Attachment 13 Key Personnel Experience Form 11.25.26.pdf
PDF 132 KB Posted
- Attached to
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades
- Solicitation number
- 6973GH-27-R-00005
About this file
This document is a template form for submitting resumes of key personnel proposed for a federal construction contract. The form requires bidders to complete one resume for each key person assigned to the contract.
The form begins with ten sections collecting biographical and professional information: name, company name and location, proposed role, previous roles held with the company, total years of experience, years with current company, years in the proposed role, professional qualifications and certifications, relevant education or training, and optional additional relevant information. Following the biographical section, the form mandates submission of detailed information for a minimum of five relevant projects demonstrating experience in the proposed role. For each project, bidders must provide the project name and location (city and state), owner/client name, construction completion year, construction cost (to nearest thousand dollars), project size (area in square feet or acres for site development), a brief project description including scope and disciplines involved, the specific role held on the project (such as Superintendent or Project Manager), and indication of whether the project was performed with the current company. Bidders may optionally list up to ten total projects; however, all information for the mandatory five projects must be provided for the submission to be considered responsive. The template provides identical formatting for projects 6 through 10, which are designated as optional.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one for each key person)
RESUME OF KEY PERSONNEL Page 1
1. NAME:
2. COMPANY NAME AND LOCATION:
3. PROPOSED ROLE FOR THIS CONTRACT:
4. PREVIOUS ROLE(S) HELD WITH THIS COMPANY:
5. NUMBER OF YEARS’ EXPERIENCE TOTAL:
6. NUMBER OF YEARS’ EXPERIENCE WITH CURRENT COMPANY:
7. NUMBER OF YEARS’ EXPERIENCE IN ROLE PROPOSED FOR THIS CONTRACT:
8. PROFESSIONAL QUALIFICATIONS (Certifications, etc):
9. RELEVANT EDUCATION OR TRAINING:
10. OTHER RELEVANT INFORMATION (Optional):
FOR ITEMS 11 THROUGH 15, PROVIDE THE LISTED INFORMATION FOR AT LEAST FIVE (5)
RELEVANT PROJECTS THAT SHOW EXPERIENCE IN THE PROPOSED ROLE FOR THIS CONTRACT.
TO BE CONSIDERED RESPONSIVE, ALL INFORMATION LISTED MUST BE PROVIDED.
ITEMS 16 THROUGH 20 ARE OPTIONAL. IF DESIRED, A MAXIMUM OF TEN (10) PROJECTS MAY BE
LISTED.
RESUME OF KEY PERSONNEL Page 2
11. RELEVANT PROJECT 1 – NAME AND LOCATION (city and state):
a. NAME OF OWNER/CLIENT:
b. YEAR CONSTRUCTION WAS / OR WILL BE COMPLETED:
c. CONSTRUCTION COST (to nearest thousand):
d. SIZE (Area in SF, or Acres if site development):
e. BRIEF PROJECT DESCRIPTION (Include, scope, disciplines involved, & other information):
f. SPECIFIC ROLE ON PROJECT (Superintendent, Project Manager, etc):
g. INDICATE IF PROJECT PERFORMED WITH CURRENT COMPANY: YES NO
12. RELEVANT PROJECT 2 – NAME AND LOCATION (city and state):
a. NAME OF OWNER/CLIENT:
b. YEAR CONSTRUCTION WAS / OR WILL BE COMPLETED:
c. CONSTRUCTION COST (to nearest thousand):
RESUME OF KEY PERSONNEL Page 3
13. RELEVANT PROJECT 3 – NAME AND LOCATION (city and state):
a. NAME OF OWNER/CLIENT:
b. YEAR CONSTRUCTION WAS / OR WILL BE COMPLETED:
c. CONSTRUCTION COST (to nearest thousand):
14. RELEVANT PROJECT 4 – NAME AND LOCATION (city and state):
a. NAME OF OWNER/CLIENT:
b. YEAR CONSTRUCTION WAS / OR WILL BE COMPLETED:
c. CONSTRUCTION COST (to nearest thousand):
RESUME OF KEY PERSONNEL Page 4
15. RELEVANT PROJECT 5 – NAME AND LOCATION (city and state):
a. NAME OF OWNER/CLIENT:
b. YEAR CONSTRUCTION WAS / OR WILL BE COMPLETED:
c. CONSTRUCTION COST (to nearest thousand):
The following section is optional – Five additional projects may be listed using the format above.
16. RELEVANT PROJECT 6 – NAME AND LOCATION (city and state):
a. NAME OF OWNER/CLIENT:
b. YEAR CONSTRUCTION WAS / OR WILL BE COMPLETED:
c. CONSTRUCTION COST (to nearest thousand):
RESUME OF KEY PERSONNEL Page 5
17. RELEVANT PROJECT 7 – NAME AND LOCATION (city and state):
a. NAME OF OWNER/CLIENT:
b. YEAR CONSTRUCTION WAS / OR WILL BE COMPLETED:
c. CONSTRUCTION COST (to nearest thousand):
18. RELEVANT PROJECT 8 – NAME AND LOCATION (city and state):
a. NAME OF OWNER/CLIENT:
b. YEAR CONSTRUCTION WAS / OR WILL BE COMPLETED:
c. CONSTRUCTION COST (to nearest thousand):
RESUME OF KEY PERSONNEL Page 6
19. RELEVANT PROJECT 9 – NAME AND LOCATION (city and state):
a. NAME OF OWNER/CLIENT:
b. YEAR CONSTRUCTION WAS / OR WILL BE COMPLETED:
c. CONSTRUCTION COST (to nearest thousand):
20. RELEVANT PROJECT 10 – NAME AND LOCATION (city and state):
a. NAME OF OWNER/CLIENT:
b. YEAR CONSTRUCTION WAS / OR WILL BE COMPLETED:
c. CONSTRUCTION COST (to nearest thousand):
End of document.
| NAME: |
| COMPANY NAME: |
| PROPOSED ROLE: |
| PREVIOUS ROLES: |
| TOTAL YEARS EXPERIENCE: |
| YEARS EXP WITH CURRENT COMPANY: |
| YEARS EXP IN ROLE: |
| PROFESSIONAL QUALS: |
| EDUCE OR TRAINING: |
| Text10: |
| Project Name 2: |
| Owner: |
| Const Complete: |
| Cost: |
| Size: |
| YES: Off |
| NO: Off |
| Project Role: |
| Project Name 1: |
| name: |
| name 2: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Check Box3: Off |
| Check Box4: Off |
| Name: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text35: |
| Check Box5: Off |
| Check Box6: Off |
| Text36: |
| Text37: |
| Text38: |
| Text39: |
| Text40: |
| Text41: |
| Text42: |
| Text43: |
| Check Box7: Off |
| Check Box8: Off |
| Text45: |
| Text46: |
| Text47: |
| Text48: |
| Text49: |
| Text50: |
| Text51: |
| Text52: |
| Check Box9: Off |
| Check Box10: Off |
| Text53: |
| Text54: |
| Text55: |
| Text56: |
| Text57: |
| Text58: |
| Text59: |
| Text60: |
| Check Box11: Off |
| Check Box12: Off |
| Text61: |
| Text62: |
| Text63: |
| Text64: |
| Text65: |
| Text66: |
| Text67: |
| Text68: |
| Check Box13: Off |
| Check Box14: Off |
| Text69: |
| Text70: |
| Text71: |
| Text72: |
| Text73: |
| Text74: |
| Text75: |
| Text76: |
| Check Box15: Off |
| Check Box16: Off |
| 10 name: |
| Text86: |
| Text87: |
| Text88: |
| Text89: |
| Text90: |
| Text91: |
| Text92: |
| Check Box19: Off |
| Check Box20: Off |
| 9 name: |
| 9 Name 2: |
| Text93: |
| Text94: |
| Text95: |
| Text96: |
| 9 Description: |
| Text98: |
| Check Box21: Off |
| Check Box22: Off |
| Description: |
File details come from the government source that posted it. Updated .