01330-2

SECTION 01330

SUBMITTAL PROCEDURES

PART 1 - GENERAL

Description

Work under this section consists of furnishing all manufacturer's data, samples, certifications, guarantees, reports, installation manuals, and maintenance manuals required for this project.
Submittals
Manufacturer's Literature
The Contractor will demonstrate compliance to this contract by submission of Manufacturer's literature. The purpose of the Manufacturer's Literature is to demonstrate to the COR that the Contractor has an understanding of the equipment and material he intends to furnish and install, and the details of the fabrication and installation intended to be used.

PART 2 - PRODUCTS - None.

PART 3 - EXECUTION

Timing and Approval

It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow ten (10) working days from date of receipt, by the Government, for processing of submittals, unless otherwise specified. If after review, the COR determines that the submittal requires changes or revisions, the Contractor shall supply the COR with a revised submittal. The Government review period will be repeated for each re-submittal. The Government will assume no liability for loss of time or money should the Contractor fail to comply with this specification.
Number of Copies and Information Required
Submit two (2) copies to the COR for approval on the items required herein. For each submittal, the Contractor must receive written approval from the COR to use the item before incorporating it into the project work. All submittals shall have the project name, the intended location, and reference specification number on the submittal. All data and literature submitted shall be complete and marked or otherwise designated to show the exact model, type, size, number required, etc., the Contractor proposes to use. Information must be adequate to determine compliance with the specifications. If material or equipment other than that specified is submitted for approval, the submittal data shall clearly show and point out any differences with adequate information to determine its equality.

Submittals will be waived if Contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract, however a copy of the invoice from the supplier shall be provided to the COR.

Submittals should preferably be made in groups of items which are related to facilitate cross checking and coordination.

PART 4 - MEASUREMENT AND PAYMENT

Measurement

The work specified herein will not be measured for payment.
Payment

The work is incidental to other items in this contract and direct separate item payment will not be made.

END OF SECTION

Other files for this federal contract opportunity

Other files attached to CONSTRUCT HEAVY TIMBER LOG RECREATION SHELTER AT AMOLE CANYON, newest first.
File Type Posted
SF 30.pdf PDF
Sf 30 modification 1.docx DOCX document
02336-imported_fill.docx DOCX document
09900.doc DOC document
01410-Testing_Quality.doc DOC document
03-SiteDetails 11X17(2) —
06100-carpentry.rtf RTF text file
01200_Mobilization.doc DOC document
07-Shelter2 11X17(2) —
03200-qrs.doc DOC document
02310_Grading.doc DOC document
02230_Clearing_ _Grubbing.doc DOC document
CONSTRUCTION rfq amole canyon.docx DOCX document
05-ShelterDetails 11X17(2) —
06-Shelter 11X17(2) —
Wage Det NM100001 6-4-10 NM1.docx DOCX document
02725_agg_base_surface.rtf RTF text file
02-SitePlan 11X17(2) —
05120-qrs.doc DOC document
03100-qrs.doc DOC document
04-Sections Dtls 11X17(2) —
02317_Excavation_ _Backfill_Structures.doc DOC document
01101-Abbrevaitions.doc DOC document
02845-wheel_stops.docx DOCX document
06131-Log_Shelter.doc DOC document
03350_Concrete_Finishing.docx DOCX document
07900_-_joint_sealers.docx DOCX document
07410-metal_roofing.rtf RTF text file
Response Pkg Amole Canyon.docx DOCX document
07130_-_underlaymentr.rtf RTF text file
01-TitleSheet 11X17(2) —
03300-qrs.doc DOC document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .