07130_-_underlaymentr.rtf

RTF text file 55 KB Posted

Attached to
CONSTRUCT HEAVY TIMBER LOG RECREATION SHELTER AT AMOLE CANYON Federal contract opportunity
Solicitation number
AG-83A7-10-S-0013
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

Attachment - Specification

Text of this file

07130 - 2 1- 07130

SECTION 07130

ROOF UNDERLAYMENT

PART I GENERAL

RELATED WORK SPECIFIED ELSEWHERE

Section 01300 – Submittals
Section 06131 – Heavy Timber Log Shelter
Section 07410 – Metal Roofing
SUBMITTALS

Submit manufacturer's literature, with samples, to the COR for approval.

PRODUCT HANDLING

Materials shall be packaged, and property protected during delivery to, and storage on, the site.

PART 2 PRODUCTS

UNDERLAYMENT

A. GRACE Ice and Water Shield, self –adhesive cold applied High Density cross-laminated polyethylene 40 mil thick membrane with a rubberized asphalt adhesive. Tensile strength of 250 psi as determined by ASTM D412 (Die C Method) which meets the thermal stability standard ASTM D-1970, as manufactured by GRACE Construction Products, or approved equal.

PART 3 EXECUTION

INSTALLATION

Roof Underlayment
Install on top of exposed plywood decking over entire roof surface according to manufacturer’s recommendations.
Decking shall be free of all old felt paper and shall be swept clean of all dust , dirt, loose nails, and other debris.
Deck shall have no voids, damaged or unsupported areas.

Replace all damaged deck prior to installing underlayment.

Sheets that show any punctures or tears shall be removed and replaced at the Contractor’s expense.
PART 4 MEASUREMENT AND PAYMENT
MEASUREMENT

This work shall not be measured for separate payment.

PAYMENT

This work shall be incidental to Pay Item 06131 – Heavy Timber Log Shelter.

END OF SECTION 07130

Other files for this federal contract opportunity

Other files attached to CONSTRUCT HEAVY TIMBER LOG RECREATION SHELTER AT AMOLE CANYON, newest first.
File Type Posted
SF 30.pdf PDF
Sf 30 modification 1.docx DOCX document
02336-imported_fill.docx DOCX document
09900.doc DOC document
01410-Testing_Quality.doc DOC document
03-SiteDetails 11X17(2) —
06100-carpentry.rtf RTF text file
01200_Mobilization.doc DOC document
07-Shelter2 11X17(2) —
03200-qrs.doc DOC document
02310_Grading.doc DOC document
02230_Clearing_ _Grubbing.doc DOC document
01330-submittal_procedure.rtf RTF text file
05120-qrs.doc DOC document
03100-qrs.doc DOC document
04-Sections Dtls 11X17(2) —
02317_Excavation_ _Backfill_Structures.doc DOC document
01101-Abbrevaitions.doc DOC document
02845-wheel_stops.docx DOCX document
06131-Log_Shelter.doc DOC document
03350_Concrete_Finishing.docx DOCX document
CONSTRUCTION rfq amole canyon.docx DOCX document
05-ShelterDetails 11X17(2) —
06-Shelter 11X17(2) —
Wage Det NM100001 6-4-10 NM1.docx DOCX document
02725_agg_base_surface.rtf RTF text file
02-SitePlan 11X17(2) —
07900_-_joint_sealers.docx DOCX document
07410-metal_roofing.rtf RTF text file
Response Pkg Amole Canyon.docx DOCX document
01-TitleSheet 11X17(2) —
03300-qrs.doc DOC document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .