This document is a Project Management and Coordination specification section (Section 01 31 00.01) for the EHRM Infrastructure Upgrades project in Grand Junction, CO. The specification details requirements for a web-based Project management software package to be used throughout the project's lifecycle. The required software must provide comprehensive digital project management capabilities, including compilation of project data, access control, document workflow planning, tracking of project communications, processing of payment applications and contract modifications, meeting minute distribution, document management, and construction progress photo management.

Key requirements include providing user licenses for the Owner, Architect, and Architect's consultants, delivering eight hours of software training, and creating a digital archive at project completion in a format readable by common desktop software applications. The specified software platforms include Procore, Oracle Primavera Submittal Exchange, or equivalent web-based project management software. The document emphasizes mobile device compatibility and security features such as locked markups and preventing further changes to the final project archive.

View the file

Other files

File Type Posted
S05 - 575-21-700 Tech Questions responses updated - GJ CO - 8-28-25.docx DOCX document
575-700.VA Archtitectural Grand Junction EHRM Addendum 2 - Changed Sheets Only.pdf PDF
For Information Only - B44_2013_TERRACON_41013_Parking_Garage.pdf PDF
575-700.VA Civil Grand Junction EHRM Addendum 2 - Fiber Optic Manhole Detail.pdf PDF
575-700.VA Telecom Grand Junction EHRM Addendum 2 - Changed Sheets Only.pdf PDF
For Information Only - B9_2019_Geotech_Report_HB_Boiler_Plant.pdf PDF
575-700.VA Mechanical Grand Junction EHRM Addendum 2 - Changed Sheets Only.pdf PDF
S06- Amendment 0009.pdf PDF
S06 - Amendment 0008.pdf PDF
S06- Amendment 0007.pdf PDF
32 05 23 Cement and Concrete for Exterior Improvements.pdf PDF
32 12 16 Asphalt Paving.pdf PDF
CIP concrete short form.pdf PDF
S06- Amendment 0006- Bid due date extended 08-28-25.pdf PDF
S06- Amendment 0005- Bid due date extended.pdf PDF
S06- Amendment 0005- Bid due date extended.pdf PDF
B12 Roof 20250730.pdf PDF
S06- Amendment 0004- Bid opening info and all tech questions responses.pdf PDF
4 Utility Plan.pdf PDF
B7 Roof 20250730.pdf PDF
S05 - 575-21-700 All Tech Questions Responses - CO.docx DOCX document
S06- Amendment 0003 - DB Wages updated - Bid extension - RFI answers.pdf PDF
S05 - 575-21-700 Tech Questions Responses- GJ CO 07-28-25.docx DOCX document
P07- Updated Wages Determination - Grand Junction CO 07-25-2025.pdf PDF
S04- Signed site visit sign in sheet - 57521700 CO.pdf PDF
S06- Amendment 0002- Signed site visit sheet.pdf PDF
ATT 12- Drawings - EHRM - Grand Junction - CO.pdf PDF
ATT 13- Specifications-Combined- EHRM - Grand Junction CO.pdf PDF
ATT 4- Grand Junction CO - SPECS 07-03-25- Addendum.pdf PDF
ATT 11 - Site Visit Instructions.pdf PDF
ATT 1- Grand Junction EHRM - Drawings 07-03-25 - Addendum.pdf PDF
S06 - Amendment 0001.pdf PDF
ATT 3- Estimated Construction Schedule- EHRM- Grand Junction CO.pdf PDF
ATT 10 - GEO Reports B20.pdf PDF
ATT 6 - Wages Determination - Grand Junction CO.pdf PDF
ATT 5- 100 CD Basis of Design -Combined- Grand Junction CO.pdf PDF
ATT 1- Grand Junction EHRM - Drawings 07-03-25.pdf PDF
ATT 8 - Limitations on Subcontracting.docx DOCX document
36C77625B0039.pdf PDF
ATT 11- Site Visit Instructions.pdf PDF
ATT 4- Grand Junction CO - SPECS 07-03-25.pdf PDF
ATT 2- Parking Guidelines Grand Junction VAMC.pdf PDF
ATT 9- Hazardous Materials Report.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number: 575-21-700

Project Name : EHRM Infrastructure Upgrades Project Location: Grand Junction CO

PROJECT MANAGEMENT AND COORDINATION

06-09-2025

01 31 00.01 - 1

SECTION 01 31 00.01

PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative provision for coordinating construction operations on Project, including, but not limited to, the following:

1. Web-based Project management software package.

B. Each contractor shall participate in coordination requirements. Certain areas of responsibility are assigned to a specific contractor.

1.3 DEFINITIONS

A. BIM: Building Information Modeling.

B. RFI: Request for Information. Request from Owner, Architect, or Contractor seeking information required by or clarifications of the Contract Documents.

1.4 DIGITAL PROJECT MANAGEMENT PROCEDURES

A. Web-Based Project Management Software Package: Provide, administer, and use web-based

Project management software package for purposes of hosting and managing Project communication and documentation until Final Completion.

1. Basis of Specification: Procore, Oracle Primavera Submittal Exchange or other equivalent web-based project management software.

2. Web-based Project management software includes, at a minimum, the following features:

a. Compilation of Project data, including Contractor, subcontractors, Architect, Architect's consultants, Owner, and other entities involved in Project. Include names of individuals and contact information.

b. Access control for each entity for each workflow process, to determine entity's digital rights to create, modify, view, and print documents.

c. Document workflow planning, allowing customization of workflow between project entities.

d. Creation, logging, tracking, and notification for Project communications required in other Specification Sections, including, but not limited to, RFIs, submittals, Minor

Changes in the Work, Construction Change Directives, and Change Orders.

e. Track status of each Project communication in real time, and log time and date when responses are provided.

Project Number: 575-21-700

Project Name : EHRM Infrastructure Upgrades Project Location: Grand Junction CO

PROJECT MANAGEMENT AND COORDINATION

06-09-2025

01 31 00.01 - 2

f. Procedures for handling PDFs or similar file formats, allowing markups by each entity. Provide security features to lock markups against changes once submitted.

g. Processing and tracking of payment applications.

h. Processing and tracking of contract modifications.

i. Creating and distributing meeting minutes.

j. Document management for Drawings, Specifications, and coordination drawings, including revision control.

k. Management of construction progress photographs.

l. Mobile device compatibility, including smartphones and tablets.

3. Provide Project management software user licenses for use of Owner, Architect, and

Architect's consultants. Provide eight hours of software training for web-based Project software users.

4. At completion of Project, provide digital archive in format that is readable by common desktop software applications in format acceptable to Architect. Provide data in locked format to prevent further changes.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

- - - END - - -