63-Sec 02 41 16 - DEMOLITION.pdf

PDF 116 KB Posted

Attached to
Bristol Township 2026 Road Paving, Inlet Replacement, and Curb Ramp Program
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This is a Demolition specification document (Section 02 41 16) for the Bristol Township 2026 Road Paving, Inlet Replacement, and Curb Ramp Program in Pennsylvania. The specification outlines the removal of designated concrete curbs and sidewalks as part of the broader road infrastructure project. The work requires contractors to conduct demolition while minimizing interference with traffic and maintaining protected egress and access throughout the project duration. Contractors must coordinate with temporary barrier installation, protect existing facilities and adjoining properties, and restore any damaged asphalt pavement in accordance with contract specifications. Pennsylvania Act 172 requirements mandate that contractors contact the Pennsylvania One Call System at least three days prior to excavation work to locate and verify underground utilities before commencing demolition activities.

The specification establishes restoration product standards requiring materials equal to or better than original quality and mandates daily cleanup with immediate removal of demolished materials from the site. Contractors are responsible for properly disconnecting, removing, and capping designated utility services, with location documentation required on Project Record Documents. All contaminated, vermin-infested, or dangerous materials must be removed and disposed of in state-approved disposal areas at the contractor's expense. The specification requires contractors to conduct thorough site examinations prior to work commencement, report any discrepancies to the Engineer, and implement appropriate erosion and sediment control measures before starting demolition activities. No specific pricing, award dates, or contract term information is provided in this technical specification document.

View the file

Other files

File Type Posted
24-Doc 00 52 00 - AGREEMENT.pdf PDF
56-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
72-Sec 33 41 00 - STORM DRAIN PIPE.pdf PDF
17-Doc 00 21 13.1 - ELECTRONIC BIDDING INSTRUCTIONS.pdf PDF
70-Sec 32 05 19.13 - GEOTEXTILE.pdf PDF
60-Sec 31 11 00 - CLEARING AND GRUBBING.pdf PDF
71-Sec 32 17 26 - ADA DETECTABLE WARNING SURFACE.pdf PDF
58-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
14-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
7-010 Curb Ramp Construction Notes and Details.pdf PDF
36-Doc 00 73 00 - 01 - APPENDIX A COVER.pdf PDF
1-05 2026 Inlet Program Map - Dixon Ave.pdf PDF
57-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
47-Sec 01 22 00 - 03 - EXHIBITS E-F.pdf PDF
40-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
59-Sec 31 20 00 - EARTHWORK.pdf PDF
49-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
29-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
35-Doc 00 73 00 - 03 - APPENDIX C COVER.pdf PDF
8-08 BT Curb Ramp Program Plumbridge.pdf PDF
15-Doc 00 11 13 ADVERTISEMENT FOR BIDS-FULL PROGRAM.pdf PDF
12-Doc 00 91 13 - ADDENDA.pdf PDF
6-02 2026 Road Program Striping Details.pdf PDF
74-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
45-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
67-Sec 33 44 14 - STORM INLETS CATCH BASINS ENDWALLS END SECTIONS.pdf PDF
69-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
18-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
3-04 2026 Inlet Program Map - Red Cedar Section.pdf PDF
52-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
5-06 Inlet Layout Sketches.pdf PDF
39-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
62-Sec 31 23 00 - EXCAVATION BACKFILL AND COMPACTION FOR ROADWAYS.pdf PDF
11-Doc 00 01 10 -TABLE OF CONTENTS.pdf PDF
75-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
26-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
37-Doc 00 73 00 - 00 - SUPPLEMENTARY CONDITIONS.pdf PDF
50-Sec 01 22 00 - 02 - EXHIBITS C-D.pdf PDF
48-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
30-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
76-Sec 32 92 00 - FINISH GRADING SEEDING AND SODDING.pdf PDF
10-09 BT Curb Ramp Program Red Cedar.pdf PDF
2-07 Stormwater Details.pdf PDF
25-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
38-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
13-Doc 00 01 15 - LIST OF DRAWINGS.pdf PDF
19-Doc 00 45 13.1 - CONTRACTOR RESPONSIBILITY CERTIFICATION.pdf PDF
23-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
16-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
64-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEMOLITION

02 41 16-1

SECTION 02 41 16

PART 1 - GENERAL

1.01 WORK INCLUDED

A. Remove all items shown on the plans including the following:

1. Remove designated concrete curb and sidewalk.

1.02 RELATED WORK

A. Section 31 23 33: Excavation, Backfill and Compaction

1.03 EXISTING CONDITIONS

A. Conduct demolition to minimize interference with traffic and other property access. Maintain protected egress and access at all times.

B. Provide, erect, and maintain temporary barriers and security devices.

C. Traffic

1. Conduct site preparation, removals and salvaging operations to ensure minimum interference with roads, streets, walks and other adjacent occupied or used facilities. Do not close or obstruct streets, walks or other occupied or used facilities without permission from authorities having jurisdiction.

D. Protection

1. Contractor shall minimize removal of existing asphalt pavement. In the event curb and sidewalk cannot be removed without damaging pavement, restore damaged pavement in accordance with Section 32 12 23.

2. Contractor shall be responsible for the protection of existing facilities and improvements, indicated to remain in place, within the area of the site where his work is being done.

3. Contractor shall be responsible for the protection of existing facilities on adjoining properties.

4. Any disturbances to the work and improvements or any impairment of facilities resulting from work of this Section, shall be promptly restored, repaired or replaced at no extra cost to the owner.

E. Protection of Existing Utilities

1. Pursuant to the requirements of Pennsylvania Act 172, the Contractor shall contact the Pennsylvania One Call System at 1-800-242-1776 at least three days prior to any excavation work.

2. Utility companies owning services that will be affected by alteration and removal of demolition work shall be notified in advance according to the requirements of the utility.

3. The existence and location of underground utilities are not guaranteed and shall be

02 41 16-2 investigated and verified in the field by the Contractor before starting work. Excavation in the vicinity of the existing utilities shall be carried on with extreme caution. Utilities encountered on the Owner's property are to be maintained in existing condition unless otherwise indicated on the drawings. All existing underground utilities, storm piping and associated structures designated for removal shall be completely removed in accordance with the utility company or agency having jurisdiction. Underground utilities designated to be abandoned in place shall be properly plugged and abandoned in accordance with the regulations of the utility company or agency having jurisdiction. Material removed shall be disposed of off-site in a lawful manner.

PART 2 - PRODUCTS

2.01 GENERAL

A. Products and materials utilized in this item of work shall be subject to the approval of the Owner’s representative.

2.02 RESTORATION

A. Products and materials used in restoration and repair of private and public property shall be of a quality equal to or better than the original project or material.

PART 3 - EXECUTION

3.01 PREPARATION

A. Locate existing active utilities and verify whether each utility will remain in service and therefore requires protection of is part of the demolition and removal activity.

B. Protect existing items which are not indicated to be altered.

C. Prior to starting work make arrangements with the proper authorities for turning off and disconnecting utilities in conjunction with demolition activities. Disconnect, remove, and cap designated utility services within demolition areas. Mark location of disconnected utilities.

Identify and indicate capping locations on Project Record Documents.

D. Visit the premises and verify all conditions covering the work of this Section and verify all dimensions. Examine all drawings covering the work of this Section and refer to all other drawings that may affect the work of this Section or require coordination with other trades.

Before starting the work of this Section, make a thorough examination of all portions of the premises in which the work of this Section is to be performed. Check all of the work adjoining, adjacent to, and underlying the locations where the work of this Section is to be performed. Report to the Engineer any and all conditions that may interfere with or otherwise affect or prevent the proper execution and/or completion of the work of this Section. Do not commence work until any and all such conditions have been corrected by the trade or trades responsible.

E. Demolish in an orderly and careful manner. Protect any existing structures to remain from damage.

F. Do not disturb existing paving unless it becomes necessary to do so in order to complete other work.

G. Except where noted otherwise, immediately remove demolished materials from site.

H. Remove materials to be re installed or retained in manner to prevent damage.

02 41 16-3

I. Remove and promptly dispose of contaminated, vermin infested, or dangerous materials encountered.

J. Remove demolished materials from site as work progresses. Upon completion of work, leave areas of work in clean condition.

K. In the event of discrepancy, immediately notify the Owner’s Engineer. Do not proceed with work of this Section in areas of discrepancy until all such discrepancies have been fully resolved. Should any work performed under this Section expose previously unknown major conditions, all work shall be stopped and the matter reported immediately to the Engineer for instructions. However, the Contractor shall use any measures necessary to insure adequate safety conditions.

L. Appropriate erosion and sediment control measures (as shown on the Contract Drawings or otherwise required to complete the work) should be installed prior to commencement of work of this Section.

3.03 CLEAN-UP

A. Execute work in such a manner as to avoid interference with, use of, or passage to and from adjoining spaces and facilities. Do not burn materials or debris on premises. Remove from the site all rubbish and debris resulting from work of this Section.

B. Do not allow the accumulation of scraps and debris arising from the work of this Section.

Maintain the premises in a neat and orderly condition at all times. Daily clean-up of construction areas is required.

3.04 DISPOSAL OF DEBRIS

A. All items of demolition within the contract limits, including stones, rubbish, utility lines and fixtures, plant material, and similar items shall be, unless otherwise directed, the Contractor's property and shall promptly be removed from the site and disposed of in a legal manner, in a state approved disposal area.

END OF SECTION