This is Amendment 0004 to Solicitation 6973GH-27-R-00005, issued by AAQ-730 Facilities & Aviation Safety Acquisition (FAC) in Oklahoma City, Oklahoma with an effective date of October 20, 2026. The amendment revises the Statement of Requirements (SIR) in response to Q&A Log 1 dated November 23, 2026 and incorporates multiple modifications to the original solicitation.

The amendment specifies eight key revisions: (1) Section L.2(f) is revised to establish a 15 Megabyte size limit for individual emails; (2) Section L.3(e)(4) is revised to require price breakdown in contractor format identifying major components of work and overhead/profit rates for the base bid and each individual option; (3) AMS Clause 3.4.1-1 is updated to establish a proposal guarantee requirement of 20 percent, not to exceed $3 million; (4) Asbestos and Lead Based Paint documentation are posted as informational files, including three survey documents; (5) Historical plans are posted for informational purposes only; (6) Attachment 12 MMAC Delivery Truck Route Roads is incorporated to identify truck haul routes; (7) Attachment 10 Chapter 33 Construction Safety Rev 11.23.26 replaces the previous version in its entirety; and (8) Q&A Log #1 11.23.26 is posted. Offerors must acknowledge receipt of this amendment prior to the offer deadline by completing items 8 and 15 on the form, acknowledging receipt on each copy of the offer submitted, or by separate letter/telegram referencing the solicitation and amendment number. Failure to acknowledge receipt at the designated place prior to the specified hour and date may result in offer rejection.

View the file

Other files

File Type Posted
Attachment 13 Key Personnel Experience Form 11.25.26.pdf PDF
QA Log 2 11.25.26.pdf PDF
Amend 0005 6973GH-27-R-00005.pdf PDF
Informational File 2 Asbestos Survey 190-CLS.pdf PDF
Informational File 4 Historic Plans-Information Purposes Only.pdf PDF
Attachment 10 Chapter 33 Construction Safety Rev 11.23.26.pdf PDF
QA Log 1 11.23.26.pdf PDF
Attachment 12 MMAC Delivery Truck Route Roads.pdf PDF
Informational File 1 Asbestos Survey 186-IWT.pdf PDF
Informational File 3 Lead Based Paint Readings 186-IWT XRF.pdf PDF
Amend 0003 6973GH-27-R-00005.pdf PDF
Amend 0002 6973GH-27-R-00005.pdf PDF
Site Visit Attendance Log IWTP 27-R-00005.pdf PDF
Amend 0001 6973GH-27-R-00005.pdf PDF
Attachment 8 Contractor Release.pdf PDF
Attachment 3 SF25A Payment Bond.pdf PDF
Attachment 1b FAA MMAC IWTP_Specifications_IFC Volume II_2026 06 10.pdf PDF
6973GH-27-R-00005.pdf PDF
Attachment 6 Past Performance Experience Form 9.21.26.docx DOCX document
Attachment 1a FAA MMAC IWTP_Specifications_IFC Volume I Rev 2026 09 29.pdf PDF
Attachment 5 Past Performance Survey 9.21.26.docx DOCX document
Attachment 10 Chapter 33 Construction Safety.pdf PDF
Attachment 7 Client Authorization Letter.docx DOCX document
Attachment 11 Davis-Bacon Act WD-OK20260049.pdf PDF
Attachment 4 SF24 Bid Bond.pdf PDF
Attachment 1c FAA MMAC IWTP_Specifications_IFC Volume III_2026 06 10.pdf PDF
Attachment 2 SF25 Performance Bond.pdf PDF
Attachment 9 AMP400-ENV-OC-2.4.3-CC.pdf PDF
Attachment 1d 13289-007_MMAC IWTP Drawings.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6)CODE

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. CONTRACT AUTHORITY

(Signature of Contracting Officer)

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

See continuation page

AAQ-730 FAC. & AVIATION SAFETY ACQ

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

OKLAHOMA CITY OK 73125

AAQ730-AFN

6973GH-27-R-00005

10/20/2026

10/20/2026

1 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

ITEM NO.

(A)

QUANTITY

(C)

6973GH-27-R-00005/0004

The purpose of this amendment is to revise the

SIR in response to Q&A Log 1 11.23.2026

FIRST: Section L.2(f) is revised to add language to identify the size limit for individual emails as follows:

"Individual emails should not exceed 15

Megabytes"

SECOND: Section L.3(e)(4) is revised to specify price breakdown must include all options as follows:

"(4) Price Breakdown: Contractor Format, Identifying Major Components of work and overhead rates/profit rate for the base bid and each individual option"

THIRD: AMS Clause 3.4.1-1 is revised to specify a $3M not to exceed amount for the proposal guarantee as follows:

AMS Clause 3.4.1-1 has been updated to read:

"(b) The required amount of the proposal guarantee is 20%; Not to Exceed $3M."

FOURTH: Asbestos and Lead Based Paint documentation are posted as Informational files as indicated below:

a) Informational File 1 Asbestos Survey

186-IWT

b) Informational File 2 Asbestos Survey

190-CLS

c) Informational File 3 Lead Based Paint

Readings 186-IWT XRF

FIFTH: Historical Plans are posted for

Informational Purposes Only as indicated below:

a) Informational File 4 Historic

Plans-Information Purposes Only

SIXTH: "Attachment 12 MMAC Delivery Truck Route

Roads" is hereby incorporated to identify MMAC

Truck Haul Routes

Continued...

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

ITEM NO.

(A)

QUANTITY

(C)

6973GH-27-R-00005/0004

SEVENTH: "Attachment 10 Chapter 33 Construction

Safety Rev 11.23.26" is hereby incorporated and replaces the previous "Attachment 10 Chapter 33

Construction Safety" in its entirety

EIGHTH: "Q&A Log #1 11.23.26" is hereby posted

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Continuation sheet
Reference Number
Name of Offeror or Contractor

File details come from the government source that posted it. Updated .