13-Section 01200 - Project Meetings 031826.pdf
PDF 168 KB Posted
- Solicitation number
- ITB No.: 26-403/DL
- Issued by
- Palm Beach County, Florida
About this file
This is a Project Meetings specification document for ITB No. 26-403/DL, issued by a Florida authority for the Rehabilitation of Manholes, Sanitary Stations and Wet Wells - Phased Projects. The scope of work encompasses rehabilitation of twenty-six manholes, thirteen detection stations, two pump stations, replacement of eleven manhole covers and rims in Class I and Class III landfill leachate collection systems, and five sanitary lift stations, including cleaning and protective coatings. The contractor must be a licensed and authorized Warren Environmental products applicator with a minimum of five years' experience. The contract will be structured as a phased project with an initial two-year term and an option to renew for an additional one-year period at the authority's sole discretion. Bidders must submit responses electronically through Bonfire by specified deadlines, with all questions and clarifications submitted through the same platform.
The specification establishes mandatory meeting protocols throughout the project lifecycle, including a pre-construction meeting scheduled no later than ten calendar days after the effective agreement date, regular progress meetings every thirty days following the pre-construction meeting or notice to proceed, and weekly construction progress meetings. The pre-construction and progress meeting agendas must address construction progress, deliveries, subcontractor activities, work schedules, submittals, design and permitting issues, potential change orders, and payment applications. Contractor representatives attending meetings must be qualified and authorized to act on behalf of their respective entities, and the owner will prepare agendas, arrange facilities, preside over meetings, and distribute minutes within fifteen working days of each meeting. The contractor is responsible for providing current submittal logs and updated construction schedules at each progress meeting in accordance with Sections 01300 and 01310 of the contract documents.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB No.: 26-403/DL 01200 - 1 Rehab of Manholes, Sanitary Stations and Wet Wells - Phased Projects.
SECTION 01200
PROJECT MEETINGS
PART 1 – GENERAL
1.01 REQUIREMENTS INCLUDED:
A. The OWNER shall schedule and administer the pre-construction meeting, periodic progress meetings, and specifically called meetings throughout progress of the Work. The OWNER shall:
1. Prepare agenda for meetings.
2. Make physical arrangements for meetings.
3. Preside at meetings.
4. Record the minutes; include significant proceedings and decisions.
5. Reproduce and distribute copies of minutes within fifteen
(15) working days after each meeting.
a. To participate in the meeting.
b. To parties affected by decisions made at the meeting.
B. Representatives of CONTRACTOR, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents.
C. The CONTRACTOR shall attend meetings to ascertain that work is expedited consistent with Contract Documents and construction schedules.
1.02 RELATED REQUIREMENTS:
A. The Contract Documents include, but are not limited to, the following related sections:
1. Instructions to Bidders
2. Section 01300: Submittals
3. Section 01310: Construction Schedules
1.03 PRE-CONSTRUCTION MEETING:
A. Schedule a pre-construction meeting no later than ten (10) calendar days after effective date of Agreement.
B. The location shall be at a central site, convenient for all parties, designated by the OWNER.
C. Attendance:
1. OWNER’s representative
2. Resident Project Representative
3. CONTRACTOR’s Superintendent
4. Major Subcontractors
5. Others as appropriate
ITB No.: 26-403/DL 01200 - 2
D. Suggested Agenda:
1. Comments, corrections, or additions to the notes of the previous meeting.
2. Review of work performed since last meeting.
a. Construction
b. Deliveries
c. Subcontractors on site
d. Work force/schedule
e. OWNER’s comments
3. Contractor’s forecast or work projected.
a. Construction
b. Major deliveries
c. Subcontractors scheduled on site.
d. Work force/schedule
4. Review of contractor’s construction schedule
a. Milestones
b. Problems which may impact schedule.
c. Corrective measures
d. Critical and long-lead items
5. Submittals
6. Issues, concerns, and action items
a. Design issues
b. Permitting issues
c. Potential change orders
d. Action items
e. Other issues
7. Applications for payment and construction photos
8. Other business
a. Next meeting
1.04 PROGRESS MEETINGS:
A. Schedule regular periodic meetings. The progress meetings will be held every thirty (30) days with the first meeting thirty
(30) days after the pre-construction meeting or thirty (30) days after the date of Notice to Proceed.
B. Hold called meetings as required by progress of the Work.
C. Location of the meetings: Project field office of ENGINEER or other location designated by the OWNER.
D. Attendance:
1. OWNER or his representative
2. CONTRACTOR’s Project Manager and Superintendent
3. Subcontractors as appropriate to the agenda
4. Suppliers as appropriate to the agenda
5. Others as appropriate.
ITB No.: 26-403/DL 01200 - 3
E. Suggested Agenda:
1. Comments, corrections, or additions to the notes of the previous meeting
2. Review of work performed since last meeting.
a. Construction
b. Deliveries
c. Subcontractors on site
d. Work force/schedule
e. OWNER’s comments
3. Contractor’s forecast or work projected.
a. Construction
b. Major deliveries
c. Subcontractors scheduled on site.
d. Work force/schedule
4. Review of Contractor’s construction schedule
a. Milestones
b. Problems which may impact schedule
c. Corrective measures
d. Critical and long-lead items
5. Submittals
6. Issues, concerns, and action items
a. Design issues
b. Permitting issues
c. Potential change orders
d. Action items
e. Other issues
7. Applications for payment and construction photos
8. Other business
a. Next meeting
b. Warranties
F. The CONTRACTOR is to attend progress meetings and is to study previous meeting minutes and current agenda items, in order to be prepared to discuss pertinent topics such as deliveries of materials and equipment, progress of the Work over the past thirty (30) days, and work forecast for next thirty (30) days.
G. The CONTRACTOR is to provide a current submittal log at each progress meeting in accordance with Section 01300, and an updated construction schedule in accordance with Section 01310.
1.05 WEEKLY MEETINGS:
A. Schedule weekly construction progress meetings.
B. Attendance:
1. OWNER or his representative
2. CONTRACTOR’s Project Manager and Superintendent
3. Subcontractors as appropriate
4. Suppliers as appropriate
5. Others as appropriate
ITB No.: 26-403/DL 01200 - 4
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXECUTION (NOT USED)
END OF SECTION