23-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf

PDF 130 KB Posted

Attached to
Bristol Township 2026 Road Paving, Inlet Replacement, and Curb Ramp Program
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This is a Surety Company Agreement document issued by Bristol Township, Pennsylvania for Contract #25-01237: 2026 Road Paving, Inlet Replacement, and Curb Ramp Program. The agreement establishes the surety company's commitment to provide Performance and Payment Bonds, each in an amount equal to 100% of the contract value, to guarantee the contractor's faithful performance and proper fulfillment of project obligations. The surety company must execute and deliver the required bonds to Bristol Township at 2501 Bath Road, Bristol, PA 19007 within the timeframe specified in the contract documents, provided the contract is awarded to the bidder within sixty (60) days after bid opening or as otherwise outlined in the Instructions to Bidders. The project encompasses milling, base repair, leveling course, manhole rim adjustments, inlet design and replacements, wearing course installation along various township roads, and ADA/PennDOT compliant curb ramp installation with associated sidewalks, curbing, utility adjustments, and sign work at specified locations.

The surety company is obligated to comply with all material, labor, and equipment requirements in accordance with PennDOT Publication 408 and Township Standards. Should the surety company fail to execute the required bonds after award notification, it shall compensate Bristol Township for any difference between the bidder's proposal amount and the actual cost incurred by the township to procure the work elsewhere, less any amount recovered through forfeiture of the proposal security. The agreement must be executed by an authorized representative of the surety company, with documentation of signing authority required if executed by anyone other than the President or Vice President.

View the file

Other files

File Type Posted
24-Doc 00 52 00 - AGREEMENT.pdf PDF
56-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
72-Sec 33 41 00 - STORM DRAIN PIPE.pdf PDF
17-Doc 00 21 13.1 - ELECTRONIC BIDDING INSTRUCTIONS.pdf PDF
70-Sec 32 05 19.13 - GEOTEXTILE.pdf PDF
60-Sec 31 11 00 - CLEARING AND GRUBBING.pdf PDF
71-Sec 32 17 26 - ADA DETECTABLE WARNING SURFACE.pdf PDF
58-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
14-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
7-010 Curb Ramp Construction Notes and Details.pdf PDF
36-Doc 00 73 00 - 01 - APPENDIX A COVER.pdf PDF
1-05 2026 Inlet Program Map - Dixon Ave.pdf PDF
57-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
47-Sec 01 22 00 - 03 - EXHIBITS E-F.pdf PDF
40-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
59-Sec 31 20 00 - EARTHWORK.pdf PDF
49-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
29-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
35-Doc 00 73 00 - 03 - APPENDIX C COVER.pdf PDF
8-08 BT Curb Ramp Program Plumbridge.pdf PDF
15-Doc 00 11 13 ADVERTISEMENT FOR BIDS-FULL PROGRAM.pdf PDF
12-Doc 00 91 13 - ADDENDA.pdf PDF
6-02 2026 Road Program Striping Details.pdf PDF
74-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
45-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
67-Sec 33 44 14 - STORM INLETS CATCH BASINS ENDWALLS END SECTIONS.pdf PDF
69-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
18-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
3-04 2026 Inlet Program Map - Red Cedar Section.pdf PDF
52-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
63-Sec 02 41 16 - DEMOLITION.pdf PDF
5-06 Inlet Layout Sketches.pdf PDF
39-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
62-Sec 31 23 00 - EXCAVATION BACKFILL AND COMPACTION FOR ROADWAYS.pdf PDF
11-Doc 00 01 10 -TABLE OF CONTENTS.pdf PDF
75-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
26-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
37-Doc 00 73 00 - 00 - SUPPLEMENTARY CONDITIONS.pdf PDF
50-Sec 01 22 00 - 02 - EXHIBITS C-D.pdf PDF
48-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
30-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
76-Sec 32 92 00 - FINISH GRADING SEEDING AND SODDING.pdf PDF
10-09 BT Curb Ramp Program Red Cedar.pdf PDF
2-07 Stormwater Details.pdf PDF
25-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
38-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
13-Doc 00 01 15 - LIST OF DRAWINGS.pdf PDF
19-Doc 00 45 13.1 - CONTRACTOR RESPONSIBILITY CERTIFICATION.pdf PDF
16-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
64-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AGREEMENT OF SURETY COMPANY

00 45 53-1

DOCUMENT 00 45 53

AGREEMENT OF SURETY COMPANY

We,_____________________________________as Surety, a corporation existing under the laws of the (Surety Company)

State of ________________________, and authorized to transact business in the Commonwealth of Pennsylvania hereby agree intending to be legally bound hereby, to execute and deliver to

Bristol Township, 2501 Bath Road, Bristol, PA 19007 within the time limit specified in the Contract Documents, (Owner, Name and Address) the Performance Bond and Payment Bond in the forms included in the Contract Documents or equivalent each in an amount of 100% of the contract amount, in favor of Owner, as required for the faithful performance and proper fulfillment of Contract #25-01237: 2026 Road Paving, Inlet Replacement, and Curb Ramp Program on behalf of

(Bidder, Name and Address) provided that the above contract is awarded to Bidder within sixty (60) days after the date of opening of the bids or otherwise as set forth in the Instructions to Bidders.

Surety Company further agrees that should Surety Company, after notification of such award, omit or refuse to execute the required bonds then Surety Company shall pay to Owner any difference between the total amount specified in Bidder's proposal for the required work and the amount for which Owner may procure the same work if the latter amount be in excess of the former and after deduction therefrom of payment made by reason of the forfeiture of the proposal security.

IN WITNESS WHEREOF, the Surety Company has hereunto set its hand and seal this _____ day of

_____________________, 20____.

SURETY

Company:

(Corp. Seal) Signature:

Name and Title:

NOTE: This statement, if executed by any person other than the President or Vice President of the

Surety Company, must be accompanied by a current and effective certificate showing authority conferred upon the person so signing to execute such instruments on behalf of the Surety Company represented.

END OF DOCUMENT

File details come from the government source that posted it. Updated .