18-Section 01740 - Warranties and Bonds 031826.pdf

PDF 108 KB Posted

Attached to
Rehabilitation of Manholes, Sanitary Stations and Wet Wells - Phased Projects
Solicitation number
ITB No.: 26-403/DL
Issued by
Palm Beach County, Florida

About this file

This is a Warranties and Bonds specification section (Section 01740) for ITB No. 26-403/DL, a Florida state and local contract opportunity for the Rehabilitation of Manholes, Sanitary Stations and Wet Wells - Phased Projects. The contract requires a licensed and authorized Warren Environmental products applicator with a minimum of five years' experience to perform rehabilitation work on twenty-six manholes, thirteen detection stations, two pump stations, five sanitary lift stations, and replacement of eleven manhole covers and rims in Class I and Class III landfill leachate collection systems. The work includes cleaning and protective coatings and will be executed in phases. The contract is structured as an initial two-year period with an option to renew for an additional one-year term at the Authority's sole discretion. The contractor must provide all labor, materials, equipment, and incidentals necessary to complete the work as detailed in the contract documents.

The specification establishes comprehensive warranty and bonding requirements that the contractor must fulfill. All written warranties must be submitted to the Owner prior to the date fixed for Substantial Completion, with designated portions requiring submission within fifteen days of completion. Two copies of all required warranties and bonds must be compiled, organized according to the Project Manual's table of contents, and bound in heavy-duty commercial quality three-ring vinyl binders with labeled dividers and a typed table of contents. The contractor is responsible for the full cost of replacing or rebuilding any defective work covered by warranty, regardless of prior use by the Owner, and must reinstate warranties for corrected work with an equitable adjustment for depreciation. The Engineer of Record is required to verify that the contractor's bond remains in effect during the one-year warranty period. Questions and clarifications must be submitted through Bonfire by specified deadlines, and all bid responses must be submitted electronically through Bonfire by the stated due date and time.

View the file

Other files

File Type Posted
5-Section 01370 - Schedule of Values 031826.pdf PDF
20-Section 01153 - Change Order Procedures 031826.pdf PDF
13-Section 01200 - Project Meetings 031826.pdf PDF
9-Section 01111- Permits 031826.pdf PDF
23-MANHOLE AND WET WELL REHABILITATION RECORD DWG CDM FEB 2014 7.pdf PDF
12-Section 01310 - Progress Schedules 031826.pdf PDF
30-ITB 26-403 - Project Experience Forms.pdf PDF
2-Section 01095 - Reference Standards 031826.pdf PDF
11-Section 02767 - Monolithic Lining System 031826.pdf PDF
25-SHT C-2 - Class III Leachate Piping Site Plan.pdf PDF
24-SHT C-1 - Class I Leachate Piping Site Plan.pdf PDF
19-Section 01700 - Contract Closeout 031826.pdf PDF
8-Section 01152 - Applications for Payment 031826.pdf PDF
1-Section 01005 - General Requirements 031826.pdf PDF
22-Class I and III Leachate Collection System Details.pdf PDF
15-Section 01010 - Summary of Work 031826.pdf PDF
33-ITB 26-403 - Vendor Acknowledgement Form.pdf PDF
27-ITB 26-403 - Bid Bond.pdf PDF
29-ITB 26-403 - Insurance Requirement Checklist.pdf PDF
16-Section 01100 - Special Project Procedures 031826.pdf PDF
7-Section 01610 - Material and Equipment 031826.pdf PDF
21-Section 01110 - Environmental Protection Procedures 031826.pdf PDF
31-ITB 26-403 - Section 00300 - Bid Form - Price.pdf PDF
10-Section 01300 - Submittals 031826.pdf PDF
4-Section 01102 - Safety Health and Emerg Response Requirements 031826.pdf PDF
26-ITB 26-403 - Authority to Execute Contract.pdf PDF
6-Section 01025 - Measurement and Payment 031826.pdf PDF
3-Section 01014 - Construction Sequence 031826.pdf PDF
14-Section 01710 - Cleaning 031826.pdf PDF
34-ITB 26-403 - Rehab of Manholes, Sanitary Stations and Wet Wells - Phased Projects.pdf PDF
28-ITB 26-403 - Bidders Qualifications Statement.pdf PDF
32-ITB 26-403 - Trench Safety Act.pdf PDF
17-Section 01041 - Project Coordination 031826.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB No.: 26-403/DL 01740 - 1 Rehab of Manholes, Sanitary Stations & Wet Wells - Phased Projects.

SECTION 01740

WARRANTIES AND BONDS

PART 1 – GENERAL

1.01 SCOPE OF WORK

A. This Section specifies general administrative and procedural requirements for warranties and bonds required by the Contract Documents, included MANUFACTURER’S standard warranties on products and special warranties.

1.02 RELATED REQUIREMENTS

A. The Contract Documents include, but are not limited to, the following related sections:

1. Refer to Conditions of Contract for the general requirements relating to warranties and bonds.

2. General closeout requirements are included in Section 01700

Contract Closeout.

3. Specific requirements for warranties for the Work and products and installations that are specified to be warranted are included in the individual sections.

1.03 SUBMITTALS

A. Submit written warranties to the OWNER prior to the date fixed by the OWNER for Substantial Completion. If the Certificate of Substantial Completion designates a commencement date for warranties other than the date of Substantial Completion for the Work, or a designated portion of the Work, submit written warranties upon request of the OWNER.

B. When a designated portion of the Work is completed and occupied or used by the OWNER, by separate agreement with the Contractor during the construction period, submit properly executed warranties to the OWNER within fifteen (15) days of completion of that designated portion of the Work.

C. At Substantial Completion, compile two (2) copies of each required warranty and bond properly executed by the Contractor, or by the Contractor’s subcontractor, supplier, or MANUFACTURER.

Organize the warranty documents into an orderly sequence based on the table of contents of the Project Manual.

D. Bind warranties and bonds in heavy-duty, commercial quality, durable 3-ring vinyl covered loose-leaf binders, thickness as necessary to accommodate contents and sized to receive 8-1/2in by 11-in paper.

ITB No.: 26-403/DL 01740 - 2

E. Table of Contents: Neatly typed, in the sequence of the Table of Contents of the Project Manual, with each item identified with the number and title of the specification Section in which specified, and the name of the product or work item.

F. Provide heavy paper dividers with celluloid covered tabs for each separate warranty. Mark the tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product, and the name, address and telephone number of the installer, supplier and

MANUFACTURER.

G. Identify each binder on the front and the spine with the typed or printed title “WARRANTIES AND BONDS”, the Project title or name, and the name, address and telephone number of the Contractor.

1.04 WARRANTY REQUIREMENT

A. Related Damages and Losses: When correcting warrantied Work that has failed, remove and replace other Work that has been damaged as a result of such failure or that must be removed and replaced to provide access for correction of warrantied Work.

B. Reinstatement of Warranty: When Work covered by a warranty has failed and been corrected by replacement or rebuilding, reinstate the warranty by written endorsement. The reinstated warranty shall be equal to the original warranty with an equitable adjustment for depreciation.

C. Replacement Cost: Upon determination that Work covered by a warranty has failed, replace or rebuild the Work to an acceptable condition complying with requirements of Contract Documents.

The Contractor is responsible for the cost of replacing or rebuilding defective Work regardless of whether the OWNER has benefited from use of the Work through a portion of its anticipated useful service life.

D. OWNER’s Recourse: Written warranties made to the OWNER are in addition to implied warranties, and shall not limit the duties, obligations, rights and remedies otherwise available under the law, nor shall warranty periods be interpreted as limitations on time in which OWNER can enforce such other duties, obligations, rights, or remedies.

E. Rejection of Warranties: The OWNER reserves the right to reject warranties and to limit selections to products with warranties not in conflict with requirements of the Contract Documents.

F. The OWNER reserves the right to refuse to accept Work for the

Project where a special warranty, certification, or similar

ITB No.: 26-403/DL 01740 - 3 commitment is required on such Work or part of the Work, until evidence is presented that entities required to countersign such commitments are willing to do so.

G. Disclaimers and Limitations: MANUFACTURER’s disclaimers and limitations on product warranties do not relieve the Contractor of the warranty on the Work that incorporates the products, nor does it relieve suppliers, MANUFACTURERS and subcontractors required to countersign special warranties with the Contractor.

H. Separate Prime Contracts: Each Prime Contractor is responsible for warranties related to its own Contract.

I. Engineer of Record shall verify that the contractor’s bond is in effect during the one (1) year warranty period.

1.05 DEFINITIONS

A. Standard Product Warranties are preprinted written warranties published by individual MANUFACTURERS for particular products and are specifically endorsed by the MANUFACTURER to the OWNER.

B. Special Warranties are written warranties required by or incorporated in the Contract Documents, either to extend time limits provided by standard warranties or to provide greater rights for the OWNER.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED

END OF SECTION