About this file

This is a Permits Section specification document for ITB No. 26-403/DL 01111 issued by a Florida authority for the Rehabilitation of Manholes, Sanitary Stations and Wet Wells—Phased Projects. The project requires contractors to rehabilitate twenty-six (26) manholes, thirteen (13) detection stations, two (2) pump stations, and five (5) sanitary lift stations within Class I and Class III landfill leachate collection systems, including cleaning, protective coatings, replacement of eleven (11) manhole covers and rims, and confined space entry approvals. The contractor must be a licensed and authorized Warren Environmental products applicator with a minimum of five (5) years' experience. The contract will operate on an initial two (2) year period with an option to renew for an additional one (1) year at the Authority's sole discretion. All bidders must submit responses electronically through Bonfire by the specified date and time, with questions and clarifications submitted through the same platform by the deadline specified in bid documents.

The contractor is responsible for furnishing all labor, materials, equipment, and incidentals necessary to comply with all applicable permit conditions throughout project execution. Relevant permits include the State of Florida Department of Environmental Protection's Site Certification PA 84-20, its 1994 modification, and FDEP Permits to Construct and Operate Class I Landfill cells dating from August 1998 and January 2004. Contractors must obtain all required permit approvals and are subject to penalties up to $10,000 per day per violation of permit conditions. The contractor must submit permit-related materials to the owner within seven (7) days of request and cannot submit permit information directly to agencies without prior owner review and concurrence. The contractor bears responsibility for any fines, legal fees, and restoration costs resulting from permit violations.

View the file

Other files

File Type Posted
5-Section 01370 - Schedule of Values 031826.pdf PDF
20-Section 01153 - Change Order Procedures 031826.pdf PDF
13-Section 01200 - Project Meetings 031826.pdf PDF
23-MANHOLE AND WET WELL REHABILITATION RECORD DWG CDM FEB 2014 7.pdf PDF
12-Section 01310 - Progress Schedules 031826.pdf PDF
30-ITB 26-403 - Project Experience Forms.pdf PDF
2-Section 01095 - Reference Standards 031826.pdf PDF
11-Section 02767 - Monolithic Lining System 031826.pdf PDF
25-SHT C-2 - Class III Leachate Piping Site Plan.pdf PDF
24-SHT C-1 - Class I Leachate Piping Site Plan.pdf PDF
19-Section 01700 - Contract Closeout 031826.pdf PDF
8-Section 01152 - Applications for Payment 031826.pdf PDF
1-Section 01005 - General Requirements 031826.pdf PDF
22-Class I and III Leachate Collection System Details.pdf PDF
15-Section 01010 - Summary of Work 031826.pdf PDF
33-ITB 26-403 - Vendor Acknowledgement Form.pdf PDF
27-ITB 26-403 - Bid Bond.pdf PDF
29-ITB 26-403 - Insurance Requirement Checklist.pdf PDF
16-Section 01100 - Special Project Procedures 031826.pdf PDF
7-Section 01610 - Material and Equipment 031826.pdf PDF
21-Section 01110 - Environmental Protection Procedures 031826.pdf PDF
31-ITB 26-403 - Section 00300 - Bid Form - Price.pdf PDF
10-Section 01300 - Submittals 031826.pdf PDF
4-Section 01102 - Safety Health and Emerg Response Requirements 031826.pdf PDF
26-ITB 26-403 - Authority to Execute Contract.pdf PDF
6-Section 01025 - Measurement and Payment 031826.pdf PDF
18-Section 01740 - Warranties and Bonds 031826.pdf PDF
3-Section 01014 - Construction Sequence 031826.pdf PDF
14-Section 01710 - Cleaning 031826.pdf PDF
34-ITB 26-403 - Rehab of Manholes, Sanitary Stations and Wet Wells - Phased Projects.pdf PDF
28-ITB 26-403 - Bidders Qualifications Statement.pdf PDF
32-ITB 26-403 - Trench Safety Act.pdf PDF
17-Section 01041 - Project Coordination 031826.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB No.: 26-403/DL 01111 - 1 Rehab of Manholes, Sanitary Stations and Wet Wells - Phased Projects.

SECTION 01111

PERMITS

PART 1 – GENERAL

1.01 SCOPE AND INTENT:

A. The work covered by this Section consists of furnishing all labor, materials, equipment and performing all work required to comply with all conditions of the permits, where applicable, for this project.

B. Permits relating to this project are available for CONTRACTOR’s review at the office of the OWNER. These permits include, but are not limited to, the following available permits:

1. State of Florida Department of Environmental Regulation Palm Beach County Resource Recovery Facility Power Plant Site Certification PA 84-20 Conditions of certificate dated 3/14/86

2. State of Florida Department of Environmental Protection Palm Beach County Resource Recovery Facility Power Plant Site Certification Modification dated 11/9/94

3. FDEP Permit to Construct and Operate Class I Landfill Cell Nos.

9,10,11,12,13,14,15, and 16 dated August 1998.

4. FDEP Permit to Construct and Operate Class I Landfill Cells 23 and 25, dated January 2004.

C. CONTRACTOR is responsible for complying with all general and special permit conditions. Violations of these conditions shall result in up to a maximum fine of $10,000 levied against CONTRACTOR per day per violation. CONTRACTOR is responsible for obtaining permit approvals required for the construction of this project including confined space entry.

D. CONTRACTOR will be held responsible for any fines levied against the OWNER as a result of these violations, as well as, legal fees and restoration costs associated with these violations.

1.02 SUBMITTALS:

A. The CONTRACTOR shall be responsible to submit to the OWNER for review various permit condition material within seven (7) days of OWNER’s request to the CONTRACTOR.

B. The CONTRACTOR shall not submit permit condition information directly to an agency prior to the review and concurrence of the

OWNER.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

END OF SECTION