This document is a Utility Plan drawing set (CU101) for a fiber optic manhole infrastructure project at the Grand Junction, CO VA Medical Center. The utility plan, prepared by Calibre Engineering and Specialized Engineering Solutions (SES), contains three detailed sheets (1OF01, 1OF02, 1OF03) showing utility layout, fiber optic manhole specifications, and installation details. The drawings are part of the 100% Construction Documents for the EHRM Infrastructure Upgrades project, issued on 12/17/2024, and feature technical specifications for fiber optic infrastructure installation, including underground conduit routing, manhole configurations, and associated utility connections. The drawings include isometric views, cross-sectional diagrams, and technical annotations detailing the precise specifications for fiber optic manhole construction and integration within the VA Medical Center campus.

View the file

Other files

File Type Posted
S05 - 575-21-700 Tech Questions responses updated - GJ CO - 8-28-25.docx DOCX document
575-700.VA Archtitectural Grand Junction EHRM Addendum 2 - Changed Sheets Only.pdf PDF
For Information Only - B44_2013_TERRACON_41013_Parking_Garage.pdf PDF
575-700.VA Civil Grand Junction EHRM Addendum 2 - Fiber Optic Manhole Detail.pdf PDF
575-700.VA Telecom Grand Junction EHRM Addendum 2 - Changed Sheets Only.pdf PDF
For Information Only - B9_2019_Geotech_Report_HB_Boiler_Plant.pdf PDF
575-700.VA Mechanical Grand Junction EHRM Addendum 2 - Changed Sheets Only.pdf PDF
S06- Amendment 0009.pdf PDF
S06 - Amendment 0008.pdf PDF
S06- Amendment 0007.pdf PDF
32 05 23 Cement and Concrete for Exterior Improvements.pdf PDF
32 12 16 Asphalt Paving.pdf PDF
CIP concrete short form.pdf PDF
S06- Amendment 0006- Bid due date extended 08-28-25.pdf PDF
S06- Amendment 0005- Bid due date extended.pdf PDF
S06- Amendment 0005- Bid due date extended.pdf PDF
B12 Roof 20250730.pdf PDF
S06- Amendment 0004- Bid opening info and all tech questions responses.pdf PDF
B7 Roof 20250730.pdf PDF
S05 - 575-21-700 All Tech Questions Responses - CO.docx DOCX document
S06- Amendment 0003 - DB Wages updated - Bid extension - RFI answers.pdf PDF
S05 - 575-21-700 Tech Questions Responses- GJ CO 07-28-25.docx DOCX document
P07- Updated Wages Determination - Grand Junction CO 07-25-2025.pdf PDF
S04- Signed site visit sign in sheet - 57521700 CO.pdf PDF
S06- Amendment 0002- Signed site visit sheet.pdf PDF
ATT 12- Drawings - EHRM - Grand Junction - CO.pdf PDF
ATT 13- Specifications-Combined- EHRM - Grand Junction CO.pdf PDF
ATT 4- Grand Junction CO - SPECS 07-03-25- Addendum.pdf PDF
ATT 11 - Site Visit Instructions.pdf PDF
ATT 1- Grand Junction EHRM - Drawings 07-03-25 - Addendum.pdf PDF
S06 - Amendment 0001.pdf PDF
ATT 7 - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
ATT 3- Estimated Construction Schedule- EHRM- Grand Junction CO.pdf PDF
ATT 10 - GEO Reports B20.pdf PDF
ATT 6 - Wages Determination - Grand Junction CO.pdf PDF
ATT 5- 100 CD Basis of Design -Combined- Grand Junction CO.pdf PDF
ATT 1- Grand Junction EHRM - Drawings 07-03-25.pdf PDF
ATT 8 - Limitations on Subcontracting.docx DOCX document
36C77625B0039.pdf PDF
ATT 11- Site Visit Instructions.pdf PDF
ATT 4- Grand Junction CO - SPECS 07-03-25.pdf PDF
ATT 2- Parking Guidelines Grand Junction VAMC.pdf PDF
ATT 9- Hazardous Materials Report.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM IU AT THE GRAND JUNCTION,

CO VA MEDICAL CENTER

2121 North Ave, Grand Junction, CO 81501

575-21-700

12/17/2024Revisions: Date: ARDJAG

Calibre Engineering, Inc.

9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre 7100E BELLEVIEW AVE, STE 107

GREENWOOD VILLAGE,

CO 80111

Phone: (720) 200-5955 www.specializedeng.com

SES Project : 22295

100% CONSTRUCTION

DOCUMENTS

35754

JA

MES A LA N GUSKYCO

LO

RADO REGI STERED

PROFESS IONA L ENGIN

EE

R

CU101

UTILITY PLAN

FIBER OPTIC MANHOLE FIBER OPTIC MANHOLE

Sheets and Views
4 UTILITY PLAN