06100-3

SECTION 06100

ROUGH CARPENTRY

PART 1 - GENERAL

Description This section specifies all carpentry work necessary and required for the construction of the project as indicated. Such work includes, but is not necessarily limited to, the furnishing and installing of all carpentry work as shown on the drawings and specified herein.

Related Work Specified Elsewhere
Section 06131 – Heavy Timber Log Shelter
Section09900 - Painting
Miscellaneous Items
A.Carpentry work, miscellaneous items and their related components which are to be furnished and/or installed under this Section are not necessarily individually described. Rough carpentry work and miscellaneous items not mentioned or described shall be furnished and/or installed in accordance with the intent of the drawings and specifications and as required to complete the work.
Codes and Standards
A.The "International Building Code" (IBC), latest Edition, is hereby made a direct part of this specification, and all carpentry work included in this contract shall conform with the applicable requirements therein except as modified herein.
Submittals
Contractor shall submit color samples for staining or painting all exposed wood beams, members, panels and trim to the COR for approval.

PART 2 - PRODUCTS

Wood

Framing Lumber: Grading of lumber shall comply with the "Standard Grading and Dressing Rules" No. 15 of the West Coast Lumber Inspection Bureau. Grade shall be stamped on lumber at the mill. Lumber moisture content shall be no greater than 19%.
Structural timber and lumber shall meet the requirements of AASHTO M 168.

Plywood shall be graded in accordance with Product Standard PS-1. Furnish sheets identifiable by a grade mark of a recognized grading association.

Timber preservatives and treatment methods shall meet the requirements of AASHTO M 133. The type of treatment to be used and minimum net retention of preservatives is described below. All treated timber shall be completely and accurately fabricated before treatment. Retentions of preservatives in all lumber and timbers shall be determined by the assay method.

Hardware
Nails shall be coated common wire. Use galvanized nails for all exposed framing.

Bolts: Standard mild steel, square or hexagonal head machine bolts with matching nuts and cut washers as indicated.

Bolts and nuts shall meet the requirements of ASTM A 307, Grade A. Washers shall be American Standard Plain Washers.

Anchor bolts shall be Type 1, Grade 1 steel.

Screws: Standard #10-16x1" Phillips drive wafer head screws.

PART 3 - EXECUTION

Installation Installation of carpentry and millwork shall conform to the applicable requirements of the A.W.I. "Architectural Woodwork Institute".

Use only galvanized nails for installation of finish carpentry work. For securing all exterior members, face nail with common nails, driven flush. Where other anchorage details are shown, use appropriate galvanized hardware.

Nail size and placement shall conform to the IBC requirements and to good common industry standards.

Secure all trim with finishing nails, galvanized or aluminum. Do not penetrate bottom of plywood in exposed areas.

Secure metal roofing panels to plywood with screws to meet design loads.

No members shall be spliced unless approved by COR.

All work shall be installed to details shown; plumb, level, true to line, and securely anchored. Nails shall be neatly set and all wood raised in the driving of nails removed. All exterior corner joints shall be mitered.

Prepare all woodwork installed hereunder by cleaning and sanding as required to receive finishes specified in Section 09900 - Painting.

Hammer or toolmarks or marred surfaces and edges will not be acceptable on exposed finished surfaces, and shall be the basis for rejection of such work.

PART 4 - MEASUREMENT AND PAYMENT

4.01MEASUREMENT
The work specified herein will not be measured for payment.
4.02PAYMENT
This work is incidental to other items in this contract and direct separate item payment will not be made.

END OF SECTION

Other files for this federal contract opportunity

Other files attached to CONSTRUCT HEAVY TIMBER LOG RECREATION SHELTER AT AMOLE CANYON, newest first.
File Type Posted
SF 30.pdf PDF
Sf 30 modification 1.docx DOCX document
02336-imported_fill.docx DOCX document
09900.doc DOC document
01410-Testing_Quality.doc DOC document
03-SiteDetails 11X17(2) —
01200_Mobilization.doc DOC document
07-Shelter2 11X17(2) —
03200-qrs.doc DOC document
02310_Grading.doc DOC document
02230_Clearing_ _Grubbing.doc DOC document
07900_-_joint_sealers.docx DOCX document
07410-metal_roofing.rtf RTF text file
Response Pkg Amole Canyon.docx DOCX document
07130_-_underlaymentr.rtf RTF text file
01-TitleSheet 11X17(2) —
03300-qrs.doc DOC document
CONSTRUCTION rfq amole canyon.docx DOCX document
05-ShelterDetails 11X17(2) —
06-Shelter 11X17(2) —
Wage Det NM100001 6-4-10 NM1.docx DOCX document
02725_agg_base_surface.rtf RTF text file
02-SitePlan 11X17(2) —
01330-submittal_procedure.rtf RTF text file
05120-qrs.doc DOC document
03100-qrs.doc DOC document
04-Sections Dtls 11X17(2) —
02317_Excavation_ _Backfill_Structures.doc DOC document
01101-Abbrevaitions.doc DOC document
02845-wheel_stops.docx DOCX document
06131-Log_Shelter.doc DOC document
03350_Concrete_Finishing.docx DOCX document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .