ATT 11 - Site Visit Instructions.pdf
PDF 349 KB Posted
- Solicitation number
- 36C77625B0039
About this file
This document is a site visit instructions document for the OKC EHRM Infrastructure Upgrades - Construction (NRM) 575-21-700 project. The site visit is scheduled for Tuesday, July 15, 2025, at 1:00 PM (MST) at the VA Western Colorado Health Care System in Building 8, located at 2121 North Avenue in Grand Junction, Colorado.
Attendees are required to bring specific personal protective equipment, including steel-toed shoes, hard hats, and reflective vests, as they will be entering an active construction area. Health precautions are in place, with participants expected to be in good health and free of cold and flu symptoms. Masks are optional but not provided by the VA, and all attendees must park off-campus and arrive early to ensure parking availability. The site visit is part of a larger infrastructure upgrade project involving modifications to existing technology infrastructure, electrical systems, building management systems, and communication networks across multiple buildings at the VA facility.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit
OKC EHRM Infrastructure Upgrades - Construction (NRM) 575-21-700
An organized site visit has been scheduled for: Tuesday July 15, 2025, at 1:00 PM (MST)
Participants will meet at: VA Western Colorado Health Care System
Building 8
2121 North Avenue
Grand Junction, Colorado 81501
All attendees will be expected to be in good health (free of Cold & Flu) to prevent unnecessary exposure and spread of possible illness contingents. All attendees are not required, but may opt, to wear a mask throughout visit times while inside the facility. Masks will not be provided by the VA. All attendees will park off campus. Attendees are advised to arrive early to ensure parking availability.
Important note: Attendees will need to bring steel toes, hard hats, and a reflective vest. Since we will be entering an active construction area.
Building 8
File details come from the government source that posted it. Updated .