About this file

This is a scope of work document for the Solid Waste Authority of Palm Beach County, Florida, detailing rehabilitation services for landfill infrastructure. The project encompasses rehabilitation of twenty-six (26) manholes, thirteen (13) detection stations, two (2) pump stations, and five (5) sanitary lift stations located in the Class I and Class III landfill leachate collection systems in Central Palm Beach County. The work includes cleaning, surface preparation, and application of protective epoxy coatings to these structures, along with replacement of eleven (11) manhole covers and rims featuring Round F900 heavy-duty access covers rated for up to 90 tons. Contractors must be licensed and authorized Warren Environmental products applicators with a minimum of five (5) years' experience. The contract is structured as a phased project with an initial two (2) year period and one (1) year renewal option at the Authority's sole discretion. All work must comply with the technical specifications outlined in Section 02767, and submittal of responses must occur electronically through Bonfire by the specified deadline.

Substantial completion requires submission of all field conformance testing, project record drawings, and completion of all items indicated on the contract drawings. Final acceptance is contingent upon completion and owner approval of punch list items, owner recommendation of any final change order proposals, and owner acceptance of the final invoice. The contractor must furnish all labor, materials, equipment, and incidentualities required for the work and is responsible for limiting construction areas to avoid interference with other contractors and owner operations. All materials must be Warren Environmental products applied exclusively by trained and approved Warren Environmental applicators using the specified patented heated meter/mix plural-component spray, trowel, brush, pour, and squeegee application methods. The epoxy coating must be solvent-free, 100% solids, high-build protective epoxy rated for corrosive wastewater and industrial environments and safe for aquatic life per EPA 2007.0 standards.

View the file

Other files

File Type Posted
5-Section 01370 - Schedule of Values 031826.pdf PDF
20-Section 01153 - Change Order Procedures 031826.pdf PDF
13-Section 01200 - Project Meetings 031826.pdf PDF
9-Section 01111- Permits 031826.pdf PDF
23-MANHOLE AND WET WELL REHABILITATION RECORD DWG CDM FEB 2014 7.pdf PDF
12-Section 01310 - Progress Schedules 031826.pdf PDF
30-ITB 26-403 - Project Experience Forms.pdf PDF
2-Section 01095 - Reference Standards 031826.pdf PDF
11-Section 02767 - Monolithic Lining System 031826.pdf PDF
25-SHT C-2 - Class III Leachate Piping Site Plan.pdf PDF
24-SHT C-1 - Class I Leachate Piping Site Plan.pdf PDF
19-Section 01700 - Contract Closeout 031826.pdf PDF
8-Section 01152 - Applications for Payment 031826.pdf PDF
1-Section 01005 - General Requirements 031826.pdf PDF
22-Class I and III Leachate Collection System Details.pdf PDF
33-ITB 26-403 - Vendor Acknowledgement Form.pdf PDF
27-ITB 26-403 - Bid Bond.pdf PDF
29-ITB 26-403 - Insurance Requirement Checklist.pdf PDF
16-Section 01100 - Special Project Procedures 031826.pdf PDF
7-Section 01610 - Material and Equipment 031826.pdf PDF
21-Section 01110 - Environmental Protection Procedures 031826.pdf PDF
31-ITB 26-403 - Section 00300 - Bid Form - Price.pdf PDF
10-Section 01300 - Submittals 031826.pdf PDF
4-Section 01102 - Safety Health and Emerg Response Requirements 031826.pdf PDF
26-ITB 26-403 - Authority to Execute Contract.pdf PDF
6-Section 01025 - Measurement and Payment 031826.pdf PDF
18-Section 01740 - Warranties and Bonds 031826.pdf PDF
3-Section 01014 - Construction Sequence 031826.pdf PDF
14-Section 01710 - Cleaning 031826.pdf PDF
34-ITB 26-403 - Rehab of Manholes, Sanitary Stations and Wet Wells - Phased Projects.pdf PDF
28-ITB 26-403 - Bidders Qualifications Statement.pdf PDF
32-ITB 26-403 - Trench Safety Act.pdf PDF
17-Section 01041 - Project Coordination 031826.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB No.: 26-403/DL 01010 - 1 Rehab of Manholes, Sanitary Stations and Wet Wells - Phased Projects.

SECTION 01010

SUMMARY OF WORK

PART 1 – GENERAL

1.01 LOCATION OF WORK:

A. All of the work of this Contract is located in the right-of-way or on property owned by Solid Waste Authority of Palm Beach County, Florida, generally located in Central Palm Beach County, Florida.

1.02 SCOPE OF WORK:

A. The CONTRACTOR shall furnish all labor, materials, equipment, and incidentals required to rehabilitate leachate pump station, manholes and sanitary pump stations as shown on the Drawings and specified herein.

B. The work includes, but is not necessarily limited to, the following:

1. Rehabilitation of manholes, in the Class I and Class III landfill leachate collection systems including but not limited to cleaning, surface preparation, and application of protective coatings.

2. Rehabilitation of sanitary pump stations including but not

3. Rehabilitation of leachate pump stations, in the Class III landfill leachate collection systems, , including but not

4. Rehabilitation of detection stations, in the Class I landfill, including but not limited to cleaning, surface preparation, and application of protective coatings.

5. Replace manhole covers and frame, Round F900 manhole covers that are heavy-duty access covers designed for extremely heavy loads, supporting up to 90 tons (900 kN).

1.03 SUBSTANTIAL COMPLETION:

A. The following items are required to be completed to achieve Substantial Completion:

1. Submittal of all field conformance testing.

2. Submittal of Project Record Drawings (refer to Section

01720).

3. Completion of all items indicated on the Drawings.

ITB No.: 26-403/DL 01010 - 2

1.04 FINAL ACCEPTANCE:

A. The following items are required to be completed to achieve Final Acceptance:

1. Completion and OWNER’s approval of punch list items.

2. OWNER’s recommendation of CONTRACTOR’s proposal for a final change order, if applicable.

3. OWNER’s recommendation of CONTRACTOR’s request for final payment and OWNER’s acceptance of final invoice.

1.05 WORK SEQUENCE:

A. Perform work to ensure completion of the work in the contract time. Completion dates of the various stages shall be in accordance with the approved construction schedule submitted by the CONTRACTOR. See Section 01014 for additional requirements.

1.06 CONSTRUCTION AREAS:

A. CONTRACTOR shall limit his use of the construction areas for work and for storage, to allow for:

1. Work by other contractors

2. OWNER use

B. Coordinate use of work site with OWNER.

C. Assume full responsibility for the protection and safekeeping of Products under this Contract, stored on the site.

D. Move any stored Products, under CONTRACTOR’s control which interfere with operations of the OWNER or other CONTRACTOR.

E. Obtain and pay for the use of additional storage or work areas needed for operations.

F. CONTRACTOR shall at all times conduct his operations to ensure the least inconvenience to landfill operations and the general public.

1.07 PLANS AND SPECIFICATIONS:

A. Specifications

1. The Technical Specifications consists of three (3) parts:

General, Products, and Execution. The General Section contains General Requirements which govern the work.

Products and Execution modify and supplement these by detailed requirements of the work and shall always govern whenever there appears to be a conflict.

B. Intent

1. All work called for in the Specifications applicable to this

Contract, but not shown on the Plans in their present form, ITB No.: 26-403/DL 01010 - 3 or vice versa, shall be of like effect as if shown or mentioned in both. Work not specified in either the Plans or in the Specifications but involved in carrying out their intent or in the complete and proper execution of the work, is required and shall be performed by the CONTRACTOR as though it were specifically delineated or described.

2. The apparent silence of the Specifications as to any detail, or the apparent omission from them of a detailed description concerning any work to be done and materials to be furnished, shall be regarded as meaning that only the best general practice is to prevail and that only material and workmanship of the best quality is to be used, and interpretation of these Specifications shall be made upon that basis.

3. The inclusion of the General Requirements (or work specified elsewhere) in the General part of the Specifications is only for the convenience of the CONTRACTOR and shall not be interpreted as a complete list of related Specification Sections.

PART 2 – PRODUCTS

2.1 MATERIALS

A. Solvent-free, high build epoxy series, 100% solids, high-build protective epoxy coating designed to protect substrates from corrosive environments in wastewater and industrial service, safe for aquatic life per EPA 2007.0.

B. Materials shall be ALL Warren Environmental products.

2.2 PRODUCTS - GENERAL

A. Application: Warren epoxy products are applied by a patented heated meter/mix plural-component spray, trowel, brush, pour and squeegee. Warren Environmental products shall only be applied by trained/approved Warren Environmental products applicators.

PART 3 – EXECUTION (NOT USED)

END OF SECTION