Addendum 4 to ODF Santiam Fire & Administrative Buildings Construction

This Solicitation Addendum No. 4, issued by the Oregon Department of Forestry (ODF) North Cascade District on February 4, 2026, modifies the original bidding documents dated October 15, 2025, for the construction of replacement fire and administrative buildings at 22965 North Fork Road SE in Lyons, Oregon. The addendum, approved by the Department of Justice on February 5, 2026, primarily eliminates plumbing equipment specifications and related construction components. Specifically, it deletes oil/water interceptors from Section 22 3000 of the Plumbing Equipment specifications, removes the oil/water separator and its connection to the septic system from the civil utility plan (Drawing C103), eliminates the oil/water separator notation from architectural drawings (A002 and A202), removes trench drain specifications from multiple plumbing drawings (P002, P202, P204), and deletes a 6-inch vent through roof (VTR) component from Drawing P302. The addendum also eliminates interior trench drains at the Fire Shop vehicle bays from Drawing A202, replacing them with concrete floor slopes. These modifications are comprehensive across civil, architectural, and plumbing design documents, with all affected drawings and specification sections listed as attachments. Protests to the addendum must be submitted by February 7, 2026, at 5:00 PM PT using the same procedures outlined in RFP Section 4.4. Bidders are required to acknowledge receipt of Addendum No. 4 with an authorized representative signature and date prior to bid closing to avoid bid rejection.

The addendum maintains all other contractual terms, specifications, and requirements from the original bidding documents in full force. The modifications reflect design refinements made during the project development phase, eliminating redundant or unnecessary plumbing infrastructure components while preserving the core construction requirements for the two-building project. No changes are indicated to project cost estimates, schedule (bid closing February 12, 2026; substantial completion May 30, 2027), labor requirements, bonding, insurance, or funding sources previously established. The deletion of oil/water interceptor equipment reduces contractor material and installation costs and simplifies the sanitary system design by relying on the owner-furnished septic system design. All bidders must acknowledge this addendum as part of their bid submission to remain compliant with procurement requirements.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

S-DASOBO-00015003

SOLICITATION ADDENDUM #4

ODF Santiam Fire & Admin Buildings S-DASOBO-00015004 ADDENDUM #4 Page 1 of 1

This Solicitation Addendum modifies the Bid Document(s) only to the extent indicated herein. All other areas not specifically mentioned or affected by this Solicitation Addendum shall remain in full force. This Solicitation Addendum shall be added as a part of the Original Bidding Documents.

This Solicitation Addendum must be acknowledged by providing the required signature prior to Bid Closing. Failure to do so may result in rejection of Bid.

1 Modification

Attachment B – Technical Specifications (Specs_Project_Manual) is modified per Addendum 4Attachment 1 attached hereto.

PROTEST

Protests to this addendum must be submitted in the same manner required in RFP Section 4.4 – Solicitation Protests and are due by February 7, 2026 at 5:00PM PT.

DOJ APPROVAL

DOJ approval by: Maribeth Bonner, Assistant Attorney General - via email February 5, 2026

Acknowledgement of Addendum #4

Bidder Name: Company Name:

Authorized Representative Signature & Date

END OF ADDENDA #4

ADDENDUM TO CONTRACT DOCUMENTS

Project: ODF NCD Santiam Facility Owner: Oregon Department of Forestry North Cascade District Headquarters Building F, 200 State Street 22965 North Form Road SE Salem, Oregon 97310 Lyons, Oregon 97358

To: Bidders Architect: LRS Architects, Inc.

720 NW Davis Street, Suite 300 Portland, OR 97209

Project No. 223294

Date: February 4, 2026 Addendum No: 04

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated October 15, 2025.

Specs Project Manual

4.1 Document 22 3000: Plumbing Equipment

Delete: Section 22 3000, Part 1 – General, 1.1, A.5: Oil/Water Interceptors

Delete: Section 22 3000, Part 2 – Products, 2.1, Manufacturers, E: Oil/Water Interceptors

Delete: Section 22 3000, Part 2 – Products, 2.7: Oil/Water Interceptors

Plans ODF Permit Set

Civil

4.2 Drawing C103

Delete: Oil/Water separator and connection to the septic system

Architectural

4.3 Drawing A002

Delete: Oil/Water separator

4.4 Drawing A202

Delete: Interior trench drains at Fire Shop vehicle bays

Add: Concrete floor slopes at Fire Shop vehicle bays

ODF NCD Santiam Facility Addendum No. 04 North Cascade District Headquarters

Plumbing

4.5 Drawing P001

Delete: Drawing P702

4.6 Drawing P002

Delete: OWS-1 Oil Water Separator – Fire Shop Building

Delete: (8) Trench Drains

4.7 Drawing P202

Delete: OWS-1 Oil Water Separator – Fire Shop Building

Delete: Trench Drains

4.8 Drawing P204

Delete: OWS-1 Oil Water Separator – Fire Shop Building

Delete: Trench Drains

4.9 Drawing P302

Delete: 6” VTR

ATTACHMENTS

Specifications:

Section 22 3000: Plumbing Equipment

Drawings:

C103 A002 A202 P001 P002 P202 P204 P302

END OF ADDENDUM NO. 04

ODF NCD Santiam Facility

February 4, 2026

[ADDM. 04] Plumbing Equipment 22 30 00

LRS Architects, Inc

PART 1 - GENERAL

1.1 SUMMARY

A. Work Included:

1. Heat Pump (Hybrid) Storage Type Water Heaters

2. Domestic Expansion Tanks ASME

3. Domestic Circulation Pump with Adaptive Variable Speed Drive

4. Garbage Disposal

5. Oil/Water Interceptors [ADDM. 04]

1.2 RELATED SECTIONS

A. Contents of Division 22, Plumbing and Division 01, General Requirements apply to this

Section.

1.3 REFERENCES AND STANDARDS

A. References and Standards as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.

1.4 SUBMITTALS

A. Submittals as required by Section 22 00 00, Plumbing Basic Requirements and Division 01, General Requirements.

B. In addition, provide:

1. Seismic anchor details and calculations signed and stamped by licensed Oregon structural engineer with equipment data.

1.5 QUALITY ASSURANCE

A. Quality assurance as required by Section 22 00 00, Plumbing Basic Requirements and

Division 01, General Requirements.

B. In addition, meet the following:

1. NSF 61, Annex G compliant.

2. ISO 9001 Certified.

3. IAPMO Low Lead Certification.

February 4, 2026

C. Products approved for installation by state authorizing agency, no exceptions.

1.6 WARRANTY

A. Warranty of materials and workmanship as required by Section 22 00 00, Plumbing Basic

Requirements and Division 01, General Requirements.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Heat Pump (Hybrid) Storage Type Water Heaters:

1. Rheem/Ruud

2. Or approved equivalent.

B. Domestic Expansion Tanks ASME:

1. Amtrol

2. Armstrong

3. Or approved equivalent.

C. Domestic Circulation Pump with Adaptive Variable Speed Drive:

1. Grundfos

2. Armstrong

3. Bell & Gossett

4. Or approved equivalent.

D. Garbage Disposal:

1. In-Sink-Erator

2. Salvajor

3. Hobart

4. Waste King

5. Or approved equivalent.

E. Oil/Water Interceptors: [ADDM. 04]

1. Polyethylene: HDPE

a. STRIEM

b. Or approved equivalent.

February 4, 2026

2.2 GENERAL

A. Reference Drawings for capacities and specific model numbers.

2.3 HEAT PUMP (HYBRID) STORAGE TYPE WATER HEATERS

A. System: Domestic Hot Water.

B. The Heat Pump water heater shall meet the ENERGY STAR requirement with 2.73 to 3.52

UEF (Uniform Energy Factor) in hybrid mode.

C. Code Compliance: Complies with the Federal Energy Conservation Standards effective April

16, 2015, in accordance with the Energy Policy and Conservation Act, (EPCA), as amended.

D. Electronic user interface/control: The electronic control features shall allow for a minimum of three operating modes (Electric, Hybrid and Efficiency), to match the heating requirements of the environment. The controller shall allow easy control of temperature setting, operating mode, and shall provide diagnostics

E. Easy to read temperature display and shall store the last four error messages in the control system memory.

F. Immersion Heating Elements: Zinc-coated copper sheath elements designed for longer life in hard, aggressive water.

G. Tank: Glass-Lined Steel Tank, 300 PSI test pressure, 150 PSI working pressure.

H. Non-CFC Foam Insulation: A uniform coverage of thick closed cell foam insulation minimizes standby heat loss, maximizes heat retention and delivers a high Energy Factor.

I. Tank Anode: A large diameter/high capacity anode shall be provided to inhibit corrosion of the tank interior.

J. Heat Trap: Heat traps are to be built into the inlet and outlet connections to eliminate heat migration and heat loss in the water piping when the circulation system is not in operation.

K. Temperature & Pressure Relief Valve: CSA certified and ASME rated temperature & pressure relief valve.

L. Brass Drain Valve: An enhanced ball valve design for effective drainage and positive shut-off.

M. Warranty: 10 Year Residential Tank & Parts Warranty. 1-year Commercial Tank & Parts

Warranty when installed in a commercial application.

February 4, 2026

2.4 DOMESTIC EXPANSION TANKS ASME

A. System: Domestic water.

B. Welded steel, constructed, tested and stamped in accordance with ASME Boiler and

Pressure Vessel Code for working pressure of 125 PSI. Support floor mounted tanks with steel legs or base. Provide single flexible diaphragm securely sealed into tank to separate air charge from system water, to maintain design expansion capacity. Provide pressure gauge and air-charging fitting, and drain fitting. Diaphragm: Removable and replaceable in line.

2.5 DOMESTIC CIRCULATION PUMP WITH ADAPTIVE VARIABLE SPEED DRIVE

A. The pump is to be listed for domestic hot water systems and is to comply with lead free (less than or equal to 0.25 percent) products in potable/drinking water systems.

B. Pump is to be of the in-line wet rotor design.

C. The pump is to be a standard product of a single pump manufacturer.

D. The enclosure to be marked “Enclosure Type 2.”

E. The pump to be certified and listed by a Nationally Recognized Test Laboratory (NRTL) for

U.S. and Canada to comply with:

1. UL778

2. UL 60730-1A

3. CAN/CSA No. 108

F. The pump is to be labeled on the nameplate as having an Energy Efficiency Index (EEI) of no greater than 0.20.

G. Ratings:

1. Maximum Pressure: 175 PSIG

2. Minimum Media Temperature: 14 degrees F

3. Maximum Media Temperature: 230 degrees F

4. Maximum Continuous Media Temperature: 203 degrees F

5. Maximum Sound Pressure Level: 43dB(A)

6. Voltage tolerance: [1x115V +/-10 percent][1x208-230V +/-10 percent]

7. Maximum Energy Efficiency Index: 0.20

H. Pump Construction:

February 4, 2026

1. Pump housing: Cast Iron: EN-JGL-250 with surface treatment; Stainless Steel: 304

Stainless Composite.

2. Impellers: PES 30-percent GF or stainless steel.

3. Rotor Can: PPS: PPS reinforced with Carbon Fiber(Fortran MT9141L GF40)

4. Rotor Cladding: 316 Stainless Steel

5. Stator Housing: Aluminum

6. Shaft: 316L Stainless Steel

7. Thrust Bearing: Axial: Carbon Graphite, Radial: ceramic Alumina Hilox 961

8. O-Rings: EPDM

9. Bearing Plate: 304 Stainless Steel

10. Neck Ring: 304 Stainless Steel

11. Control Box: Polycarbonate

I. Motor:

1. Motor to be 4-pole permanent-magnet (PM motor) and tested with the pump as one unit.

2. Each motor is to be of the integrated Variable Speed Drive design consisting of a motor and a Variable Frequency Drive (VFD) built and tested as one unit.

3. The Motor to be self-ventilating.

4. Minimum insulation class for the motor to be Class F.

5. The integrated VFD control is to utilize an energy optimization algorithm to minimize energy consumption by reducing the factory-set setpoint and adjust to system characteristics.

J. Operating Modes:

1. The pump is to have the following control mode and operating modes:

a. Proportional Pressure - The head delivered is to be reduced from a manual setpoint linearly in accordance with decrease in flow demand in the system

b. Constant Pressure - A manual set, constant head is maintained, irrespective of flow up to the maximum speed of the pump.

c. Constant Curve - The pump runs as an uncontrolled pump by the means of a set of pump curves. The pump curve adjustable between maximum and minimum from the control panel or through a wireless remote control.

d. Constant Temperature - The pump is to adjust speed to maintain a constant media temperature in the flow pipe in which the pump is installed.

February 4, 2026

e. Constant Differential Temperature - The pump is to adjust speed to maintain a constant temperature drop between the flow pipe in which the pump is installed and a user installed temperature sensor.

K. Interface and Communication:

1. The pump is to have an integrated operator interface consisting of:

a. Minimum 2.4-inch (measured diagonally) color TFT display.

1) Push buttons for navigation of menu.

2) Push Buttons must be able to operate at minimum 25,000 times.

3) LEDs to signal pump status for quick indication.

2. The pump is to have a sensor integrated directly into the pump housing with 4 lines consisting of Ground, Supply, and two signals for Differential Pressure and Media

Temperature.

3. The pump module is to have one analog input configurable for either 4-20mA or 0-

10VDC input signal configurable for external Temperature or Pressure sensor, or

Setpoint influence.

4. The pump module is to have two Output Relays. Each relay to be configurable for

Alarm, Reading, or Operating indication.

5. Is to be capable of accepting an optional add-on module for integration into Building

Management Systems:

a. LonWorks

1) BACnet

2) Modbus

3) Profibus

2.6 GARBAGE DISPOSAL

A. Residential Duty:

1. General: Complete food waste disposal to include a stainless steel sink flange adapter assembly to match fixture. Dishwasher connection. Stainless steel or galvanized grind chamber, shredder ring, and two 360 degree swivel impellers/lugs.

Continuous feed.

2. Single phase, permanently lubricated motor with manual reset, corrosion protection shield, and sound absorbing upper shell. UL listed.

3. Warranty: 2 year parts and in-home service.

February 4, 2026

2.7 OIL/WATER INTERCEPTORS [ADDM. 04]

A. Polyethylene: HDPE

1. Provide extensions to furnished floor where required by structural features or depth of piping.

2. Interceptor to be installed flush with finish floor construction.

PART 3 - EXECUTION

3.1 GENERAL

A. Examine areas and conditions under which equipment is to be installed. Do not proceed with work until unsatisfactory conditions have been corrected.

B. Install equipment in accordance with manufacturer's installation instructions. Install units plumb and level, firmly anchored in locations indicated, and maintain manufacturer's recommended clearances.

C. Orients so controls and devices needing service and maintenance have adequate access.

D. Certificates: Submit appropriate Certificates of Shop Inspection and Data Report as required by provisions of ASME Boiler and Pressure Vessel Code.

E. Connect water piping to units with shutoff valves and unions.

F. Equipment Rigging: Heavy duty rigging eye bolts for Crosby Group swivel hoist rings installed over pump access covers for removal or maintenance.

G. Equipment Start-Up:

1. Start-up, test, and adjust equipment in accordance with manufacturer's start-up instructions. Check and calibrate controls.

2. Start-up performed by authorized manufacturer's representative or agent. Provide credentials of start-up personnel to Owner, Architect and Owner's Authorized

Representative for approval.

3. Remove and replace filters when start-up testing is executed.

4. Manufacturer adjusts operating parameters of equipment to compensate to elevation of 500-feet above sea level.

5. Owner, Architect, Commissioning Agent, and Owner's Authorized Representative will be notified 10 days prior to start-up and will be present at start-ups.

6. Provide written report from manufacturer's representative on results of start-up within

48 hours.

February 4, 2026

7. Technical Training of maintenance staff includes two hours minimum per each piece of equipment.

8. Seismic Verification:

a. Contractor will retain structural engineer who will submit stamped and signed anchoring and restraint details on plumbing equipment with submittal data in accordance with Division 22, Plumbing requirements.

b. Contractor's Structural Engineer will test and verify in writing that seismic restraints have been installed in accordance with their details.

3.2 HEAT PUMP (HYBRID) STORAGE TYPE WATER HEATERS

A. Certificates: Submit appropriate Certificates of Shop Inspection and Data Report as required by provisions of ASME Boiler and Pressure Vessel Code.

B. Connect water piping to units with shutoff valves and unions.

C. Equipment Start-Up:

1. Start-up, test, and adjust equipment in accordance with manufacturer's start-up instructions. Check and calibrate controls.

2. Start-up performed by authorized manufacturer's representative or agent. Provide credentials of start-up personnel to Owner, Architect and Owner's Authorized

Representative for approval.

3. Remove and replace filters when start-up testing is executed.

4. Manufacturer adjusts operating parameters of equipment to compensate to elevation of 500-feet above sea level.

5. Owner, Architect, Commissioning Agent, and Owner's Authorized Representative will be notified 10 days prior to start-up and will be present at start-ups.

6. Provide written report from manufacturer's representative on results of start-up within

48 hours.

7. Technical Training of maintenance staff includes two hours minimum per each piece of equipment.

8. Seismic Verification: Contractor will retain structural engineer who will submit stamped and signed anchoring and restraint details on plumbing equipment with submittal data in accordance with Division 22, Plumbing requirements.

3.3 DOMESTIC EXPANSION TANKS ASME

A. Precharge tank per manufacturers recommendation.

February 4, 2026

B. Examine areas and conditions under which equipment is to be installed. Do not proceed with work until unsatisfactory conditions have been corrected.

C. Install equipment in accordance with manufacturer's installation instructions. Install units plumb and level, firmly anchored in locations indicated, and maintain manufacturer's recommended clearances.

D. Orients so controls and devices needing service and maintenance have adequate access.

E. Certificates: Submit appropriate Certificates of Shop Inspection and Data Report as required by provisions of ASME Boiler and Pressure Vessel Code.

F. Connect water piping to units with shutoff valves and unions.

3.4 DOMESTIC CIRCULATION PUMP WITH ADAPTIVE VARIABLE SPEED DRIVE

A. Install equipment in accordance with manufacturer's installation instructions. Install units plumb and level, firmly anchored in locations indicated, and maintain manufacturer's recommended clearances.

B. Orients so controls and devices needing service and maintenance have adequate access.

C. Connect water piping to units with shutoff valves and unions.

D. Equipment Start-Up:

1. Set pump in temp control mode for start up.

2. Seismic Verification:

a. Contractor will retain structural engineer who will submit stamped and signed anchoring and restraint details on plumbing equipment with submittal data in accordance with Division 22, Plumbing requirements.

b. Contractor's Structural Engineer will test and verify in writing that seismic restraints have been installed in accordance with their details.

3.5 GARBAGE DISPOSAL

A. Examine areas and conditions under which equipment is to be installed. Do not proceed with work until unsatisfactory conditions have been corrected.

B. Install complete food waste disposal system including water, waste connections, and electrical connection, including associated control devices. Install equipment in accordance with manufacturer's installation instructions. Install units plumb and level, firmly anchored in locations indicated, and maintain manufacturer's recommended clearances. Set devices and adjust any support or mounting assemblies per manufacturer's recommendations.

February 4, 2026

C. Water supplies, as applicable are to be provided with shut-off valves, solenoid valves, backflow preventers and water hammer arrestors.

D. Coordinate power requirements and connection methods with Division 26.

E. Equipment Start-Up:

1. Start-up, test, and adjust equipment in accordance with manufacturer's start-up instructions. Check and calibrate controls.

2. Start-up performed by authorized manufacturer's representative or agent. Provide credentials of start-up personnel to Owner, Architect and Owner's Authorized

Representative for approval.

END OF SECTION

NO

RT

H

SA

NT

IA

M H

IG

HW

AY

NORTH FORK ROAD

E

GA

TE

12" SD

24" SD

EXISTING

SEEDLING

BLDG

FF = 688.6

MB

FIRE SHOP BUILDING

4,251 SF

OFFICE BUILDING

6,825 SF

T

TT

47 5044

JOIN EXISTING

INV 685.70

IN

V

4.8

INV 685.50

INV 684.06

SEPTIC TANKS

DESIGN BY OTHERS

S=0.

S= 0.0

IN

V

5.0

IN

V

4.2

S=0.014

4" SS

PIPING TO DRAINFIELD

PER SEPTIC DESIGN

4" SS

4"

SS

4" SS

S=0.010 4" SS

10" SD

12" SD

8" SD

12" SD

12" SD

12" SD

12" SD

E NG I NE ERREG

ISTERED PROFESSIONAL

103436PE

OREGONK E R R Y S E S S I O N S

EXPIRATION DATE: 06/30/2026

SEPT . 12 , 2023

D

AT

E:

2/

4/

F

IL

E:

w

:\2 m is c pr iv at e en gi ne er in g w or k\

-3 lr s ar ch ite ct s

- o df n cd s an tia m fa ci lit y\ d es ig n se rv ic es \C

AD

\D

W G

\L ay ou ts

\O D

F C

D C iv il\

O D

F C

D C iv il.

dw g

PROJECT NUMBER:

SHEET TITLE:

DRAWN BY:

CONSULTANT:

SHEET:

Suite 300 www.lrsarchitects.com Portland OR 97209

AR CHI TE C TS

720 NW Davis 503.221.1121

Bid Set

ODF NCD

Santiam Facility

North Cascade District Headquarters 22965 North Fork Road

SE

Lyon, OR 97358

223294

LRS Architects, Inc. © 2024

WILLAMETTE VALLEY

541.223.5130 WWW.CIVILWEST.COM

IJB

C103 2/4/2025

UTILITY PLAN

WATER CONSTRUCTION NOTES:

JOIN EXISTING 6" PVC WATER

INSTALL NEW FIRE HYDRANT

CONSTRUCT 6" HYDRANT LATERAL AND VALVE.

CONNECT TO EXISTING 6" PVC PIPE.

NEW 2" WATER METER TO BE INSTALLED BY

LYONS-MEHAMA WATER DISTRICT

CONSTRUCT 6" PVC FIRE SERVICE LINE

CONSTRUCT 2.5" PVC DOMESTIC WATER

SERVICE LINE

INSTALL 6" WATTS SERIES 757 DOUBLE

DETECTOR CHECK ASSEMBLY (OR OWNER

APPROVED EQUIVALENT) IN UNDERGROUND

VAULT

INSTALL FIRE DEPARTMENT CONNECTION

INSTALL WATTS LF009M2-QT 2 (2") BACKFLOW

PREVENTOR IN WATTS WPHR-2-G INSULATED

ENCLOSURE (OR OWNER APPROVED

EQUIVALENT) INSTALLED ON A CONCRETE PAD.

PROVIDE ELECTRICAL SERVICE FOR

FREEZE-PROTECTION HEATING.

INSTALL TOP FILL STATION

INSTALL IRRIGATION BACKFLOW PREVENTER

PER LANDSCAPE PLAN

CONSTRUCT 2" PVC WATERLINE TO RECONNECT

WATER TO SEEDLING BUILDING

NOTE:

THIS PLAN DOES NOT

SHOW THE PROPOSED

SEPTIC DESIGN FOR THE

PROJECT THAT WILL BE

DESIGNED BY OTHERS.

N

PLAN SCALE

1"=20'

020 20 40

MISC. UTILITY NOTES:

UNDERGROUND POWER TO BE INSTALLED BY

CONSUMER POWER INC

NEW TRANSFORMER PER ELECTRICAL SHEETS

(NOT USED)

CONNECT ENTRY GRATE DRAIN TO BUILDING

SANITARY PIPING PER PLUMBING SHEETS

UNDERGROUND REFRIGERANT PIPING PER

MECHANICAL SHEETS

CONSTRUCT 4" PVC SEWER LINE

SHEET NOTES:

1. CONTRACTOR SHALL CONTACT "ONE CALL" FOR UTILITY

LOCATES PRIOR TO THE START OF ANY EXCAVATION.

2. CONTRACTOR SHALL POTHOLE ALL EXISTING UTILITIES

PRIOR TO COMMENCING CONSTRUCTION. IF THE

LOCATION OR CONNECTIONS OF UNDERGROUND

UTILITIES DIFFER FROM THOSE SHOWN ON THE PLANS,

OR IF UNMARKED UTILITIES ARE DISCOVERED, THE

CONTRACTOR SHALL IMMEDIATELY NOTIFY THE PROJECT

ENGINEER.

1 ADDENDUM 01 1/9/2026

3 ADDENDUM 03 2/02/2026

4 ADDENDUM 04 2/04/2026

H Y D

GA

TE

GA

TE

GA

TE

E

MB

RIDGE

LIN

E

.5

FS

FF =

688.70

SS DR

ISS SSSS

H Y D

IRR

IRR

IRR

IRR

IRR

IRR

WM

CO

CO

COMH MH

GA

TE

GA

TE

EX. RET WALL

GA

TE

E

MB

688.37TC

687.92FS

688.46TC

688.11FS

688.06TC

0"CF

688.02TC

0"CF

688.42TC

687.97FS

8.0

8.0

8.5

FS

-G B

8.1

FS

-G B

8.0

FS

-G B

8.4

FS

-G B

1.5%

1.5%

1.5%

1.5%

8.4

4F S

1.0

688.36TC

687.86FS

1.5%

0.6%

1.0

1.0

1.0

1.5%

1.0

687.72FS

1.5%

688.11 TC

687.61 FS

RIDGE

LIN

E

.5

FS

SS

SS

SSSS

SS

SS

H Y D

IRR

IRR

IRR

IRR

IRR

IRR

WM

CO

CO

COMH MH

GA

TE

GA

TE

EX. RET WALL

GA

TE

E

MB

688.37TC

687.92FS

688.46TC

688.11FS

688.06TC

0"CF

688.02TC

0"CF

688.42TC

687.97FS

8.0

8.0

8.5

FS

-G B

8.1

FS

-G B

8.0

FS

-G B

8.4

FS

-G B

1.5%

1.5%

1.5%

1.5%

8.4

4F S

1.0

688.36TC

687.86FS

1.5%

0.6%

1.0

1.0

1.0

1.5%

1.0

687.72FS

1.5%

688.11 TC

687.61 FS

RIDGE

LIN

E

.5

FS

FF = 688.70

FF =

688.70

T MT

SITE EASEMENTS

SITE SETBACKS

SITE PROPERTY BOUNDARY

PROPOSED BUILDING

SITE EGRESS PATH TO RIGHT OF WAY

PROPOSED CONCRETE SIDEWALK

*R *P

RESTRICTED ENTRY NOT ON

ACCESSIBLE ROUTE

PUBLIC ENTRY ON ACCESSIBLE

ROUTE

* ENTRY/EXIT ACCESS TO ACCESSIBLE

MEANS OF EGRESS

EXISTING BUILDING

SITE POLE LIGHTING

TRAFFIC ARROW

EXISTING FIRE HYDRANT

HYD

FDC FIRE DEPARTMENT CONNECTION

0' - 0" SPOT GRADE ELEVATION

FINISH FLOOR ELEVATIONF.F. 123'

# NO. OF PARKING SPACES IN GROUP

BOLLARD

EXISTING SITE LIGHTING

FIRE HYDRANT

HYD

EXISTING SITE EASEMENTS

EXISTING FENCE

7'-0" HIGH PROPOSED FENCE

WALL MOUNTED BUILDING LIGHT

EXISTING SITE NOT IN SCOPE

ASPHAULT SPEED HUMP

A.

B.

C.

D.

E.

F.

G.

H.

SITE INFORMATION IS BASED ON OWNERS SURVEY

DATED 06/13/24 BY CIVIL WEST ENGINEERING

SERVICES, INC.

ALL SURVEY INFORMATION INDICATING ALL EXISTING

CONDITIONS ARE SHOWN FOR REFERENCE ONLY.

SEE A100i FOR STANDARD ACCESSIBILITY

REQUIREMENTS.

ALL PARKING SPACE DIMENSIONS ARE TO ASPHALT

SIDE OF CURB. PARKING SPACES ARE 9’-0” OC UNO.

STREET, PARKING, DRIVE CUTS, AND/ OR PUBLIC

RIGHT OF WAY INFORMATION ARE SHOWN FOR

REFERENCE ONLY. SEE CIVIL DRAWINGS FOR

DETAILED INFORMATION.

DIMENSIONS SHOWN ON THIS PLAN ARE FOR

GENERAL LAYOUT OF THE BUILDINGS AND SITE

ELEMENTS.

REFER TO THE LEGAL SURVEY (PROVIDED BY

OTHERS) FOR PROPERTY LINE DIMENSIONS AND

EXACT LOCATIONS OF EXISTING SITE ELEMENTS.

SEE CIVIL FOR TYPICAL DIMENSIONS UNO.

'-0

'-2

'-0

5'-0"

5'-0"

PARKING

LOT 01

(PUBLIC

PARKING)

A901

A501 86

'-0

20'-0"

SETBACK LINE

20'-0"

'-0

'-0

24'-0" 20'-0"

10'-0"

'-0

A501 912

A901

A901

4 TYP

G0003

5'-0"

012 012012013

012012

PARKING LOT 02

(STAFF PARKING)

10'-6"

40'-0"

CL

CL

30'-0"

C L 5' -0

" 43'-7"

CL

CL

2'-0"

'-8

48'-3"

CL87'-11"

C L

C L

'-7

CLCL 52'-6"

C L C L

'-0

'-3

'-6

A901

TYP

10'-0"

TY

P

'-0

TO EDGE O

F PAVEMENT

'-3

040040

G0003

A241 10

A501 1 A502

A5023

'-1

0"

'-0

012 012

012012

PARKING LOT 03

(FLEET PARKING)

'-0

29'-4"

TYP

10'-0"

'-0

10'-0"

'-0

TRUE NORTH

PROJECT NUMBER:

SHEET TITLE:

DRAWN BY:

CONSULTANT:

SHEET:

Suite 300 www.lrsarchitects.com

Portland OR 97209

A R C H I T E C T S 720 NW Davis 503.221.1121

KEY PLAN:

2/ 4/

1:

:0

A

M A ut od es k

D oc s:

//2

- O

D F

N C

D S an tia m F ac ili ty /2

4_ O

D F

N C

D _A

R C

H _R

_A

C C

.rv t

Author

A002

ARCHITECTURAL

ENLARGED SITE

PLAN

Bid Set

ODF NCD

Santiam Facility

North Cascade District Headquarters 22965 North Fork Road SE Lyons, OR 97358

223294

10/15/2025

LRS Architects, Inc. © 2024

LEGEND

0 10' 20' 40'

KEYNOTES

007 NEW CHAIN LINK FENCE

008 NEW CHAIN LINK MOTORIZED CANTILEVERED SLIDE

GATE

010 CONCRETE BENCH WITH WOOD PLANK SEAT

011 NEW CONCRETE SIDEWALK

012 CONCRETE FILLED BOLLARDS, , SEE DETAIL 6/A901

013 TOP FILL STATION WATER BOOM, 8' LONG

STATIONARY CANTILEVER ARM, SEE CIVIL &

PLUMBING

014 RELOCATE FLAG POLE WITH UP LIGHTING

015 NEW ODF MONUMENT SIGN

031 NEW SITE POLE LIGHTING, TYP

033 NEW LIT FIRE DANGER SIGN

034 RAISED ASPHALT SPEED HUMP

035 10'X20' PARKING SPACES, TYP

037 EXTERIOR WALK-OFF BOOT GRATE

039 ASPHALT AREA AT RECYCLE/TRASH

040 GATE OPERATOR AND PAD, PER MANUF

041 STORMWATER RETENTION POND, SEE CIVIL

042 CONCRETE PAD AND 8'-0" CHAIN LINK FENCE W/

BLACK PRIVACY SLATS AT SITE EQUIPMENT

045 (2) RV PARKING STALLS

046 CHAIN LINK FENCE ENCLOSURE

047 NEW FIRE HYDRANT, SEE CIVIL

048 NEW CHAIN LINK MANUAL SWING GATES

049 LEFT-HAND PEDESTAL FOR SWIPE CARD READER,

LOCK BOX, WITH CAMERA TOWARD INCOMING

TRAFFIC. LOCK BOX TO CONTAIN FIRE DEPARTMENT

KEY SET WITH ACCESS FOR EACH BUILDING AS

WELL AS FOB FOR VEHICULAR GATE ACCESS.

052 LOCK BOX TO CONTAIN FIRE DEPARTMENT KEY SET

WITH ACCESS FOR EACH BUILDING AS WELL AS FOB

FOR VEHICULAR GATE ACCESS.

053 PROVIDE PUCK READERS FOR INGOING VEHICLES.

ADJUST SENSITIVITY FOR MOTORCYCLE TRAFFIC.

054 FENCE GATE BY NEIGHBOR, NOT IN SCOPE

055 PAVED STALL FOR TEMPORARY GENERATOR

TRAILER

056 STRIPING ON PAVEMENT

058 CPI INSTALLED (2) 2'X3' VAULTS ALONG WEST

PROPERTY LINE. NEIGHBOR'S ACCESS ROAD TO

SHIFT EAST 6"-12"TO CLEAR VAULTS. CONTRACTOR

TO COORDINATE WITH ARCHITECT AND OWNER.

059 SEPTIC SYSTEM LOCATION, SEE SANITARY SYSTEM

DRAWINGS

060 SURFACE MOUNTED SEPTIC SYSTEM CONTROL

LOCATION, SEE SANITARY SYSTEM DRAWINGS

GENERAL NOTES

SCALE: 1/16" = 1'-0"A002

3. ENLARGED SITE PLAN - PARKING LOT 01

SCALE: 1/16" = 1'-0"A002

1. ENLARGED SITE PLAN - PARKING LOT 02

SCALE: 1/16" = 1'-0"A002

2. ENLARGED SITE PLAN - PARKING LOT 03

1 BID Set Rev 11/05/25

4 ADDENDUM 04 02/04/26

H Y D

STUMP

WM

GM

IRR

IRR

IRR

IRR

IRR

IRR

WM

CO

CO

COMH MH

SAWCUTLINE

NO

RT

H

SA

NT

IA

M H

IG

HW

AY

NORTH FORK ROAD

EXISTING

SEEDLINE

BLDG

FF = 688.6

EXISTING

OREGON

STATE BLDG

FF = 691.1

GA

TE

GA

TE

H

YD

12" SD

24" SD

EX. RET WALL

GA

TE

S

ES

S w

MB

w

688.37TC

687.92FS

688.46TC

688.11FS

688.06TC

0"CF

688.02TC

0"CF

688.42TC

687.97FS

8.0

8.0

8.5

FS

-G B

8.1

FS

-G B

8.0

FS

-G B

8.4

FS

-G B

1.5%

1.5%

1.5%

1.5%

8.4

4F S

1.0

688.36TC

687.86FS

1.5%

0.6%

1.0

1.0

1.0

1.5%

1.0

687.72FS

1.5%

688.11 TC

687.61 FS

RIDGE

LIN

E

.5

FS

A.

B.

C.

D.

E.

F.

G.

H.

SEE A200 SERIES 1/8” SCALE PLANS FOR ADDITIONAL

INFORMATION.

SITE INFORMATION FOR REFERENCE ONLY. SEE SITE

PLANS.

ALL DIMENSIONS ARE TO FACE OF STUD UNO OR

CENTER OF WINDOW OPENING, COLUMN, OR GRID.

EXTERIOR DIMENSIONS ARE TO FACE OF

FOUNDATION/FACE OF FRAMING. DIMENSIONS

INDICATED AS “CLR MIN” ARE TO FACE OF FINISH.

ALL DOOR OPENINGS PERPENDICULAR TO A WALL

ARE 5" TO WALL UNO.

FOR WINDOW TYPES, SEE EXTERIOR ELEVATIONS.

SEE SHEET A101A FOR STANDARD FIXTURE

MOUNTING HEIGHTS AND REQUIREMENTS UNO.

SEE SHEET A130 FOR WALL TYPES. SEE FINISH PLAN

FOR FLOORING TRANSITIONS.

REVIEW ALL PLAN AND PROJECT SPECIFICATIONS

PRIOR TO ANY CONSTRUCTION WORK. NOTIFY

ARCHITECTS OF ANY DISCREPANCIES BETWEEN

WORK SHOWN ON PLANS OR SPECIFICAITONS AND

ACTUAL SITE CONDITIONS PRIOR TO START OF WORK.

1'

2'

3'

M LO

SHOP OFFICE

METALS SHOP

WOOD SHOP

VEHICLE BAYS210

FIRE CACHE

HOSE DRYING AREA

C O

U N

TE

R

W D

ELEC

DRYING ROOM &

LAUNDRY

(28) LOCKERS

FIRE RISER

BREAK

'-6

'-6

'-0

127'-0"

1 6 T N E

1 6 T N E

1 6 T N E

1 6 T N E

1 6 T N E

1 6 T N E

N

A502

A502

A5023

A502 1

TYP.

FDFD

FD

FD

FD

WH

TYP.

12'-0" 30'-0"2'-0" 6'-0"

HALLWAY

'-2

6'

-8

'-2

209A

209E

209B209C

209D210B

210A

STORAGE CAGE

A602

A602

A602

A602

COMMS CLOSET

2'-0" 12'-0" 2'-0" 12'-0" 2'-0" 12'-0"

CL6"

12'-0" 2'-0" 12'-0" 2'-0" 12'-0" 2'-0"

'-0

7'

-6

7' -6

A241

P

A612

A612

A612

202C

ADA SHOWER

202B

SHOWER RM

202A

RESTROOM /

SHOWERS

202D

JAN.

2A

208B

2C

202D

12'-0" 2'-0"6'-0" 5'-6" 12'-0" 5'-6"

1 6 T N E

F1

'-1 0"

6' -1

'-2

9'-0 1/4"

CLCL 16'-8" 22'-3 3/4"

C L

'-0

CL21'-8"

6"

6"

A901

10 TYP

A 6 A N S

A 4 - N S

A 4 - N S

A103

23'-0" 2'-0" 9'-0 1/4"

A951

2 TYP

A951

3 TYP

A241 10

FD

FD

FD

1/ 8"

1/

8"

A - A N S

SEE A100 CODE SERIES CODE ANALYSIS PLANS

AND WALL TYPE SHEETS FOR ADDITIONAL

INFORMATION.

EXTERIOR WALLS:

EXTERIOR WALL FINISH VARY. SEE EXTERIOR

ELEVATIONS AND WALL SECTIONS FOR

LOCATIONS, UNO.

TYPICAL WALL W/SIDING SYSTEM IS TYPE

INTERIOR WALLS:

TYPICAL INTERIOR WALL IS TYPE

1 6 T N E

TRUE NORTH

PROJECT NUMBER:

SHEET TITLE:

DRAWN BY:

CONSULTANT:

SHEET:

Suite 300 www.lrsarchitects.com

Portland OR 97209

A R C H I T E C T S 720 NW Davis 503.221.1121

KEY PLAN:

2/ 4/

1:

:0

A

M A ut od es k

D oc s:

//2

- O

D F

N C

D S an tia m F ac ili ty /2

4_ O

D F

N C

D _A

R C

H _R

_A

C C

.rv t

Author

A202

FLOOR PLAN -

FIRE SHOP

BUILDING

Bid Set

ODF NCD

Santiam Facility

North Cascade District Headquarters 22965 North Fork Road SE Lyons, OR 97358

223294

10/15/2025

LRS Architects, Inc. © 2024

KEYNOTES

012 CONCRETE FILLED BOLLARDS, , SEE DETAIL

6/A901

202 RECESSED SLAB FOR BOOT GRATE WITH

DRAIN. SEE STRUCTURAL AND PLUMBING

203 WALL HEATER ON TIMER

204 DRINKING FOUNTAIN W/ BOTTLE FILL

206 UTILITY SINK

207 CHAIN LINK CAGE W/ DOOR

216 ICE MAKER, PROVIDE FLOOR DRAIN

217 WALL MOUNTED ICE MAKER FILTER

GENERAL NOTES

SCALE: 1/8" = 1'-0"A202

1. FLOOR PLAN - FIRE SHOP BUILDING

0 4' 8' 16'

WALL TYPES

1 BID Set Rev 11/05/25

4 ADDENDUM 04 02/04/26

A. COORDINATE INSTALLATION OF PIPING BELOW AND ABOVE GRADE

WITH STRUCTURAL COMPONENTS AND OTHER SYSTEMS

INSTALLATIONS.

B. COORDINATE FIXTURES, EQUIPMENT, PIPE ROUGH-IN/CONNECTION

LOCATIONS AND DRAIN LOCATIONS WITH ARCHITECTURAL DRAWINGS.

C. PIPING ROUTED THROUGH ROOF TO BE INSTALLED PER

ARCHITECTURAL REQUIREMENTS (SEE ARCHITECTURAL DETAILS).

D. LOCATE ALL VTR A MINIMUM OF 10'-0" FROM OUTSIDE AIR OPENINGS

OF ROOFTOP HVAC EQUIPMENT.

E. EXTERIOR HOSE BIBBS TO BE MOUNTED AT 24 INCHES ABOVE FINISH

GRADE (UNLESS SPECIFICALLY NOTED OTHERWISE).

F. LOCATE VALVES FOR SERVICE ACCESSIBILITY. VALVES INSTALLED

ABOVE CEILING SHALL BE WITHIN 18" OF CEILING.

G. INSTALL OVERHEAD PIPING AS CLOSE TO STRUCTURE AS POSSIBLE IN

AREAS WITH EXPOSED ROOF STRUCTURE.

H. REFER TO SPECIFICATIONS FOR SEISMIC RESTRAINT REQUIREMENTS

FOR PIPING AND EQUIPMENT.

I. PROVIDE CLEANOUTS FOR SANITARY WASTE AND STORM DRAINAGE

SYSTEMS WHERE SHOWN AND AS OTHERWISE REQUIRED BY CODE.

J. VERIFY LOCATIONS OF CONNECTIONS TO PIPING INSTALLED BY SITE

CONTRACTOR.

K. PIPING INSTALLED IN EXTERIOR WALLS TO BE INSTALLED ON WARM

SIDE OF INSULATION.

L. FURNISH AND INSTALL VALVES, TRAPS, STRAINERS, BACK FLOW

PREVENTERS, ETC. NOT FURNISHED BY EQUIPMENT SUPPLIER, BUT

REQUIRED FOR PROPER EQUIPMENT OPERATION.

M. SHUT-OFF VALVES TO BE INSTALLED IN ALL WATER PIPING AT

LOCATIONS SHOWN. PROVIDE ACCESS PANELS IF CEILING AND

STRUCTURAL CONDITIONS DO NOT ALLOW NORMAL ACCESS.

COORDINATE EXACT TYPE AND LOCATION WITH OWNER AND

GENERAL CONTRACTOR PRIOR TO ROUGH-IN.

N. SEE PLUMBING FIXTURE SCHEDULE FOR PIPE CONNECTION SIZES.

O. COORDINATE INSTALLATION OF DUCTWORK, PIPING, FIXTURES,

EQUIPMENT, ETC. WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL,

ELECTRICAL AND FIRE PROTECTION SYSTEMS PRIOR TO

INSTALLATION.

P. REFER TO ARCHITECTURAL DRAWINGS FOR ADA ACCESSIBILITY

REQUIREMENTS.

Q. PROVIDE CEILING ACCESS PANELS FOR VALVES LOCATED ABOVE

INACCESSIBLE CEILING SYSTEMS. VALVES INSTALLED ABOVE CEILING

SHALL BE WITHIN 18" OF CEILING. MAINTAIN FIRE RATINGS WHERE

REQUIRED.

GENERAL PLUMBING NOTES

PROJECT NUMBER:

SHEET TITLE:

DRAWN BY:

CONSULTANT:

SHEET:

Suite 300 www.lrsarchitects.com

Portland OR 97209

A R C H I T E C T S 720 NW Davis 503.221.1121

EXPIRES: 12/31/26

/4

/2

:0

:3

P M

A u to d e s k D o c s /2

O

D F

N C

D S a n ti a m F a c ili ty /O

D F

N C

D

M E

P

R

.r v t

TK

P001

SYMBOL LIST

AND GENERAL

NOTES -

PLUMBING

Bid Set

ODF NCD

Santiam Facility

North Cascade District Headquarters 22965 North Fork Road

SE

Lyons, OR 97358

223294

10/15/2025

LRS Architects, Inc. © 2024

P001 SYMBOL LIST AND GENERAL NOTES - PLUMBING

P002 SCHEDULES - PLUMBING

P201 UNDERGROUND PLAN - OFFICE BUILDING - PLUMBING

P202 UNDERGROUND PLAN - FIRE SHOP BUILDING - PLUMBING

P203 FLOOR PLAN - OFFICE BUILDING - PLUMBING

P204 FLOOR PLAN - FIRE SHOP BUILDING - PLUMBING

P205 FLOOR PLAN - CONDENSATE - OFFICE BUILDING - PLUMBING

P206 FLOOR PLAN - CONDENSATE - FIRE SHOP BUILDING - PLUMBING

P240 ENLARGED PLANS - PLUMBING

P301 ROOF PLAN - OFFICE BUILDING - PLUMBING

P302 ROOF PLAN - FIRE SHOP BUILDING - PLUMBING

P701 DETAILS - PLUMBING

SHEET INDEX

PLUMBING SYMBOL LIST

NOTE: This is a standard symbol list and not all items listed may be used.

Control Symbols

FLOW METER

General

DETAIL NUMBER AND SHEET LOCATION

KEYED NOTE

SECTION NUMBER AND SHEET LOCATION

NEW WORK

PIPE OR CONDUIT BELOW GRADE

CONTINUATION

PIPE BELOW GRADE

POINT OF CONNECTION

FIXTURE TAG (LEVEL BELOW FIXTURE)

HVAC EQUIPMENT IDENTIFICATION (REF. ONLY)

PLUMBING EQUIPMENT IDENTIFICATION

Piping Fittings

ACCESS PANEL

AQUASTAT

AREA DRAIN

BLIND FLANGE

CAP

CATCH BASIN

CLEANOUT TO GRADE

CONCENTRIC REDUCER

DOWNSPOUT NOZZLE

ECCENTRIC REDUCER

FLEXIBLE CONNECTION

FLOOR CLEANOUT

FLOOR DRAIN

FLOOR SINK

FLOW DIRECTION

FLOW SWITCH

HOSE BIBB / WALL HYDRANT

HUB DRAIN

PIPE DROP

PIPE RISE

PRESSURE GAUGE WITH COCK

PRESSURE RELIEF

PUMP

SHOCK ABSORBER / WATER HAMMER ARRESTOR

STRAINER

T&P RELIEF VALVE WITH PIPE TO DRAIN

TEE DOWN ON PIPE

TEE UP ON PIPE

TEMPERATURE SENSOR

TEST PORT

THERMOMETER

Abbreviations

AFF ABOVE FINISHED FLOOR

AP ACCESS PANEL

AC AIR COMPRESSOR

& AND

A AQUASTAT, ARCHITECT, ANCHOR, AMPHERE

AD AREA DRAIN, AIR DRYER

@ AT

BFP BACKFLOW PREVENTER

BV BALANCING VALVE

BFF BELOW FINISHED FLOOR

BF BLIND FLANGE

BTUH BRITISH THERMAL UNITS PER HOUR

BLDG BUILDING

CV CHECK VALVE

CP CIRCULATION PUMP

CO CLEANOUT

CW COLD WATER

CD CONDENSATE DRAIN

CONT. CONTINUATION

CFH CUBIC FEET PER HOUR

CFS CUBIC FEET PER SECOND

DW DISHWASHER, DOMESTIC WATER

DET DOMESTIC EXPANSION TANK

DCVA DOUBLE CHECK VALVE ASSEMBLY

DN DOWN

D DRAIN

DFU DRAINAGE FIXTURE UNIT

DWV DRAINAGE, WASTE AND VENT

DF DRINKING FOUNTAIN

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

ELECT ELECTRICAL

EEW EMERGENCY EYE WASH

ESH EMERGENCY SHOWER

(E) EXISTING

EJ EXPANSION JOINT

FT FEET

FPS FEET PER SECOND

FFE FINISHED FLOOR ELEVATION

F FIRE, FAHRENHEIT

FC FLEXIBLE CONNECTOR

FL FLOOR

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FS FLOOR SINK, FLOW SWITCH

FV FLUSH VALVE

' FOOT, FEET

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GD GARBAGE DISPOSER, GARAGE DRAIN

HD HEAD, HUB DRAIN

HP HEAT PUMP, HORSE POWER, HOUSEKEEPING PAD

HVAC HEATING, VENTILATING AND AIR CONDITIONING

HZ HERTZ

HB HOSE BIBB

HW HOT WATER

HWFU HOT WATER FIXTURE UNIT

HWR HOT WATER RETURN

IN, " INCHES

IW INDIRECT WASTE

INV INVERT ELEVATION

KW KILOWATT

L LAVATORY

MAX MAXIMUM

HG MERCURY

MIN MINIMUM

MX MIXING VALVE

MS MOP SINK

MH MOUNTING HEIGHT, MANHOLE

(N) NEW

NPCW NON-POTABLE COLD WATER

NOP NORMALLY OPEN

N NORTH

N/A NOT APPLICABLE

NIC NOT IN CONTRACT

NTS NOT TO SCALE

# NUMBER

NO. NUMBER

OFCI OWNER FURNISHED, CONTRACTOR INSTALLED

OFOI OWNER FURNISHED, OWNER INSTALLED

PH PHASE

PLBG PLUMBING

P PLUMBING, PUMP

POC POINT OF CONNECTION

PSI POUNDS PER SQUARE INCH

PD PRESSURE DROP, PLUMBING DEMOLITION, PUMPED DISCHARGE

PG PRESSURE GAUGE

PRV PRESSURE REDUCING VALVE

PS PRESSURE SWITCH

QTY QUANTITY

RWL RAINWATER LEADER

RPBP REDUCED PRESSURE BACKFLOW PREVENTER

RV RELIEF VENT, RELIEF VALVE

RPM REVOLUTIONS PER MINUTE

SAN SANITARY

SJ SEISMIC JOINT

SB SERVICE BOX

SS SERVICE SINK

SHT SHEET

SA SHOCK ARRESTOR

SH SHOWER

SOV SHUT OFF VALVE

S, SK SINK

SF SQUARE FEET

SD STORM DRAIN

TEMP TEMPERATURE

T&P TEMPERATURE AND PRESSURE

T TEMPERATURE, THERMOMETER

TP TRAP PRIMER, TOTAL PRESSURE

TD TRENCH DRAIN

TYP TYPICAL

U, UR URINAL

V VACUUM, VENT, VOLT

VFD VARIABLE FREQUENCY DRIVE

VS VENT STACK

VTR VENT THRU ROOF

WCO WALL CLEANOUT

WB WASHER BOX

W WASTE

WS WASTE STACK

WC WATER COLUMN

WC WATER COLUMN, WATER CLOSET

WHA WATER HAMMER ARRESTOR

WH WATER HEATER, WALL HYDRANT

WSFU WATER SUPPLY FIXTURE UNIT

W/ WITH

TRAP PRIMER MANIFOLD

TRENCH DRAIN

UNION

VACUUM RELIEF

VENT THROUGH ROOF

WALL CLEANOUT

Piping Systems

120%%d HOT WATER PIPING

120%%d HOT WATER RETURN PIPING

140%%d HOT WATER PIPING

COLD WATER PIPING

COMPRESSED AIR PIPING

CONDENSATE / INDIRECT DRAIN PIPING

FIRE PROTECTION PIPING

HOT WATER PIPING

HOT WATER RETURN PIPING

NON-POTABLE COLD WATER PIPING

SANITARY VENT PIPING

SANITARY WASTE OR SOIL PIPING ABOVE GRADE OR FINISHED

FLOOR

SANITARY WASTE OR SOIL PIPING BELOW GRADE OR FINISHED

FLOOR

TEMPERED WATER PIPING

TRAP PRIMER PIPING

Valves

BACKFLOW PREVENTER

BACKWATER VALVE

BALANCING VALVE

CHECK VALVE

GLOBE VALVE

HOSE END DRAIN VALVE

PRESSURE REDUCING VALVE

SHUTOFF VALVE, GENERAL

PROJECT

CONTACT

www.interfaceengineering.com

TODD KOLIBABA

2023-1388

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

4 Addendum 04 02/04/2026

EXPIRES: 12/31/26

SYMBOL FIXTURE TYPE DESCRIPTION MFR MODEL ACCESSORIES W V CW HW NOTES

BV-1 BALANCING VALVE DOMESTIC HOT WATER RETURN -

BUILDING

1.0 GPM TOUR &

ANDERSSEN

786 -- -- 3/4 --

BV-2 BALANCING VALVE DOMESTIC HOT WATER RETURN -

BUILDING

3 GPM TOUR &

ANDERSSEN

786 -- -- 3/4 --

DET-1 DOMESTIC WATER

EXPANSION TANK -

ASME

6.4 GALLON CAPACITY, WELDED

STEEL CONSTRUCTION,

HEAVY-DUTY BUTYL DIAPHRAGM,

SEPARATE RIGID

POLYPROPYLENE-LINED WATER

RESERVOIR, AIR-CHARGING VALVE,

ASME CERTIFIED

AMTROL

THERM-X-TROL

ST-12C-DD --- --- 3/4" --- OFFICE BUILDING

DET-2 DOMESTIC WATER

EXPANSION TANK -

ASME

6.4 GALLON CAPACITY, WELDED

STEEL CONSTRUCTION,

HEAVY-DUTY BUTYL DIAPHRAGM,

SEPARATE RIGID

POLYPROPYLENE-LINED WATER

RESERVOIR, AIR-CHARGING VALVE,

ASME CERTIFIED

AMTROL

THERM-X-TROL

ST-12C-DD --- --- 3/4" --- SHOP BUILDING

LMV-1 LAVATORY MIXING

VALVE

THERMOSTATIC MIXING VALVE,

ASSE 1070 COMPLIANT, INTEGRAL

CHECK VALVES, LEAD FREE

WATTS LFMMV --- --- 1/2" 1/2" INSTALL ON ALL

LAVATORIES AND SINKS

MMV-1 MASTER MIXING VALVE

- SHOP BUILDING

DIGITAL MIXING VALVE, ASSE 1017

COMPLIANT, INTEGRAL CHECK

VALVES, LEAD FREE, SET POINTS

BETWEEM 60-180 F, MIN. FLOW .5

GPM, 5 PSI LOSS 16 GPM

HEAT-TIMER 915671-00 --- 3/4" 3/4" OUTLET 3/4", PROVIDE

HOT & COLD TEMP

SENSORS, COORDINATE

WITH DIV. 26, POWER

115V/ 1 PH / 20 A

TC-1 TIME CLOCK - OFFICE

BUILDING

DOMESTIC HOT WATER SYSTEM GRASSLIN FM1D14-AV -- -- -- -- COORDINATE WITH DIV

26 TO CONTROL THE

RECIRC PUMP, PROVIDE

A TIME CLOCK 115V / 1

PH, 24 HOUR / 7 DAYS A

WEEK

TC-2 TIME CLOCK - SHOP

BUILDING

DOMESTIC HOT WATER SYSTEM GRASSLIN FM1D14-AV -- -- -- -- COORDINATE WITH DIV

26 TO CONTROL THE

RECIRC PUMP, PROVIDE

A TIME CLOCK 115V / 1

PH, 24 HOUR / 7 DAYS A

WEEK

NOTES: COORDINATE WITH DIV. 26

PLUMBING DEVICES SCHEDULE

BASIS OF DESIGN CONNECTION

GD-1 GARBAGE DISPOSAL WITH S-1 / OFFICE & SHOP BUILDINGS INSINKERATOR BADGER 1 120 1 5.6 1/3 HP PROVIDE TOP SWITCH BUTTON STS-00, COORDINATE WITH DIV. 26

TP-1 ELECTRONIC TRAP PRIMER OFFICE BUILDING PRECISION PLUMBING

PRODUCTS

PRIME TIME 120 1 2 6.3 --- CONTROLLER INCLUDES CIRCUIT BREAKER,

MANUAL SWITCH, AND TIME CLOCK. SERVES

1 TO 30 DRAINS.

TP-2 ELECTRONIC TRAP PRIMER SHOP BUILDING PRECISION PLUMBING

PRODUCTS

PRIME TIME 120 1 2 6.3 --- CONTROLLER INCLUDES CIRCUIT BREAKER,

MANUAL SWITCH, AND TIME CLOCK. SERVES

1 TO 30 DRAINS.

NOTES: COORDINATE WITH DIV. 26.

MISCELLANEOUS EQUIPMENT SCHEDULE

SYMBOL EQUIPMENT TYPE LOCATION / SERVING

BASIS OF DESIGN ELECTRICAL

COMMENTSMFR MODEL VOLTS PH AMPS WATTS HP CP-1 DOMESTIC HOT WATER

CIRCULATING PUMP

DOMESTIC HOT WATER

SYSTEM/ OFFICE BUILDING

BELL & GOSSETT ECOCIRC XL

55-45

5 20 208 1 .02-2.0 30-500 .5 CAST IRON BODY, IN-LINE PUMP

CP-2 DOMESTIC HOT WATER

CIRCULATING PUMP

DOMESTIC HOT WATER

SYSTEM/ SHOP BUILDING

BELL & GOSSETT ECOCIRC XL

55-45

5 20 208 1 .02-2.0 30-500 .5 CAST IRON BODY, IN-LINE PUMP

NOTE:

PUMP SCHEDULE

SYMBOL EQUIPMENT TYPE LOCATION / SERVING

BASIS OF DESIGN FLOW

RATE

(GPM)

HEAD (FT

H2O)

ELECTRICAL

COMMENTSMFR MODEL VOLTS PH AMPS WATTS HP

COORDINATE WITH DIV 26 FOR POWER CONNECTIONS

MFR MODEL VOLTS PH AMPS KW

DWH-1 ELECTRIC WATER HEATER OFFCIE BUILDING RHEEM HPLD40-1RH 36 4,200 60 27 4500 5,000 208 1 21 5 PROVIDED WITH OUTLET DUCT ADAPTOR

KIT, COORDINATE WITH DIV 23 FOR

EXHAUST DUCT, 30 AMP BREAKER,

PROVIDE WITH WIFI CAPABLE CONNECTION

AND THE ECONET APP REMOTELY

MONITOR. TOTAL WT: 478 lbs

DWH-2 ELECTRIC WATER HEATER SHOP BUILDING RHEEM HPLD80-1RH 72 4,200 87 27 4500 21 208 1 21 5 PROVIDED WITH OUTLET DUCT ADAPTOR

KIT, COORDINATE WITH DIV 23 FOR

EXHAUST DUCT, 30 AMP BREAKER,

PROVIDE WITH WIFI CAPABLE CONNECTION

AND THE ECONET APP REMOTELY

MONITOR. TOTAL WT: 888 lbs

NOTES: COORDINATE WITH DIV. 26

HYBRID HEAT PUMP WATER HEATER SCHEDULE

SYMBOL EQUIPMENT TYPE LOCATION / SERVING

BASIS OF DESIGN

TANK

CAPACITY

(GALLONS)

COMPRESSOR

BTU/H

FIRST HR.

RATING

(GALLONS)

RECOVERY IN

G.P.H. 90

DEGREE RISE

ELEMENT

WATTAGE

TOTAL UNIT

WATTAGE

ELECTRICAL

COMMENTS

PROJECT NUMBER:

SHEET TITLE:

DRAWN BY:

CONSULTANT:

SHEET:

Suite 300 www.lrsarchitects.com

Portland OR 97209

A R C H I T E C T S 720 NW Davis 503.221.1121

EXPIRES: 12/31/26

/4

/2

:0

:3

P M

A u to d e s k D o c s /2

O

D F

N C

D S a n ti a m F a c ili ty /O

D F

N C

D

M E

P

R

.r v t

TK

P002

SCHEDULES -

PLUMBING

Bid Set

ODF NCD

Santiam Facility

North Cascade District Headquarters 22965 North Fork Road

SE

Lyons, OR 97358

223294

10/15/2025

LRS Architects, Inc. © 2024

FIXTURE UNIT CALCULATIONS - UPC

COUNT DESCRIPTION

WATER SUPPLY FIXTURE

UNITS

DRAINAGE

FIXTURE UNITS

CWFU

(TABLE

A-2)

CWFU

TOTAL

.75

HWFU

DFU

(TABLE

7-3)

DFU

TOTAL

1 CLOTHES WASHER, DOMESTIC, STANDPIPE 4 4 3 3 3

2 DRINKING FOUNTAIN 0.5 1 0.5 1

11 FLOOR DRAIN 0 2 22

5 FLOOR SINK 0 2 10

8 HOSE BIBB 2.5 20 0

3 ICE HOOKUP 2.5 7.5 0 0

1 LAUNDRY SINK 1.5 1.5 1.125 2 2

8 LAVATORY 1 8 0.75 1 8

2 MOP SINK 3 6 2.25 3 6

2 SHOWER, PER HEAD 2 4 1.5 2 4

3 SINK 2 6 1.5 2 6

1 URINAL, 1.0 GFP FLUSHOMETER VALVE 4 4 0 2 2

9 WATER CLOSET, 1.6 GPF OR LESS, FLUSHOMETER

VALVE

5 45 0 4 36

FIXTURE UNIT COUNT TOTALS: 107 100

PLUMBING FIXTURE SCHEDULE

SYMBOL FIXTURE TYPE DESCRIPTION

BASIS OF DESIGN

ACCESSORIES

CONNECTION

ELECTRICAL COMMENTSMFR MODEL W V CW HW

EWC-1 ELECTRIC WATER

COOLER

ELECTRIC WATER COOLER - SINGLE STATION,

SURFACE MOUNTED, FILTERED, BOTTLE

FILLER,STAINLESS STEEL FINISH, VANDAL

RESISTANT, MECHANICALLY ACTIVATED, MOUNTING

FRAME

ELKAY LZSG8WSSK IN-WALL CARRIER SYSTEM - ELKAY MODEL MLP100 1-1/2" 1-1/2" 1/2" -- 115V, 60HZ, 6 AMPS SEE ARCHITECTURAL PLANS FOR

MOUNTING HEIGHT. COORDINATE

ELECTRICAL REQUIREMENTS

WITH DIVISION 26.

FD-1 FLOOR DRAIN CAST IRON BODY, FLASHING COLLAR, 6-INCH

ADJUSTABLE NICKEL BRONZE STRAINER HEAD,

TRAP PRIMER, VANDAL PROOF SCREWS

JR SMITH 2005Y-A-06-P0

50-U-NB

SEE DWGS SEE DWGS PRIMER CONN. --

FD-2 FLOOR DRAIN CAST IRON BODY, FLASHING COLLAR, 8-1/2-INCH

ROUND ADJUSTABLE TOP, BAR GRATE, SEDIMENT

BUCKET, TRAP PRIMER CONNECTION

JR SMITH 2350Y-P050 SEE DWGS SEE DWGS PRIMER CONN. --

FS-1 FLOOR SINK 12-1/2" TOP, CAST IRON FLANGED RECEPTOR,

SEEPAGE HOLES, ACID RESISTANT COATED

INTERIOR, NICKEL BRONZE RIM, 1/2-GRATE,

ALUMINUM DOME BOTTOM STRAINER, 6-INCH DEEP,

NO-HUB OUTLET

JR SMITH 3140Y-12 SEE PLANS SEE PLANS PRIMER CONN. -- --

IM-1 OUTLET BOX ICE MAKER OUTLET BOX (FIRE RATED) - NSF-372

COMPLIANT, ABS BOX/FRAME, NO-LEAD BRASS

VALVE, ASSE 1010 WATER HAMMER ARRESTOR, 1/4"

OUTLET CONNECTION

SIOUX CHIEF 696RG1010 -- -- 1/2" -- -- SUPPLY CONNECTION TYPE PER

PIPING MATERIAL. INSTALL WITH

BOTTOM OF BOX AT 18" A.F.F.

UNLESS NOTED OTHERWISE.

L-1 LAVATORY WALL HUNG, ADA COMPLIANT, VITREOUS CHINA,

SINGLE-HOLE PUNCH, FRONT OVERFLOW

AMERICAN

STANDARD

0356.421 DECK MOUNTED, METERING FAUCET, SINGLE HOLE,

SINGLE-SUPPLY, 0.20 MAX. GALLON/CYCLE, VANDAL

RESISTANT; CHICAGO FAUCETS MODEL

3500-E2805ABCP; ASSE 1070 COMPLIANT MIXING VALVE,

INTEGRAL CHECK VALVES, WATTS MODEL LFMMV (SET

DISCHARGE TEMPERATURE AT 110 DEG. F.)

1-1/2" 1-1/2" 1/2" 1/2" -- MOUNT LAVATORY AT ADA

COMPLIANT HEIGHT, SEE

ARCHITECTURAL PLANS FOR

HEIGHT AND LOCATION. SEE

SPECIFICATION SECTION 224000

FOR FLOOR MOUNTED CARRIER,

TRAP COVERS, SUPPLY STOPS

AND ADDITIONAL ACCESSORIES

L-2 LAVATORY COUNTERTOP, SELF-RIMMING, ADA COMPLIANT,

ROUND, 19-1/8" DIA.,VITREOUS CHINA, SINGLE-HOLE

PUNCH, FRONT OVERFLOW

AMERICAN

STANDARD

0490.156 DECK MOUNTED, METERING FAUCET, SINGLE HOLE,

SINGLE-SUPPLY, 0.20 MAX. GALLON/CYCLE, VANDAL

RESISTANT; CHICAGO FAUCETS MODEL

3500-E2805ABCP; ASSE 1070 COMPLIANT MIXING VALVE,

INTEGRAL CHECK VALVES, WATTS MODEL LFMMV (SET

DISCHARGE TEMPERATURE AT 110 DEG. F.)

1-1/2" 1-1/2" 1/2" 1/2" -- SEE SPECIFICATION SECTION

224000 FOR TRAP COVERS,

SUPPLY STOPS AND ADDITIONAL

ACCESSORIES

LS-1 LAUNDRY SINK FLOOR MOUNTED, FAUCET MOUNTING DECK

(4-INCH CENTERS), ONE PIECE MOLDED

STRUCTURAL THERMOPLASTIC RESIN, STEEL LEGS,

20-INCHES X 24-INCHES X 13 INCHES DEEP TUB

MUSTEE 19F DECK MOUNTED, MANUAL FAUCET, 4-INCH CENTERS, 8"

RIGID/SWING SPOUT, ATMOSPHERIC VACUUM

BREAKER, WRISTBLADE HANDLES, 2.2 GPM; CHICAGO

FAUCETS MODEL 895-317-GN8BVBE3MAB; 3/8" OFFSET

INLET SUPPLY ARM WITH INTEGRAL CHECK; CHICAGO

FAUCETS MODEL GCJKABCP

2" 1-1/2" 1/2" 1/2" -- SEE SPECIFICATION SECTION

224000 FOR SUPPLY STOPS AND

ADDITIONAL ACCESSORIES.

MS-1 MOP SINK FLOOR MOUNTED, TERRAZZO, 24-INCHES X

24-INCHES X 10-INCHES, WITH OPTIONAL (A-20)

ALUMINUM BUMPER GUARDS AND (BP) SPLASH

PANELS

STERN

WILLIAMS

MTB-2424 WALL HUNG, MOP SINK FAUCET, 8-INCH CENTERS,

LEVER HANDLES, PAIL HOOK, CHROME PLATED,

ATMOSPHERIC VACUUM BREAKER, 3/4" THREADED

HOSE OUTLET AND WALL FLANGE; CHICAGO FAUCETS

MODEL 540-LD897SWXFABCP; 3/8" OFFSET INLET

SUPPLY ARM WITH INTEGRAL CHECK; CHICAGO

FAUCETS MODEL GCJKABCP

3" 2" 1/2" 1/2" --

S-1 SINK UNDER COUNTER MOUNTED, SINGLE BOWL, 18

GAUGE STAINLESS STEEL, 30.5-INCHES X

18.5-INCHES X 5-3/8-INCHES DEEP, 36-INCH MINIMUM

CABINET SIZE, 3-HOLE PUNCH, BARRIER FREE,

PROVIDE GARBAGE DISPOSAL: INSINKERATOR:

BADGER 5, 1/2 HP WITH BUTTON MOUNTED ABOVE

THE COUNTER, COORDINATE WITH DIV 26

ELKAY ELUHAD28165

DECK MOUNTED FAUCET, 8-INCH RIGID/SWING

GOOSENECK, 4" WRISTBLADE HANDLES, 8-INCH FIXED

CENTERS, 1.5 GPM AERATED FLOW RATE; CHICAGO

FAUCETS MODEL 201-AGN8AE35-317AB

2" 1-1/2" 1/2" 1/2" -- SEE SPECIFICATION SECTION

224000 FOR SUPPLY STOPS AND

ADDITIONAL ACCESSORIES.

S-2 SINK FLOOR MOUNTED, SINGLE BOWL, 16 GAUGE

STAINLESS STEEL, 27-INCHES X 27-13/16-INCHE X

14-INCHES DEEP, 2-HOLE PUNCH, BARRIER FREE

ELKAY 14-1C22X22-0X BACKSPLASH MOUNTED FAUCET, X-INCH RIGID/SWING

GOOSENECK, 4" WRISTBLADE HANDLES, 8-INCH FIXED

CENTERS, 2.2 GPM AERATED FLOW RATE; ELKAY

FAUCET MODEL: LK940GN05T6H

3" 1-1/2" 1/2" 1/2" -- SEE SPECIFICATION SECTION

224000 FOR SUPPLY STOPS AND

ADDITIONAL ACCESSORIES.

SH-1 SHOWER BARRIER FREE, ONE PIECE, 60-INCHES X 30-INCHES

X 77-1/2-INCHES INSIDE DIMENSIONS, SLIP

RESISTANT TEXTURED BOTTOM, HORIZONTAL

BACK AND SIDE WALL GRAB BARS, VERTICAL SIDE

WALL GRAB BAR, FOLD UP SEAT, STEEL CURTAIN

ROD, 3/4-INCH THRESHOLD

COMFORT

DESIGNS

SSS 6233BF-F

.75 L-BAR

SINGLE HANDLE PRESSURE BALANCING SHOWER

VALVE, SERVICE/CHECK STOPS, 1.5 GPM HANDHELD

SHOWER HEAD FLOW RATE, 60-INCH FLEXIBLE METAL

HOSE, 24-INCH MOUNTING BAR, VACUUM BREAKER;

ZURN MODEL Z7300-SS-HW-MT-H9

2" 1-1/2" 1/2" 1/2" -- HANDING BASED ON SEAT

LOCATION, COORDINATE WITH

ARCHITECT AND OWNER PRIOR

TO PROCUREMENT. PROVIDE

WITH OPTIONS AS LISTED IN

DESCRIPTION.

SH-2 SHOWER BARRIER FREE, ONE PIECE, 36-INCHES X 36-INCHES

X 82-INCHES INSIDE DIMENSIONS, SLIP RESISTANT

TEXTURED BOTTOM, HORIZONTAL L-GRAB BAR,

VERTICAL GRAB BAR, FOLD UP SEAT, STEEL

CURTAIN ROD, 5/8-INCH THRESHOLD

COMFORT

DESIGNS

SSS 3682BF

RRF

SINGLE HANDLE PRESSURE BALANCING SHOWER

VALVE, SERVICE/CHECK STOPS, 1.5 GPM HANDHELD

SHOWER HEAD FLOW RATE, 60-INCH FLEXIBLE METAL

HOSE, 24-INCH MOUNTING BAR, VACUUM BREAKER;

ZURN MODEL Z7300-SS-HW-MT-H9

2" 1-1/2" 1/2" 1/2" -- HANDING BASED ON SEAT

LOCATION, COORDINATE WITH

ARCHITECT AND OWNER PRIOR

TO PROCUREMENT. PROVIDE

WITH OPTIONS AS LISTED IN

DESCRIPTION.

UR-1 URINAL WALL HUNG, 0.125 GPF, VITREOUS CHINA, TOP

SPUD, FLUSHOMETER, BARRIER FREE MOUNTING

HEIGHT

KOHLER K-5452-ET FLUSH VALVE - MANUAL OPERATION, 0.125 GPF,

DUAL-FILTERED BYPASS, POLISHED CHROME FINISH,

TOP SPUD; SLOAN MODEL ROYAL 186-0.125-DBP

2" 1-1/2" 3/4" -- -- MOUNT URINAL AT ADA

COMPLIANT HEIGHT, SEE

ARCHITECTURAL PLANS FOR

HEIGHT AND LOCATION. SEE

SPECIFICATION SECTION 224000

FOR FLOOR MOUNTED CARRIER

AND ADDITIONAL ACCESSORIES.

WC-1 WATER CLOSET FLOOR MOUNTED, FLOOR OUTLET, GRAVITY TANK

TYPE, VITREOUS CHINA, STANDARD HEIGHT,

ELONGATED, 1.28 GPF, 12" ROUGH-IN

KOHLER K-25087 SEAT - ELONGATED, PLASTIC, SELF-SUSTAINING CHECK

HINGES WITH NON-CORRODING STAINLESS STEEL

POSTS; BEMIS MODEL 1955SSCT

4" 2" 1/2" -- -- SEE ARCHITECTURAL PLANS FOR

LOCATION. SEE SPECIFICATION

SECTION 224000 FOR ADDITIONAL

ACCESSORIES.

WC-2 WATER CLOSET FLOOR MOUNTED, FLOOR OUTLET, GRAVITY TANK

TYPE, VITREOUS CHINA, ADA HEIGHT, ELONGATED,

1.28 GPF, 12" ROUGH-IN

KOHLER K-26077 SEAT - ELONGATED, PLASTIC, SELF-SUSTAINING CHECK

HINGES WITH NON-CORRODING STAINLESS STEEL

POSTS; BEMIS MODEL 1955SSCT

4" 2" 1/2" -- -- SEE ARCHITECTURAL PLANS FOR

LOCATION. SEE SPECIFICATION

SECTION 224000 FOR ADDITIONAL

ACCESSORIES.

WH-1 WALL HYDRANT ENCASED (RECTANGULAR BOX), NON-FREEZE,

ANTI-SIPHON, AUTOMATIC DRAINING, CHROME

PLATED BOX/DOOR ASSEMBLY, DOUBLE CHECK

BACKFLOW PREVENTER, LOOSE TEE KEY

OPERATION

WOODFORD B67 -- -- 1/2" --

WH-2 WALL HYDRANT ENCASED, HOT AND COLD, NON-FREEZE,

ANTI-SIPHON, AUTOMATIC DRAINING, CHROME

PLATED ASSEMBLY, DOUBLE CHECK BACKFLOW

PREVENTER, LOOSE KEY OPERATION

WOODFORD HCB67 -- -- 1/2" --

WM-1 OUTLET BOX WASHING MACHINE OUTLET BOX (FIRE RATED) -

NSF-372 COMPLIANT, ABS BOX/FRAME, NO-LEAD

BRASS VALVES, ASSE 1010 WATER HAMMER

ARRESTORS, 3/4" OUTLET CONNECTIONS, 2" DRAIN

CONNECTION, INDIVIDUAL DRAIN AND SUPPLY

BOXES

SIOUX CHIEF 696RG2313 2" 1-1/2" 1/2" 1/2" -- SUPPLY CONNECTION TYPE PER

PIPING MATERIAL. INSTALL WITH

BOTTOM OF BOX AT 34" A.F.F.

UNLESS NOTED OTHERWISE.

PROJECT

CONTACT

www.interfaceengineering.com

TODD KOLIBABA

2023-1388

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

EXPIRES: 12/31/26EXPIRES: 12/31/26

2-1/2" DOMESTIC

COLD WATER UP

W/ SOV

POC 2-1/2" DOMESTIC

COLD WATER SERVICE

SEE CIVIL DWG'S FOR

CONT.

POC 4" SAN SEWER

SEE CIVIL DWG'S

FOR CONT.

I.E. = -3'-2"

POC 3" SAN SEWER

SEE CIVIL DWG'S

FOR CONT.

I.E. = - 3'-0"

S

WCWC WC

FD

WB

LS

S

SH

SH

6" FIRE PROTECTION UP

POC 6" FIRE PROTECTION

SEE CIVIL DWG'S FOR CONT.

FS

FS

2" SAN UP

W/WCO

FD

FD

3" SAN

2" SAN

4" SAN UP

TO COTG

3" @ 2%

3" @ 2%

2" @ 2%

2" @ 2% 1'

2'

3'

M LO NP

S A

N

FD

FD

EWC

LLL

FD

FD

MS

3" SAN UP

TO FCO

2" V UP

3" SAN

2" @ 2% 2" @ 2%

3" @ 2%

4"

4"

4" @ 2%

3" @ 2%

4" @ 2%

3" SAN UP

TO FCO

FD

4" SAN4

S A

N

4" @ 2%

2" V UP

FS

3" SAN UP

TO WCO

3" @ 2%

TRUE NORTH

PROJECT NUMBER:

SHEET TITLE:

DRAWN BY:

CONSULTANT:

SHEET:

Suite 300 www.lrsarchitects.com

Portland OR 97209

A R C H I T E C T S 720 NW Davis 503.221.1121

KEY PLAN:

EXPIRES: 12/31/26

/4

/2

:0

:3

P M

A u to d e s k D o c s /2

O

D F

N C

D S a n ti a m F a c ili ty /O

D F

N C

D

M E

P

R

.r v t

TK

P202

UNDERGROUND

PLAN - FIRE

SHOP BUILDING -

PLUMBING

Bid Set

ODF NCD

Santiam Facility

North Cascade District Headquarters 22965 North Fork Road

SE

Lyons, OR 97358

223294

10/15/2025

LRS Architects, Inc. © 2024

PROJECT

CONTACT

www.interfaceengineering.com

TODD KOLIBABA

2023-1388

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

0' 4' 8' 16'

1/8" = 1'-0"

1 UNDERGROUND PLAN - FIRE SHOP BUILDING - PLUMBING

IM-1

S-1

WC-2WC-1

L-2 L-2

EWC-1

FD-1

FD-1

SH-2

SH-1

S-2

DWH-2CP-2

DET-2

P701

LS-1

WM-1

FD-1

FD-1

COTG2-1/2" DOMESTIC

COLD WATER

SERVICE W/ SOV

FS-1

WH-2

WH-1

WH-1

PROVIDE 1/2" W/ SOV

ROUTED TO COFFEE MAKER

TP-2

3" V UP

TO VTR

FS-1

6" FIRE PROTECTION

RISER

3" V UP

TO VTR

3" V UP

TO VTR

1'

2'

3'

M LO NP

MMV-1

2" CW 2" CW

OVERHEAD

TRUCK FILL

MS-1

WC-1

FCO

1/2" CW

1/2" CW 1/2" CW

FD-1

FD-1

FD-11

1 1/2" V

/4

H

W

C W

/4

H

W R

2" CW

3/4" HWR

3/4" HW

1 1/2" V1/2" HW

1 1/2" V

V

V

1 1/4" CW 1" CW1 1/4" CW

COTG

FD-1

SHOP OFFICE

ELEC

METALS SHOP

FIRE CACHE

STORAGE CAGE

VEHICLE BAYS

BREAK

DRYING ROOM & LAUNDRY

HALLWAY

FIRE RISER

WOOD SHOP

COMMS CLOSET

JAN.

202D

RESTROOM /…

This is the start of the file's text. The full file is on GovTribe.