This file is an equipment list appendix for the Wastewater Solids Wastewater Pretreatment Plant (WSWPP). The document catalogs all equipment required for the facility's operations, organized by equipment type, identification number, location, and operational purpose.

The equipment inventory includes eight mixers with variable speed capabilities located in tanks T-1 through T-8, plus additional specialized mixers for precoat and bentonite applications. The facility operates two motor-driven mixer units at the Gravity Separation Unit (GSU) for scraper blade operation. Sludge handling is performed by six sludge pumps distributed between the GSU and Filter Press locations, with pumps SP1-SP3 moving sludge to T-10 and pumps SP4-SP6 transferring solids to the Filter Press. Two Filter Press units support dewatering operations. General process pumping includes eight variable-speed and fixed-speed pumps (P1-P11) distributed across multiple tank locations for treatment flow, effluent pumping, and backup capacity. Chemical handling comprises six chemical pumps (CP1-CP2, CP11-CP15) dedicated to sulfuric acid delivery, polymer application, and bentonite distribution, with Chemical Pump #15 specifically designated for transferring 93% sulfuric acid from non-bulk containers into Tank T-12. pH monitoring and control is maintained through five probe units: three probes at tanks T-3, T-4, and T-7 for pH control, and two probes at the effluent discharge point for pH monitoring. Chemical pumps CP5 and CP6 at Tank T-13 are noted as not in use.

View the file

Other files

File Type Posted
Attachment A - PWS Waste Water Pretreatment Plant Operation and Maintenance_6 Oct 2026.pdf PDF
2031ZA26R00023 0004.pdf PDF
2031ZA26R00023 0003.pdf PDF
Attachment A - PWS Waste Water Pretreatment Plant Operation and Maintenance_v5 - 21 Aug 2026.pdf PDF
WWPP - Request for Clarifications-Questions-Answers.xlsx XLSX spreadsheet
Attachment B - Pricing Sheet - 21 Aug 2026.xlsx XLSX spreadsheet
Attachment D - Past Performance Questionnaire.docx DOCX document
2031ZA26R00023 0002 - 07 Aug 2026.pdf PDF
2031ZA26R00023 0001 - 06 Aug 2026.pdf PDF
Attachment C - Site Visit Information - 6 Aug 2026.docx DOCX document
Attachment B - Pricing Sheet - 6 Aug 2026.xlsx XLSX spreadsheet
Att 19 - Sodium-Sulfated Castor Oil Specification.pdf PDF
Att 23 - Spare Parts and Supplies.pdf PDF
Att 2 - WSWPP Process Description.pdf PDF
Attachment 29 - Monthly Workforce Report.docx DOCX document
Att 1 - BEP 017-12.pdf PDF
Att 18 - Sodium Hydroxide Specification.pdf PDF
Att 3 - PWPP Process Description.pdf PDF
Att 24 - Nonreimburseable Tools - Janitorial - PPE Supplies.pdf PDF
Att 20 - Boxes - Lids Specification.pdf PDF
Att 15 - Sulfuric Acid Specification.pdf PDF
Att 21 - Pallets Specification.pdf PDF
Att 11 - Wage Determination.pdf PDF
Att 10 - PWPP Equipment List.pdf PDF
2031ZA26R00023 WWPP Solicitation.pdf PDF
Attachment A - PWS Waste Water Pretreatment Plant Operation and Maintenance_v4.pdf PDF
Att 5 - WSRP Process Description.pdf PDF
Attachment 28 Staffing Plan.doc DOC document
Att 13 - Restricted Materials at DCF.pdf PDF
Att 26 - Equipment.pdf PDF
Attachment 27 - Corrosion Monitoring.pdf PDF
Att 16 - Sodium Bisulfite Specification.pdf PDF
Attachment B - Pricing Sheet.xlsx XLSX spreadsheet
Att 7 - BEP Furnished Equipment.pdf PDF
Att 12 - EHS Requirements for Purchased Materials.pdf PDF
Att 22 - Process and Treatment Chemicals.pdf PDF
Att 8 - EHS Contractor Requirements.pdf PDF
Att 25 - Laboratory Analysis.pdf PDF
Attachment C - Site Visit Information.pdf PDF
Att 4 - GTWPP Process Description.pdf PDF
Att 14 - Bentonite Specification.pdf PDF
Att 17 - Filter Aid Specification.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 9

Equipment List for WSWPP

Equipment ID Location Purpose

M-1 Mixer w/variable speed T-1 Mix Wastewater M-3 Mixer w/variable speed T-3 Mix Solution

M-4 Mixer w/variable speed T-4 Mix Solution

M-5 Mixer w/variable speed T-5 Mix Solution

M-6 Mixer w/variable speed T-6 Mix Solution

M-7 Mixer w/variable speed T-7 Mix Solution

M-8 Mixer w/variable speed T-8 Mix Solution

M-10 Mixer w/variable speed T-10 Mix Solution

Precoat Mixer T-21 Mix Precoat

Bentonite Mixer T-19 Mix Bentonite

Motor and Mixer # 1 GSU Scraper Blades on GSU

Motor and Mixer # 2 GSU Scraper Blades on GSU Sludge Pump # 1 SP1 GSU Pump Sludge to T-10 Sludge Pump # 2 SP2 GSU Pump Sludge to T-10 Sludge Pump # 3 SP3 GSU Pump Sludge to T-10 Sludge Pump # 4 SP4 Filter Press Pump Solids to Filter Press Sludge Pump # 5 SP5 Filter Press Pump Solids to Filter Press Sludge Pump # 6 SP6 Filter Press Pump Solids to Filter Press Filter Press # 1 Filter Press Dewater Sludge Filter Press # 2 Filter Press Dewater Sludge Pump # 1 w/variable speed P1 T-1 Pump from T-1 to Treatment Pump # 2 w/variable speed P2 T-1 Pump from T-1 to Treatment Pump # 3 w/variable speed P3 T-8 Pump from T-9 to Effluent Pump # 4 w/variable speed P4 T-8 Pump from T-9 to Effluent Pump # 5 P5 Filter Press Pump from T-17 to T-7 Pump # 6 P6 Filter Press Pump from T-17 to T-7 Pump # 7 P7 T-7 Back-up Process Pump Pump # 8 P8 T-7 Back-up Process Pump Pump # 10 P10 T-21 Pump Precoat to Filter Press Pump # 11 P11 T-11 Decant from T-11 Chemical Pump # 1 CP1 T-12 Pump Sulfuric Acid Chemical Pump # 2 CP2 T-12 Pump Sulfuric Acid Chemical Pump # 5 CP5 T-13 Not in Use Chemical Pump # 6 CP6 T-13 Not in Use Chemical Pump # 11 CP11 T-22 Pump Polymer Chemical Pump # 12 CP12 T-22 Pump Polymer Chemical Pump # 13 CP13 T-19 Pump Bentonite Chemical Pump # 14 CP14 T-19 Pump Bentonite

Chemical Pump # 15 CP15 T-13

Pump New 93% Sulfuric Acid from non-bulk containers into

T-12

Att. 9 Page 1 of 2 Pages

Attachment 9

Equipment ID Location Purpose pH Probes T-3 Controls pH pH Probes T-4 Controls pH pH Probes T-7 Controls pH pH Probes - A Effluent Monitors pH pH Probes - B Effluent Monitors pH