11.- Exhibit M1 - O_M QASP Template (2).pdf

PDF 242 KB Posted

Attached to
Laredo Texas Full Maintenance; Operations and Maintenance; Custodial, Grounds, and Related Services
Solicitation number
47PH0225R0006
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for an Operations & Maintenance contract with the General Services Administration (GSA), Contract No. 47PH02XXDXXXX. The QASP outlines the government's method for monitoring and evaluating the contractor's performance of operation and maintenance services, with a focus on ensuring quality control and meeting contract standards.

The plan details four primary surveillance methods: periodic surveillance inspections (weekly to quarterly), tenant interviews, service request documentation, and tenant satisfaction surveys conducted by the Gallup Organization. Key evaluation areas include existing deficiency lists, building operating plans, equipment inventory, building management support services, maintenance programs, water treatment, repairs, safety and environmental compliance, and fire protection systems. The Contracting Officer (CO) and Contracting Officer's Representative (COR) will use GSA-3423 inspection forms and the Contractor Performance System (CPS) to document and assess performance, with contractors required to respond to performance issues within 14 days.

View the file

Other files

File Type Posted
47PH0225R0006 Amendment 0003 SF30 0 OF 12.pdf PDF
47PH0225R0006 Amendment 0003 Specification Laredo Texas Full Maintenance Operations and Maintenance1 of 12.pdf PDF
47PH0225R0006 Amendment 0003 BL-1 Fire Extinguisher Report 9 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Amendment 0003 - Notes by Gemini Pre-Proposal Meeting Laredo - 10 of 12.pdf PDF
47PH0225R0006 Amendment 0002 SF30 PDF Form 12 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Attendees to the Pre-Proposal Walk Thru Laredo Texas Full Maintenance 2 of 12.pdf PDF
47PH0225R0006 Amendment 0003 PDF Form SF1449-21 Solicitation for Commercial Products 3 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Excel Doc Figure L-1 Combined Management Plan 7 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Attachment 2_ Wage Determination Laredo Texas 3 of 7.pdf PDF
47PH0225R0006 Amendment 0001 SF30 1 of 4.pdf PDF
4.- Exhibit C4 - Solid Waste Audit Reports (1).pdf PDF
5. Exhibit C5 - Building Information Sheet - Columbia Land Port Of Entry (1).pdf PDF
6. Exhibit C5 - Building Information Sheet - Covent Land Port Of Entry (1).pdf PDF
18.- Exhibit M8_ Miscellaneous Best Practices Shave Energy.pdf PDF
1.- Exhibit C1- Custodial R7 Recycling & Solid Waste Trash Report - APR24.pdf PDF
2.- Exhibit C-2 M1-FM Quality Assurance Surveillance Plan (1).pdf PDF
12.- Exhibit M2 - Green Purchasing Report (1) (1).pdf PDF
17.- Exhibit M7 - Electrical Testing Technicians Requisites.pdf PDF
20.- Exhibit M10 Final Refrigerant Management SOP 2022.pdf PDF
47PH0225R0006 Amendment 0001 FIGURE L-3 Experience Worksheet 3 of 4.pdf PDF
47PH0225R0006 Amendment 0001 Questions and Answers 4 of 4.pdf PDF
3.- Exhibit C3 - Pest Control Work and Inspection Report (1).pdf PDF
3.- Exhibit C3 - Pest Control Work and Inspection Report.pdf PDF
7. Exhibit C5 - Building Information Sheet - Juarez Lincoln Land Port of Entry.pdf PDF
11.- Exhibit M1 - O_M QASP Template (1).pdf PDF
19.- Exhibit M9 2022 GSA PBS PM Guide (1).pdf PDF
28.- BL1_ Extinguisher Report - List of Assets.pdf PDF
32.- BL6 Work Order History - List of Work Orders.pdf PDF
33.- BL7 Energy_&_Water_Monthly_Report_template.docx.pdf PDF
37.- Figure L-1 Combined Management Plan 7.18.24.xlsx XLSX spreadsheet
5. Exhibit C5 - Building Information Sheet - Columbia Land Port Of Entry.pdf PDF
9. Exhibit C5 - Building Information Sheet - Border Patrol Sector Headquarters.pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse.pdf PDF
14.- Exhibit M4 Building Operating Plan Template.pdf PDF
21.- Exhibit M11_ Flag Policy.pdf PDF
22.- Exhibit M12_ Flushing Stagnant Plumbing.pdf PDF
23.- Exhibit M13 Sample Fuel Storage Tank Management Plan.pdf PDF
29.- BL2 Inventory to Include Fire Alarm Devices - List of Assets.pdf PDF
36.- Figure B-3 FM 5 Year Contract 10.30.24 .xlsx XLSX spreadsheet
38.- Figure L-2 Past Performance Reference Questionnaire.pdf PDF
Solicitation 47PH0225R0006 Laredo Texas Full Maintenance Operations and Maintenance Custodial Grounds and Related Services.pdf PDF
2.- Exhibit C-2 M1-FM Quality Assurance Surveillance Plan.pdf PDF
Building Information World Trade Land Port of Entry.pdf PDF
12.- Exhibit M2 - Green Purchasing Report (1).pdf PDF
20.- Exhibit M10 Final Refrigerant Management SOP 2022 (1).pdf PDF
24.- Exhibit M14_ Underground Fuel Storage Tank Inspection Requirements .pdf PDF
25.- Exhibit M15_ Above Ground Fuel Storage Tank Inspection Requirement.pdf PDF
31.- BL5 Roof Information - List of Assets.pdf PDF
34.- FIGURE B-1 for Union and Non Union FM Contracts.xlsx XLSX spreadsheet
39.- FIGURE L-3 Experience Worksheet.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT M1

OPERATIONS & MAINTENANCE

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

CONTRACT No. 47PH02XXDXXXX

Introduction

This Quality Assurance Surveillance Plan (QASP) is designed to provide the General Services Administration (GSA) with an effective surveillance method of monitoring and evaluating the Contractor's performance under a Performance-Based Statement of Work (PBSOW) for operation and maintenance services.

In accordance with Federal Acquisition Regulation (FAR) Part 37.601, performance-based Contracting methods are intended to ensure that the required performance quality levels are achieved and that the total payment is related to the degree that services performed or outcomes achieved meet Contract standards. GSA’s role in quality assurance is to ensure that the Contractors are achieving the quality levels established in the operation and maintenance services Contracts and focuses on the Contractors’ QCP. GSA periodically validates the execution of the Contractors' quality control programs by reviewing such areas as the Contractors' inspection forms, service request logs, tenant reports, tenant satisfaction surveys, and the timeliness of corrective actions.

A. PURPOSE OF THE QASP

The QASP is intended to accomplish the following:

● Define the roles and responsibilities of participating Government officials.

● Identify the performance objectives based upon the PBSOW in accordance with

FAR Part 46.401(a) (1).

● Identify the performance quality level standards in accordance with FAR Part

37.601(a) (2).

● Describe the methods of surveillance for GSA to identify quality levels in accordance with FAR Part 46.401(a) (2).

● Establish a method to provide feedback to the Contractor regarding quality and timeliness of the service performance, i.e., copies of inspection forms, copies of tenant reports, data on tenant satisfaction scores; and any other drivers or measures of performance that are required by the CO or designee

● Establish timeframes for communication and performance improvement if needed.

● Establish specified procedures for changes to the Contract price when services are not performed or do not meet Contract requirements in accordance to FAR Part 37.601(a) (3).

● Ensure the Contractor has developed and implemented a QCP establishing procedures and responsibilities for controlling the quality of work performed.

B. ROLES AND RESPONSIBILITIES OF GOVERNMENT OFFICIALS

The following Government officials will participate in assessing the quality of the Contractor's performance. Their roles and responsibilities are described as follows:

1. The COR is the person designated by the CO. The COR is responsible for monitoring, assessing, recording, and reporting on the performance of the Contractor. The CO or their designee shall have the primary responsibility for completing forms that will be used to evaluate the Contractor’s performance. In addition, the COR or designee shall use the Contractor Performance System (CPS) to document the Contractor’s performance.

1. The person designated as the CO will have overall responsibility for overseeing the Contractor's performance. The CO shall be responsible for monitoring the Contractor's performance in the areas of Contract compliance and Contract administration. The CO will review the COR or designee's written inspections and assessments of the Contractor’s performance and resolve any discrepancies that may arise between the Contractor and COR or their designee. In addition, the CO shall use the Contractor Performance System (CPS) to document the Contractor’s performance.

C. TYPES OF WORK TO BE PERFORMED

1. The Contractor’s performance in providing the following operation and maintenance services shall be evaluated by the Government:

a. Existing deficiency list

b. Building operating plan

c. Equipment inventory

e. Reference library

f. Building management support services

g. Operational requirements

h. Service requests

i. RESERVED

j. Maintenance program

k. Water treatment

l. Oil analysis

m. Lamp and ballast replacements

n. Repairs

o. Safety and environmental

p. Fire Protection and Life Safety equipment and systems

q. Other services as described in Section CM

D. METHODS OF SURVEILLANCE

The method of surveillance is based on the performance criteria of the Contract terms and specifications. Each requirement will describe the tasks to be performed and the standard for successful performance. GSA intends to monitor and evaluate the Contractor's performance based on any or all of the following surveillance methods:

1. Periodic Surveillance Inspections: This method consists of selected surveillance tasks by the Government that do not require 100 percent inspection, or are performed on a random basis. The CO or their designee will evaluate the Contractor’s reports, surveys, etc. on a weekly, biweekly, monthly, or quarterly basis.

2. Tenant Interviews: All tenant concerns received through the CO or their designee will be documented and evaluated on a planned schedule developed by the CO or designee. This method may help the CO or their designee focus on areas that may require further action from the CO.

3. Service Request Documentation: This method of surveillance will provide information to the CO or designee, such as identification of the types of service requests received the frequencies of service requests, corrective action taken, timeliness of completion, and any other pertinent data. At a minimum, this method shall be performed on a monthly basis.

4. Tenant Satisfaction Surveys: The Gallup Organization conducts surveys for one-third of GSA’s tenants in Government-owned and leased buildings. These surveys gather important data in many areas, including specific categories pertaining to the operation and maintenance of GSA's buildings. The surveys provide the CO or their designee with satisfaction scores that can be further evaluated to determine if there are any weaknesses within the various programs. There are various measures that can be taken, such as reviewing the survey’s comments, obtaining further feedback from the tenants, or sharing the scores with the Contractor to establish a plan of action.

E. QUALITY ASSURANCE FORMS AND REPORTS

Inspection Form: The GSA-3423 form, or as documented in the CMMS as an inspection type work order, will be used to document and evaluate the Contractor's performance. The COR will evaluate each event in accordance with the performance standards and performance requirements stated in this SOW. All tasks that are considered to have unacceptable performance shall be substantiated and documented on the GSA-3423 form, or as documented in the CMMS. The form, or the work orders will be completed and submitted to the Contractor within 24 hours. The Contractor shall return the GSA- 3423 form, or complete the work order, identifying the corrective action taken within 14 days.

Inspection of Services Clause: The CO shall fill in applicable commercial or non-commercial clause as appropriate, i.e., FAR Part 52.246.4 paragraphs (e) and (f).

F. RESERVED

Monthly CO Report: At the end of each month the COR will summarize the overall results of the Contractor’s performance for the previous month and send to the CO. If appropriate, the CO may investigate the event(s) further to determine if all the facts and circumstances surrounding the event(s) are accurate. The CO may discuss with the Contractor an event or trend that indicates unacceptable performance.

File details come from the government source that posted it. Updated .