Attachment 12 - Construction Cost Estimate.xls

XLS spreadsheet 724 KB Posted

Attached to
Repair Taxiway Mike & Delta
Solicitation number
FA4855-21-R-0008
Issued by

About this file

This solicitation requests proposals for a single construction project involving repair of two taxiways at Cannon Air Force Base in New Mexico. The project has two phases involving reconstruction of sections of Taxiway Mike and Taxiway Delta. Phase one requires reconstruction of 102,000 square feet of Taxiway Mike, replacing asphalt with Portland cement concrete, including slab replacement and joint seal repair. Phase two requires reconstruction of 25,000 square feet of Taxiway Delta in one section and replacement of 75,000 square feet of asphalt with concrete in another section, along with additional slab replacement and joint seal repair. Both taxiways are located on the same airfield at Cannon Air Force Base. The solicitation was issued by the Department of the Air Force Special Operations Command stemming from needed repairs identified in a 2015 Pavement Condition Index Report.

View the file

Other files

File Type Posted
Main Questions and Answers Repair Taxiways Mike and Delta 7 June 21.xlsx XLSX spreadsheet
Attachment 3 - Reconstruct Taxiway Mike 100 Specifications_08 June 2021.pdf PDF
Attachment 5 - Reconstruct Taxiway Delta_100 Specifications_ 08 June 2021.pdf PDF
Solicitation Amendment FA485521R00080001 SF 30.pdf PDF
Questions and Answers Repair Taxiways Mike and Delta 4 June 21.xlsx XLSX spreadsheet
Attachment 5 - Reconstruct Taxiway Delta 100 Specifications_20181206.pdf PDF
Attachment 7 - CAFB 32-201 Cannon AFB Fire Protection Program.pdf PDF
Attachment 4 - Reconstruct Taxiway Mike Final Plans August 2020.pdf PDF
Attachment 15 - Subcontractor Consent Letter.docx DOCX document
Solicitation - FA485521R0008.pdf PDF
Attachment 20 - AF Form 3065.xlsx XLSX spreadsheet
Attachment 9 - As-Built Submittal Guidelines-2014.pdf PDF
Attachment 10 - New Mexico Wage Determination NM20210036 _1 Jan 2021.pdf PDF
Attachment 6 - Reconstruct Taxiway Delta Final Plans_20181219.pdf PDF
Attachment 8 - AEC CAD Standards 6.1 Aug 2019.pdf PDF
Attachment 12 - Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 19 - AF Form 103.pdf PDF
Attachment 21 - AF Form 3000.pdf PDF
Attachment 3 - Reconstruct Taxiway Mike 100 Specifications August 2020.pdf PDF
Attachment 18 - AF Form 3064.xlsx XLSX spreadsheet
Attachment 11 - Past Performance Information.docx DOCX document
Attachment 16 - DD1354 Taxiway Mike.pdf PDF
Attachment 1 - SOW Repair Taxiway Mike_Delta 07 Apr 2021.pdf PDF
Attachment 17 - DD 1354 Taxiway Delta.pdf PDF
Attachment 2 - SOMs Twy Mike Delta Material Register 14 April 2021.xlsx XLSX spreadsheet
Attachment 14 - Past Performance Questionnaire.docx DOCX document
Attachment 13 - Past Performance Cover Letter.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit of Measure

STANDARD OPERATING PROCEDURE FOR UNITS OF MEASUREMENT ON CONSTRUCTION CONTRACTS
#ITEMUNITREMARKS
1Hydraulic Dredging - EDCYapplies to all jobs originating in Engineering Division
2Hopper Dredging - EDCYapplies to all jobs originating in Engineering Division
3Hydraulic Dredging - ODHRSapplies to all jobs originating in Operations Division
4Hopper Dredging - ODHRSapplies to all jobs originating in Operations Division
5Pile Dike
- PilesLF
- WalesLF
6Guide Walls
- PilesLF
- Guidewalls and FendersLS
- Wales, Thrust Blocks, Shear Blocks and GirtsLF
7Dolphins - Sheet Piling
- Sheet PilingSFsheet pile is broken out separated from the rest of the dolphin
- New DolphinLSremaining features of work
8Rock / StoneTONSmeasured by barge displacement or truck measure
9BeddingCYtruck measure
TONSbarge displacement measurement
10SurfacingCYtruck measure
11GeotextileSYin-place measurement
12PipeLFin-place measurement
13Catch Basins and ManholesEAuse separate items for different types
14DewateringLScontractor design
15Structural ExcavationLSspecifications or drawings must delineate the quantity
16Structural BackfillLSspecifications or drawings must delineate the quantity
17Channel ExcavationCYmeasured by the end-area method
18Canal ExcavationCYtruck measure
19Clearing and Grubbing - Levee Work
- Levee WorkLSundefined quantity based on borrow and to fill estimated for job
- Misc.n/aless than $50,000 placed in job overhead
20Levee EmbankmentsCYmeasured by the end-area method with settlement plates
21Earthen DikesLScontractor designed
22Sheet PilesSFmeasured by projected area - length x depth
may be broken out into separate items for furnishing and driving
23H-PilesLFmay be broken out into separate items for furnishing and driving
24Timber PilesLFmay be broken out into separate items for furnishing and driving
25Concrete PilesLFmay be broken out into separate items for furnishing and driving
26Temporary Sheet PilingSFwhen Corps designed
LSwhen contractor designed
27Work PlatformLScontractor designed where required
28Pile Load TestsEAmay include subdivided items
Examples: AA. "First 4 Tests" and AB. "All Over 4 Tests"
29Pile CapsEAwhen all caps are of uniform section; includes costs for all forming, rebar, finishing, etc.
LSwhen dimensions vary; includes costs for all forming, rebar, finishing, etc.
30Bridge Deck
- Precast GirdersLFincludes costs for all forming, rebar, finishing, etc.
- Deck PavingSYincludes costs for all forming, rebar, finishing, etc.
31Concrete PavingSYseparate items for each thickness; includes costs for all forming, rebar, finishing, etc.
32Road Sub-BaseSYseparate items for each thickness
CYmeasured by truck measure
33Concrete CurbLFuse separate items for barrier curb, rollover curb, etc.; includes costs for all forming, rebar, etc.
includes costs for all forming, rebar, finishing, etc.
34GuardrailLF
35Concrete Slope PavingSQ1 SQ = 100 SF
quantity includes cutoff walls; includes costs for all rebar, forming, etc.
36Concrete I-WallsLFuniform cross-section; includes costs for all forming, rebar, finishing, etc.
LSnon-uniform cross-section; includes costs for all forming, rebar, finishing, etc.
37Concrete T-WallsLSincludes costs for all forming, rebar, finishing, etc.
38Concrete Flumes and Box CulvertsLFuniform cross-section; includes costs for all forming, rebar, finishing, etc.
LSnon-uniform cross-section; includes costs for all forming, rebar, finishing, etc.
39AsphaltSY
TONSmeasured by truck at plant
40Flood GatesLSexception - under supply contracts paid for by the pound.
41Miter GatesLSexception - under supply contracts paid for by the pound.
42Sector GatesLSexception - under supply contracts paid for by the pound.
43Suice GatesEA
44ValvesEA
45FencingLF
- Permanent FencingLF
- Silt FencingLF or n/apaid for by the linear foot when over $10,000; otherwise covered in job overhead
- Safety FencingLF or n/apaid for by the linear foot when over $10,000; otherwise covered in job overhead
- Silt and Safety FencingLFwhen both items are along uniform placement they may be covered under a common bid item
46Fertilizing, Seeding and MulchingAcrevendor letter prompted NOD policy of quantifying bid items
47SoddingAcre
48ElectricalLSfeatures of work may be separated into separate line items
49Mechanical
- Pumping Station
- Pump EnginesEA
- Gear ReducersEA
- PumpsEA
50Miscellaneous MetalworkLS
51Painting / Coatings - Sheetpile
- SheetpileSF or n/amay be paid for separately or within the sheet pile item
- Pipesn/ausually included in the pipe item
- FloodwallsSF or n/amay be paid for separately or within the floodwall item

Instructions

Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.

Exceptions:

(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.

(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.

The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.
Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.
* CSI = Construction Specifications Institute

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Summary

CONSTRUCTION COST ESTIMATE
SUMMARYDate:
Fill HereFILL IN AS REQUIRED (this will link to the entire document)This spreadsheet contains many formulas... please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas
PRIME CONTRACTOR
Fill Here
PROJECT NUMBERGC Overhead7.81%
Fill HereGC Profit15.00%
PROJECTSub OverheadSee Divisions
Fill HereSub ProfitSee Divisions
LOCATIONPROJECT NO.Risk/Bonding2.50%Hide Divisions not used on both SUMMARY and TABS
Fill HerePXLY-128SNMGRT6.125%
DIVISIONDESCRIPTION% By
DivisionDivision Total
DIVISION 01Div01 - GENERAL REQUIREMENTS15.3%2,949.75
DIVISION 02Div02 - EXISTING CONDITIONS77.8%14,995.20
DIVISION 03Div03 - CONCRETE WORK0.0%- 0
DIVISION 04Div04 - MASONRY0.0%- 0
DIVISION 05Div05 - METALS0.0%- 0
DIVISION 06Div06 - WOOD, PLASTICS AND COMPOSITES0.0%- 0
DIVISION 07Div07 - THERMAL AND MOISTURE PROTECTION0.0%- 0
DIVISION 08Div08 - OPENINGS0.0%- 0
DIVISION 09Div09 - FINISHES0.0%- 0
DIVISION 10Div10 - SPECIALTIES0.0%- 0
DIVISION 11Div11 - EQUIPMENT6.9%1,320.00
DIVISION 12Div12 - FURNISHINGS0.0%- 0
DIVISION 13Div13 - SPECIAL CONSTRUCTION0.0%- 0
DIVISION 14Div14 - CONVEYING EQUIPMENT0.0%- 0
DIVISION 21Div21 - FIRE SUPRESSION0.0%- 0
DIVISION 22Div22 - PLUMBING0.0%- 0
DIVISION 23Div23 - HEATING, VENTILATING AND A/C0.0%- 0
DIVISION 25Div25 - INTEGRATED AUTOMATION0.0%- 0
DIVISION 26Div26 - ELECTRICAL0.0%- 0
DIVISION 27Div27 - COMMUNICATIONS0.0%- 0
DIVISION 28Div28 - ELECTRONIC SAFETY AND SECURITY0.0%- 0
DIVISION 31Div31 - EARTHWORK0.0%- 0
DIVISION 32Div32 - EXTERIOR IMPROVEMENTS0.0%- 0
DIVISION 33Div33 - UTILITIES0.0%- 0
DIVISION 34Div34 - TRANSPORTATION0.0%- 0
DIVISION 35Div35 - WATERWAYS AND MARINE CONSTRUCTION0.0%- 0
DIVISION 40Div40 - PROCESS INTEGRATION0.0%- 0
DIVISION 41Div41 - MATERIAL PROCESING AND HANDLING EQUIPMENT0.0%- 0
DIVISION 42Div42 - PROCESS HEATING, COOLING AND DRYING EQUIPMENT0.0%- 0
DIVISION 43Div43 - PROCESS GAS & LIQUID HANDLING, PURIFICATION & STORAGE EQUIPMENT0.0%- 0
DIVISION 44Div44 - POLLUTION CONTROL EQUIPMENT0.0%- 0
DIVISION 46Div46 - WATER and WASTEWATER EQUIPMENT0.0%- 0
DIVISION 48Div48 - ELECTRICAL POWER GENERATION0.0%- 0
ALL DIVISIONS SUB-TOTAL (HARD COST)100%19,264.95
PRIME GENERAL CONTRACT OFFICE OVERHEAD7.810%1,504.59
SUBTOTAL20,769.55
PRIME GENERAL CONTRACTOR'S PROFIT15.000%3,115.43
SUBTOTAL23,884.98
DESIGN (6%)6.000%1,433.10
SUBTOTAL25,318.08
BUILDER'S RISK / PERFORMANCE BONDS2.500%597.12
SUBTOTAL24,482.10
NEW MEXICO GROSS RECEIPTS TAX (NMGRT)6.125%1,499.53
CONTRACT TOTAL$ 27,414.73

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div1

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here2,949.75
Div01 - GENERAL REQUIREMENTSPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1asphalt exampleSY4,111.006.5526,927.05Hrs960.0030.0028,800.00- 0- 0100.0055,827.05
2SAMPLE...Project Dumspter (With Non Refund Deposit)Ea2.0080.00160.0030.00- 0- 070.00230.00
3SAMPLE...Project Billboard (Ususall not required Sample only)Ea1.00115.00115.00Hrs0.5027.4213.71- 0128.71
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST27,202.0528,813.71- 0170.0056,185.76
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)5.00%2,809.29
SUBTOTAL58,995.05
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)5.00%2,949.75
TOTAL$ 2,949.75
960.00

&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N

Div2

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here14,995.20
Div02 - EXISTING CONDITIONSPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1SAMPLE...Demo Asphalt Driveway 3" Thick (Leave Base Coarse) (480SF)SY53.00480.0025,440.00- 02.00106.00100.0025,646.00
2SAMPLE...Backhoe with 2 Laborors working 8 HrsDays- 0Hrs28.002,325.0065,100.00- 065,100.00
3SAMPLE...Landfill cost- 0- 0- 0134.00134.00
4- 0- 0- 0- 0
5480SY- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST25,440.0065,100.00106.00234.0090,880.00
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%9,088.00
SUBTOTAL99,968.00
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%14,995.20
TOTAL$ 14,995.20

Div3

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div03 - CONCRETE WORKPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0Hrs- 0- 0- 0
2- 0Hrs- 0- 0- 0
3- 0Hrs- 0- 0- 0
4- 0Hrs- 0- 0- 0256
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div4

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div04 - MASONRYPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div5

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div05 - METALSPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div6

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div06 - WOOD, PLASTICS AND COMPOSITESPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div7

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div07 - THERMAL AND MOISTURE PROTECTIONPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div8

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div08 - OPENINGSPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div9

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div09 - FINISHESPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div10

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div10 - SPECIALTIESPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div11

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here1,320.00
Div11 - EQUIPMENTPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1SF4,000.00- 0- 02.008,000.008,000.00
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 08,000.00- 08,000.00
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%800.00
SUBTOTAL8,800.00
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%1,320.00
TOTAL$ 1,320.00

Div12

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div12 - FURNISHINGSPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div13

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div13 - SPECIAL CONSTRUCTIONPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div14

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div14 - CONVEYING EQUIPMENTPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div21

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div21 - FIRE SUPRESSIONPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div22

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div22 - PLUMBINGPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div23

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div23 - HEATING, VENTILATING AND A/CPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div25

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div25 - INTEGRATED AUTOMATIONPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div26

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div26 - ELECTRICALPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div27

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div27 - COMMUNICATIONSPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div28

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div28 - ELECTRONIC SAFETY AND SECURITYPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div31

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div31 - EARTHWORKPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div32

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div32 - EXTERIOR IMPROVEMENTSPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div33

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div33 - UTILITIESPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div34

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div34 - TRANSPORTATIONPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div35

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div35 - WATERWAYS AND MARINE CONSTRUCTIONPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div40

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div40 - PROCESS INTEGRATIONPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div41

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div41 - MATERIAL PROCESING AND HANDLING EQUIPMENTPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0
17- 0- 0- 0- 0
18- 0- 0- 0- 0
19- 0- 0- 0- 0
20- 0- 0- 0- 0
SUBTOTAL MATERIAL / LABOR / OTHER DIRECT COST- 0- 0- 0- 0- 0
Sub-Contractor's Overhead (If Prime Contractor Performing Woek Put 0%)10.00%- 0
SUBTOTAL- 0
Sub-Contractor's Profit (If Prime Contractor Performing Woek Put 0%)15.00%- 0
TOTAL$ - 0

Div42

CONSTRUCTION COST ESTIMATE BREAKDOWNDATE:
Fill Here
CONTRACTOR (OR SUB-CONTRACTOR PERFORMING WORKADDRESS
Fill Here
PROJECTY NAMEPROPOSED TOTAL ESTIMATED AMOUNT
Fill Here- 0
Div42 - PROCESS HEATING, COOLING AND DRYING EQUIPMENTPROJECT NO.WORK LOCATION
Fill HereFill Here
No.ITEMMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTLINE TOTAL
MEASUREQTYUNITTOTALMANHOURS
MANDAYSQTYAVG RATETOTALUNITTOTAL
1- 0- 02.00- 0- 0
2- 0- 0- 0- 0
3- 0- 0- 0- 0
4- 0- 0- 0- 0
5- 0- 0- 0- 0
6- 0- 0- 0- 0
7- 0- 0- 0- 0
8- 0- 0- 0- 0
9- 0- 0- 0- 0
10- 0- 0- 0- 0
11- 0- 0- 0- 0
12- 0- 0- 0- 0
13- 0- 0- 0- 0
14- 0- 0- 0- 0
15- 0- 0- 0- 0
16- 0- 0- 0- 0