This document is a Wage Determination for building construction projects in Mesa County, Colorado, effective 07/25/2025. The wage determination establishes hourly rates and fringe benefits for various construction trade classifications, including Power Equipment Operators (crane), Ironworkers (ornamental and structural), Painters, Plumbers, Pipefitters, Sheet Metal Workers, Bricklayers, Carpenters, Electricians, and Laborers. Hourly rates range from $13.25 for common laborers to $47.23 for plumbers, with corresponding fringe benefits varying from $0.00 to $22.11.

The document notes that contracts subject to the Davis-Bacon Act must generally pay at least the applicable minimum wage rate under Executive Order 14026 or 13658. It includes provisions for wage rates based on contract entry dates between 2015 and 2025, with specific requirements for union and non-union rates. The wage determination also provides guidance on the appeals process for wage-related issues, including contact information for the U.S. Department of Labor's Wage and Hour Division for submitting requests and appeals.

View the file

Other files

File Type Posted
S05 - 575-21-700 Tech Questions responses updated - GJ CO - 8-28-25.docx DOCX document
575-700.VA Archtitectural Grand Junction EHRM Addendum 2 - Changed Sheets Only.pdf PDF
For Information Only - B44_2013_TERRACON_41013_Parking_Garage.pdf PDF
575-700.VA Civil Grand Junction EHRM Addendum 2 - Fiber Optic Manhole Detail.pdf PDF
575-700.VA Telecom Grand Junction EHRM Addendum 2 - Changed Sheets Only.pdf PDF
For Information Only - B9_2019_Geotech_Report_HB_Boiler_Plant.pdf PDF
575-700.VA Mechanical Grand Junction EHRM Addendum 2 - Changed Sheets Only.pdf PDF
S06- Amendment 0009.pdf PDF
S06 - Amendment 0008.pdf PDF
S06- Amendment 0007.pdf PDF
32 05 23 Cement and Concrete for Exterior Improvements.pdf PDF
32 12 16 Asphalt Paving.pdf PDF
CIP concrete short form.pdf PDF
S06- Amendment 0006- Bid due date extended 08-28-25.pdf PDF
S06- Amendment 0005- Bid due date extended.pdf PDF
S06- Amendment 0005- Bid due date extended.pdf PDF
B12 Roof 20250730.pdf PDF
S06- Amendment 0004- Bid opening info and all tech questions responses.pdf PDF
4 Utility Plan.pdf PDF
B7 Roof 20250730.pdf PDF
S05 - 575-21-700 All Tech Questions Responses - CO.docx DOCX document
S06- Amendment 0003 - DB Wages updated - Bid extension - RFI answers.pdf PDF
S05 - 575-21-700 Tech Questions Responses- GJ CO 07-28-25.docx DOCX document
S04- Signed site visit sign in sheet - 57521700 CO.pdf PDF
S06- Amendment 0002- Signed site visit sheet.pdf PDF
ATT 12- Drawings - EHRM - Grand Junction - CO.pdf PDF
ATT 13- Specifications-Combined- EHRM - Grand Junction CO.pdf PDF
ATT 4- Grand Junction CO - SPECS 07-03-25- Addendum.pdf PDF
ATT 11 - Site Visit Instructions.pdf PDF
ATT 1- Grand Junction EHRM - Drawings 07-03-25 - Addendum.pdf PDF
S06 - Amendment 0001.pdf PDF
ATT 7 - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
ATT 3- Estimated Construction Schedule- EHRM- Grand Junction CO.pdf PDF
ATT 10 - GEO Reports B20.pdf PDF
ATT 6 - Wages Determination - Grand Junction CO.pdf PDF
ATT 5- 100 CD Basis of Design -Combined- Grand Junction CO.pdf PDF
ATT 1- Grand Junction EHRM - Drawings 07-03-25.pdf PDF
ATT 8 - Limitations on Subcontracting.docx DOCX document
36C77625B0039.pdf PDF
ATT 11- Site Visit Instructions.pdf PDF
ATT 4- Grand Junction CO - SPECS 07-03-25.pdf PDF
ATT 2- Parking Guidelines Grand Junction VAMC.pdf PDF
ATT 9- Hazardous Materials Report.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .