About this file

This is a Bidder Qualification Statement form for Bristol Township in Pennsylvania related to Contract No. 2025-01237 for the 2026 Road Paving, Inlet Replacement, and Curb Ramp Program. The project encompasses milling, base repair, leveling course, manhole rim adjustments, inlet design and replacements, and wearing course work along various township roads, along with the installation of ADA/PennDOT-compliant curb ramps, sidewalks, curbing, and utility adjustments at specified locations. All work must comply with PennDOT Publication 408 and Township Standards. The statement must be submitted as part of the bid, and failure to provide a fully completed and executed form may result in bid rejection.

The Bidder Qualification Statement requires comprehensive documentation including organizational background, work history on similar projects completed within the past five years, current projects in progress, details on any contract defaults or failures, principal personnel construction experience, bonding company information, banking references, trade references, and an audited financial statement. Bidders must identify their organizational structure, years in business as a contractor, subcontractor work portions, and provide an affidavit affirming the truthfulness of submitted information. The form does not specify pricing details, set-asides, award dates, or contract term information within this qualification document itself.

View the file

Other files

File Type Posted
24-Doc 00 52 00 - AGREEMENT.pdf PDF
56-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
72-Sec 33 41 00 - STORM DRAIN PIPE.pdf PDF
17-Doc 00 21 13.1 - ELECTRONIC BIDDING INSTRUCTIONS.pdf PDF
70-Sec 32 05 19.13 - GEOTEXTILE.pdf PDF
60-Sec 31 11 00 - CLEARING AND GRUBBING.pdf PDF
71-Sec 32 17 26 - ADA DETECTABLE WARNING SURFACE.pdf PDF
58-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
14-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
7-010 Curb Ramp Construction Notes and Details.pdf PDF
36-Doc 00 73 00 - 01 - APPENDIX A COVER.pdf PDF
1-05 2026 Inlet Program Map - Dixon Ave.pdf PDF
57-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
47-Sec 01 22 00 - 03 - EXHIBITS E-F.pdf PDF
40-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
59-Sec 31 20 00 - EARTHWORK.pdf PDF
49-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
29-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
35-Doc 00 73 00 - 03 - APPENDIX C COVER.pdf PDF
8-08 BT Curb Ramp Program Plumbridge.pdf PDF
15-Doc 00 11 13 ADVERTISEMENT FOR BIDS-FULL PROGRAM.pdf PDF
12-Doc 00 91 13 - ADDENDA.pdf PDF
6-02 2026 Road Program Striping Details.pdf PDF
74-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
45-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
67-Sec 33 44 14 - STORM INLETS CATCH BASINS ENDWALLS END SECTIONS.pdf PDF
69-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
3-04 2026 Inlet Program Map - Red Cedar Section.pdf PDF
52-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
63-Sec 02 41 16 - DEMOLITION.pdf PDF
5-06 Inlet Layout Sketches.pdf PDF
39-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
62-Sec 31 23 00 - EXCAVATION BACKFILL AND COMPACTION FOR ROADWAYS.pdf PDF
11-Doc 00 01 10 -TABLE OF CONTENTS.pdf PDF
75-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
26-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
37-Doc 00 73 00 - 00 - SUPPLEMENTARY CONDITIONS.pdf PDF
50-Sec 01 22 00 - 02 - EXHIBITS C-D.pdf PDF
48-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
30-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
76-Sec 32 92 00 - FINISH GRADING SEEDING AND SODDING.pdf PDF
10-09 BT Curb Ramp Program Red Cedar.pdf PDF
2-07 Stormwater Details.pdf PDF
25-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
38-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
13-Doc 00 01 15 - LIST OF DRAWINGS.pdf PDF
19-Doc 00 45 13.1 - CONTRACTOR RESPONSIBILITY CERTIFICATION.pdf PDF
23-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
16-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
64-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDER QUALIFICATION STATEMENT

00 45 13-1

DOCUMENT 00 45 13

1. INTRODUCTION

1.1 This document must be included as part of the Bid submission. Failure to submit a fully completed and executed Bidder Qualification Statement may be considered justification for rejection of the bid.

1.2 This Bidder Qualification Statement is submitted with respect to the following project:

Contract No: 2025-01237

Contract For: 2026 Road Paving, Inlet Replacement, and Curb Ramp Program

2. GENERAL INFORMATION

2.1 Name of Bidder:

2.2 Address of Bidder:

2.3 Telephone No. of Bidder:

3. ORGANIZATIONAL BACKGROUND

3.1 Type of Organization:

Corporation Individual

Partnership Joint Venture

Other:

3.2 How long has your organization been in business

a. As a Contractor? years

b. As a Contractor engaged in construction work of the type proposed under this Contract:______ years

c. Under your current business name? ______ years

3.3 If the bidder is a corporation, complete this section:

a. Date & State of Incorporation:

00 45 13-2

b. Names & Titles of Officers:

3.4 If the Bidder is other than a corporation, describe the structure of your organization including date of initiation as a business and list the principals involved:

3.5 What portions of the work (i.e. trades work items, etc.) included in the proposed contract will be performed by subcontractors?

4. WORK HISTORY

4.1 Attach or list the following information on similar projects which your organization has completed in the past five (5) years. Name and type of project, owner, engineer, contract amount, date of completion.

00 45 13-3

4.2 Attach or list the following information on similar project which your organization now has in progress. Name and type of project, owner, engineer, contract amount, scheduled date of completion.

4.3 Has your organization ever defaulted on or otherwise failed to complete any work under contract? If so, note the circumstances:

4.4 Has any officer, partner or principal of your organization ever been an officer, partner or principal of another organization which defaulted on or otherwise failed to complete any work under contract? If so, note the circumstances:

4.5 Provide the construction experience (length, type) of the principal individuals of your organization which would be assigned to perform the proposed work under this Contract:

5. REFERENCES

5.1 Bonding Company

and Agent

00 45 13-4

5.2 Bank

5.3 Trade

6. FINANCIAL STATEMENT

6.1 Attach a copy of a recent financial statement as prepared by your auditor.

7. CERTIFICATION

7.1 This Bidder Qualification Statement has been prepared on behalf of the following organization:

Name of Organization:

Name of Preparer:

Title of Preparer:

Date:

7.2 AFFIDAVIT

State of , County of

I, , being duly sworn, according to (Name of Official) law, depose and say that I am the ___, (position) of the above organization, and that the responses provided in the Bidder Qualification

Statement, including any attachments thereto are true and correct to the best of my knowledge and belief.

Sworn and Subscribed _________________________ (Signature of Official) to before me this day of , 20 .

Notary Public

END OF DOCUMENT