This is a Performance Work Statement attachment for the operation and maintenance of a Wastewater Pretreatment Plant (WWPP) and Wiping Solution Recycling Plant (WSRP). The system processes used wiping solution from intaglio presses through a multi-stage chemical treatment process involving polymer dosing (Nalco 8100), perlite filtration, and solution reconstitution with soft water, caustic soda, and castor oil. Treated solution is recycled back to printing presses while sludge byproduct is collected and packaged for disposal.

The Contractor is required to operate the system using prudent engineering practices and perform specific tasks including: taking system readings every two hours (pump data, flows, tank levels, set points); conducting inspections and analyses every two hours or as needed; starting, stopping, and emptying filter presses with proper pallet and box preparation; filling boxes to between 2,350 and 2,400 pounds with appropriate labeling and computer data entry; changing or cleaning filter cloths as needed; mixing system materials for optimal operation; performing weekly maintenance checks on control devices; responding to all system alarms; and cleaning and inspecting tanks biannually or more frequently if sludge blockage occurs. A detailed process flow diagram is included showing all tanks, pumps, filter presses, and system components with their interconnections.

View the file

Other files

File Type Posted
Attachment A - PWS Waste Water Pretreatment Plant Operation and Maintenance_6 Oct 2026.pdf PDF
2031ZA26R00023 0004.pdf PDF
WWPP - Request for Clarifications-Questions-Answers.xlsx XLSX spreadsheet
Attachment B - Pricing Sheet - 21 Aug 2026.xlsx XLSX spreadsheet
2031ZA26R00023 0003.pdf PDF
Attachment A - PWS Waste Water Pretreatment Plant Operation and Maintenance_v5 - 21 Aug 2026.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
2031ZA26R00023 0002 - 07 Aug 2026.pdf PDF
2031ZA26R00023 0001 - 06 Aug 2026.pdf PDF
Attachment C - Site Visit Information - 6 Aug 2026.docx DOCX document
Attachment B - Pricing Sheet - 6 Aug 2026.xlsx XLSX spreadsheet
Attachment A - PWS Waste Water Pretreatment Plant Operation and Maintenance_v4.pdf PDF
Attachment 28 Staffing Plan.doc DOC document
Att 13 - Restricted Materials at DCF.pdf PDF
Att 26 - Equipment.pdf PDF
Attachment 27 - Corrosion Monitoring.pdf PDF
Att 16 - Sodium Bisulfite Specification.pdf PDF
Attachment B - Pricing Sheet.xlsx XLSX spreadsheet
Att 7 - BEP Furnished Equipment.pdf PDF
Att 19 - Sodium-Sulfated Castor Oil Specification.pdf PDF
Att 23 - Spare Parts and Supplies.pdf PDF
Att 2 - WSWPP Process Description.pdf PDF
Attachment 29 - Monthly Workforce Report.docx DOCX document
Att 12 - EHS Requirements for Purchased Materials.pdf PDF
Att 22 - Process and Treatment Chemicals.pdf PDF
Att 8 - EHS Contractor Requirements.pdf PDF
Att 25 - Laboratory Analysis.pdf PDF
Attachment C - Site Visit Information.pdf PDF
Att 4 - GTWPP Process Description.pdf PDF
Att 14 - Bentonite Specification.pdf PDF
Att 17 - Filter Aid Specification.pdf PDF
Att 1 - BEP 017-12.pdf PDF
Att 18 - Sodium Hydroxide Specification.pdf PDF
Att 3 - PWPP Process Description.pdf PDF
Att 24 - Nonreimburseable Tools - Janitorial - PPE Supplies.pdf PDF
Att 20 - Boxes - Lids Specification.pdf PDF
Att 15 - Sulfuric Acid Specification.pdf PDF
Att 21 - Pallets Specification.pdf PDF
Att 11 - Wage Determination.pdf PDF
Att 10 - PWPP Equipment List.pdf PDF
Att 9 - WSWPP Equipment List.pdf PDF
2031ZA26R00023 WWPP Solicitation.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

Att. 5 Page 1 of 3 Pages

Wastewater Pretreatment Plant (WWPP) Chemical Treatment Process

Wiping Solution Recycling Plant (WSRP)

PROCESS DESCRIPTION: The used wiping solution coming from the intaglio presses is conveyed to the storage tank TK101. If maintenance on the recycling section is required, the effluent can be conveyed to the treatment tank TK403.

TK101 is connected by overflow to the emergency tanks TK100-100A, where the wiping solution can be stored in case of maintenance and then pumped to the pre-treatment section (tank TK403). TK101 flows to the process tank TK102 where the polymer Nalco 8100 is dosed to begin treatment. From TK102 the material is transferred to TK201 where perlite is added. Perlite is added by screw conveyor from TK202. The material is then transferred to either of the filter presses of the recycling system FP305 or FP405. Please note that the decanters shown in the diagram are not used. They may be used in the future for materials storage or possibly removed.

The sludge falls into containers placed beneath the filter press. Before operating in production the automatic stand-by cycle makes the effluent circulate back to the feeding tank TK201. This represents the filtration warm-up (maximum 5 minutes) which properly distributes the pressure on the plate surface and removes impurities from the cloths before starting the production.

The filtered effluent is sent to the recycled solution storage tank TK301. The recovered solution contained in the tank TK301 is pumped to the mixing tank TK315, through a set of filter cartridges, then the solution is re-heated and lost material is made up from raw materials as described earlier in the document.

The recycled wiping solution is then pumped to the printing presses by centrifugal pumps.

Spills from the system are collected by the floor sumps and returned to the system for pretreatment. For any major spill within the plant, the entire system is surrounded by a sealed curb which creates a secondary containment around the system to contain the spill.

The recycled solution in tank TK315 is reconstituted by adding soft water from tank TK601 and with caustic soda solution from TK390 and castor oil from TK380 from the corresponding dosing lines by using conductivity as the control.

PROCESS OPERATION: The Contractor shall operate the system with prudent engineering and operating practices. Operating the system includes, but is not limited to, the following tasks:

(1) The Contractor shall take readings every two (2) hours of the pumps data, flows, tank levels, data set points and operating conditions from the computer, and other set points throughout the system. It should be noted that in the future this may be at least partially performed by SCADA software.

(2) The Contractor shall perform an inspection/analysis of the WSRP every two (2) hours minimally or more often as needed for proper operation.

Att. 5 Page 2 of 3 Pages

(3) The Contractor shall start, stop, empty filter presses, prepare the pallets, boxes, liners, fill each box to between >2,350 pounds and ≤ 2,400 pounds, band, properly label, and enter the data into the computer logging system which is furnished by the BEP, for the performance of this contract.

(4) The Contractor shall change/clean filter press filter cloths as needed when they become blinded or physically damaged.

(5) The Contractor shall mix the system materials as needed for the optimal operation of the system.

(6) The Contractor shall check and perform maintenance on control devices weekly at a minimum or more often, as needed.

(7) The Contractor shall respond to all alarms, correcting the conditions to assure proper operation of the system.

(8) The Contractor shall clean and inspect the tanks at least biannually as well as clean the tanks and affected equipment if there is a blockage (build-up) of sludge in any tank as necessary during the operation of the system.