QA Log 2 11.25.26.pdf
PDF 136 KB Posted
- Attached to
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades
- Solicitation number
- 6973GH-27-R-00005
About this file
This is a Questions and Answers Log documenting clarifications issued by the Federal Aviation Administration (FAA) for a wastewater treatment infrastructure contract. The document addresses key evaluation criteria, commissioning requirements, equipment decontamination standards, and pricing methodology for the solicitation.
Regarding evaluation factors, Amendment 0005 revised Factor 4 (packaged wastewater treatment equipment) to allow contractor discretion in formatting, with scope focused on installer qualifications per Specification Section 46 07 53, 1.9 Quality Assurance B. Basis of design specifications and substitution processes are referenced in Sections 46 07 53, 01 60 00, and 01 60 10. Factor 5 addressing site infrastructure subcontractor credentials was similarly revised by Amendment 0005. For pricing evaluation, the total evaluated price equals the sum of the base bid and any bid options the FAA elects to award at the time of base bid award; the FAA reserves the right to award all, none, or some options, which are not listed in order of importance. Specification 01 91 13 (commissioning) was removed from contract documents and struck from drawing sheet C-001; the new Integrated Wastewater Treatment Plant (IWTP) building requires only a TAB report, while wastewater process equipment commissioning requirements are covered under Specification 46 07 53. For trench demolition and equipment decontamination per RCRA standards, the FAA environmental specialist will visually inspect equipment and piping after high-pressure washing at 3,000+ psi, deeming material acceptable for hauling once 95% clean per square inch with zero free liquids and no manually wipeable residue. If analytical verification certificates are required, the FAA will provide rinse water or wipe sample analysis prior to removal. Cleaned metal may be sent to scrap recyclers and non-metal materials to standard subtitle D landfills, with manifest, weight ticket, and receipt documentation required per Specification 017419 paragraphs 1.5 A, E, and F.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. Reference Sheet Question Answer
5 SIR Sec L/M
Confirm the required scope and formatting for Factor 4 packaged wastewater treatment equipment, including approved basis-of-design manufacturer, equality/substitution review and experience threshold.
Amendment 0005 has revised Factor 4
Format is at the discretion of the contractor.
The Scope is the installers qualifications as described in Specification Section 46 07 53, 1.9 Quality Assurance B.
Reference Basis of Design specification section 46 07 53 Packaged Wastewater Treatment Equipment.
Reference Spec Section 01 60 00 and 01 60 10 for substitution process.
6 SIR Sec L/M Confirm the precise acceptable project history for Factor 5 site infrastructure subcontractor, and whether multiple subcontractors may combine credentials.
Reference Amendment 0005 which revised Factor 5
7 SIR Sec L/M
Clarify treatment of options in the evaluated lowest-price determination and whether alternate manufacturer exclusions or deviations cause unacceptability.
The total evaluated price will be the sum of the base bid and the bid options the FAA elects to award.
The FAA's decision to award bid options will be made at time of the base bid award. The FAA reserves the right to award all, none, or some of the bid options.
Reference Basis of Design specification section 46 07 53 Packaged Wastewater Treatment Equipment.
Reference Spec Section 01 60 00 and 01 60 10 for substitution process.
43 01 91 13 C-001 Define who acts as commissioning authority, FAT/SAT protocols, performance trial duration, acceptance certificates, witnessing and corrective action/re-test windows.
Specification 01 91 13 was removed from the contract documents and should be struck from drawing sheet C-001. The new IWTP building will not need to be commissioned with the exception of a TAB report being required. The wastewater process equipment does require commissioning and Specification 46 07 53 covers those requirements.
Q&A Log #2 11.25.26
71 Trench Demolition, 5.4 Pg. C-001
Pg. C-001, Phase A1-Trench Demolition, 5.4:
In regards to the FAA visually inspecting the equipment/piping to verify if it is “clean” prior to hauled off site, can you please define “clean” and who will make this determination in the field? This could be a very big difference between two people
Per RCRA, Cleaning / Decontamination of the piping requires a high-pressure wash over 3,000 psi to strip the interior pipe and equipment walls down to bare substrate. An FAA environmental specialist will visually inspect the equipment / piping after cleaning. The FAA's visual inspection of the equipment will be considered acceptable to be hauled off site for recycling or disposal once the equipment/piping is 95% clean within each individual square inch of the entire surface. "Clean" means completely free from sludge, scale, caked coating and zero free liquids remaining. Once the piping / equipment has been thoroughly high-pressure washed there should be no remaining residue that can be manually wiped or chipped off. If there is remaining residue exceeding 5% per square inch of surface area after three power-washes, uncleanable section should be removed from any equipment able to be adequately cleaned and be turned over to the FAA for additional cleaning. Piping should be cut into small enough lengths to perform a visual inspection of the inside of the pipe. If the contractor's recycling facility or landfill requires a Certificate of Decontamination with analytical verification, the FAA will take rinse water samples or wipe samples and provide the certificate and analysis prior to the contractor removing the clean equipment and piping from the facility. Once the equipment / piping has been decontaminated / cleaned, it is no longer considered hazardous and the metal can be sent to a scrap metal recycler and the non-metal piping and tanks to a standard subtitle D landfill. Refer to specification 017419 paragraph 1.5 A, E & F for manifest, weight ticket, receipts and invoice documentation submittals.
72 Trench Demolition, 5.4 Pg. C-001
Is the inside of the piping to be power washed as well? See Response to Question #71.
73 Trench Demolition, 5.4 Pg. C-001
With areas of corrosion that can not be removed by power washing, what is defined as “corrosion”?
How much time does the contractor spend on attempting to remove corrosion on an item before they turn it over to FAA for additional cleaning?
See Response to Question #71.
What documentation must be provided by contractor for disposal of equipment/piping? Please be as specific as possible.
See Response to Question #71.
Please provide further explanation on how pricing evaluations will be conducted.
a. Will the FAA evaluate pricing based on the base bid first and then options after?
b. Will the pricing evaluations occur based on the base bid and all options together?
c. Are the options listed in order of importance with Option 1 being the most important to the FAA?
a. No, the total evaluated price will be the sum of the base bid and the bid options the FAA elects to award.
The FAA's decision to award bid options will be made at time of the base bid award. The FAA reserves the right to award all, none, or some of the bid options. The options are not listed in order of importance
99 Spec 01 01 00 §1.4.A.b
C-702 Notes 2.1 through 2.4
Sheet C-702, notes 2.1 through 2.4, define the JCI and Contractor responsibilities at the lift stations.
Can a similar breakdown be provided for the IWTP building BAS connection (Spec 01 01 00 §1.4.A.b)?
Refer to Response #37.