This document is a technical specification for asphalt paving for the EHRM Infrastructure Upgrades project at the Grand Junction VA Medical Center, with VA Contract #36C77622C0145. The specification details requirements for hot asphalt concrete pavement installation, including aggregate and asphalt base/surface courses. Key technical requirements include using crushed stone, gravel, or sand aggregates, asphaltic materials with specific gradation and penetration grades, and precise construction methods involving subgrade preparation, base course placement, and paving techniques.

The specification provides detailed technical instructions for material composition, mixing temperatures (143-160 degrees C), placement conditions, rolling techniques, and seal coating procedures. Special considerations include waiting a full year before seal coating new asphalt to allow for proper oil curing, using specific application methods for different pavement ages, and achieving a smooth, uniform surface with strict smoothness tolerances (no deviations greater than 3mm in 1.8m). The project is located in Grand Junction, Colorado, with construction documents dated 12/17/2024 and specification version 09-01-15.

View the file

Other files

File Type Posted
S05 - 575-21-700 Tech Questions responses updated - GJ CO - 8-28-25.docx DOCX document
575-700.VA Archtitectural Grand Junction EHRM Addendum 2 - Changed Sheets Only.pdf PDF
For Information Only - B44_2013_TERRACON_41013_Parking_Garage.pdf PDF
575-700.VA Civil Grand Junction EHRM Addendum 2 - Fiber Optic Manhole Detail.pdf PDF
575-700.VA Telecom Grand Junction EHRM Addendum 2 - Changed Sheets Only.pdf PDF
For Information Only - B9_2019_Geotech_Report_HB_Boiler_Plant.pdf PDF
575-700.VA Mechanical Grand Junction EHRM Addendum 2 - Changed Sheets Only.pdf PDF
S06- Amendment 0009.pdf PDF
S06 - Amendment 0008.pdf PDF
S06- Amendment 0007.pdf PDF
32 05 23 Cement and Concrete for Exterior Improvements.pdf PDF
CIP concrete short form.pdf PDF
S06- Amendment 0006- Bid due date extended 08-28-25.pdf PDF
S06- Amendment 0005- Bid due date extended.pdf PDF
S06- Amendment 0005- Bid due date extended.pdf PDF
B12 Roof 20250730.pdf PDF
S06- Amendment 0004- Bid opening info and all tech questions responses.pdf PDF
4 Utility Plan.pdf PDF
B7 Roof 20250730.pdf PDF
S05 - 575-21-700 All Tech Questions Responses - CO.docx DOCX document
S06- Amendment 0003 - DB Wages updated - Bid extension - RFI answers.pdf PDF
S05 - 575-21-700 Tech Questions Responses- GJ CO 07-28-25.docx DOCX document
P07- Updated Wages Determination - Grand Junction CO 07-25-2025.pdf PDF
S04- Signed site visit sign in sheet - 57521700 CO.pdf PDF
S06- Amendment 0002- Signed site visit sheet.pdf PDF
ATT 12- Drawings - EHRM - Grand Junction - CO.pdf PDF
ATT 13- Specifications-Combined- EHRM - Grand Junction CO.pdf PDF
ATT 4- Grand Junction CO - SPECS 07-03-25- Addendum.pdf PDF
ATT 11 - Site Visit Instructions.pdf PDF
ATT 1- Grand Junction EHRM - Drawings 07-03-25 - Addendum.pdf PDF
S06 - Amendment 0001.pdf PDF
ATT 7 - Spec 01 31 00.01 Project Management and Coordination.pdf PDF
ATT 3- Estimated Construction Schedule- EHRM- Grand Junction CO.pdf PDF
ATT 10 - GEO Reports B20.pdf PDF
ATT 6 - Wages Determination - Grand Junction CO.pdf PDF
ATT 5- 100 CD Basis of Design -Combined- Grand Junction CO.pdf PDF
ATT 1- Grand Junction EHRM - Drawings 07-03-25.pdf PDF
ATT 8 - Limitations on Subcontracting.docx DOCX document
36C77625B0039.pdf PDF
ATT 11- Site Visit Instructions.pdf PDF
ATT 4- Grand Junction CO - SPECS 07-03-25.pdf PDF
ATT 2- Parking Guidelines Grand Junction VAMC.pdf PDF
ATT 9- Hazardous Materials Report.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EHRM Infrastructure Upgrades – Grand Junction, CO 100% Construction Documents

Grand Junction VA Medical Center 12/17/2024

VA Contract #36C77622C0145 Version 09-01-15

32 12 16 - 1

SECTION 32 12 16

ASPHALT PAVING

PART 1 - GENERAL

1.1 DESCRIPTION

This work shall cover the composition, mixing, construction upon the prepared subgrade, and the protection of hot asphalt concrete pavement.

The hot asphalt concrete pavement shall consist of an aggregate or asphalt base course and asphalt surface course constructed in conformity with the lines, grades, thickness, and cross sections as shown. Each course shall be constructed to the depth, section, or elevation required by the drawings and shall be rolled, finished, and approved before the placement of the next course.

1.2 RELATED WORK

A. Laboratory and field testing requirements: Section 01 45 29, TESTING

LABORATORY SERVICES.

B. Subgrade Preparation: Paragraph 3.3 and Section 31 20 00, EARTH MOVING.

C. Pavement Markings: Section 32 17 23, PAVEMENT MARKINGS.

1.3 INSPECTION OF PLANT AND EQUIPMENT

The Resident Engineer shall have access at all times to all parts of the material producing plants for checking the mixing operations and materials and the adequacy of the equipment in use.

1.4 ALIGNMENT AND GRADE CONTROL

The Contractor’s Registered Professional Land Surveyor shall establish and control the pavement (aggregate or asphalt base course and asphalt surface course) alignments, grades, elevations, and cross sections as shown on the Drawings.

1.5 SUBMITTALS

A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND

SAMPLES, furnish the following:

B. Data and Test Reports:

1. Aggregate Base Course: Sources, gradation, liquid limit, plasticity index, percentage of wear, and other tests required by State Highway

Department.

2. Asphalt Base/Surface Course: Aggregate source, gradation, soundness loss, percentage of wear, and other tests required by State Highway

Department.

32 12 16 - 2

3. Job-mix formula.

C. Certifications:

1. Asphalt prime and tack coat material certificate of conformance to

State Highway Department requirements.

2. Asphalt cement certificate of conformance to State Highway

Department requirements.

3. Job-mix certification - Submit plant mix certification that mix equals or exceeds the State Highway Specification.

D. One copy of State Highway Department Specifications.

E. Provide MSDS (Material Safety Data Sheets) for all chemicals used on ground.

PART 2 - PRODUCTS

2.1 GENERAL

A. Asphaltic base and asphalt concrete materials shall conform to the requirements of the following and other appropriate sections of the latest version of the State Highway Material Specifications, including amendments, addenda and errata. Where the term "Engineer" or

"Commission" is referenced in the State Highway Specifications, it shall mean the VA Resident Engineer or VA Contracting Officer.

2.2 AGGREGATES

A. Provide aggregates consisting of crushed stone, gravel, sand, or other sound, durable mineral materials processed and blended, and naturally combined.

B. Subbase aggregate (where required) maximum size: 38mm(1-1/2").

C. Base aggregate maximum size:

1. Base course over 152mm(6") thick: 38mm(1-1/2");

2. Other base courses: 19mm(3/4").

D. Asphaltic base course:

1. Maximum particle size not to exceed 25.4mm(1”).

2. Where conflicts arise between this specification and the requirements in the latest version of the State Highway

Specifications, the State Specifications shall control.

E. Aggregates for asphaltic concrete paving: Provide a mixture of sand, mineral aggregate, and liquid asphalt mixed in such proportions that the percentage by weight will be within:

32 12 16 - 3

Sieve Sizes Percentage Passing

19mm(3/4") 100

9.5mm(3/8") 67 to 85

6.4mm(1/4") 50 to 65

2.4mm(No. 8 mesh) 37 to 50

600µm(No. 30 mesh) 15 to 25

75µm(No. 200 mesh) 3 to 8 plus 50/60 penetration liquid asphalt at 5 percent to 6-1/2 percent of the combined dry aggregates.

2.3 ASPHALTS

A. Comply with provisions of Asphalt Institute Specification SS2:

1. Asphalt cement: Penetration grade 50/60

2. Prime coat: Cut-back type, grade MC-250

3. Tack coat: Uniformly emulsified, grade SS-1H

2.4 SEALER

A. Provide a sealer consisting of suitable fibrated chemical type asphalt base binders and fillers having a container consistency suitable for troweling after thorough stirring, and containing no clay or other deleterious substance.

B. Where conflicts arise between this specification and the requirements in the latest version of the State Highway Specifications, the State

Specifications shall control.

PART 3 - EXECUTION

3.1 GENERAL

The Asphalt Concrete Paving equipment, weather limitations, job-mix formula, mixing, construction methods, compaction, finishing, tolerance, and protection shall conform to the requirements of the appropriate sections of the State Highway Specifications for the type of material specified.

3.2 MIXING ASPHALTIC CONCRETE MATERIALS

A. Provide hot plant-mixed asphaltic concrete paving materials.

1. Temperature leaving the plant: 143 degrees C(290 degrees F) minimum, 160 degrees C(320 degrees F) maximum.

2. Temperature at time of placing: 138 degrees C(280 degrees F) minimum.

32 12 16 - 4

3.3 SUBGRADE

A. Shape to line and grade and compact with self-propelled rollers.

B. All depressions that develop under rolling shall be filled with acceptable material and the area re-rolled.

C. Soft areas shall be removed and filled with acceptable materials and the area re-rolled.

D. Should the subgrade become rutted or displaced prior to the placing of the subbase, it shall be reworked to bring to line and grade.

E. Proof-roll the subgrade with maximum 45 tonne (50 ton) gross weight dump truck as directed by VA Resident Engineer or VA Contracting

Officer. If pumping, pushing, or other movement is observed, rework the area to provide a stable and compacted subgrade.

3.4 BASE COURSES

A. Subbase (when required)

1. Spread and compact to the thickness shown on the drawings.

2. Rolling shall begin at the sides and continue toward the center and shall continue until there is no movement ahead of the roller.

3. After completion of the subbase rolling there shall be no hauling over the subbase other than the delivery of material for the top course.

B. Base

1. Spread and compact to the thickness shown on the drawings.

2. Rolling shall begin at the sides and continue toward the center and shall continue until there is no movement ahead of the roller.

3. After completion of the base rolling there shall be no hauling over the base other than the delivery of material for the top course.

C. Thickness tolerance: Provide the compacted thicknesses shown on the

Drawings within a tolerance of minus 0.0mm (0.0") to plus 12.7mm

(0.5").

D. Smoothness tolerance: Provide the lines and grades shown on the

Drawings within a tolerance of 5mm in 3m (3/16 inch in ten feet).

E. Moisture content: Use only the amount of moisture needed to achieve the specified compaction.

3.5 PLACEMENT OF ASPHALTIC CONCRETE PAVING

A. Remove all loose materials from the compacted base.

32 12 16 - 5

B. Apply the specified prime coat, and tack coat where required, and allow to dry in accordance with the manufacturer’s recommendations as approved by the Architect or Engineer.

C. Receipt of asphaltic concrete materials:

1. Do not accept material unless it is covered with a tarpaulin until unloaded, and unless the material has a temperature of not less than

130 degrees C(280 degrees F).

2. Do not commence placement of asphaltic concrete materials when the atmospheric temperature is below 10 degrees C (50 degrees F), not during fog, rain, or other unsuitable conditions.

D. Spreading:

1. Spread material in a manner that requires the least handling.

2. Where thickness of finished paving will be 76mm (3") or less, spread in one layer.

E. Rolling:

1. After the material has been spread to the proper depth, roll until the surface is hard, smooth, unyielding, and true to the thickness and elevations shown own the drawings.

2. Roll in at least two directions until no roller marks are visible.

3. Finished paving smoothness tolerance:

a. No depressions which will retain standing water.

b. No deviation greater than 3mm in 1.8m (1/8" in six feet).

3.6 APPLICATION OF SEAL COAT

A. Prepare the surfaces, mix the seal coat material, and apply in accordance with the manufacturer’s recommendations as approved by the

Architect or Engineer.

B. Achieve a finished surface seal which, when dry and thoroughly set, is smooth, tough, resilient, of uniform black color, and free from coarse textured areas, lap marks, ridges, and other surface irregularities.

C. When sealing new asphalt paving wait an entire year to allow for the expansion and contraction of a year’s cycle of both warm and cool temperatures. This allows for the asphalt’s oils to properly cure and begin oxidation before applying a seal coat.

D. When seal coating in less than a year apply two coats, spray applied.

This application method is preferred for less than a year application when there is still plenty of asphalt cement present for the seal coat to bond to.

32 12 16 - 6

E. When seal coating existing paving that has new asphalt patches, apply two coats sprayed to the existing asphalt and a single lighter coat on new patch work, just enough to make the color of the new patches match the rest of the reseal coated paving.

F. When resealing existing paving 5, 10, 15 years and older, that is oxidized and is very light in color, squeegee apply the first coat of seal coat and spray on a second coat. Two coats are preferred in older paving when the asphalt cement has oxidized leaving the seal coat with nothing to bond to other than the aggregate that in many cases has polished over time leaving less than a desirable surface to bond to.

3.7 PROTECTION

Protect the asphaltic concrete paved areas from traffic until the sealer is set and cured and does not pick up under foot or wheeled traffic.

3.8 FINAL CLEAN-UP

Remove all debris, rubbish, and excess material from the work area.