17.- Exhibit M7 - Electrical Testing Technicians Requisites.pdf

PDF 66 KB Posted

Attached to
Laredo Texas Full Maintenance; Operations and Maintenance; Custodial, Grounds, and Related Services
Solicitation number
47PH0225R0006
Issued by

About this file

This document is Exhibit M7, detailing the Qualifications of Electrical Testing Technicians (ETT) based on the ANSI/NETA ETT-2010 Standard for Certification of Electrical Testing Technicians. The exhibit outlines four progressive certification levels (Trainee, Assistant, Certified, and Senior Technician) with increasing requirements for education, training, experience, and job responsibilities. Each level requires progressively more safety and electrical training hours, with a minimum of 40 hours safety and 160 hours electrical training at the entry level, escalating to 40 hours safety and 360 hours electrical training at the highest level. Technicians must advance through levels sequentially, with experience requirements ranging from none at Level I to ten years at Level IV, and all levels requiring examination by a certifying organization with a minimum 70% score.

View the file

Other files

File Type Posted
47PH0225R0006 Amendment 0005 SF30.pdf PDF
CBA IUOE 351 2025 06 01-2028 05 31 Final .pdf PDF
47PH0225R0006 Amendment 0004.pdf PDF
47PH0225R0006 Amendment 0003 SF30 0 OF 12.pdf PDF
47PH0225R0006 Amendment 0003 PDF Form SF1449-21 Solicitation for Commercial Products 3 of 12.pdf PDF
47PH0225R0006 Amendment 0003 BL-1 Fire Extinguisher Report 9 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Amendment 0003 Excel Doc Figure L-1 Combined Management Plan 7 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Amendment 0003 Word Doc FIGURE L-3 Experience Worksheet 6 of 12.docx DOCX document
47PH0225R0006 Amendment 0003 Attendees to the Pre-Proposal Walk Thru Laredo Texas Full Maintenance 2 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Laredo Texas Full Maintenance Questions and Answers 11 of 12.pdf PDF
47PH0225R0006 Amendment 0003 - Notes by Gemini Pre-Proposal Meeting Laredo - 10 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Specification Laredo Texas Full Maintenance Operations and Maintenance1 of 12.pdf PDF
47PH0225R0006 Amendment 0002 SF30 PDF Form 12 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Word Doc FIGURE L-2 Past Performance Questionnaire 5 of 12.docx DOCX document
47PH0225R0006 Amendment 003 Preventive Maintenance Guide 2022 4 of 12.pdf PDF
47PH0225R0006 Amendment 0003 BL-2 Inventory to Include Fire Alarm Devices 8 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Pre-Proposal Walk Thru Schedule Laredo Texas Full Maintenance 6 of 7.pdf PDF
47PH0225R0006 Pre-Proposal Conference Presentation Laredo Texas Full Maintenance 4 of 7.pdf PDF
47PH0225R0006 Attachment 2_ Wage Determination Laredo Texas 3 of 7.pdf PDF
47PH0225R0006 Amendment 0002 SF30 1 OF 7.pdf PDF
47PH0225R0006 Questions and Answers Laredo Texas Full Maintenance 7 of 7.pdf PDF
47PH0225R0006 Amendment 0002 Specification Laredo Texas Full Maintenance Operations and Maintenance 2 of 7.pdf PDF
47PH0225R0006 Pre-Proposal Conference Notes Laredo Full Maintenance - 2025_10_14 08_25 CDT 5 of 7.pdf PDF
19.- Exhibit M9 2022 GSA PBS PM Guide.pdf PDF
3.- Exhibit C3 - Pest Control Work and Inspection Report (1).pdf PDF
18.- Exhibit M8_ Miscellaneous Best Practices Shave Energy.pdf PDF
14.- Exhibit M4 B Operating Plan Template.pdf PDF
13.- Exhibit M3_ Sustainable Products and GSA Attribute Preferences (1).pdf PDF
47PH0225R0006 Amendment 0001 Specification Laredo Texas Full Maintenance Operations and Maintenance.pdf PDF
21.- Exhibit M11_ Flag Policy.pdf PDF
6. Exhibit C5 - Building Information Sheet - Covent Land Port Of Entry (1).pdf PDF
11.- Exhibit M1 - O_M QASP Template (2).pdf PDF
47PH0225R0006 Amendment 0001 SF30 1 of 4.pdf PDF
7. Exhibit C5 - Building Information Sheet - Juarez Lincoln Land Port of Entry (1).pdf PDF
15.- Exhibit M5 - Smart Bldgs.pdf PDF
20.- Exhibit M10 Final Refrigerant Management SOP 2022.pdf PDF
2.- Exhibit C-2 M1-FM Quality Assurance Surveillance Plan (1).pdf PDF
1.- Exhibit C1- Custodial R7 Recycling & Solid Waste Trash Report - APR24.pdf PDF
12.- Exhibit M2 - Green Purchasing Report (1) (1).pdf PDF
5. Exhibit C5 - Building Information Sheet - Columbia Land Port Of Entry (1).pdf PDF
4.- Exhibit C4 - Solid Waste Audit Reports (1).pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse (1).pdf PDF
16.- Exhibit M6 - Water Treatment Instructions (1).pdf PDF
9. Exhibit C5 - Building Information Sheet - Border Patrol Sector Headquarters (1).pdf PDF
47PH0225R0006 Amendment 0001 Questions and Answers 4 of 4.pdf PDF
47PH0225R0006 Amendment 0001 FIGURE L-3 Experience Worksheet 3 of 4.pdf PDF
8.- Exhibit C5 - Building Information World Trade Land Port of Entry.pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse.pdf PDF
31.- BL5 Roof Information - List of Assets.pdf PDF
3.- Exhibit C3 - Pest Control Work and Inspection Report.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT M7

Qualifications of Electrical Testing Technicians

(ETT) (ANSI/NETA ETT-2010 Standard for Certification of Electrical Testing Technicians)

TITLE:

LEVEL:

Trainee Technician Level I

Assistant Technician Level II

Certified Technician Level III

Certified Senior Technician Level IV

EDUCATION AND

TRAINING: High School / GED Safety 40 hours

Electrical 160 hours Safety 24 hours add’l Electrical 240 hours add’l Safety 40 hours add’l Electrical 200 hours add’l

RELATED EXPERIENCE: None Two Years* Five Years* Ten Years*

TYPICAL DUTIES: None Generally requires Capable direct supervision.

Responsible for safety of self. Understands hazardous electrical energy control procedures.

of supervising Levels I and II. Routine and moderately complex projects. Record keeping. Safety of others.

Switching. Evaluations.

Supervises large projects, multiple crews. Works independently. More complex investigations, tests, and evaluations.

TYPICAL ACTIVITIES:

Lockout/Tagout, safety grounding.

Simple assistance. Simple measurements. Test equipment set up and removal. Cleaning.

Test for de- Corrects energized medium- voltage equipment. Performs moderately complex tasks.

Interacts with other skills and operations.

system failures. Performs very complex tests. Interacts with engineers and managers. Writes reports.

EXAMINATION: By employer

Assists. Inspects. Tests. Data collection. Test for de-energized locked out/tagged out equipment.

By certifying organization, 70% minimum score By certifying organization,70% minimum score

By certifying organization, 70 % minimum score NOTE: Candidates for Levels II, III, IV must have met the qualifications for all previous levels. * Completion of two or more years of technical education in an electrical field shall be equivalent to a maximum of one year of experience.

File details come from the government source that posted it. Updated .