Attachment 5 Past Performance Survey 9.21.26.docx

DOCX document 30 KB Posted

Attached to
Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades
Solicitation number
6973GH-27-R-00005
Issued by

About this file

This is a Past Performance Survey template designed to collect contractor performance feedback for the Industrial Wastewater Treatment Plant (IWTP) Upgrades project at the FAA's Mike Monroney Aeronautical Center (MMAC), Solicitation Number 6973GH-27-R-00005. The survey is to be completed by past clients or project owners who have worked with contractors bidding on this $10-20 million total small business set-aside construction project.

The survey is divided into two parts: Part 1 requires the offeror to provide project details including contract type, contractor role (prime or subcontractor classification), contract amounts, performance period, and any compliance issues such as deficiency notices, cure notices, or show cause orders. Part 2 requests the customer or client point of contact to evaluate contractor performance across multiple criteria including overall compliance with contract requirements, schedule adherence, absence of terminations for default, personnel performance, integrity, and willingness to recommend for future work. Responses must be submitted to Contracting Officer Andre Casiano at Andre.Casiano@faa.gov no later than November 20, 2026, at 4:00 p.m. Central Time, which is the RFP due date. The survey serves as a critical evaluation tool for past performance documentation in the proposal evaluation process, with responses requested from organizations that can speak to contractor performance on similar renovation or industrial wastewater treatment projects.

View the file

Other files

File Type Posted
Informational File 2 Asbestos Survey 190-CLS.pdf PDF
Informational File 4 Historic Plans-Information Purposes Only.pdf PDF
Attachment 10 Chapter 33 Construction Safety Rev 11.23.26.pdf PDF
QA Log 1 11.23.26.pdf PDF
Attachment 12 MMAC Delivery Truck Route Roads.pdf PDF
Informational File 1 Asbestos Survey 186-IWT.pdf PDF
Amend 0004 6973GH-27-R-00005.pdf PDF
Informational File 3 Lead Based Paint Readings 186-IWT XRF.pdf PDF
Amend 0003 6973GH-27-R-00005.pdf PDF
Amend 0002 6973GH-27-R-00005.pdf PDF
Site Visit Attendance Log IWTP 27-R-00005.pdf PDF
Amend 0001 6973GH-27-R-00005.pdf PDF
Attachment 8 Contractor Release.pdf PDF
Attachment 3 SF25A Payment Bond.pdf PDF
Attachment 1b FAA MMAC IWTP_Specifications_IFC Volume II_2026 06 10.pdf PDF
6973GH-27-R-00005.pdf PDF
Attachment 6 Past Performance Experience Form 9.21.26.docx DOCX document
Attachment 1a FAA MMAC IWTP_Specifications_IFC Volume I Rev 2026 09 29.pdf PDF
Attachment 10 Chapter 33 Construction Safety.pdf PDF
Attachment 7 Client Authorization Letter.docx DOCX document
Attachment 11 Davis-Bacon Act WD-OK20260049.pdf PDF
Attachment 4 SF24 Bid Bond.pdf PDF
Attachment 1c FAA MMAC IWTP_Specifications_IFC Volume III_2026 06 10.pdf PDF
Attachment 2 SF25 Performance Bond.pdf PDF
Attachment 9 AMP400-ENV-OC-2.4.3-CC.pdf PDF
Attachment 1d 13289-007_MMAC IWTP Drawings.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROCUREMENT SENSITIVE WHEN COMPLETED Attachment 5 Sept 21, 2026

FOR OFFICIAL USE ONLY

SIR/RFO No. 6973GH-27-R-00005 IWTP Construction

PAST PERFORMANCE SURVEY

To: _______________________________________________________________________

Organization:_____________________________________________________________

Fax No.: _________________________ E-mail Address:_________________________

Date: __________________________ Number of Pages (including this sheet): 4 in total

Your name was provided as a past performance point of contract for the following:

Contractor Name:_________________________________________________________

Contract Number: _______________________________ Date(s)____________________

Project Title: ___________________________________________________________

Contractor Role / Responsibility (circle one):

(Prime Contractor) (Mechanical Subcontractor) (Electrical Subcontractor) (Other Subcontractor)

In regard to the above contractor’s performance on the referenced contract, please complete the attached Past Performance Questionnaire and return as follows:

Send to: Andre Casiano, Contracting Officer

E-mail Address: Andre.Casiano@faa.gov

For questions, please contact me at telephone 405-954-7850

Please provide your response no later than the RFP due date of Thursday, November 20th, 2026, at 16:00p.m. Central Time

Thank you!

PART 1. OFFEROR TO COMPLETE THIS PAGE:

1. Name of Contractor: ____________________________________________________

2. Provide a brief description of the renovation project and how it is same/similar to the Industrial Wastewater Treatment Plant (IWTP) Upgrades. Offeror’s may provide additional description of project on an additional sheet.

3. Type of contract; e.g., firm fixed-price, cost-reimbursable: _______________________________________

4. Contractor Role (circle one):

Prime Contractor, Mechanical Subcontractor, Electrical Subcontractor, Pool Subcontractor

5. Contract Number (if applicable): _______________________________________________

6. Total Contract Amount - Original contract amount: $____________ Final Contract Amount: $_____________ Provide rationale for the difference________________________________________________________

7. Date of Contract Award: ______________________________________________________

8. Contract Period of Performance: Start Complete _________________

9. Was project completion date consistent with the contract completion date? ___________ If no, explain why___________________________________________________________________________________.

10. Was a deficiency notice issued? ___________ If so, was the issue successfully resolved? ___________

11. Was a Cure Notice issued? _____________ If so, was the issue successfully resolved? _____________

12. Was a Show Cause issued? _____________ If so, was the issue successfully resolved? _____________

PART II. CUSTOMER/CLIENT TO COMPLETE THE FOLLOWING PAGES:

Name of Responding Point of Contact: _____________________________________________________

Agency/Organization: _________________________________________________________________

Telephone Number: __________________________________

E-mail Address: __________________________________

1. How would you rate the contractor's overall compliance with contract requirements?

( ) Acceptable ( ) Unacceptable

2. How would you rate the timeliness of the Contractor - adhering to the required schedule?

( ) Acceptable ( ) Unacceptable `

3. Has this contract been partially or completely terminated for default, or is a termination pending?

( ) Yes / If yes, please explain and indicate the status.

( ) No/Acceptable

4. Has it ever been necessary to send this Contractor a Notice to Cure letter?

( ) Yes If yes, please explain and indicate the status.

( ) No

5. How would you rate the performance of the contractor's key personnel?

( ) Acceptable ( ) Unacceptable

6. Would you recommend awarding similar contracts or using the offeror again for future work?

( ) Yes/Acceptable ( ) No/Unacceptable

7. Did you experience any integrity problems with this Contractor?

( ) Yes If yes, please explain.

( ) No

8. Please provide any other comments you may have.