30-ITB 26-403 - Project Experience Forms.pdf

PDF 56 KB Posted

Attached to
Rehabilitation of Manholes, Sanitary Stations and Wet Wells - Phased Projects
Solicitation number
ITB No.: 26-403/DL
Issued by
Palm Beach County, Florida

About this file

This is a Project Experience Form document for ITB No. 26-403/DL issued by a Florida authority for the Rehabilitation of Manholes, Sanitary Stations and Wet Wells. The project encompasses rehabilitation of twenty-six (26) manholes, thirteen (13) Detection Stations, two (2) Pump Stations, replacement of eleven (11) Manhole Covers and Rims in Class I and Class III landfill leachate collection systems, and five (5) Sanitary Lift Stations, with work including cleaning and protective coatings. The contractor must be a licensed and authorized Warren Environmental products applicator with a minimum of five (5) years' experience. This is structured as a phased project with an initial two (2) year contract period with the option to renew for an additional one (1) year at the Authority's sole discretion. Bidders must submit responses electronically through Bonfire by the specified date and time, with all questions or clarification requests also submitted through Bonfire by the deadline indicated in bid documents.

The document consists of three blank Project Experience Forms that bidders are required to complete, requesting details for each relevant project including project name, location, owner information, primary and secondary contact details, original contract amount, scheduled and actual completion dates, project management personnel, and a summary of the number of manholes, sanitary stations, or wet wells rehabilitated. No Small Business Enterprise (SBE) participation set-aside is required for this solicitation. Bidders must demonstrate their experience and qualifications through submission of completed forms with verifiable project references and contact information from previous work of similar scope and complexity.

View the file

Other files

File Type Posted
5-Section 01370 - Schedule of Values 031826.pdf PDF
20-Section 01153 - Change Order Procedures 031826.pdf PDF
13-Section 01200 - Project Meetings 031826.pdf PDF
9-Section 01111- Permits 031826.pdf PDF
23-MANHOLE AND WET WELL REHABILITATION RECORD DWG CDM FEB 2014 7.pdf PDF
12-Section 01310 - Progress Schedules 031826.pdf PDF
2-Section 01095 - Reference Standards 031826.pdf PDF
11-Section 02767 - Monolithic Lining System 031826.pdf PDF
25-SHT C-2 - Class III Leachate Piping Site Plan.pdf PDF
24-SHT C-1 - Class I Leachate Piping Site Plan.pdf PDF
19-Section 01700 - Contract Closeout 031826.pdf PDF
8-Section 01152 - Applications for Payment 031826.pdf PDF
1-Section 01005 - General Requirements 031826.pdf PDF
22-Class I and III Leachate Collection System Details.pdf PDF
15-Section 01010 - Summary of Work 031826.pdf PDF
33-ITB 26-403 - Vendor Acknowledgement Form.pdf PDF
27-ITB 26-403 - Bid Bond.pdf PDF
29-ITB 26-403 - Insurance Requirement Checklist.pdf PDF
16-Section 01100 - Special Project Procedures 031826.pdf PDF
7-Section 01610 - Material and Equipment 031826.pdf PDF
21-Section 01110 - Environmental Protection Procedures 031826.pdf PDF
31-ITB 26-403 - Section 00300 - Bid Form - Price.pdf PDF
10-Section 01300 - Submittals 031826.pdf PDF
4-Section 01102 - Safety Health and Emerg Response Requirements 031826.pdf PDF
26-ITB 26-403 - Authority to Execute Contract.pdf PDF
6-Section 01025 - Measurement and Payment 031826.pdf PDF
18-Section 01740 - Warranties and Bonds 031826.pdf PDF
3-Section 01014 - Construction Sequence 031826.pdf PDF
14-Section 01710 - Cleaning 031826.pdf PDF
34-ITB 26-403 - Rehab of Manholes, Sanitary Stations and Wet Wells - Phased Projects.pdf PDF
28-ITB 26-403 - Bidders Qualifications Statement.pdf PDF
32-ITB 26-403 - Trench Safety Act.pdf PDF
17-Section 01041 - Project Coordination 031826.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00300

BID FORM

ITB No.: 26-403/DL – Rehab of Manholes, Sanitary - 22 – Stations and Wet Wells

PROJECT EXPERIENCE FORM # 1

Project Name: __________________________________________________________________________________________

Project Location: ________________________________________________________________________________________

Owner: ________________________________________________________________________________________________

Primary Contact (Owner’s Project Manager): __________________________________________________________________

Address: _______________________________________________________________________________________________

E-mail Address: _________________________________________________________________________________________

Telephone No.: _________________________________________________________________________________________

Secondary Contact: ______________________________________________________________________________________

Address: _______________________________________________________________________________________________

E-mail Address: _________________________________________________________________________________________

Telephone No.: _________________________________________________________________________________________

Original Contract Amount: $________________________________________________________________________________

Original Scheduled Completion Date: ________________________________________________________________________

Change Order Amount: $ _________________________________________________________________________________

Actual Completion Date: __________________________________________________________________________________

Project Manager Name: ___________________________________________________________________________________

Project Superintendent Name: ______________________________________________________________________________

Installation of the following: Total Manholes (Warren Environmental) rehabilitated __________ or Sanitary Stations rehabilitated:

__________ or Wet Wells rehabilitated: __________

Project Summary:

ITB No.: 26-403/DL – Rehab of Manholes, Sanitary - 23 –

PROJECT EXPERIENCE FORM # 2

Project Name: __________________________________________________________________________________________

Project Location: ________________________________________________________________________________________

Owner: ________________________________________________________________________________________________

Primary Contact (Owner’s Project Manager): __________________________________________________________________

Address: _______________________________________________________________________________________________

E-mail Address: _________________________________________________________________________________________

Telephone No.: _________________________________________________________________________________________

Secondary Contact: ______________________________________________________________________________________

Address: _______________________________________________________________________________________________

E-mail Address: _________________________________________________________________________________________

Telephone No.: _________________________________________________________________________________________

Original Contract Amount: $________________________________________________________________________________

Original Scheduled Completion Date: ________________________________________________________________________

Change Order Amount: $ _________________________________________________________________________________

Actual Completion Date: __________________________________________________________________________________

Project Manager Name: ___________________________________________________________________________________

Project Superintendent Name: ______________________________________________________________________________

Installation of the following: Total Manholes (Warren Environmental) rehabilitated __________ or Sanitary Stations rehabilitated:

ITB No.: 26-403/DL – Rehab of Manholes, Sanitary - 24 –

PROJECT EXPERIENCE FORM # 3

Project Name: __________________________________________________________________________________________

Project Location: ________________________________________________________________________________________

Owner: ________________________________________________________________________________________________

Primary Contact (Owner’s Project Manager): __________________________________________________________________

Address: _______________________________________________________________________________________________

E-mail Address: _________________________________________________________________________________________

Telephone No.: _________________________________________________________________________________________

Secondary Contact: ______________________________________________________________________________________

Address: _______________________________________________________________________________________________

E-mail Address: _________________________________________________________________________________________

Telephone No.: _________________________________________________________________________________________

Original Contract Amount: $________________________________________________________________________________

Original Scheduled Completion Date: ________________________________________________________________________

Change Order Amount: $ _________________________________________________________________________________

Actual Completion Date: __________________________________________________________________________________

Project Manager Name: ___________________________________________________________________________________

Project Superintendent Name: ______________________________________________________________________________

Installation of the following: Total Manholes (Warren Environmental) rehabilitated __________ or Sanitary Stations rehabilitated:

File details come from the government source that posted it. Updated .