This document is Chapter 33 of AC 3900.21K, the Construction Safety standards for the Miami-Dade Aviation Department (MMAC). The chapter establishes mandatory work requirements, procedures, and standards that all construction contractors and related service providers must comply with while working on MMAC campus facilities.

All construction, renovation, and related activities must comply with OSHA's 29 CFR 1926 and referenced industry standards including FAA Orders 3900.19D (Chapters 13 and 17), ANSI standards for elevating work platforms, scaffolding, and cranes (A92.2, A92.3, A10.8, A92.6, B30.5), and ASTM specifications for footwear. Key program elements include comprehensive personal protective equipment requirements (clothing, head protection, eye and face protection, hearing protection, foot protection, and respiratory protection); fire protection measures (emergency notification, means of egress, housekeeping, smoking restrictions, heating device clearances, fire extinguisher placement, and hot work permits with mandatory fire watch); roof work fall protection and debris control; scaffold construction and inspection requirements; medical services and first aid compliance with 29 CFR 1926.50; excavation cave-in protection per 29 CFR 1926.652; hazardous energy control (lockout/tagout); exposed electrical circuit safety; confined space entry procedures with 24-hour advance notification to Environmental, Occupational Safety and Health Staff; lightning safety protocols; concrete saw dust control; and crane operations requiring compliance with all federal, state, and local regulations. Specific responsibilities are assigned to MMAC Top Management, the Environmental, Occupational Safety and Health Staff, Operations and Maintenance Division (AMP-300), Architecture and Engineering Division (AMP-400), supervisors, employees, and Contracting Officers, who must incorporate construction safety requirements into contract documents.

View the file

Other files

File Type Posted
Attachment 13 Key Personnel Experience Form 11.25.26.pdf PDF
QA Log 2 11.25.26.pdf PDF
Amend 0005 6973GH-27-R-00005.pdf PDF
Informational File 2 Asbestos Survey 190-CLS.pdf PDF
Informational File 4 Historic Plans-Information Purposes Only.pdf PDF
QA Log 1 11.23.26.pdf PDF
Attachment 12 MMAC Delivery Truck Route Roads.pdf PDF
Informational File 1 Asbestos Survey 186-IWT.pdf PDF
Amend 0004 6973GH-27-R-00005.pdf PDF
Informational File 3 Lead Based Paint Readings 186-IWT XRF.pdf PDF
Amend 0003 6973GH-27-R-00005.pdf PDF
Amend 0002 6973GH-27-R-00005.pdf PDF
Site Visit Attendance Log IWTP 27-R-00005.pdf PDF
Amend 0001 6973GH-27-R-00005.pdf PDF
Attachment 8 Contractor Release.pdf PDF
Attachment 3 SF25A Payment Bond.pdf PDF
Attachment 1b FAA MMAC IWTP_Specifications_IFC Volume II_2026 06 10.pdf PDF
6973GH-27-R-00005.pdf PDF
Attachment 6 Past Performance Experience Form 9.21.26.docx DOCX document
Attachment 1a FAA MMAC IWTP_Specifications_IFC Volume I Rev 2026 09 29.pdf PDF
Attachment 5 Past Performance Survey 9.21.26.docx DOCX document
Attachment 10 Chapter 33 Construction Safety.pdf PDF
Attachment 7 Client Authorization Letter.docx DOCX document
Attachment 11 Davis-Bacon Act WD-OK20260049.pdf PDF
Attachment 4 SF24 Bid Bond.pdf PDF
Attachment 1c FAA MMAC IWTP_Specifications_IFC Volume III_2026 06 10.pdf PDF
Attachment 2 SF25 Performance Bond.pdf PDF
Attachment 9 AMP400-ENV-OC-2.4.3-CC.pdf PDF
Attachment 1d 13289-007_MMAC IWTP Drawings.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07/22/26 AC 3900.21K

33-1

Chapter 33. Construction Safety

33-1. General. The MMAC Construction Safety program has been developed to protect MMAC employees, contractors, visitors, and students from workplace incidents related to construction activities. This chapter establishes work requirements, procedures, and standards that construction contractors and related providers must comply with while working on the MMAC campus.

33-2. Scope. This chapter applies to all personnel working on and near construction projects or whose responsibilities impact construction activities on the MMAC campus.

33-3. References. All MMAC construction, renovation, and related activities must comply with OSHA’s Safety and Health Regulations for Construction, 29 CFR 1926, and other applicable industry standards. This includes, but is not limited to:

a. 29 CFR 1926, Safety and Health Regulations for Construction.

b. FAA Order 3900.19D, Chapter 13. Welding, Cutting, and Brazing.

c. FAA Order 3900.19D, Chapter 17. Construction Safety and Health.

d. ANSI A92.2, Vehicle Mounted Elevating and Rotating Aerial Devices.

e. ANSI A92.3, Manually Propelled Elevating Aerial Platforms.

f. ANSI A10.8, Safety Requirements for Scaffolding-American National Standard for Construction and Demolition.

g. ANSI A92.6, Self-Propelled Elevating Work Platforms.

h. ANSI B30.5, Mobile and Locomotive Cranes.

33-4. Definitions.

a. Excavation. Any man-made cut, cavity, trench, or depression in the earth's surface formed by earth removal.

b. Scaffold. Any temporary elevated platform and its supporting structure used for supporting workers or materials or both.

33-5. Roles and Responsibilities.

a. MMAC Top Management. Top management must ensure that all organizational programs and projects address construction safety requirements, where applicable.

b. Environmental, Occupational Safety and Health (EOSH) Staff of the Facility Services Division (AMP-100) of the Office of Facility Management. The EOSH Staff must:

1) Inspect all major construction sites at the MMAC at least once per week.

33-2

2) Provide technical assistance and ensure compliance with this chapter.

c. Operations and Maintenance Division (AMP-300) of the Office of Facility Management.

AMP-300 must:

1) Ensure contractors performing construction, renovation, repair, and related activities required by AMP-300 comply with applicable portions of this chapter.

2) Establish a contractor selection protocol that ensures all contractors are reputable and safety-conscious.

d. Architecture and Engineering Division (AMP-400) of the Office of Facility Management. AMP-400 must:

1) Ensure contractors performing construction, renovation, repair, and related activities required by AMP-400 comply with applicable portions of this chapter.

2) Establish a contractor selection protocol that ensures all contractors contracted are reputable and safety-conscious.

e. MMAC Supervisors. MMAC supervisors must:

1) Ensure all employees under their supervision understand applicable rules, roles, and responsibilities related to construction safety.

2) Ensure compliance with this chapter.

f. MMAC Employees. MMAC employees must:

1) Comply with all applicable provisions of this program.

2) Adhere to all warnings, signs, and barricades in and around construction areas.

3) Not enter construction areas unless expressly authorized.

4) Report any hazardous or questionable activities to the EOSH Staff at 954-3503.

g. Contracting Officers (COs) and Contracting Officers Representatives (CORs). COs and CORs must:

1) Ensure all contractors follow applicable OSHA regulations and MMAC policy regarding construction.

2) Incorporate construction safety requirements into contract documents to ensure that contractor operations comply with the requirements of this chapter.

33-6. Program Elements.

33-3

a. Personal Protective Equipment. Personal protective equipment (PPE) provides protection when administrative and engineering controls are not feasible or sufficient. Many construction workers depend on properly selected and used PPE for their protection on a daily basis. Where required by work task or hazard, PPE must be selected, donned, and maintained in accordance with this program while performing construction, renovation, or related tasks at the MMAC. Refer to Chapter 25, Personal Protective Equipment, for additional PPE requirements.

1) Clothing.

a) All personnel conducting construction activities must wear full-length pants.

b) Sleeveless shirts and tank tops are prohibited on construction sites where any welding, torch cutting, and grinding are performed.

c) Synthetic clothing is prohibited on any construction site where welding, torch cutting, and grinding are performed.

2) Head Protection.

a) Head protection is required where there is a danger of impact to the head from flying or falling objects or from electrical burns.

b) Head protection must meet the requirements of ANSI Z89, Safety Requirements for Industrial Head Protection.

3) Eye and Face Protection.

a) Eye and face protection equipment is required when machines or work tasks present the potential for eye and face injuries.

b) Eye and face protection must meet the requirements of ANSI Z87.1, Eye and Face Protection.

4) Hearing Protection.

a) Personal hearing protection shall be required where engineering or administrative controls are not feasible, are not practical, or fail to reduce noise exposures below 85 dBA. Refer to Chapter 21, Hearing Conservation Program, for additional hearing protection requirements.

b) Workers must not be exposed to noise over 140 decibels without hearing protection (e.g., powder-actuated tools).

5) Foot Protection.

a) Foot protection is required when workers are working in areas where there is potential for foot injuries from falling objects, rolling objects, piercing soles, and electrical hazards.

33-4

b) All footwear must comply with ASTM F2413, Standard Specification for Performance Requirements for Foot Protection.

6) Respiratory Protection.

a) Respirators are required when respiratory hazards are present.

b) Employers must have a written program complying with 29 CFR 1910.134, as referenced by 29 CFR 1926.103, when their employees require the use of respirators for protection. For additional information, see Chapter 20, Respiratory Protection.

b. Fire Protection. All construction activities must provide an adequate level of fire protection to prevent damage to property or personal injury. Additional fire protection requirements can be found in Chapter 24, Fire Prevention.

1) Emergency Notification.

a) Contractors must ensure that workers are familiar with MMAC emergency notification procedures (See Chapter 3, Workplace Emergencies).

b) Employers must ensure that workers have the means to activate emergency response (e.g., cell phones, two-way radios).

2) Means of Egress.

a) Exits must be arranged and maintained to allow free, unobstructed egress from a building or structure.

b) Exits must be marked with readily visible signs.

3) Housekeeping. Combustibles and scrap debris must be removed from buildings at the end of each workday. Scrap debris will not be repositioned in locations that would create hazards to personnel traveling throughout the Center.

4) Smoking.

a) Smoking, use of e-cigarettes, and vaping are prohibited within all buildings at the

MMAC.

b) Smoking, e-cigarette use, and vaping are prohibited outdoors in courtyards and within 25 feet of doorways and air intake ducts in outdoor spaces.

c) Smoking and materials that represent a fire hazard are prohibited near operations.

d) Fire hazards must be marked with conspicuous signage stating “No Smoking or Open Flame.”

5) Heating Devices.

33-5

a) Heating devices must be kept clear of all combustible materials. A clearance of 36 inches for radiant heaters and 12 inches for circulatory heaters must be maintained.

b) Petroleum-burning space heaters are prohibited indoors and in enclosed areas.

6) Fire Extinguishers.

a) Fire extinguishers with a minimum rating of 2A must be provided for every 3,000 ft² of construction area. Additionally, a travel distance of no more than 100 feet may exist from any one point to an extinguisher.

b) At least one extinguisher per construction story must be provided.

c) Fire extinguishers (with a rating of 10b) must be provided within 50 feet of five gallons of flammable and combustible liquids or five cubic feet of flammable gas.

7) Hot Work Permits. Hot work permits are required when flame, heat, spark, or smoke-producing operations are conducted in areas not specifically designed for these operations.

a) All hot work activities conducted by construction contractors must be coordinated with either AMP-300 or AMP-400.

b) Hot work sites must be prepared for hot work activities in accordance with Chapter 24, Fire Prevention.

c) Hot work permits must be approved and posted before beginning work.

d) Fire Watch. Most fires associated with hot work occur when a spark smolders in an unseen location. To prevent fires resulting from the hot work activities at the MMAC:

i A person other than the operator must perform fire watch duties and remain at the work site for at least 30 minutes after hot work operations have ended.

ii Fire watch personnel must be capable of adequately performing fire watch duties.

Basic duties and capabilities include the principles of fire extinguisher use, methods of recognizing fire hazards with techniques for removing and guarding against them, and emergency notification and evacuation procedures.

iii Access to alarms, cell phones, or two-way radios must be maintained throughout the duration of the fire watch.

iv Additional fire watch personnel must be used when exposure potential exists in adjoining areas.

c. Roof Work.

1) All roof work repairs and renovations must comply with 29 CFR 1926.502, Fall Protection Systems Criteria and Practices, at a minimum.

33-6

2) At the MMAC, Roof work between the roof edge and warning line is prohibited without workers being protected by guardrails, fall arrest, or fall restraints. This prohibition also prohibits the use of the “monitor system” as fall protection.

3) Debris, tools, and other materials must be secured to prevent them from being unintentionally blown or dislodged from the roof.

4) Precautions must be taken to protect personnel below the roof work from falling debris, tools, and other materials.

5) High winds increase the hazards associated with roof work. The following precautions must be taken to protect contractors and FAA personnel.

a) All roof work is prohibited when winds are reported or forecasted to be sustained at 23 mph or more or when wind gusts are reported or are forecasted to exceed 35 mph.

b) Chemicals used to perform roof work should be monitored to prevent infiltration of building HVAC systems.

d. Scaffolds.

1) Scaffolds must be constructed, erected, and maintained in accordance with 29 CFR 1926.451, Scaffolds-General Requirements.

2) Only competent personnel may perform scaffold erection.

3) Fall protection is required for scaffolding equal to or greater than ten feet high unless guardrails over 38 inches high are in use (See Chapter 10, Fall Protection).

4) Workers on and around the scaffold must wear hard hats.

5) Scaffold loads, including tools and other equipment, must be kept to a minimum and removed when not in use and at the end of each shift.

6) Personnel must not use scaffolds during high winds, rain, snow, or bad weather.

7) Parts, tools, and equipment on a scaffold must be secured before moving the scaffold.

8) Scaffolds must not be moved with personnel on the scaffold.

9) Heavy tools, equipment, and materials must be hoisted up rather than carried up by climbing personnel.

10) When working on or near electrical hazards, scaffolds must be erected at minimum safe clearances in accordance with Chapter 34, Electrical Safety.

11) A competent person must inspect the scaffold before each shift and before its initial use.

e. Medical Services and First Aid.

33-7

1) Medical and first aid services must, at a minimum, comply with 29 CFR 1926.50.

2) Contractors must ensure that workers are familiar with MMAC emergency notification procedures (See Chapter 3, Workplace Emergencies).

3) Contractors must ensure that workers have the means to activate emergency response procedures (e.g., cell phones, two-way radios).

f. Excavations.

1) All workers inside excavations must be protected from cave-ins by a protection system that complies with 29 CFR 1926.652.

2) Cave-in protection is not required for excavations under four feet in depth if there is no potential for a cave-in.

3) A competent person, as defined by 29 CFR 1926.32 (f), must be present when employees are in excavations.

4) Shielding must be within two feet of the bottom of the excavation.

g. Hazardous Energy Control (Lockout/Tagout).

1) All hazardous energy control must comply with 29 CFR 1926.416, 1926.417; Chapter 13, Hazardous Energy Control, and the provisions of this chapter.

2) Controls of deactivated equipment and circuits must be plainly tagged and marked to identify what equipment or circuits are being worked on.

3) Tags must be attached at any point where reenergization can occur.

4) Equipment and circuits that are de-energized must have the controls rendered inoperative prior to beginning work (e.g., lockout locks, disassembly).

5) Prior to work initiation, the contractor must verify that all circuits that may be contacted during the work are de-energized.

6) A copy of the applicable hazardous energy control plan, as submitted with the contract, must be retained on-site while work activities are being conducted.

7) To control hazardous energy, employees must be provided with appropriate devices, equipment, procedures, and training. The MMAC does not issue lockout/tagout equipment or provide training for contractors.

h. Exposed Electrical Circuits. Construction contractors must:

1) Comply with the contractual provisions for an electrical safety program that meets or exceeds FAA, NFPA, OSHA, and the requirements of AC Order 3900.21K, Chapter 34, Electrical Safety.

33-8

2) Ensure that the guarding used to protect workers against energized circuits is adequate and designed for that use.

3) Retain a copy of the applicable electrical safety program as submitted with the contract on site.

4) Provide appropriate safety equipment and training for their employees.

5) Avoid exposure to electrical conductors and parts that are energized or have the potential to become energized. Observe safe work practices, including the proper use of PPE, and comply with all OSHA safety and health requirements.

6) Inspect and maintain all equipment according to the manufacturer's instructions and OSHA regulations. Take all defective equipment out of service and report the removal immediately to the COR.

i. Confined Spaces. While working at the MMAC, construction contractors must comply with 29 CFR 1926 Subpart AA—Confined Spaces in Construction (b), Chapter 11, Confined Space Entry, and the following.

1) Construction contractors must notify the EOSH Staff at least 24 hours before entering any confined space at MMAC.

2) Construction contractors must comply with all MMAC confined space permitting, monitoring, and entry procedures. See Chapter 11, Confined Space Entry, for additional requirements.

j. Lightning. Construction contractors must cease all outdoor construction activities and seek shelter when lightning-producing storms are within 15 miles of their work site.

1) Concrete Saws.

2) Whenever feasible, concrete sawing must be performed using a wet method for dust control.

3) When concrete sawing is performed using dry methods, precautions must be taken to protect workers, FAA personnel, and FAA property (including vehicles) from concrete dust.

k. Crane Operations.

1) General Requirements

a) All crane operations must comply with all federal, state, and local regulations regarding training, inspection, maintenance, and operation of the crane.

b) The crane work area must be adequately secured and signage posted to prevent unauthorized entry.

33-9

c) All operations must comply with all manufacturers’ instructions, procedures, and recommendations applicable to the operational functions of the equipment, including the use of attachments.

d) All lifts must be planned to avoid situations where the operator cannot maintain safe control of the lift.

2) Loads must not be hoisted above any person.

a) Where loads must be hoisted over occupied structures, a qualified person must determine what portions of the building should be evacuated and any other additional procedures required to perform the lift safely. For multiple-story buildings, at a minimum, the top two floors must be evacuated below the affected areas.

b) Priority should be given to performing these lifts after hours or on weekends when minimal personnel will be affected.

33-7. Contracts and Contract Employees. Contractors and subcontractors performing construction, renovation, and construction-related activities on MMAC facilities must comply with all provisions of this chapter.