47PH0225R0006 Amendment 0003 Excel Doc Figure L-1 Combined Management Plan 7 of 12.xlsx

XLSX spreadsheet 89 KB Posted

Attached to
Laredo Texas Full Maintenance; Operations and Maintenance; Custodial, Grounds, and Related Services
Solicitation number
47PH0225R0006
Issued by

About this file

This file is an Excel document detailing a Management Plan Baseline for a Full Maintenance contract in Laredo, Texas (Solicitation Number: 47PH0225R0006). The document provides a comprehensive breakdown of the government's projected manpower requirements, including personnel allocation across various roles such as Project Manager, Chief Engineer, HVAC technicians, GMW specialists, Admin Clerk, Custodial Supervisors, and Janitors. The total government baseline staffing is 54.64 Full-Time Equivalents (FTEs), with a total annual labor hours of 113,649.37, covering productive time, vacation, holidays, and sick leave.

The associated federal contract opportunity is a GSA Public Buildings Service procurement for Operations and Maintenance and Custodial services covering six federal buildings totaling approximately 13,050,108 square feet. The contract is specifically set aside for 8(a) small businesses under NAICS code 561210 with a $47M size standard. The procurement will follow FAR Part 15 procedures, with a base period of 12 months and four one-year option periods, anticipated to begin around 06/01/2026. The contract type will be Firm Fixed Price with monthly payments, and the solicitation is being issued electronically through SAM.gov.

View the file

Other files

File Type Posted
47PH0225R0006 Amendment 0005 SF30.pdf PDF
CBA IUOE 351 2025 06 01-2028 05 31 Final .pdf PDF
47PH0225R0006 Amendment 0004.pdf PDF
47PH0225R0006 Amendment 0003 SF30 0 OF 12.pdf PDF
47PH0225R0006 Amendment 0003 PDF Form SF1449-21 Solicitation for Commercial Products 3 of 12.pdf PDF
47PH0225R0006 Amendment 0003 BL-1 Fire Extinguisher Report 9 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Amendment 0003 Word Doc FIGURE L-3 Experience Worksheet 6 of 12.docx DOCX document
47PH0225R0006 Amendment 0003 Attendees to the Pre-Proposal Walk Thru Laredo Texas Full Maintenance 2 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Laredo Texas Full Maintenance Questions and Answers 11 of 12.pdf PDF
47PH0225R0006 Amendment 0003 - Notes by Gemini Pre-Proposal Meeting Laredo - 10 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Specification Laredo Texas Full Maintenance Operations and Maintenance1 of 12.pdf PDF
47PH0225R0006 Amendment 0002 SF30 PDF Form 12 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Word Doc FIGURE L-2 Past Performance Questionnaire 5 of 12.docx DOCX document
47PH0225R0006 Amendment 003 Preventive Maintenance Guide 2022 4 of 12.pdf PDF
47PH0225R0006 Amendment 0003 BL-2 Inventory to Include Fire Alarm Devices 8 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Pre-Proposal Walk Thru Schedule Laredo Texas Full Maintenance 6 of 7.pdf PDF
47PH0225R0006 Pre-Proposal Conference Presentation Laredo Texas Full Maintenance 4 of 7.pdf PDF
47PH0225R0006 Attachment 2_ Wage Determination Laredo Texas 3 of 7.pdf PDF
47PH0225R0006 Amendment 0002 SF30 1 OF 7.pdf PDF
47PH0225R0006 Questions and Answers Laredo Texas Full Maintenance 7 of 7.pdf PDF
47PH0225R0006 Amendment 0002 Specification Laredo Texas Full Maintenance Operations and Maintenance 2 of 7.pdf PDF
47PH0225R0006 Pre-Proposal Conference Notes Laredo Full Maintenance - 2025_10_14 08_25 CDT 5 of 7.pdf PDF
19.- Exhibit M9 2022 GSA PBS PM Guide.pdf PDF
3.- Exhibit C3 - Pest Control Work and Inspection Report (1).pdf PDF
18.- Exhibit M8_ Miscellaneous Best Practices Shave Energy.pdf PDF
14.- Exhibit M4 B Operating Plan Template.pdf PDF
13.- Exhibit M3_ Sustainable Products and GSA Attribute Preferences (1).pdf PDF
47PH0225R0006 Amendment 0001 Specification Laredo Texas Full Maintenance Operations and Maintenance.pdf PDF
21.- Exhibit M11_ Flag Policy.pdf PDF
6. Exhibit C5 - Building Information Sheet - Covent Land Port Of Entry (1).pdf PDF
11.- Exhibit M1 - O_M QASP Template (2).pdf PDF
47PH0225R0006 Amendment 0001 SF30 1 of 4.pdf PDF
7. Exhibit C5 - Building Information Sheet - Juarez Lincoln Land Port of Entry (1).pdf PDF
15.- Exhibit M5 - Smart Bldgs.pdf PDF
20.- Exhibit M10 Final Refrigerant Management SOP 2022.pdf PDF
2.- Exhibit C-2 M1-FM Quality Assurance Surveillance Plan (1).pdf PDF
1.- Exhibit C1- Custodial R7 Recycling & Solid Waste Trash Report - APR24.pdf PDF
12.- Exhibit M2 - Green Purchasing Report (1) (1).pdf PDF
5. Exhibit C5 - Building Information Sheet - Columbia Land Port Of Entry (1).pdf PDF
4.- Exhibit C4 - Solid Waste Audit Reports (1).pdf PDF
17.- Exhibit M7 - Electrical Testing Technicians Requisites.pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse (1).pdf PDF
16.- Exhibit M6 - Water Treatment Instructions (1).pdf PDF
9. Exhibit C5 - Building Information Sheet - Border Patrol Sector Headquarters (1).pdf PDF
47PH0225R0006 Amendment 0001 Questions and Answers 4 of 4.pdf PDF
47PH0225R0006 Amendment 0001 FIGURE L-3 Experience Worksheet 3 of 4.pdf PDF
8.- Exhibit C5 - Building Information World Trade Land Port of Entry.pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse.pdf PDF
31.- BL5 Roof Information - List of Assets.pdf PDF
3.- Exhibit C3 - Pest Control Work and Inspection Report.pdf PDF
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Management Plan Baseline

FIGURE L-1

MANAGEMENT PLAN

Solicitation Number: 47PH0225R0006
Full Maintenance, Laredo, Texas
The Management Plan Baseline represents the government's projection of the manpower requirement to meet the requirements in the specification. The baseline is not intended to dictate an offeror's proposed manpower. It is a benchmark to evaluate the offerors understanding of the requirement in the solicitation. Refer to Section L of the solicitation for further guidance.
Government's Baseline
Personnel185618568088562080
LOCATIONPOSITION TITLEAnnual ProductiveAnnual VacationAnnual HolidayAnnual SickAnnual TotalTotal FTE
Project Manager18561.0080.0088.0056.002080.001.00
Chief Engineer18561.0080.0088.0056.002080.001.00
HVAC129927.00560.00616.00392.0014560.007.00
GMW37122.00160.00176.00112.004160.002.00
Admin Clerk18561.0080.0088.0056.002080.001.00
Custodial Supervisors5862.093.16252.68277.94176.876569.583.16
Janitors, Grounds73276.1239.483158.453474.302210.9282119.7939.48
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
TOTALS101410.214371.134808.243059.79113649.3754.64

Contractor's L1 Management Plan

MANAGEMENT185618568088562080
LOCATIONPOSITION TITLEAnnual ProductiveAnnual VacationAnnual HolidayAnnual SickAnnual TotalTotal FTEAnticipated Work Schedule
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
TOTALS00.000.000.000.000.00
EMPLOYEES185618568088562080
LOCATIONPOSITION TITLEAnnual ProductiveAnnual VacationAnnual HolidayAnnual SickAnnual TotalTotal FTEAnticipated Work Schedule
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
0.000.000.000.000.000.00
TOTALS0.00.000.000.000.000.00

image1.jpeg

File details come from the government source that posted it. Updated .