45-Sec 01 32 36 - AUDIO-VIDEOTAPING.pdf
PDF 116 KB Posted
- Solicitation number
- Not on record
- Issued by
- Bucks County, Pennsylvania
About this file
This is a Scope of Work specification document for audio-videotaping services required by Bristol Township, Pennsylvania for its 2026 Road Paving, Inlet Replacement, and Curb Ramp Program. The contractor must engage a professional electrographer actively experienced in preparing color DVD or CD recordings for municipal construction projects to document the entire project site and zone of influence. The electrographer must record all surface features within a minimum of 15 feet from each side of designated roadways, including existing driveways, road surfaces, sidewalks, signs, drainage culverts, visible utilities, retaining walls, railroad grade crossings, parking areas, curbs, and drainage ditches. Recording must occur during conditions of good visibility and when snow coverage does not exceed 10 percent of the project area unless otherwise authorized by the Engineer. The contractor must provide two complete copies of DVDs or CDs to the Engineer for approval before construction begins, with any unacceptable recordings re-recorded at no additional charge to the Owner.
The specifications require professional-grade equipment capable of producing NTSC-525 lines at 60 fields with minimum 500 TV lines resolution and geometric distortion not exceeding 1.5 percent of picture height. The recording medium must include both audio and video tracks recorded simultaneously, with audio containing live electrographer narration and optional Engineer comments. All DVDs or CDs must display transparent digital information including project name, date, time, location, viewing direction, and progress description on the upper left portion of the screen. The vehicle-mounted camera lens must maintain a minimum height of 12 feet from the ground, with travel speed not exceeding 48 feet per minute to ensure object clarity. All recordings become the property of the Owner upon approval and acceptance, and the electrographer is subject to Owner review and approval before work commences, with the right to reject and require replacement if qualifications are deemed insufficient.
View the file
Other files
Show 40 more
Latest 50 of 75 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUDIO-VIDEOTAPING
01 32 36-1
SECTION 01 32 36
PART 1 GENERAL
1.01 DESCRIPTION
A. Contractor shall utilize a professional electrographer who is actively engaged in preparation of color DVD or CD recordings for municipal construction projects, similar to the Work included in this Contract.
1.02 QUALITY ASSURANCE
A. Owner may make such investigations as Owner deems necessary to determine the ability of the electrographer to perform the work. Contractor shall furnish to Owner all such information and data for this purpose as requested by Owner. Owner reserves the right to reject any electrographer if the investigation of such electrographer fails to satisfy Owner that such electrographer is properly qualified to carry out the work specified herein. Upon rejection of an electrographer by Owner, Contractor shall engage the services of another electrographer, who shall be subject to a similar review and approval process by Owner specified herein, prior to approval by Owner.
B. No construction shall begin prior to review and approval of the DVD’s and/or CD’s covering the existing conditions of the entire project area by Engineer. Any recordings that are unacceptable to Engineer shall be re-recorded by the electrographer at no additional charge. All DVD’s and/or CD’s and written records shall become the property of Owner, upon approval and acceptance.
1.03 SUBMITTALS
A. Two (2) complete copies of project DVD’s and/or CD’s shall be provided to Engineer for approval.
1.04 JOB CONDITIONS
A. All recording shall be performed during days when good visibility is available. No recording shall be done during when more than ten (10) percent of the project’s ground area is covered with snow, unless otherwise authorized by Engineer.
PART 2 PRODUCTS
2.01 EQUIPMENT
A. Mobile Unit
When conventional wheeled vehicles are used, the distance from the camera lens to the ground shall be at least twelve (12) feet in order to ensure that the proper perspective is obtained. In some instances, recorded coverage will be required in areas not accessible by conventional wheeled vehicles. In that case, such coverage shall be obtained by walking or special conveyance approved by Engineer.
B. Camera
Video output from the camera used must be capable of producing NTSC-525 lines/60 field. Video output shall provide resolution in the “Y” channel, minimum 500 TV lines at center, utilizing a bias lit beam split prism, in combination with a professional and/or industrial charge-coupled device (CCD) camera, for optimum color imagery and minimum lag through 3.1 meter-candles (10 foot-candles), with geometric distortion not to exceed 1.5% of picture height at any point in the picture area.
C. Audio-video recording medium
Contractor’s electrographer shall utilize professional-grade DVD or CD recording equipment in the preparation of the project recordings. Contractor’s electrographer shall provide a sufficient quantity of DVD’s or CD’s to properly and completely record the work. DVD’s and/or CD’s shall become the property of Owner at the completion of the project.
D. Lighting
Contractor shall provide, if necessary, all lighting and power that is required to fill in any “shadow”
01 32 36-2 areas caused by trees, signs, structures, or other objects.
2.02 RECORDED INFORMATION
A. Audio
Each DVD or CD shall begin with the current date, project name and municipality, and be followed by the general location (intersecting street, municipal boundary line, etc.). The viewing side and direction of progress (northerly, southeasterly, etc.) shall also be included.
B. Video
Periodic transparent alpha-numeric information consisting of the project name, description of area covered, direction of travel, viewing side, etc. shall appear on the screen. All video recordings shall, by electronic means, display continuously and simultaneously generated transparent digital information to include the date and time of recording. The date information shall contain the month, day and year (i.e. 4/15/11) and shall be placed directly below the time information. The time information shall consist of hours, minutes and seconds, separated by colons (i.e. 11:42:22). This transparent information shall appear on the extreme upper left hand third of the screen (or as approved by Engineer).
C. Audio-Video Tracks
The DVD or CD shall consist of both visual and audio information, recorded simultaneously. Tracks shall consist of original live recordings and shall not be copies of previous recordings. Audio track shall contain the narrative commentary of the electrographer, recorded simultaneously with his fixed elevation visual record of construction. Engineer shall have the option of recording comments on the audio track.
PART 3 EXECUTION
3.01 DVD OR CD COVERAGE
A. The entire project site shall be recorded. The zone of influence shall be extended a minimum of 15 feet from each side of each roadway designated to receive a mill and overlay.
B. Recorded coverage shall include all surface features located within the above mentioned area supported by appropriate audio description. Audio description shall be made simultaneously with video coverage. Such coverage shall include, but not be limited to, all existing driveways, road surface, sidewalks, signs, drainage culverts, visible utilities, retaining walls, railroad grade crossing features, parking areas, curbs, and drainage ditches located within the zone of influence.
C. When applicable, house numbers shall be used to identify houses or other buildings, in such a manner that proposed system structures (i.e. manholes) may be located by reference.
D. The rate of speed in the direction of travel of conveyance shall not exceed 48 feet per minute.
Panning rates and zoom rates shall be controlled sufficiently so that object clarity will not be obscured during playback.
3.02 IDENTIFICATION
A. All DVD’s or CD’s (on the disk and on storage cases) shall be properly identified by number, location, date, project name, and municipality in a manner acceptable to Engineer.
B. A record of the contents of each DVD or CD shall be supplied by a sheet identifying each segment in the disk by location. This shall include roll number, street or road viewing, tape counter number, viewing side, starting point, traveling direction and ending destination point.
END OF SECTION
File details come from the government source that posted it. Updated .