03300-qrs.doc

DOC document 62 KB Posted

Attached to
CONSTRUCT HEAVY TIMBER LOG RECREATION SHELTER AT AMOLE CANYON Federal contract opportunity
Solicitation number
AG-83A7-10-S-0013
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

Attachment - Specification

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT HEAVY TIMBER LOG RECREATION SHELTER AT AMOLE CANYON, newest first.
File Type Posted
SF 30.pdf PDF
Sf 30 modification 1.docx DOCX document
02336-imported_fill.docx DOCX document
09900.doc DOC document
01410-Testing_Quality.doc DOC document
03-SiteDetails 11X17(2) —
06100-carpentry.rtf RTF text file
01200_Mobilization.doc DOC document
07-Shelter2 11X17(2) —
03200-qrs.doc DOC document
02310_Grading.doc DOC document
02230_Clearing_ _Grubbing.doc DOC document
01330-submittal_procedure.rtf RTF text file
05120-qrs.doc DOC document
03100-qrs.doc DOC document
04-Sections Dtls 11X17(2) —
02317_Excavation_ _Backfill_Structures.doc DOC document
01101-Abbrevaitions.doc DOC document
02845-wheel_stops.docx DOCX document
06131-Log_Shelter.doc DOC document
03350_Concrete_Finishing.docx DOCX document
CONSTRUCTION rfq amole canyon.docx DOCX document
05-ShelterDetails 11X17(2) —
06-Shelter 11X17(2) —
Wage Det NM100001 6-4-10 NM1.docx DOCX document
02725_agg_base_surface.rtf RTF text file
02-SitePlan 11X17(2) —
07900_-_joint_sealers.docx DOCX document
07410-metal_roofing.rtf RTF text file
Response Pkg Amole Canyon.docx DOCX document
07130_-_underlaymentr.rtf RTF text file
01-TitleSheet 11X17(2) —
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 03300PRIVATE

CAST‑IN‑PLACE CONCRETE

PART 1 -

GENERAL

1.01

SECTION INCLUDES

A.

Continuous and isolated spread footings.

B.

Floors and slabs on grade.

C.

Control, joint devices associated with concrete work, including joint sealants.

1.02

PRODUCTS FURNISHED BUT NOT INSTALLED UNDER THIS SECTION

Section 03100 ‑ Concrete Formwork: Placement of joint device joint device anchors in formwork.

1.03 seq level2 \h \r0

RELATED SECTIONS

Section 01410 – Testing and Quality Control

Section 03100 ‑ Concrete Formwork: Formwork and accessories.

Section 03200 ‑ Concrete Reinforcement.

D.

Section 03350 ‑ Concrete Finishing.

1.04

REFERENCES

ACI 301 ‑ Structural Concrete for Buildings.

ACI 302 ‑ Guide for Concrete Floor and Slab Construction.

ACI 304 ‑ Recommended Practice for Measuring, Mixing, Transporting, and Placing Concrete.

D.

ACI 305R ‑ Hot Weather Concreting.

E.

ACI 306R ‑ Cold Weather Concreting.

F.

ACI 308 ‑ Standard Practice for Curing Concrete.

G.

ACI 318 ‑ Building Code Requirements for Reinforced Concrete.

H.

ANSI/ASTM D994 ‑ Preformed Expansion Joint Filler for Concrete (Bituminous Type).

I.

ANSI/ASTM D1190 ‑ Concrete Joint Sealer, Hot‑Poured Elastic Type.

J.

ANSI/ASTM D1751 ‑ Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction (Non‑extruding and Resilient Bituminous Types).

K.

ASTM C33 ‑ Concrete Aggregates.

L.

ASTM C94 ‑ Ready‑Mixed Concrete.

M.

ASTM C150 ‑ Portland Cement.

N.

ASTM C260 ‑ Air Entraining Admixtures for Concrete.

O.

ASTM C494 ‑ Chemicals Admixtures for Concrete.

P.

ASTM C618 ‑ Fly Ash and Raw or Calcinated Natural Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete.

1.05

SUBMITTALS

Concrete Mix Design: Submit under provisions of Section 01300.

Product Data: Provide data on joint devices, attachment accessories, admixtures.

Manufacturer's Installation Instructions: Indicate installation procedures and interface required with adjacent Work.

1.06

PROJECT RECORD DOCUMENTS

Accurately record actual locations of embedded utilities and components which are concealed from view.

1.07

QUALITY ASSURANCE

Perform Work in accordance with ACI 301.

Acquire cement and aggregate from same source for all work.

Conform to ACI 305R when concreting during hot weather.

Conform to ACI 306R when concreting during cold weather.

1.08

COORDINATION

Coordinate the placement of joint devices with erection of concrete formwork and placement of form accessories.

PART 2 -seq level1 \h \r0 seq level2 \h \r0

PRODUCTS

2.01

CONCRETE MATERIALS

Cement: ASTM C150, Type I ‑ Normal or Type II ‑ Moderate Portland type.

Fine and Coarse Aggregates: ASTM C33.

C.

Water: Clean and not detrimental to concrete.

2.02

ADMIXTURES

Air Entrainment: ASTM C260.

Chemical: ASTM C494 Type A ‑ Water Reducing.

Fly Ash: ASTM C618 Class C.

2.03

ACCESSORIES

Bonding Agent: Two component modified epoxy resin.

Vapor Barrier: 8 mil thick clear polyethylene film, type recommended for below grade application.

Non‑Shrink Grout: Premixed compound consisting of non‑metallic aggregate, cement, water reducing and plasticizing agents; capable of developing minimum compressive strength of 2,400 psi in 48 hours and 7,000 psi in 28 days.

2.04

JOINT DEVICES AND FILLER MATERIALS

Joint Filler Type A: ASTM D1751; Asphalt impregnated fiberboard or felt, ¼ inch thick; tongue and groove profile.

Construction Joint Devices: Integral galvanized steel formed to tongue and groove profile, with removable top strip exposing sealant trough, knockout holes spaced at 6 inches, ribbed steel spikes with tongue to fit top screed edge.

Sealant: ASTM D1190; Hot applied rubber compound.

2.05

CONCRETE MIX

Mix concrete in accordance with ACI 304. Deliver concrete in accordance with ASTM C94.

Provide concrete to the following mix design:

Unit

Measurement

Compressive Strength (28 day) 3000 psi (see 3.09)

Water/Cement Ratio (maximum) .50 by weight

Aggregate Size (maximum)

3/4 inch

Aggregate Size (minimum)

3/8 inch

Air Entrained

6%

[Fly Ash] Content:

Maximum 20% of cement content.

Slump ‑ ±1 inch

4 inches

Use accelerating admixtures in cold weather only when approved by COR. Use of admixtures will not relax cold weather placement requirements.

Use set retarding admixtures during hot weather only when approved by COR.

Add air entraining agent to normal weight concrete mix for work exposed to exterior.

PART 3 -seq level1 \h \r0 seq level2 \h \r0

EXECUTION

3.01

EXAMINATION

Verify requirements for concrete cover over reinforcement.

Verify that anchors, seats, plates, reinforcement and other items to be cast into concrete are accurately placed, positioned securely, and will not cause hardship in placing concrete.

3.02

PREPARATION

Prepare previously placed concrete by cleaning with steel brush and applying bonding agent in accordance with manufacturer's instructions.

In locations where new concrete is dowelled to existing work, drill holes in existing concrete, insert steel dowels and pack solid with non‑shrink grout.

3.03

PLACING CONCRETE

Place concrete in accordance with ACI 304.

Notify COR minimum 24 hours prior to commencement of operations.

Ensure reinforcement, inserts, embedded parts, preformed control joints, are not disturbed during concrete placement.

Separate slabs on grade from vertical surfaces with 1/2 inch thick joint filler unless otherwise shown.

Place joint filler in floor slab pattern placement sequence. Set top to required elevations. Secure to resist movement by wet concrete.

Extend joint filler from bottom of slab to within ½ inch of finished slab surface. Conform to manufacturer recommendations for finish joint sealer requirements.

G.

Install joint devices in accordance with manufacturer's instructions.

H.

Install construction joint devices in coordination with floor slab pattern placement sequence. Set top to required elevations. Secure to resist movement by wet concrete.

I.

Maintain records of concrete placement. Record date, location, quantity, air temperature, and test samples taken.

J.

Place concrete continuously between predetermined expansion, control, and construction joints.

K.

Do not interrupt successive placement; do not permit cold joints to occur.

L.

Place floor slabs in saw cut pattern indicated.

M.

Saw cut joints within 24 hours after placing. Use 3/16 inch thick blade, cut into ¼ depth of slab thickness.

N.

Screed floors and slabs on grade level, maintaining surface flatness of maximum ¼ inch in 10 feet 3.04

CONCRETE FINISHING

Provide formed concrete surfaces to be left exposed smooth rubbed finish.

Trowel finish on all interior concrete floor surfaces. Broom finish on all exterior concrete floor surfaces.

3.05

CURING AND PROTECTION

Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury.

Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete.

Cure floor surfaces in accordance with ACI 308.

Spraying: Spray water over floor slab areas and maintain wet for 7 days.

3.06

FIELD QUALITY CONTROL

Field inspection and testing will be performed in accordance with ACI 301 and under provisions of Section 01410.

Provide free access to Work and cooperate with appointed firm.

Submit proposed mix design of each class of concrete to inspection and testing firm for review prior to commencement of Work.

Tests of cement and aggregates may be performed to ensure conformance with specified requirements.

Three concrete test cylinders will be taken for every 50 or less cubic yards and at least three cylinders for any one day's pour of each class of concrete placed.

One additional test cylinder will be taken during cold weather concreting, cured on job site under same conditions as concrete it represents.

G.

One slump test will be taken for each set of test cylinders taken.

3.07

PATCHING

Allow COR to inspect concrete surfaces immediately upon removal of forms.

Excessive honeycomb or embedded debris in concrete is not acceptable. Notify COR upon discovery.

Patch imperfections in accordance with ACI 301.

3.08

DEFECTIVE CONCRETE

Defective Concrete: Concrete not conforming to required lines, details, dimensions, tolerances or specified requirements.

Repair or replacement of defective concrete will be determined by the COR.

Do not patch, fill, touch‑up, repair, or replace exposed concrete except upon express direction of COR for each individual area.

3.09

SCHEDULE ‑ CONCRETE TYPES AND FINISHES

A. Footings & Slabs on Grade: 3,000 psi 28 day concrete.

PART 4 - MEASUREMENT AND PAYMENT

4.01 Method of Measurement A.

Measurement will be made for the completed reinforced concrete slab for the recreation shelter, the adjacent parking area and the sidewalk. Work for these items includs all excavation, forming, reinforcement, aggregate base, concrete, anchor bolts and any other work specified in the Specifications and as shown on the Drawings.

4.02 Payment

Payment shall be made under the following items:

Pay Item Description Pay Unit 03300(01) Reinforced 6-inch Thick Concrete Slab: SY

Log Shelter

03300(02) Reinforced 4-inch Thick Concrete Slab SY Sidewalks on Front, Sides and Back of

Shelter Slab 03300(03) Reinforced 6-inch Thick Concrete Slab: SY

Parking Slab

03300(04) Reinforced 4-inch Thick Concrete Slab: SY

5’-Wide Sidewalk

END OF SECTION

03300-1