Questions and Answers Repair Taxiways Mike and Delta 4 June 21.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Repair Taxiway Mike & Delta
Solicitation number
FA4855-21-R-0008
Issued by

About this file

This document contains questions and answers related to a solicitation for repair work on Taxiways Mike and Delta at Cannon Air Force Base in New Mexico. The solicitation seeks a contractor to complete reconstruction of sections of the two taxiways, replacing asphalt with new Portland cement concrete. Taxiway Mike will involve removing and replacing 102,000 square feet of pavement, while work on Taxiway Delta includes reconstructing 25,000 square feet and removing and replacing an additional 75,000 square feet. The document clarifies requirements for past performance submissions, confirms that escorts and access controls will not be required, and answers other questions about staging areas, meeting participation, and role definitions.

View the file

Other files

File Type Posted
Main Questions and Answers Repair Taxiways Mike and Delta 7 June 21.xlsx XLSX spreadsheet
Attachment 3 - Reconstruct Taxiway Mike 100 Specifications_08 June 2021.pdf PDF
Attachment 12 - Construction Cost Estimate.xls XLS spreadsheet
Attachment 5 - Reconstruct Taxiway Delta_100 Specifications_ 08 June 2021.pdf PDF
Solicitation Amendment FA485521R00080001 SF 30.pdf PDF
Attachment 5 - Reconstruct Taxiway Delta 100 Specifications_20181206.pdf PDF
Attachment 7 - CAFB 32-201 Cannon AFB Fire Protection Program.pdf PDF
Attachment 4 - Reconstruct Taxiway Mike Final Plans August 2020.pdf PDF
Attachment 15 - Subcontractor Consent Letter.docx DOCX document
Solicitation - FA485521R0008.pdf PDF
Attachment 20 - AF Form 3065.xlsx XLSX spreadsheet
Attachment 9 - As-Built Submittal Guidelines-2014.pdf PDF
Attachment 10 - New Mexico Wage Determination NM20210036 _1 Jan 2021.pdf PDF
Attachment 6 - Reconstruct Taxiway Delta Final Plans_20181219.pdf PDF
Attachment 8 - AEC CAD Standards 6.1 Aug 2019.pdf PDF
Attachment 12 - Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 19 - AF Form 103.pdf PDF
Attachment 21 - AF Form 3000.pdf PDF
Attachment 3 - Reconstruct Taxiway Mike 100 Specifications August 2020.pdf PDF
Attachment 18 - AF Form 3064.xlsx XLSX spreadsheet
Attachment 11 - Past Performance Information.docx DOCX document
Attachment 16 - DD1354 Taxiway Mike.pdf PDF
Attachment 1 - SOW Repair Taxiway Mike_Delta 07 Apr 2021.pdf PDF
Attachment 17 - DD 1354 Taxiway Delta.pdf PDF
Attachment 2 - SOMs Twy Mike Delta Material Register 14 April 2021.xlsx XLSX spreadsheet
Attachment 14 - Past Performance Questionnaire.docx DOCX document
Attachment 13 - Past Performance Cover Letter.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Questions and Answers Solicitation FA4855-21-R-0008 Repair Taxiways Mike and Delta
ReferenceQuestionAnswer
1RFPIs past performance required for Critical Subcontractors? The RFP says Submit no more than three (3) in total relevant projects for the prime and no more than one (1) per critical subcontractor. However no more than 3 projects are allowed to be submitted. Based on the SOW we could have 3-4 Key Subcontractors. Please verify, if we are required to submit past performance for Key Subcontractors?Yes, past performance is required. However, If an offeror has no past performance history of relevance, the offeror must state affirmatively it possesses no past performance history of relevance. Per Section L, paragraph D, the offeror shall submit present and past performance information for itself and any joint venture member, as well as each proposed critical subcontractor in accordance with the format contained in the past performance information sheet. Furthermore, no more than three in total relevant projects for the prime and no more than one per critical subcontractor. The reference where section L states that only the first three projects will be considered, it is referring to the prime.
2RFPCan the government please eliminate the requirement for a PPQ if a CCASS already exists for the project. DoD clients continually state to us that the DoD official evaluation is in the CPARS system and a PPQ should not be required.PPQ is for additional inforomation that is not in CPARS, however, vendors will not be eliminated on the basis of PPQ.
3Section M“Critical Subcontractors: The evaluation of the offeror's/joint venture members' present/past performance WILL NOT include the present/past performance of any subcontractor(s) even though they may perform major or critical aspects of this requirement.” Can the government please elaborate on this statement in Section M. If we provide past performance for Critical Subcontractors, will be evaluated?An amendment will follow to state that past performance will include the present/past performance of any subcontractor(s) when they perform major or critical aspects of this requirement.
4REF ATT 1 SOW Paragraph 5Please provide a description of the base supplied runway closure crosses for the taxiways? Installation method?Reference Taxiway Delta Drawings, Sheet GC141, the KTR installs and re-locates the crosses, the base just supplies
5REF ATT 1 SOW Paragraph 17-Please verify if you want the entire site surrounded by lighted low profile barricades, or are they to be placed as indicated on the drawings.As indicated on the drawings
6REF Mike & Delta Specification 01 01 00-1.13.i-Confirm escorts will be provided by the Government.No esorting will be required at this time. Processing freezone request.
7Sheet 11Can the staging area shown on Sheet 11 of ATT 1 SOW be used for TW Mike & Delta?yes it is for both
8Are work and staging areas going to be in a “free zone”, and not require escort?No esorting will be required at this time. Processing freezone request.
9Are gate guards required to be provided by the Contractor at access control points?Please clarify on "access control points", as of right now the contractor will not go near any Red-Lines or restricted areas
10REF Mike & Delta Specification 01 11 00-1.5-Confirm sub-surface scan is required for utility locates.Yes
11Will the project scheduler be permitted to participate in periodic schedule update meetings via telephone and/or Microsoft Teams?Yes
12Mike 01 35 26-1.6.1.1.1States that the SSHO can also serve as Quality Control Manager. Mike 01 45 00.00 10-3.4.2 states the QC Manager shall have no other duties. Please clarify if the CQC and SSHO can be dual-hatted.The QC manager may serve as SSHO as long as they meet the requirements and qualifications of both.
13Delta 01 35 26-1.5.1.1.1States that the SSHO can also serve as Quality Control Manager. Mike 01 45 00.00 10-3.4.2 states the QC Manager shall have no other duties. Please clarify if the CQC and SSHO can be dual-hatted.The QC manager may serve as SSHO as long as they meet the requirements and qualifications of both.
14Mike Specification 32 11 36.13Lean Concrete Base Course…please advise where this is indicated in the drawings.Refer to Drawings, sheets labeled Typical Sections
15Past Performance- Due to the highly technical nature of the project, can the government expand on the evaluation criteria so the Prime Contract can demonstrate managing a DoD airfield pavement project and the key airfield paving subcontractor demonstrates specific criteria, such as construction of DoD/FAA Airfield Portland Cement Concrete (PCC) paving project with a minimum of 20,000 CY and 14 inch thick.The Government is not changing what is required by the RFP at this time.
16REF Mike Drawing CD102 Inset-How thick is the existing asphalt pavement to be removed at the service road? Is the removed asphalt to be removed to the abandoned runway?The asphalt is approx 4". The asphalt in question is to be removed starting from the South East corner of the abandoned runway heading East.
17Ref Attachment #14 PPQCan past performance projects with completed CPARS utilize the CPARS instead of the current PPQ's for these projects?PPQ is for additional inforomation that is not in CPARS, however, vendors will not be eliminated on the basis of PPQ.
18Ref Solicitation Page 61 & 62Since this is a Small Business set-aside solicitation, is the Small Business subcontracting section required to be completed for this proposal?When the clauses were contained in the submitted contracts the assessment will consider whether the past performance demonstrated the offeror's/joint venture members' (and critical subcontractor's, if applicable) compliance with FAR 52.219-8, Utilization of Small Business Concerns, or FAR 52.219-9, Small Business Subcontracting Plan, when these clauses were contained in the submitted contracts.
19Ref Solicitation Section M - Evaluation Factors for Award, II. Proposal Evaluation, pg 60, D. Volume III Past Performance, General and Past Performance AssessmentAirfield concrete paving is a very specialized trade that requires proven experience to provide the government with the best results. We recommend the following additional evaluation factors be added to qualify the PCC paver on each proposal. 1. Experience with Airfield PCCP of at least 14" thick. 2. Experienced airfield PCCP of at least 25,000 cubic yards. 3. Experience with airfield PCCP in high desert conditions comparable to Cannon AFB.The Government expects vendors to submit relevant airfield projects within the magnitude and based on the SOW, specifications, and drawings.
20Ref L and MThe Past Performance Submissions section (pg 51) of the solicitation states that past performance is evaluated using up to (3) relevant projects for the prime and (1) relevant project from each critical subcontractor. This could result in up to (4) or (5) total project submittals. However, the next line states, if more than (3) projects are submitted, only the first (3) projects will be considered for evaluation. Furthermore, in the Past Performance Assessment section (pg 61), item #3, Critical Subcontractors, it states that evaluation of the offeror's past performance will not include past performance of any subcontractors. Can the Gov't provide clarification of how many total projects will be evaluated and under what circumstance projects from critical subcontractors will be considered for evaluation?An amendment will follow to state that past performance will include the present/past performance of any subcontractor(s) when they perform major or critical aspects of this requirement. Per Section L, paragraph D, the offeror shall submit present and past performance information for itself and any joint venture member, as well as each proposed critical subcontractor in accordance with the format contained in the past performance information sheet. Furthermore, no more than three in total relevant projects for the prime and no more than one per critical subcontractor. The reference where section L states that only the first three projects will be considered, it is referring to the prime.