7. Exhibit C5 - Building Information Sheet - Juarez Lincoln Land Port of Entry.pdf

PDF 207 KB Posted

Attached to
Laredo Texas Full Maintenance; Operations and Maintenance; Custodial, Grounds, and Related Services
Solicitation number
47PH0225R0006
Issued by

About this file

This document appears to be a detailed facility specification for the Lincoln-Juarez Port of Entry located at the termination of I-35 in Laredo, TX. The facility consists of six buildings and multiple specialized areas, with a total population of approximately 180 personnel operating 24 hours a day, 7 days a week, including Federal holidays. Key buildings include an Administration Building (Building 2), Bus Processing facility, Primary Inspection building, USDA Building, and an Import Dock, with varied rentable areas ranging from 160 SF to 42,109 SF.

The facility encompasses extensive exterior and interior spaces, including specialized inspection areas for buses, personal vehicles (POV), and trucks, with multiple canopies, inspection booths, and support spaces. Outside grounds cover 126,528 SF of lawn and shrub areas and 897,936 SF of paved area. Additional features include two kennels, loading docks, and multiple hand sanitizer dispensers strategically placed in building lobbies and pedestrian walkways. The facility is designed to support comprehensive border inspection and processing operations, with detailed specifications for each building's functional spaces, fixtures, and operational zones.

View the file

Other files

File Type Posted
47PH0225R0006 Amendment 0005 SF30.pdf PDF
CBA IUOE 351 2025 06 01-2028 05 31 Final .pdf PDF
47PH0225R0006 Amendment 0004.pdf PDF
47PH0225R0006 Amendment 0003 SF30 0 OF 12.pdf PDF
47PH0225R0006 Amendment 0003 PDF Form SF1449-21 Solicitation for Commercial Products 3 of 12.pdf PDF
47PH0225R0006 Amendment 0003 BL-1 Fire Extinguisher Report 9 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Amendment 0003 Excel Doc Figure L-1 Combined Management Plan 7 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Amendment 0003 Word Doc FIGURE L-3 Experience Worksheet 6 of 12.docx DOCX document
47PH0225R0006 Amendment 0003 Attendees to the Pre-Proposal Walk Thru Laredo Texas Full Maintenance 2 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Laredo Texas Full Maintenance Questions and Answers 11 of 12.pdf PDF
47PH0225R0006 Amendment 0003 - Notes by Gemini Pre-Proposal Meeting Laredo - 10 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Specification Laredo Texas Full Maintenance Operations and Maintenance1 of 12.pdf PDF
47PH0225R0006 Amendment 0002 SF30 PDF Form 12 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Word Doc FIGURE L-2 Past Performance Questionnaire 5 of 12.docx DOCX document
47PH0225R0006 Amendment 003 Preventive Maintenance Guide 2022 4 of 12.pdf PDF
47PH0225R0006 Amendment 0003 BL-2 Inventory to Include Fire Alarm Devices 8 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Pre-Proposal Walk Thru Schedule Laredo Texas Full Maintenance 6 of 7.pdf PDF
47PH0225R0006 Pre-Proposal Conference Presentation Laredo Texas Full Maintenance 4 of 7.pdf PDF
47PH0225R0006 Attachment 2_ Wage Determination Laredo Texas 3 of 7.pdf PDF
47PH0225R0006 Amendment 0002 SF30 1 OF 7.pdf PDF
47PH0225R0006 Questions and Answers Laredo Texas Full Maintenance 7 of 7.pdf PDF
47PH0225R0006 Amendment 0002 Specification Laredo Texas Full Maintenance Operations and Maintenance 2 of 7.pdf PDF
47PH0225R0006 Pre-Proposal Conference Notes Laredo Full Maintenance - 2025_10_14 08_25 CDT 5 of 7.pdf PDF
19.- Exhibit M9 2022 GSA PBS PM Guide.pdf PDF
3.- Exhibit C3 - Pest Control Work and Inspection Report (1).pdf PDF
18.- Exhibit M8_ Miscellaneous Best Practices Shave Energy.pdf PDF
14.- Exhibit M4 B Operating Plan Template.pdf PDF
13.- Exhibit M3_ Sustainable Products and GSA Attribute Preferences (1).pdf PDF
47PH0225R0006 Amendment 0001 Specification Laredo Texas Full Maintenance Operations and Maintenance.pdf PDF
21.- Exhibit M11_ Flag Policy.pdf PDF
6. Exhibit C5 - Building Information Sheet - Covent Land Port Of Entry (1).pdf PDF
11.- Exhibit M1 - O_M QASP Template (2).pdf PDF
47PH0225R0006 Amendment 0001 SF30 1 of 4.pdf PDF
7. Exhibit C5 - Building Information Sheet - Juarez Lincoln Land Port of Entry (1).pdf PDF
15.- Exhibit M5 - Smart Bldgs.pdf PDF
20.- Exhibit M10 Final Refrigerant Management SOP 2022.pdf PDF
2.- Exhibit C-2 M1-FM Quality Assurance Surveillance Plan (1).pdf PDF
1.- Exhibit C1- Custodial R7 Recycling & Solid Waste Trash Report - APR24.pdf PDF
12.- Exhibit M2 - Green Purchasing Report (1) (1).pdf PDF
5. Exhibit C5 - Building Information Sheet - Columbia Land Port Of Entry (1).pdf PDF
4.- Exhibit C4 - Solid Waste Audit Reports (1).pdf PDF
17.- Exhibit M7 - Electrical Testing Technicians Requisites.pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse (1).pdf PDF
16.- Exhibit M6 - Water Treatment Instructions (1).pdf PDF
9. Exhibit C5 - Building Information Sheet - Border Patrol Sector Headquarters (1).pdf PDF
47PH0225R0006 Amendment 0001 Questions and Answers 4 of 4.pdf PDF
47PH0225R0006 Amendment 0001 FIGURE L-3 Experience Worksheet 3 of 4.pdf PDF
8.- Exhibit C5 - Building Information World Trade Land Port of Entry.pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse.pdf PDF
31.- BL5 Roof Information - List of Assets.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 Facility: Lincoln-Juarez Port of Entry 07020841 Location: Termination of I-35, Laredo, TX Number of Stories:

Buildings 2 and 5: 1 story Buiildings 1, 6 and Bus Processing: 2 stories

Population: Approximately 180 Official working hours of building occupants:

24 hours a day, 7 days a week, including Federal holidays Buildings 2, interior of Building 5, and Building 6: 8:00 am to 5:00 pm, Monday through Friday, including Federal holidays

Interior Statistics:

Bus Unload Canopy TX0277JL

Rentable area see grounds SF Canopy see grounds SF

Bus Secondary Inspection Canopy TX0278JL Rentable area see grounds SF Canopy see grounds SF

FMCSA Bus Inspection Canopy TX0279JL Rentable area see grounds SF Canopy see grounds SF

Bus Reload Canopy TX0280JL Rentable area see grounds SF Canopy see grounds SF

Exit Booth TX0281JL Rentable area 31 SF Net Cleaning 31 SF Inspection Booth 31 SF

Building 2 Administration Building TX0282JL Rentable area 42,109 SF Net cleaning 28,257 SF Corridors, lobbies, entrances, enclosed pedestrian walkways 6,330 SF Toilet Rooms, holding cells, locker rooms, janitor closets

Floors 1,716 SF Fixtures 42 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 19,280 SF Exercise 316 SF Labs 615 SF

Bus Processing TX0283JL Rentable area 40,104 SF Net cleaning 34,845 SF Corridors, lobbies, entrances, enclosed pedestrian walkways 9,547 SF Toilet rooms, holding cells, locker rooms, janitor closets

Floors 6,029 SF Fixtures 60 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 17,851 SF Interior stairways 2 Flights Elevators 1 Elevators Lab 251 SF Control Booth 122 SF Garage and Ramps (sally port) 1,045 SF

Bus Hard Secondary TX0285JL Rentable area 1,768 SF Net cleaning 163 SF Toilet rooms, holding cells, locker rooms, janitor closets 82 SF

Floors Fixtures 2 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 81 SF

POV Hard Secondary TX0286JL Rentable area 3,383 SF Net cleaning 250 SF Toilet rooms, holding cells, locker rooms, janitor closets

Floors 84 SF Fixtures 2 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 82 SF Control Booth 84 SF

POV Secd Inspection TX0287JL Rentable area 20,262 SF Net cleaning 319 SF Toilet rooms, holding cells, locker rooms, janitor closets

Floors 164 SF Fixtures 4 Fixtures

Control Booth 155 SF

TABC Booth TX0288JL Rentable area 160 SF Net cleaning 160 SF Toilet rooms, holding cells, locker rooms, janitor closets 60 SF

Floors Fixtures 2 Fixtures

Booth 100 SF

Outbound T3 Canopy TX0289JL Rentable area 5,280 SF Net cleaning 40 SF Inspection Booth 40 SF Canopy see grounds SF

Building 1 Primary Inspection TX0321JL Rentable area 22,238 SF Net cleaning 2,268 SF Corridors, lobbies, entrances, enclosed pedestrian walkways 1,545 SF General office, file rooms, libraries, conference rooms, ADP rooms, etc. 14 SF Inspection Booths 709 SF Canopy see grounds SF

Building 5 USDA Building TX0324JL Rentable area 6,647 SF Net cleaning 5,861 SF Corridors, lobbies, entrances, enclosed pedestrian walkways 509 SF Toilet Rooms, holding cells, locker rooms, janitor closets

Floors 302 SF Fixtures 8 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 4,557 SF Exercise area 69 SF Lab 424 SF

Building 6 Import Dock TX0325JL Rentable area 40,751 SF Net cleaning 8,294 SF Corridors, lobbies, entrances, enclosed pedestrian walkways 1,603 SF Toilet Rooms, holding cells, locker rooms, janitor closets

Floors 672 SF Fixtures 15 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 6,019 SF

Stairways 2 Flights Passenger elevators 1 Elevators Loading dock see grounds SF

Kennel 1 TX0326JL* Rentable area 632 SF Net cleaning 0 SF

*All kennels; no cleaning.

Kennel 2 TX0327JL Rentable area 2,242 SF Net cleaning 778 SF Corridors, lobbies, entrances, enclosed pedestrian walkways 147 SF Toilet Rooms, holding cells, locker rooms, janitor closets

Floors 38 SF Fixtures 2 Fixtures

General office, file rooms, libraries, conference rooms, ADP rooms, etc. 303 SF Lab 290 SF

Truck Primary Inspection TX0328JL Rentable area 3,155 SF Net cleaning 338 SF Inspection Booths 338 SF

Guard Booth TX0329JL Rentable area 36 SF Net cleaning 36 SF Inspection Booths 36 SF

Outside Grounds Area:

Lawn, shrub, and planted area 126,528 SF Paved area 897,936 SF Garage/Ramps

TX0285JL Bus Hard Secd Inspection 1,482 SF TX0286JL POV Hard Secd Inspection 2,352 SF

Loading Docks TX0325JL Import Dock 28,648 SF

Canopies TX0277JL Bus Unload Canopy 5,600 SF TX0278JL Bus Secd Inspection Canopy 15,003 SF TX0279JL FMCSA Bus Inspection Canopy 5,518 SF TX0280JL Bus Reload Canopy 14,488 SF TX0282JL Admin Bldg Canopy 5,009 SF TX0289JL Southbound OT3 Canopy 5,280 SF TX0286JL POV Hard Secd Inspection 493 SF TX0287JL POV Secd Inspection 19,866 SF TX0321JL Primary Inspection 19,761 SF TX0325JL Bldg 6 Import Dock 28,648 SF TX0328JL Truck Primary Inspection 2,910 SF

122,576 Total SF Hand Sanitizer Dispensers

TX0282JL Admin Bldg / Lobby 2 Dispensers TX0325JL Import Bldg / Lobby 1 Dispenser TX0283JL Bus Processing / Pedestrian Walkway 2 Dispensers

File details come from the government source that posted it. Updated .