4.- Exhibit C4 - Solid Waste Audit Reports (1).pdf

PDF 54 KB Posted

Attached to
Laredo Texas Full Maintenance; Operations and Maintenance; Custodial, Grounds, and Related Services
Solicitation number
47PH0225R0006
Issued by

About this file

Exhibit C4 is a detailed guide for conducting a solid waste audit within a federal building, aimed at achieving a minimum 50 percent waste diversion and supporting sustainable building principles. The contractor is required to perform a comprehensive waste stream analysis by examining a representative 24-hour sample of non-hazardous solid waste from various building spaces, including tenant areas, lobbies, and break rooms. Using scales, the contractor must sort and weigh waste into specific categories: paper, cardboard, plastic, aluminum, glass, organic/compostable waste, and non-recyclable trash.

Following the waste composition analysis, the contractor must provide recommendations for increasing the building's waste diversion rate through cost-effective collection and disposal methods. The recommendations must include a list of acceptable and unacceptable recycling materials, the potential waste diversion rate, potential additions to the building's recycling and composting program based on local recycling markets, and a narrative assessment of current recycling bin quantities, placement, and signage with suggestions for improving communication to tenants and custodial staff. The document includes a sample waste composition analysis table showing percentages of different waste types, with organic/compostable waste representing the largest portion at 41.7% of the total waste stream.

View the file

Other files

File Type Posted
47PH0225R0006 Amendment 0003 SF30 0 OF 12.pdf PDF
47PH0225R0006 Amendment 0003 Specification Laredo Texas Full Maintenance Operations and Maintenance1 of 12.pdf PDF
47PH0225R0006 Amendment 0003 BL-1 Fire Extinguisher Report 9 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Amendment 0003 - Notes by Gemini Pre-Proposal Meeting Laredo - 10 of 12.pdf PDF
47PH0225R0006 Amendment 0002 SF30 PDF Form 12 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Attendees to the Pre-Proposal Walk Thru Laredo Texas Full Maintenance 2 of 12.pdf PDF
47PH0225R0006 Amendment 0003 PDF Form SF1449-21 Solicitation for Commercial Products 3 of 12.pdf PDF
47PH0225R0006 Amendment 0003 Excel Doc Figure L-1 Combined Management Plan 7 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Attachment 2_ Wage Determination Laredo Texas 3 of 7.pdf PDF
47PH0225R0006 Amendment 0001 SF30 1 of 4.pdf PDF
5. Exhibit C5 - Building Information Sheet - Columbia Land Port Of Entry (1).pdf PDF
6. Exhibit C5 - Building Information Sheet - Covent Land Port Of Entry (1).pdf PDF
11.- Exhibit M1 - O_M QASP Template (2).pdf PDF
18.- Exhibit M8_ Miscellaneous Best Practices Shave Energy.pdf PDF
1.- Exhibit C1- Custodial R7 Recycling & Solid Waste Trash Report - APR24.pdf PDF
2.- Exhibit C-2 M1-FM Quality Assurance Surveillance Plan (1).pdf PDF
12.- Exhibit M2 - Green Purchasing Report (1) (1).pdf PDF
17.- Exhibit M7 - Electrical Testing Technicians Requisites.pdf PDF
20.- Exhibit M10 Final Refrigerant Management SOP 2022.pdf PDF
47PH0225R0006 Amendment 0001 FIGURE L-3 Experience Worksheet 3 of 4.pdf PDF
47PH0225R0006 Amendment 0001 Questions and Answers 4 of 4.pdf PDF
3.- Exhibit C3 - Pest Control Work and Inspection Report (1).pdf PDF
3.- Exhibit C3 - Pest Control Work and Inspection Report.pdf PDF
7. Exhibit C5 - Building Information Sheet - Juarez Lincoln Land Port of Entry.pdf PDF
11.- Exhibit M1 - O_M QASP Template (1).pdf PDF
19.- Exhibit M9 2022 GSA PBS PM Guide (1).pdf PDF
28.- BL1_ Extinguisher Report - List of Assets.pdf PDF
32.- BL6 Work Order History - List of Work Orders.pdf PDF
33.- BL7 Energy_&_Water_Monthly_Report_template.docx.pdf PDF
37.- Figure L-1 Combined Management Plan 7.18.24.xlsx XLSX spreadsheet
5. Exhibit C5 - Building Information Sheet - Columbia Land Port Of Entry.pdf PDF
9. Exhibit C5 - Building Information Sheet - Border Patrol Sector Headquarters.pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse.pdf PDF
14.- Exhibit M4 Building Operating Plan Template.pdf PDF
21.- Exhibit M11_ Flag Policy.pdf PDF
22.- Exhibit M12_ Flushing Stagnant Plumbing.pdf PDF
23.- Exhibit M13 Sample Fuel Storage Tank Management Plan.pdf PDF
29.- BL2 Inventory to Include Fire Alarm Devices - List of Assets.pdf PDF
36.- Figure B-3 FM 5 Year Contract 10.30.24 .xlsx XLSX spreadsheet
38.- Figure L-2 Past Performance Reference Questionnaire.pdf PDF
Solicitation 47PH0225R0006 Laredo Texas Full Maintenance Operations and Maintenance Custodial Grounds and Related Services.pdf PDF
2.- Exhibit C-2 M1-FM Quality Assurance Surveillance Plan.pdf PDF
Building Information World Trade Land Port of Entry.pdf PDF
12.- Exhibit M2 - Green Purchasing Report (1).pdf PDF
20.- Exhibit M10 Final Refrigerant Management SOP 2022 (1).pdf PDF
24.- Exhibit M14_ Underground Fuel Storage Tank Inspection Requirements .pdf PDF
25.- Exhibit M15_ Above Ground Fuel Storage Tank Inspection Requirement.pdf PDF
31.- BL5 Roof Information - List of Assets.pdf PDF
34.- FIGURE B-1 for Union and Non Union FM Contracts.xlsx XLSX spreadsheet
39.- FIGURE L-3 Experience Worksheet.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C4: Solid Waste Audits

*This exhibit is provided to the Contractor as a guide to conduct a waste audit. The purpose of the waste audit is to:

• Identify cost-effective methods of achieving a minimum 50 percent (by weight) waste diversion.

• Support compliance with Guiding Principles for Sustainable Federal Buildings.

Extent of Work

Waste Composition The Contractor shall conduct a solid waste audit to identify the composition of the building’s non- hazardous, non-construction solid waste stream. As part of the solid waste stream audit, the Contractor shall examine a representative sample of solid waste (office trash) generated in the building (tenant space, lobby, kitchenettes/break rooms, printing rooms, bathrooms) during a 24-hour period of a typical workday. The Contractor shall use scales to weigh the sorted waste by the following material types: paper (all types of recyclable paper); cardboard;

plastic (#1 PET bottles and any recyclable plastics); aluminum/cans; glass bottles;

organic/compostable waste (food, food-related compostable packaging, paper towels); non-compostable, non-recyclable trash. The table below is provided as an example.

Table of Sample Waste Composition Analysis

Type of Waste Weight (lbs)

Percentage

Paper 50 16.7% Cardboard 25 8.3% Plastic 20 6.7% Aluminum 10 3.3% Glass 20 6.7% Organic / Compostable 125 41.7% Trash (not recyclable/compostable)

50 16.7%

Total 300 100%

Waste Diversion Recommendations Based on the waste composition analysis, the Contractor shall provide recommendations for increasing the building’s waste diversion rate through cost-effective. efficient waste collection and disposal. The recommendations shall include:

• A list of currently acceptable and unacceptable waste materials for recycling (to include recycling codes, such as PET 1, 2, etc.).

• The building’s potential waste diversion rate, based on the waste composition analysis.

• A list of waste material types that could be added to the building’s recycling (and composting) program, based on the local recycling market.

• A narrative description of the current recycling, composting, and trash bin quantities, placement, and signage, and recommendations for improving signage and communication to tenants and custodial employees.

File details come from the government source that posted it. Updated .