01200_Mobilization.doc

DOC document 27 KB Posted

Attached to
CONSTRUCT HEAVY TIMBER LOG RECREATION SHELTER AT AMOLE CANYON
Solicitation number
AG-83A7-10-S-0013
Issued by

About this file

Attachment - Specification

View the file

Other files

File Type Posted
SF 30.pdf PDF
Sf 30 modification 1.docx DOCX document
02230_Clearing_ _Grubbing.doc DOC document
03350_Concrete_Finishing.docx DOCX document
02310_Grading.doc DOC document
07900_-_joint_sealers.docx DOCX document
07410-metal_roofing.rtf RTF text file
Response Pkg Amole Canyon.docx DOCX document
05-ShelterDetails 11X17(2) —
CONSTRUCTION rfq amole canyon.docx DOCX document
02336-imported_fill.docx DOCX document
06-Shelter 11X17(2) —
07130_-_underlaymentr.rtf RTF text file
09900.doc DOC document
01-TitleSheet 11X17(2) —
01410-Testing_Quality.doc DOC document
03-SiteDetails 11X17(2) —
06100-carpentry.rtf RTF text file
Wage Det NM100001 6-4-10 NM1.docx DOCX document
03300-qrs.doc DOC document
02725_agg_base_surface.rtf RTF text file
07-Shelter2 11X17(2) —
03200-qrs.doc DOC document
02-SitePlan 11X17(2) —
01330-submittal_procedure.rtf RTF text file
02317_Excavation_ _Backfill_Structures.doc DOC document
05120-qrs.doc DOC document
03100-qrs.doc DOC document
01101-Abbrevaitions.doc DOC document
06131-Log_Shelter.doc DOC document
04-Sections Dtls 11X17(2) —
02845-wheel_stops.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01200

MOBILIZATION

PART 1 - GENERAL

1.01 DESCRIPTION

A.

This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.

1.02 PAYMENT

A.

Mobilization will be paid for at the contract unit price for the item as shown in the SCHEDULE OF ITEMS.

B.

Progress payments will be made as follows:

1.

When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.

2.

When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.

3.

Upon completion of all work on the project, any unpaid amount for mobilization will be paid.

C.

The total of all payments, including bonding, shall not exceed the original contract amount for this item.

D.

Payment will be made under:

PAY ITEM

DESCRIPTION

PAY UNIT

01200(01) Mobilization (Including Bonding) Lump Sum for Shelter Slab

END OF SECTION