Storm Drain Pipe Specification Section
This is a technical specification document for storm drain pipe installation, prepared in accordance with Bristol Township's 2026 Road Paving, Inlet Replacement, and Curb Ramp Program in Pennsylvania. The specification outlines requirements for storm sewer pipelines and establishes standards for materials, installation methods, and quality assurance. The Work includes the installation of storm drain pipe systems in various diameters and materials, with coordination across multiple related construction sections including soil erosion control, excavation and backfill, storm inlet replacement, and manhole installation. The specification references PennDOT Publication 408 and references related work sections that are integral to the overall project scope.
The specification establishes product requirements for four primary pipe types: corrugated galvanized steel pipe (12 to 18-inch diameters with specified gauges and corrugation sizes), non-reinforced concrete pipe meeting ASTM C14 Class 3 minimum standards, reinforced concrete pipe meeting ASTM C76 Class III minimum standards, and smooth-lined corrugated polyethylene pipe. All materials must comply with referenced AASHTO and ASTM standards, with manufacturers required to submit descriptive literature, assembly instructions, and recommendations. Installation requirements mandate proper trench preparation with bedding materials, pipe laying upgrade with bells or grooves pointing upstream, proper joint assembly using preformed rubber gaskets or mortar, and thorough inspection for line and grade compliance. Backfilling may only proceed after Resident Project Representative examination, with mortared joints requiring proper curing conditions before backfill operations commence.
View the file
Other files
Show 40 more
Latest 50 of 75 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STORM DRAIN PIPE
33 41 00-1
SECTION 33 41 00
PART 1 - GENERAL
1.01 SECTION DESCRIPTION
A. The Work Of This Section Includes:
1. Storm sewer pipelines
1.02 RELATED SECTIONS
A. Related Work Specified Elsewhere:
1. Section 01 57 13: Soil Erosion & Sediment Control
2. Section 31 23 16.26 Rock Removal
3. Section 31 23 33: Excavation, Backfill & Compaction
4. Section 32 12 23: Restoration of Paved Surfaces
5. Section 32 93 00: Landscaping
6. Section 33 44 14: Storm Inlets, Catch Basins, Endwalls, End Sections
7. Section 33 49 13: Storm Manholes
1.03 QUALITY ASSURANCE
A. Reference Standards:
1. American Association of State Highway and Transportation Officials (AASHTO):
M36 Specification for Corrugated Steel Pipe, Metallic - Coated, for Sewers and Drains.
M294 Specification for Corrugated Polyethylene Pipe, 12-to 24-inch Diameter.
2. American Society for Testing and Materials (ASTM):
A760 Specification for Corrugated Steel Pipe, Metallic-Coated, for Sewers and Drains.
C14 Specification for Concrete Sewer, Storm Drain and Culvert Pipe.
C76 Specification for Reinforced Concrete Culvert Storm Drain, and Sewer Pipe.
C507 Specification for Reinforced Concrete Elliptical Culvert, Storm Drain, and
Sewer Pipe.
3. Pennsylvania Department of Transportation: Publication 408 Specifications
1.04 SUBMITTALS
A. Manufacturer's Literature:
1. Submit manufacturer's descriptive literature for the following items in accordance with Section 01 33 00:
33 41 00-2
• Pipe
• Pipe fittings
• Joints
2. Submit manufacturer's instructions and recommendations for the following items in accordance with Section 01 33 00
• Assembly of joints
1.05 PRODUCT DELIVERY, STORAGE AND HANDLING
A. During loading, transporting and unloading, exercise care to prevent damage to materials.
B. Do not drop pipe or fittings.
C. Other Requirements:
1. Section 01 60 00 also addresses transportation and handling along with storage and protection of materials and equipment.
PART 2 - PRODUCTS
2.01 CORRUGATED GALVANIZED STEEL PIPE
A. Pipe, End Sections and Coupling Bands:
1. Section 601.2, Publication 408 Specifications.
2. AASHTO M36, Type I or ASTM A760, Type 1.
3. Metal sheet thickness and corrugation size as noted below unless otherwise indicated on Drawings.
Pipe Diameter Wall Thickness Corrugation Size
12 in. 0.064 in. (16 gauge) 2 2/3 in. x ½ in. helical 15 in. 0.064 in. (16 gauge) 2 2/3 in. x ½ in. helical 18 in. 0.079 in. (14 gauge) 2 2/3 in. x ½ in. helical
2.02 NON-REINFORCED CONCRETE PIPE
A. Pipe:
1. ASTM C14, Minimum Class 3 unless otherwise indicated on Drawings.
B. Joints:
1. Bell and spigot, or
2. Tongue and groove
2.03 REINFORCED CONCRETE PIPE
33 41 00-3
A. Pipe and Fittings:
1. ASTM C76, Minimum Class III unless otherwise indicated on Drawings.
2.04 ELLIPTICAL REINFORCED CONCRETE PIPE
A. Pipe:
1. ASTM C507, Minimum Class HE-A or VE-II unless otherwise indicated on Drawings.
2.05 SMOOTH LINED CORRUGATED POLYETHYLENE PIPE
A. Pipe
1. Section 601.2(a)6.d.&e., Publication 408 Specifications
2. AASHTO M294, Type C (Corrugated) and Type S (Smooth-lined)
B. Joints
1. Hancor Titeline Watertight Joints or approved equal
PART 3 - EXECUTION
3.01 PREPARATION
A. Perform trench excavation to the line and grade shown on the Drawings and as specified in
Section 31 23 33.
B. Provide pipe bedding as specified in Section 31 23 33 for each type of pipe used. Place aggregate in a manner to avoid segregation, and compact to the maximum practical density so that the pipe can be laid to the required tolerances.
3.02 LAYING PIPE IN TRENCHES
A. Give ample notice to the Resident Project Representative in advance of pipe laying operations.
B. Lower pipe into trench using handling equipment designed for the purpose to assure safety of personnel and to avoid damage to pipe. Do not drop pipe.
C. Lay pipe proceeding upgrade with the bell or groove pointing upstream.
33 41 00-4
D. Lay pipe to a true uniform line with the barrel of the pipe resting solidly in bedding material throughout its length. Excavate recesses in bedding material to accommodate joints, fittings, and appurtenances.
E. Lay each section of pipe to form a close concentric joint with the adjoining section and to avoid offsets in the flow line.
F. Clean and inspect each pipe and fitting before joining. Align pipe with previously laid sections.
G. Assemble joints in accordance with the pipe manufacturer's instructions. Pipe joints shall consist of a preformed rubber gasket or be mortared except for interlocking style pipe and pipe joined with bands.
1. For mortared joints, mortar the lower half of the joint before placing the succeeding pipe section to bring the inner surface of the abutting pipe flush. Before placing mortar, wet the pipe with as much water as it will readily absorb. Fill the outside of bell- and-spigot pipe joints with mortar, flush with the bell end. Fill tongue-and-groove pipe joints flush with the pipe's outside surface. On the inside of the pipe, fill the lower half of the joint flush with mortar, wipe clean, and finish smoothly. For pipes of 24-inch diameter and larger, fill the joints for the entire inside periphery in the same manner. Fill voids for lift holes with mortar after pipe is placed.
H. Check each pipe installed as to line and grade in place. Correct deviation from line and grade immediately. A deviation from the designed grade as shown on the Drawings, or deflection of pipe joints, will be cause for rejection.
I. Place and compact sufficient backfill to hold each section of pipe firmly in place as the pipe is laid.
3.03 BACKFILLING TRENCHES
A. Backfill pipeline trenches only after examination of pipe laying by the Resident Project Representative.
1. If joints are mortared, backfilling may proceed immediately only if the operation will avoid joint damage, maintain pipe in proper alignment and grade, and provide satisfactory curing conditions for mortar.
B. Backfill and compact trenches as specified in Section 31 23 33.
END OF SECTION