19-Doc 00 45 13.1 - CONTRACTOR RESPONSIBILITY CERTIFICATION.pdf

PDF 114 KB Posted

Attached to
Bristol Township 2026 Road Paving, Inlet Replacement, and Curb Ramp Program
Solicitation number
Not on record
Issued by
Bucks County, Pennsylvania

About this file

This is a Contractor Responsibility Certification form required by Bristol Township, Pennsylvania for the 2026 Road Paving, Inlet Replacement, and Curb Ramp Program (Contract #2025-01237). The project encompasses milling, base repair, leveling course, manhole rim adjustments, inlet design and replacements, and wearing course work along various township roads, along with the installation of ADA/PennDOT compliant curb ramps, sidewalks, curbing, utility adjustments, and sign relocation/installation at specified locations. All work must comply with PennDOT Publication 408 and Township Standards. The certification requires contractors to submit documentation of their technical qualifications, resources, equipment, personnel, and financial capacity to perform the contract work or to obtain such resources through qualified subcontractors.

The certification form requires contractors to affirm they have not been debarred, defaulted on projects, had licenses revoked, committed safety violations, or violated contracting-related laws within the past three years. Contractors must also disclose any business relationships with other construction, maintenance, service, or repair entities and provide evidence of participation in a Class A Apprenticeship Program. Contractors must provide a subcontractors list and related information if awarded the contract. Bristol Township reserves the right to request additional information to evaluate prospective contractors' qualifications, resources, performance capabilities, and community impact. Certifications may be submitted electronically as required by the Township.

View the file

Other files

File Type Posted
24-Doc 00 52 00 - AGREEMENT.pdf PDF
56-Sec 01 42 13 - ORGANIZATION AND REFERENCE ACRONYMS.pdf PDF
72-Sec 33 41 00 - STORM DRAIN PIPE.pdf PDF
17-Doc 00 21 13.1 - ELECTRONIC BIDDING INSTRUCTIONS.pdf PDF
70-Sec 32 05 19.13 - GEOTEXTILE.pdf PDF
60-Sec 31 11 00 - CLEARING AND GRUBBING.pdf PDF
71-Sec 32 17 26 - ADA DETECTABLE WARNING SURFACE.pdf PDF
58-Sec 10 14 53 - POST MOUNTED SIGNS.pdf PDF
14-Doc 00 01 01 - TITLE SHEET AND COVER.pdf PDF
7-010 Curb Ramp Construction Notes and Details.pdf PDF
36-Doc 00 73 00 - 01 - APPENDIX A COVER.pdf PDF
1-05 2026 Inlet Program Map - Dixon Ave.pdf PDF
57-Sec 03 20 00 - CONCRETE REINFORCEMENT.pdf PDF
47-Sec 01 22 00 - 03 - EXHIBITS E-F.pdf PDF
40-Sec 01 11 13 - SUMMARY OF WORK.pdf PDF
59-Sec 31 20 00 - EARTHWORK.pdf PDF
49-Sec 01 31 00 - COORDINATION AND MEETINGS.pdf PDF
29-Doc 00 61 13.16 - PAYMENT BOND.pdf PDF
35-Doc 00 73 00 - 03 - APPENDIX C COVER.pdf PDF
8-08 BT Curb Ramp Program Plumbridge.pdf PDF
15-Doc 00 11 13 ADVERTISEMENT FOR BIDS-FULL PROGRAM.pdf PDF
12-Doc 00 91 13 - ADDENDA.pdf PDF
6-02 2026 Road Program Striping Details.pdf PDF
74-Sec 32 17 23.33 - THERMOPLASTIC PAVEMENT MARKINGS.pdf PDF
45-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf PDF
67-Sec 33 44 14 - STORM INLETS CATCH BASINS ENDWALLS END SECTIONS.pdf PDF
69-Sec 03 11 00 - CONCRETE FORMWORK.pdf PDF
18-Doc 00 45 13 - BIDDER QUALIFICATION STATEMENT.pdf PDF
3-04 2026 Inlet Program Map - Red Cedar Section.pdf PDF
52-Sec 01 60 00 - MATERIAL AND EQUIPMENT.pdf PDF
63-Sec 02 41 16 - DEMOLITION.pdf PDF
5-06 Inlet Layout Sketches.pdf PDF
39-Doc 00 61 19 - MAINTENANCE BOND.pdf PDF
62-Sec 31 23 00 - EXCAVATION BACKFILL AND COMPACTION FOR ROADWAYS.pdf PDF
11-Doc 00 01 10 -TABLE OF CONTENTS.pdf PDF
75-Sec 32 01 17.61 - POLYMER MODIFED ASPHALT JOINT AND CRACK SEALING.pdf PDF
26-Doc 00 65 19.16 - CONTRACTORS RELEASE OF LIENS.pdf PDF
37-Doc 00 73 00 - 00 - SUPPLEMENTARY CONDITIONS.pdf PDF
50-Sec 01 22 00 - 02 - EXHIBITS C-D.pdf PDF
48-Sec 01 70 00 - CONTRACT CLOSEOUT.pdf PDF
30-Doc 00 65 19.13 - CONTRACTORS AFFIDAVIT.pdf PDF
76-Sec 32 92 00 - FINISH GRADING SEEDING AND SODDING.pdf PDF
10-09 BT Curb Ramp Program Red Cedar.pdf PDF
2-07 Stormwater Details.pdf PDF
25-Doc 00 65 19.19 - CONSENT OF SURETY.pdf PDF
38-Doc 00 61 13.13 - PERFORMANCE BOND.pdf PDF
13-Doc 00 01 15 - LIST OF DRAWINGS.pdf PDF
23-Doc 00 45 53 - AGREEMENT OF SURETY COMPANY.pdf PDF
16-Doc 00 45 10 - BIDDER ACKNOWLEDGEMENT FORM.pdf PDF
64-Sec 31 23 33 - EXCAVATION BACKFILL AND COMPACTION.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR RESPONSIBLITY CERTIFICATION

00 45 13.1-1

DOCUMENT 00 45 13.1

PROJECT IDENTIFICATION: 2026 Road Paving, Inlet Replacement, and Curb Ramp Program

CONTRACT IDENTIFICATION AND NUMBER: #2025-01237

This Certification is submitted by (Name of Firm)

CONTRACTOR ADDRESS:

CONTACT NAME:

PHONE NO: FAX NO:

1. Has the firm been debarred by any federal, state or local government agency or authority in the past three

(3) years.

YES NO

2. Has the firm defaulted on any project in the past three (3) years.

3. Has the firm had any type of business, contracting or trade license revoked or suspended by any governmental agency or authority in the past three (3) years.

4. Has the firm committed a serious or willful violation of federal or state safety laws as determined by a final decision of a court or government agency authority in the past three (3) years.

5. Has the firm been found in violation of any other law relating to its contracting business, including but limited to wage or hour laws, environmental laws, antitrust laws, licensing laws or tax laws, by a final decision of a court or government agency authority in the past three (3) years.

6. The firm has all technical qualifications and resources including equipment, personnel and financial resources, to perform the referenced contract, or will obtain same through the use of qualified, responsible subcontractors.

7. Proof of participation in a Class A Apprenticeship Program must be attached.

The Township of Bristol may require any other additional information it deems necessary to evaluate a prospective contractor’s technical qualifications, resources and performance capabilities, as well as the type of impact its operations will have on a local community impacted by the project. The Township of Bristol may require that such information be included in a Statement of Qualifications and Experience as an attachment to the Contractors Responsibility Certification.

00 45 13.1-2

(I / We) stipulate that if awarded a contract the firm will provide a subcontractors list and subcontractors information as specified.

If submitting firm is, or was in the past five years, related to any other company or business entity that provided or provides contractual services in the construction, maintenance, service or repair industries, whether as a parent company, subsidiary or any other business relationship, it shall submit a Contractor Responsibility Certification that explains in detail the nature of any such relationship, if requested.

If any person or entity that is a shareholder, owner or partner of the submitting firm owns an interest of 20% or more in another entity or previously owned such an interest in another entity that provides or has provided contractual services in the construction, maintenance, service or repair industries, it shall attach a separate statement to its Contractor Responsibility Certification that explains in detail the nature of any such relationship.

The Township of Bristol may require that Contractor Responsibility Certifications and other information required by this act be submitted electronically.

Signature

Name

Title

END OF DOCUMENT

File details come from the government source that posted it. Updated .