Revision not stated Construct T-1A Static Display
AF IMT 3000 Material Approval Submittal.pdf Same revision and size as this file Revision not stated Repair Storm Drain Bldg 1788
Appendix C - AF Form 3000.pdf Revision not stated Static Display Aerospace Vehicles Restoration
Attachment 15 - AF Form 3000.pdf Same revision and size as this file Revision not stated Construct Honor Guard Facility, Tyndall AFB, FL
Appendix H - AF Form 3000.pdf Same revision and size as this file Revision not stated Construct AFTP Fence, Louisiana Avenue Bridge
Attachment 2_AF IMT 3000_2003091_VI_ Submittal.pdf Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 2.10 - AF Form 3000 Material Submittals Template.pdf Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 6 - AF Form 3000.pdf Revision not stated Camp Sparta Access Road
Q- AF IMT 3000_Material Approval Submittal.pdf Revision not stated Repair South Deer Fence
J. AF IMT 3000 Material Approval Submittal.pdf Revision not stated Repair_Replace Liner, Wastewater Lagoon One
Attachment 1j Mini-MACC SOW AF IMT 3000 Submittal.pdf Revision not stated JBER Mini-MACC
Attachment 9 AF Form 3000.pdf Same revision and size as this file Revision not stated B729 Parking Lot Improvements, Tyndall AFB, FL
AF Form 3000.pdf Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
15. AF Form 3000 Material Approval Submittal (2 pages) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Attachment 10. AF Form 3000.pdf Same revision and size as this file Revision not stated Repair Beacon Beach Road, Tyndall AFB, FL
Attachment 7 AF Form 3000.pdf Same revision and size as this file Revision not stated Ammo Phase III
Show all 20

Who attaches AF Form 3000

Other files

File Type Posted
Main Questions and Answers Repair Taxiways Mike and Delta 7 June 21.xlsx XLSX spreadsheet
Attachment 3 - Reconstruct Taxiway Mike 100 Specifications_08 June 2021.pdf PDF
Attachment 12 - Construction Cost Estimate.xls XLS spreadsheet
Attachment 5 - Reconstruct Taxiway Delta_100 Specifications_ 08 June 2021.pdf PDF
Solicitation Amendment FA485521R00080001 SF 30.pdf PDF
Questions and Answers Repair Taxiways Mike and Delta 4 June 21.xlsx XLSX spreadsheet
Attachment 5 - Reconstruct Taxiway Delta 100 Specifications_20181206.pdf PDF
Attachment 7 - CAFB 32-201 Cannon AFB Fire Protection Program.pdf PDF
Attachment 4 - Reconstruct Taxiway Mike Final Plans August 2020.pdf PDF
Attachment 15 - Subcontractor Consent Letter.docx DOCX document
Solicitation - FA485521R0008.pdf PDF
Attachment 20 - AF Form 3065.xlsx XLSX spreadsheet
Attachment 9 - As-Built Submittal Guidelines-2014.pdf PDF
Attachment 10 - New Mexico Wage Determination NM20210036 _1 Jan 2021.pdf PDF
Attachment 6 - Reconstruct Taxiway Delta Final Plans_20181219.pdf PDF
Attachment 8 - AEC CAD Standards 6.1 Aug 2019.pdf PDF
Attachment 12 - Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 19 - AF Form 103.pdf PDF
Attachment 3 - Reconstruct Taxiway Mike 100 Specifications August 2020.pdf PDF
Attachment 18 - AF Form 3064.xlsx XLSX spreadsheet
Attachment 11 - Past Performance Information.docx DOCX document
Attachment 16 - DD1354 Taxiway Mike.pdf PDF
Attachment 1 - SOW Repair Taxiway Mike_Delta 07 Apr 2021.pdf PDF
Attachment 17 - DD 1354 Taxiway Delta.pdf PDF
Attachment 2 - SOMs Twy Mike Delta Material Register 14 April 2021.xlsx XLSX spreadsheet
Attachment 14 - Past Performance Questionnaire.docx DOCX document
Attachment 13 - Past Performance Cover Letter.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse) Form Approved OMB No 9000-062 Expires May 31, 2005 Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington D.C. 20593. Please DO NOT RETURN your form to either of the addresses Send your completed for to: SAF/AQCP, 1050 Air Force Pentagon, Washington, D.C. 20330

SUBMITTAL

TO BE COMPLETED BY CONTRACTOR

FOR GOVERNMENT USE ONLY

ITEM NO.

SPECIFICATION SECTION/PARA NO./DRAWING NO

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc.)

AP-PROVED

DISAP- PROVED

SEE REVERSE

INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICIFICATIONS OF SUBJECT CONTRACT

FOR GOVERNMENT USE ONLY

RECOMMEND

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN ____ DAYS OF DATE SHOWN BELOW.

1.The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2.This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and sample of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to items(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of the form.

4. Request submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.”. This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than (1) one contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

INSTRUCTIONS TO CONTRACTORS

AF IMT 3000, 20030901, V1 (REVERSE)

11.0.1.20130826.2.901444.899636

To:
From:
Date_1:
Contract_Number:
New:
Resubmittal:
Previous_Contract_Number:
Cell1:
Cell2:
Cell3:
ApprovedCheckBox: 0
DispprovedCheckBox: 0
SeeReverseCheckBox: 0
Initials:
Cell4: 0
Cell4: 0
Cell4: 0
Cell4: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell6: 0
Cell6: 0
Cell6: 0
Cell6: 0
Cell6: 0
:
CheckBox1: 0
Cntractr_Date:
Contractor_Name:
Contractor:
Civil_Engineer:
To_Eval:
Contract_Officer:
To_Cntrt_Office:
Base:
Base_Civil:
APPROVED_CHECK: 0
DISAPPROVED_CHECK: 0
TextField1:
SignatureField1:
For_Eval_Action:
TextField2:

File details come from the government source that posted it. Updated .