This is an Amendment (0005) to a Screening Information Request (SIR) for Solicitation 6973GH-27-R-00005, issued by the FAA's Facility & Aviation Safety Acquisition office in Oklahoma City. The amendment revises the Statement of Instructions and Evaluation Factors in response to Q&A Log 2 dated November 25, 2026, and extends the proposal due date to December 4, 2026 at 4:00 p.m. Central Time. Key amendments include: (1) clarifying that all references to "wastewater" throughout Sections L and M shall be construed as synonymous with "industrial process wastewater"; (2) revising evaluation language to allow the FAA to use data from other sources when evaluating Factors 1 through 5, with offerors given opportunity to rebut negative information; (3) updating Factor 3 (Key Personnel) requirements to require submission of Attachment 13 Key Personnel Experience Forms for the Project Manager and Superintendent; (4) revising Factor 4 (Packaged Wastewater Treatment Equipment) to specify installer qualifications from Specification Section 46 07 53, 1.9 Quality Assurance B with a 15-page limit; and (5) revising Factor 5 (Site Infrastructure Subcontractor Experience) to require minimum two projects per subcontractor valued at or over $250,000, completed within seven years, with specific experience in trench demolition, excavation, site utility, lift station, and force main piping construction.

The acquisition utilizes Lowest Price, Technically Acceptable (LPTA) for award decision, requiring all offerors to receive "Acceptable" ratings on all five evaluation factors to be considered for award. The solicitation is for multi-discipline construction services related to an Integrated Wastewater Treatment Plant (IWTP) Upgrade Project at the Mike Monroney Aeronautical Center and requires a mandatory pre-proposal conference/site visit on November 2, 2026 at 10:00 a.m. Central Time. All proposals must be submitted electronically via email to andre.casiano@faa.gov with a Firm-Fixed-Price contract anticipated for award. The NAICS code is 236220 (Nonresidential Building Construction), with a small business size standard not exceeding $45 million in annual average receipts. Offerors must demonstrate relevant experience on at least two multi-discipline construction projects valued at or over $5,000,000 and one wastewater treatment project valued at or over $2,000,000, all completed or underway within seven years, with submission of CPARS reports or Past Performance Surveys, Key Personnel Experience forms, and appropriate past performance documentation for all factors.

View the file

Other files

File Type Posted
Attachment 13 Key Personnel Experience Form 11.25.26.pdf PDF
QA Log 2 11.25.26.pdf PDF
Informational File 2 Asbestos Survey 190-CLS.pdf PDF
Informational File 4 Historic Plans-Information Purposes Only.pdf PDF
Attachment 10 Chapter 33 Construction Safety Rev 11.23.26.pdf PDF
QA Log 1 11.23.26.pdf PDF
Attachment 12 MMAC Delivery Truck Route Roads.pdf PDF
Informational File 1 Asbestos Survey 186-IWT.pdf PDF
Amend 0004 6973GH-27-R-00005.pdf PDF
Informational File 3 Lead Based Paint Readings 186-IWT XRF.pdf PDF
Amend 0003 6973GH-27-R-00005.pdf PDF
Amend 0002 6973GH-27-R-00005.pdf PDF
Site Visit Attendance Log IWTP 27-R-00005.pdf PDF
Amend 0001 6973GH-27-R-00005.pdf PDF
Attachment 8 Contractor Release.pdf PDF
Attachment 3 SF25A Payment Bond.pdf PDF
Attachment 1b FAA MMAC IWTP_Specifications_IFC Volume II_2026 06 10.pdf PDF
6973GH-27-R-00005.pdf PDF
Attachment 6 Past Performance Experience Form 9.21.26.docx DOCX document
Attachment 1a FAA MMAC IWTP_Specifications_IFC Volume I Rev 2026 09 29.pdf PDF
Attachment 5 Past Performance Survey 9.21.26.docx DOCX document
Attachment 10 Chapter 33 Construction Safety.pdf PDF
Attachment 7 Client Authorization Letter.docx DOCX document
Attachment 11 Davis-Bacon Act WD-OK20260049.pdf PDF
Attachment 4 SF24 Bid Bond.pdf PDF
Attachment 1c FAA MMAC IWTP_Specifications_IFC Volume III_2026 06 10.pdf PDF
Attachment 2 SF25 Performance Bond.pdf PDF
Attachment 9 AMP400-ENV-OC-2.4.3-CC.pdf PDF
Attachment 1d 13289-007_MMAC IWTP Drawings.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6)CODE

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. CONTRACT AUTHORITY

(Signature of Contracting Officer)

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

See continuation page

AAQ-730 FAC. & AVIATION SAFETY ACQ

PO BOX 25082

BLDG 014-AHQ, ROOM 233A

OKLAHOMA CITY OK 73125

AAQ730-AFN

6973GH-27-R-00005

10/20/2026

10/20/2026

1 18

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

ITEM NO.

(A)

QUANTITY

(C)

6973GH-27-R-00005/0005

The purpose of this amendment is to revise the

SIR in response to Q&A Log 2 11.25.2026 and extend the proposal due date to December 4, 2026 at 4:00 p.m. Central Time

FIRST: The below language is hereby incorporated in Section L & Section M

All references to the term 'wastewater' throughout Section L & Section M shall be construed as synonymous with “industrial process wastewater”.

SECOND: The below language is hereby incorporated at the beginning of Section M.5 which replaces language at Section M.5.II

"CAUTION: Offerors are cautioned that the FAA may use the data provided by other sources in evaluating Factors 1 through 5. Offerors will be given an opportunity to rebut information considered negative and relevant to the evaluation. While the FAA may consider data from other sources, the burden of providing thorough and complete data rests with the

Offeror"

Due to the incorporation of revised language above, the below language is hereby removed from Section M.5.II

"CAUTION: Offerors are cautioned that the FAA may use the data provided by other sources in evaluating past performance. Offerors will be given an opportunity to rebut information considered negative and relevant to the evaluation. While the FAA may consider data from other sources, the burden of providing thorough and complete past performance data rests with the Offeror."

THIRD: Section L.3(f)(3) Factor 3 - Key

Personnel - Key Personnel Qualifications is hereby revised as follows:

"(3) Factor 3 - Key Personnel - Key Personnel

Qualifications: Offerors must complete and submit “Attachment 13 Key Personnel Experience

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

ITEM NO.

(A)

QUANTITY

(C)

6973GH-27-R-00005/0005

Form” for the Project Manager AND

Superintendent that will be employed on this project which documents their qualifications and experience to perform under the contract"

FOURTH: Section L.3(f)(4) Factor 4 - Packaged

Wastewater Treatment Equipment is hereby revised as follows:

"(4) Factor 4 - Packaged Wastewater Treatment

Installer: Offerors must submit installer qualifications identified in Specification

Section 46 07 53, 1.9 Quality Assurance B (See

Section J, Attachment 1c FAA MMAC

IWTP_Specifications_IFC Volume III_2026 06 10) for the Packaged Wastewater Treatment installer the offeror plans to use for the project. This factor has a fifteen (15) Page Limit"

FIFTH: Section L.3(f)(5) Factor 5 - Site

Infrastructure Subcontractor Experience is hereby revised as follows:

"(5) Factor 5 - Site Infrastructure

Subcontractor(s) Experience: The Offeror's proposed Site Infrastructure subcontractor(s) is/are required to provide a minimum of two (2) projects per each subcontractor that are wastewater related and will need to provide

“Past Performance Experience Information”

(PPEI) forms (Attachment 6 Past Performance

Experience Form) for each project to demonstrate experience in trench demolition, excavation, site utility, lift station, and/or force main piping construction projects of similar scope and complexity. If using multiple subcontractors, each subcontractor must submit at least two (2) separate projects each. Each project must be valued at or over

$250,000. Only construction projects completed within the last seven (7) years will be considered; however, one (1) project that is currently in progress and at least 80% complete by billing and scheduled to complete by no more than six (6) months from the bid date of this solicitation may be considered for no more than one project. In the "Past Performance

Experience Information" forms, all blocks must

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

ITEM NO.

(A)

QUANTITY

(C)

6973GH-27-R-00005/0005

be filled in and all data should be accurate, current, and complete."

SIXTH: Section M.III. Factor 3 - Key Personnel:

Key Personnel Qualifications - Evaluation

Criteria is hereby revised as follows:

"III. Factor 3 - Key Personnel: Key Personnel

Qualifications - Evaluation Criteria

The Government will review “Key Personnel

Experience Forms” submitted under Factor 3. To receive an “ACCEPTABLE” rating under this subfactor, the offeror’s Key Personnel

Experience Forms document the qualifications and experience for the Project Manager AND

Superintendent that meet the requirements in the table below."

SEVENTH: Section M. IV. Factor 4 – Packaged

Wastewater Treatment Equipment - Evaluation

Criteria is hereby revised as follows:

"IV. Factor 4 – Packaged Wastewater Treatment

Installer - Evaluation Criteria

The Government will review all documentation submitted under Factor 4 within the page limit identified. To receive an “ACCEPTABLE” rating under this subfactor, the offeror’s proposal must document the qualifications from specification section 46 07 53, 1.9 Quality

Assurance B as listed in the table below

Installers Qualifications: Company specializing in performing Work identified under specification section 46 07 53 with minimum

Three (3) years' documented experience."

EIGHTH: Section M.V. Factor 5 - Site

Infrastructure Subcontractor Experience -

Evaluation Criteria is hereby revised as follows:

"V. Factor 5 - Site Infrastructure

Subcontractor(s) Experience - Evaluation

Criteria

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

ITEM NO.

(A)

QUANTITY

(C)

6973GH-27-R-00005/0005

The Government's Source Evaluation Team will review the project experience of the subcontractor(s) on projects provided in response to Factor 5. Offerors must meet all of the following minimum acceptability standards to receive an "ACCEPTABLE" on this factor:

- Each subcontractor must have at least two (2) separate projects, each project must be valued at or over $250,000 submitted on the SIR attached PPEI form, that are similar to that of the work required in the project specifications and this solicitation; AND

- Projects submitted must have been completed, or underway, within the last 7 years through the closing date of the SIR."

NINTH: "QA Log 2 11.25.26" is hereby posted

TENTH: Conformed Copies of Section L and

Section M as a result of Amendment 0005 are contained in the continuation pages below.

ELEVENTH: The proposal due date is hereby extended to December 4, 2026 at 4:00 p.m.

Central Time

Section L - Instructions,Conditions, and Notices to Bidders Clause List

L.1 Mandatory Site Visit/Submission of Questions Prior to Proposal

Prospective offerors are REQUIRED to attend a MANDATORY pre-proposal conference/site visit to be held at 10:00 a.m. Central Time, Monday, November 2, 2026 at the Mike Monroney Aeronautical Center. The conference will be held for the purpose of site investigation and permit general discussions regarding this Screening Information Request.

IMPORTANT NOTICE: Proposals from offerors who did not attend the pre-proposal conference WILLNOT be considered for award

Offerors are allowed to send a maximum of three (3) individuals to represent their proposal (to include proposal teams, if applicable). Please advise the Contracting Officer, Andre Casiano, at andre.casiano@faa.gov in writing of your intent to attend by 12:00 p.m. Central Time, Friday, October 30th, 2026. Telephone requests will NOT count as notification of attendance. The Contracting Officer will send out information regarding visitor/vehicle passes and initial meetup location, no later than 2:00 p.m. Central Time, Friday, October 30th, 2026 to ONLY those that have provided the required response information. Your request should include the following information:

(1) Name of company represented

(2) Name and title of representative

(3) Phone number of representative

(4) Email address of representative

In accordance with the REAL ID Act, the following documents will be the only accepted identification forms for granting access to the Mike Monroney Aeronautical Center:

• U.S. Department of Transportation issued PIV.

• U.S. Passport or U.S. Passport Card.

• REAL-ID compliant US state issued Driver’s license or ID card.

• U.S. Military or U.S. Military dependent’s ID Card with photograph.

• Other U.S. Government issued PI

NOTE: During the site visit, the FAA will not be providing transportation to the site visit location. In order for potential offerors to view the worksite. Site Visit Attendees will be required to register their vehicles and provide documentation in order to travel to the site visit location. Therefore, Site Visit attendees must have a current insurance form for their vehicles. IT IS HIGHLY ENCOURAGED SITE VISIT ATTENDEES CAR POOL FOR

THE SITE VISIT

No changes are made to the SIR unless a written amendment is issued. The FAA assumes no responsibility for any conclusions or interpretations made by the contractor based on the information received by any means other than in writing from the Contracting Officer. The FAA does not assume responsibility for any understanding reached or representation made concerning conditions, which can affect the work, by any of its officers or agents before the execution of this contract, unless that understanding, or representation is expressly stated in the contract.

Offerors are encouraged to submit all questions they may have regarding this requirement/specifications/plans in writing to the Contracting Officer no later than Monday, November 9, 2026. E-mail questions to andre.casiano@faa.gov. Questions received after that date, together with any questions generated at the conference, will be answered in writing as soon as possible following the conference. Please use the following in the email subject line for questions: 6973GH-27-R-00005, Questions, Submitted on Behalf of “**”. Offerors are encouraged to submit questions as early as possible

Remarks, explanations, or answers to questions provided at this conference SHALL NOT qualify the Screening Information Request terms unless such remarks, explanations or answers are in the form of a formal written amendment to the Screening Information Request.

L.2 Instructions, Conditions, and Notices to Respondents for Proposal Preparation

(a) This SIR is not to be construed as a contract or a commitment of any kind. The Government and the FAA shall not be liable for payment of nor reimburse offerors or contractors for any and all costs incurred in the preparation and/or submittal of a proposal in response to this SIR. All proposal preparation and/or submittal costs are at the risk of the offeror or contractor.

(b) Certain representations and certifications must be made by the offeror and must be filled in as appropriate. The signature of the offeror on the face page of this SIR/RFO constitutes the making of certain representations and certifications. Award of any contract to the offeror shall be considered to have incorporated the applicable representations and certifications by reference.

(c) The Contracting Officer (CO) is Andre Casiano. All written questions, correspondence, and submittals must be sent to the Contracting Officer via email at andre.casiano@faa.gov.

OFFERORS MUST NOT CONTACT THE PROGRAM OFFICE OR PROGRAM OFFICE PERSONNEL AT

ANY TIME REGARDING THIS ACQUISITION

(d) This acquisition will utilize Lowest Price Technically Acceptable for an award decision, therefore an offeror must receive an "Acceptable" rating on all evaluation factors to be considered for award and there will be no weightings assigned to the technical factors. This section of the Instructions to Offerors (ITO) provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The Offeror’s proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions. Any Offeror who submits an incomplete package may be considered nonresponsive and ineligible for award. The offer shall be compliant with the requirements as stated in Section B and applicable attachments. Non-conformance with the instructions provided in the ITO may result in an unfavorable proposal evaluation.

(e) Each Offeror will submit information identified in the sections as set forth in Section L.3, Instructions for Preparation and Submission of Proposals. The data submitted should be complete, concise and relevant to the requirements of the SIR/RFO and are required to be submitted in the prescribed formats subsequently identified herein.

(f) Documentation shall be submitted electronically in accordance with Section L, Clause 3.2.2.3-20, Electronic Offers. Note: Proposal Sections I and II shall be submitted as separate documents. Individual emails should not exceed 15 Megabytes, therefore due to FAA email size limitations, it is highly recommended that offerors submit their email proposal for each Section as separate emails and in the email subject line state 6973GH-27-R-00005, Section/Factor “**” Submitted on Behalf of “<Insert Offeror Company>”. Proposals must be emailed to andre.casiano@faa.gov

(g) VERY IMPORTANT NOTICE: Offerors are further advised that due to the size of the proposal documents as well as email security requirements, Offerors should not wait until the last minute to email proposal submission as any email received after the time and date that proposals are due will be subject to AMS Clause 3.2.2.3-14 Late Submissions, Modifications, and Withdrawals of Submittals.

(h) Specific attention is invited to AMS paragraph 3.2.2.3.1.2.2, Communications with Offerors. The FAA may communicate with one or more offerors at any time during the SIR process. Communications with one offeror do not necessitate communications with other offerors, since communications will be offeror-specific. Information determined to have common application and not considered prejudicial to offerors will be communicated to all offerors. An award may be made without any discussions/negotiations. Offerors are to consider all terms and conditions contained in the formal SIR in preparation of the proposals set forth herein.

(i) Only one proposal from each offeror shall be considered

(j) The FAA reserves the right to consider as acceptable only those proposals submitted in accordance with the requirements set forth in the SIR/RFO which demonstrate an understanding of the complexity and scope of the requirements.

(k) The FAA further reserves the right to reject, as unacceptable, proposals deleting or altering technical requirements

L.3 Instructions for Preparation and Submission of Proposals

(a) Each Offeror will submit information identified in the sections as set forth in paragraph (c) below. The data submitted should be complete, concise, and relevant to the requirements of the SIR/RFO and are required to be submitted in the prescribed formats subsequently identified herein.

(b) Documentation shall be submitted electronically in accordance with Section L, Provision 3.2.2.3-20, Electronic Offers.

(c) The titles and contents of the sections should be as set forth below.

Proposal Documentation

Section Title I Contract Documentation & Price Proposal to include price breakdown

II

Factor 1 - Relevant Experience Factor 2 - Past Performance Factor 3 - Key Personnel, (6-page limit for each resume) Factor 4 - Packaged Wastewater Treatment Equipment (15-page limit) Factor 5 - Site Infrastructure Subcontractor Experience

*No reference shall be made to costs/prices in Section II

(d) Section cover shall designate section title along with applicable page(s) the Offeror deems competition sensitive.

(e) Section I - Contract Documentation: This section will be in FAA format. This will provide information to the FAA for preparing the contract document and supporting file. Offerors must complete and submit:

(1) Section A, Solicitation, Offer and Award, FAA Form 4400-82 (SF1442), Blocks 20a, 20b, and 20c

(2) Section K, Representations and Certifications

(3) Section B, Supplies or Services and Prices/Costs: Government format

(4) Price Breakdown: Contractor Format, Identifying Major Components of work and overhead rates/profit rate for the base bid and each individual option

(5) Bid Bond

(6) Executed Teaming Agreement or Joint Venture agreements (if applicable)

Completion of documents identified at (1) through (6) above indicates that the Offeror has read and agrees to the terms and conditions contained in the SIR/RFO. Any offer that fails to provide all of the requisite items identified at

(1) through (6) above, or otherwise takes exception, may be deemed non-responsive and ineligible for award.

(f) Section II - Relevant Experience / Past Performance / Key Personnel / Packaged Wastewater Treatment Equipment / Site Infrastructure Subcontractor Experience: The five (5) evaluation factors under this section will each be assigned a rating of "ACCEPTABLE" or "UNACCEPTABLE" in accordance with Section M.4 - Scoring.

These factors will be evaluated in accordance with Section M.5 Evaluation Factors of this SIR.

All references to the term 'wastewater' throughout Section L & Section M shall be construed as synonymous with “industrial process wastewater”.

(1) Factor 1 - Relevant Experience: Demonstrate the experience of offeror and/or proposed team, including sub-contractors, on projects similar to that described in the SOW for the IWTP Upgrade Project.

Offerors must complete and submit a minimum of three (3) "Past Performance Experience Information" (PPIE) forms, attached to the SIR , (Attachment 6 Past Performance Experience Form) in response to this factor. All blocks must be filled in and all data should be accurate, current, and complete. All projects submitted must have been underway or completed within the last seven (7) years through the closing date identified on the SIR. The offeror must submit at least two (2) multi-discipline construction projects valued at or over $5,000,000 and at least one (1) wastewater treatment related project valued at or over $2,000,000. The wastewater project must be a different project from the multi-discipline projects.

- If an Offeror does not have prior prime contracts to cite, then the Offeror may cite instances on which it has served as a primary subcontractor, those instances must be clearly identified as such, and the magnitude of the submitted project must be the amount of the offeror’s subcontract

- If an offeror is proposing under Teaming Agreement, each Teaming Partner must have a minimum of one (1) PPEI form towards the required three (3) PPEI forms

(2) Factor 2 - Past Performance: Demonstrate the past performance of offeror and/or proposed team, including sub-contractors, on projects similar to that described in the Specifications for the IWTP Upgrades Project.

Offerors must submit Contractor Performance Assessment Reporting System (CPARS) reports OR Offerors must have client(s) submit the Past Performance Surveys (PPSs) attached to the SIR (see Section J, List of Attachments, Attachment 5 Past Performance Survey), OR Offerors must utilize a combination of both CPARS report(s) and PPS(s) for projects submitted under this factor

The Offeror’s CPARS Report(s)/PPS(s) must be for projects that demonstrate/possess relevant past performance for construction projects equal to (or greater than) the complexity and breadth of the IWTP Upgrades Project. The Offeror’s ability to meet contract obligations in a timely manner is an area of particular importance. A proposal should demonstrate acceptable past performance on construction projects of same or similar scope, complexity, and magnitude as the IWTP Upgrades Project. A MINIMUM of three completed CPARS report(s)/PPS(s) must be received for this factor. All CPARS report(s) and/or PPS(s) must be for projects that are underway or completed within the last seven (7) years through the closing date identified on the SIR. At least one (1) CPARS report and/or PPS for each of the multidiscipline construction projects valued at or over $5,000,000 and at least one (1) CPARS report and/or PPS for the wastewater treatment related project valued at or over $2,000,000. Each CPARS report(s)/PPS(s) will need to be for each different project as listed above.

- If an Offeror does not have prior prime contracts to cite, then the Offeror may cite instances on which it has served as a primary subcontractor, those instances must be clearly identified as such, and the magnitude of the submitted project must be the amount of the offeror’s subcontract

- If an offeror is proposing under a Teaming Agreement, each Teaming Partner must have a minimum of one (1) CPARS Report/PPS form towards the required three (3) CPARS Report(s)/PPS Form(s)

Note: Alteration and/or deletion of data fields contained in the CPARS Report(s)/PPS Form(s) may result in the offeror being eliminated from further consideration.

(A) CPARS report(s):

(i) Offerors must provide a complete PDF copy of a CPARS report(s) for completed/in progress construction project(s)

(ii) It is the responsibility of the offeror to ensure the CPARS report(s) is/are complete with all required information

(B) Past Performance Survey(s) (PPSs):

(i) Offerors MUST have current or past clients/customers complete the Past Performance Survey (PPS) attached to the SIR (see Section J, List of Attachments, Attachment 5 Past Performance Survey) for completed/in progress construct project(s)

(ii) Offeror will complete Part 1 of the PPS and then provide the survey along with SIR "Attachment 7 Client Authorization Letter" (see Section J, List of Attachments) to their customer(s)/client(s) who will in turn complete Part 2 of the PPS and return the surveys directly to the Contracting Officer by the SIR closing date.

(iii) The offeror must send out – and track the completion of - PPS(s) (See Section J, List of Attachments, Attachment 5 Past Performance Survey) to each of the offeror’s or if applicable joint venture member’s (i.e., each entity’s) clients. The responsibility to send out and track the completion of the PPS(s) rests solely with the offeror -i.e., it shall not be delegated to any other entity. Offerors must exert their best effort to ensure that each POC per relevant contract submit a completed PPS directly to the Government not later than the date established in the RFP for receipt of proposals. Offeror’s Clients MUST submit completed Past Performance Surveys electronically via email to: andre.casiano@faa.gov

(iv) PPS’s that are submitted directly by an offeror WILL NOT be accepted.

(v) Offerors must include evidence that customer(s)/client(s) from projects submitted for Factor 2 (example: copy of email PPS completion request) were contacted to submit a PPS. Additionally, Offerors must provide contact information for the client(s)/customer(s) contacted to complete each PPS

The FAA will not be held responsible for those Offeror’s customers who refuse to respond or provide past performance information. If the Contracting Officer fails to receive any completed forms for an offeror, the FAA will attempt to follow up with the customers once, in order to retrieve the information.

While the FAA may consider data from other sources, the burden of providing thorough and complete past performance data rests with the Offeror

(3) Factor 3 - Key Personnel - Key Personnel Qualifications: Offerors must complete and submit “Attachment 13 Key Personnel Experience Form” for the Project Manager AND Superintendent that will be employed on this project which documents their qualifications and experience to perform under the contract

(4) Factor 4 - Packaged Wastewater Treatment Installer: Offerors must submit installer qualifications identified in Specification Section 46 07 53, 1.9 Quality Assurance B (See Section J, Attachment 1c FAA MMAC IWTP_Specifications_IFC Volume III_2026 06 10) for the Packaged Wastewater Treatment installer the offeror plans to use for the project. This factor has a fifteen (15) Page Limit

(5) Factor 5 - Site Infrastructure Subcontractor(s) Experience: The Offeror's proposed Site Infrastructure subcontractor(s) is/are required to provide a minimum of two (2) projects per each subcontractor that are wastewater related and will need to provide “Past Performance Experience Information” (PPEI) forms (Attachment 6 Past Performance Experience Form) for each project to demonstrate experience in trench demolition, excavation, site utility, lift station, and/or force main piping construction projects of similar scope and complexity. If using multiple subcontractors, each subcontractor must submit at least two (2) separate projects each. Each project must be valued at or over $250,000. Only construction projects completed within the last seven (7) years will be considered;

however, one (1) project that is currently in progress and at least 80% complete by billing and scheduled to complete by no more than six (6) months from the bid date of this solicitation may be considered for no more than one project. In the "Past Performance Experience Information" forms, all blocks must be filled in and all data should be accurate, current, and complete.

L.4 Relationship Between Sections L and M

Your attention is directed to the functional relationship between Sections L and M of this SIR. Section L provides information for the purpose of organizing the proposal and is not intended to be all-inclusive. Section M describes evaluation factors for award. Since the FAA evaluation of proposals will cover all areas identified in Section M, proposals should address all such areas for evaluation.

L.5 Submission of Supporting Cost or Pricing Data

(a) It is anticipated that price analysis will be based on adequate price competition; Offerors are required to submit a breakdown of the total proposed price

(b) The vendor shall provide current, complete, and accurate cost or pricing data within five (5) calendar days after receipt of the Contracting Officer's request.

L.6 Debriefings

The Contracting Officer (CO) will promptly notify offerors of any decision to exclude them from competition, whereupon they may request and receive a post-award debriefing in accordance with AMS 3.2.2.3.1.4. The CO will notify unsuccessful offerors in accordance with AMS 3.2.2.3.1.4. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of AMS 3.2.2.3.1.4.

L.7 Discrepancies

If any offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the CO in writing with supporting rationale as well as the remedies the offeror is asking the CO to consider as related to the omission or error. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal as received, with or without discussion. This reservation includes matters of additional or substitute pages of their initial proposal.

L.8 Electronic Reference Documents

All referenced documents for this solicitation at available on the SAM website at https://sam.gov. Potential Offerors are encouraged to subscribe for e-mail notifications to receive information posted to the website for this solicitation.

L.9 Contractor Proposal Information

This SIR is not to be construed as a contract or commitment of any kind. The Government and the FAA shall not be liable for payment of, nor reimburse offerors or contractors for any costs incurred in the preparation and/or submittal of a proposal in response to this SIR or resultant task order. All proposal preparation and/or submittal costs are at the risk of the offeror or contractor.

3.2.2.3-12 AMENDMENTS TO SCREENING INFORMATION REQUESTS (APR 2024)

3.2.2.3-13 SUBMISSION OF INFORMATION/DOCUMENTATION/OFFERS (APR 2024)

3.2.2.3-14 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF SUBMITTALS

(APR 2024)

3.2.2.3-17 PREPARING OFFERS (APR 2024)

3.2.2.3-18 PROSPECTIVE OFFEROR'S REQUESTS FOR EXPLANATIONS (APR 2024)

3.2.2.3-16 RESTRICTING, DISCLOSING AND USING DATA (APR 2024)

If the offeror includes data in the offer that the offeror does not want to be disclosed to the public or for the FAA to use except for evaluation purposes-

(a) Mark the title page with the following legend: "This offer includes data that must not be (1) disclosed outside the FAA and (2) duplicated, used, or disclosed -in whole or in part- for any purpose other than to evaluate this offer."

(b) Contracts awarded as a result of this SIR are subject to the disclosure requirements specified in this SIR. This restriction does not limit the FAA's right to use information from another source that may be contained in the offer.

(c) Use the following space to identify the pages containing the restricted data:

Numbers or other identification of pages:

(d) Mark each page the offeror wants to restrict with the following legend: "Using or disclosing data contained on this page is subject to the restriction on the title page of this offer."

(End of provision)

3.2.2.3-20 OFFERS (JAN 2018)

(a) The offeror (you) must submit responses to this SIR by the following electronic means : Email. Your offer must arrive at the place and by the time specified in the SIR.

(b) Such offers must refer to this SIR and include, as applicable, the item or sub-items, quantities, unit prices, time and place of delivery, all representations and other information required and a statement specifying the extent of your agreement with all the FAA's (we) terms, conditions, and provisions.

(c) We may decline to consider offers that do not include required information, or that reject any of the terms, conditions and provisions of the SIR.

(d) Send your offer to andre.casiano@faa.gov.

(e) We will not be responsible for any failure attributable to transmitting or receiving the offer, unless it falls under section (a) of AMS provision 3.2.2.3-14 "Late Submissions, Modifications, and Withdrawals of Submittals".

(End of provision)

3.2.4-1 TYPE OF CONTRACT (APR 1996)

The FAA contemplates award of a Firm-Fixed Price contract resulting from this Screening Information Request.

(End of provision)

3.6.1-17 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE (OCT 2022)

The North American Industry Classification System (NAICS) code for this procurement is:

236220.

The small business size standard as defined by the Small Business Administration (SBA) is the following:

For NAICS codes based on SBA's calculation of annual receipts, the annual average receipts cannot exceed $45M.

For NAICS codes based on the number of employees, the average number of employees over the last 24-month period cannot exceed [ ].

(End of provision)

3.9.1-3 PROTEST (APR 2024)

AS A CONDITION OF SUBMITTING AN OFFER OR RESPONSE TO THIS SIR (OR OTHER

SOLICITATION, IF APPROPRIATE), THE OFFEROR OR POTENTIAL OFFEROR AGREES TO BE BOUND

BY THE FOLLOWING PROVISIONS RELATING TO PROTESTS:

(a) Protests concerning Federal Aviation Administration Screening Information Requests (SIRs) or awards of contracts shall be resolved through the Federal Aviation Administration (FAA) dispute resolution system at the Office of Dispute Resolution for Acquisition (ODRA) and shall be governed by the procedures set forth in 14 C.F.R.

Parts 14 and 17, which are hereby incorporated by reference. Judicial review, where available, will be in accordance with 49 U.S.C. 46110 and shall apply only to final agency decisions. A protestor may seek review of a final FAA decision only after its administrative remedies have been exhausted.

(b) Offerors initially should attempt to resolve any issues concerning potential protests with the Contracting Officer.

The Contracting Officer should make reasonable efforts to answer questions promptly and completely, and, where possible, to resolve concerns or controversies. The protest time limitations, however, will not be extended by attempts to resolve a potential protest with the Contracting Officer.

(c) The filing of a protest with the ODRA may be accomplished by mail, overnight delivery, hand delivery, or by facsimile or if permitted by order of the ODRA, by electronic filing. A protest is considered to be filed on the date it is received by the ODRA during normal business hours. The ODRA's normal business hours are from 8:30 am to 5:00 pm Eastern Time.

(d) Only an interested party may file a protest. An interested party is one whose direct economic interest has been or would be affected by the award or failure to award an FAA contract. Proposed subcontractors are not "interested parties" within this definition.

(e) A written protest must be filed with the ODRA within the times set forth below, or the protest shall be dismissed as untimely:

(1) Protests based upon alleged improprieties in a solicitation or a SIR that are apparent prior to bid opening or the time set for receipt of initial proposals shall be filed prior to bid opening or the time set for the receipt of initial proposals.

(2) In procurements where proposals are requested, alleged improprieties that do not exist in the initial solicitation, but which are subsequently incorporated into the solicitation, must be protested not later than the next closing time for receipt of proposals following the incorporation.

(3) For protests other than those related to alleged solicitation improprieties, the protest must be filed on the later of the following two dates:

(i) Not later than seven (7) business days after the date the protester knew or should have known of the grounds for the protest; or

(ii) If the protester has requested a post-award debriefing from the FAA Product Team, not later than five (5) business days after the date on which the Product Team holds that debriefing.

(f) Protests shall be filed at:

(1) For filing by hand delivery, courier or other form of in-person delivery:

Office of Dispute Resolution for Acquisition Federal Aviation Administration 600 Independence Avenue SW., Room 2W100 Washington, DC 20591; or

For filing by U.S. Mail:

Office of Dispute Resolution for Acquisition Federal Aviation Administration 800 Independence Avenue SW Washington, DC 20591 [Attention: AGC-70, Wilbur Wright Bldg. Room 2W100]; or

Telephone: (202) 267-3290 Facsimile: (202) 267-3720 Alternate Facsimile: (202) 267-1293; or

(2) Other address as specified in 14 CFR Part 17.

(g) At the same time as filing the protest with the ODRA, the protester shall serve a copy of the protest on the Contracting Officer and any other official designated in the SIR for receipt of protests by means reasonably calculated to be received by the Contracting Officer on the same day as it is to be received by the ODRA. The protest shall include a signed statement from the protester, certifying to the ODRA the manner of service, date, and time when a copy of the protest was served on the Contracting Officer and other designated official(s).

(h) Additional information and guidance about the ODRA dispute resolution process for protests can be found on the ODRA Website at http://www.faa.gov.

(End of provision)

AC4533 REQUEST FOR MODIFICATION OF CONTRACT TERMS AND CONDITIONS (JAN 1997)

Offeror’s are hereby notified that the terms and conditions of this SIR shall be changed only through formal amendment(s) issued by the Contracting Officer. If an offeror takes issue with the terms and conditions contained herein, the offeror shall submit a Request for Modification of Terms and Conditions under separate attachment to their proposal. This request should be in offeror’s format, on offeror’s letterhead, signed by an officer of the company with authority to bind the offeror. The request must include documentation that fully highlights the offeror’s proposed changes and must be specific as to the exact term(s) or condition (s) to which the exception(s) are being taken. These changes shall not be binding on the FAA until fully agreed to by both the FAA and the offeror and incorporated into the document prior to contract award.

The remainder of this page has been intentionally left blank.

Section M - Evaluation Factors for Award Clause List

M.1 Evaluation Factors for Award

(a) Source Selection

(1) Basis for Contract Award: This acquisition will utilize Lowest Price, Technically Acceptable for an award decision, therefore an award will be made to the lowest priced offeror that receives an "Acceptable" rating on all evaluation factors AND is determined responsible in accordance with the Acquisition Management System (AMS), AND whose proposal conforms to the solicitation's requirements (to include all stated terms, conditions, representations, and certifications). There will be no weightings assigned to the technical factors. No tradeoffs will be made. There is no separate risk assessment for the factors under this acquisition since the evaluation method/process is Low-Priced, Technically Acceptable (LPTA).

(b) The Government will initially review all proposals for conformance to the SIR requirements. Only those proposals determined to be responsive through the conformance review process will be forwarded to the evaluation team for further consideration.

(1) Timeliness - No proposal or part thereof will be accepted for consideration following the closing period for this solicitation.

(2) Conformance – Proposals must conform to the format and content instructions identified at L.6. Non-adherence to proposal format and content instructions may be considered non-responsive. Proposals found by the CO to be non-responsive may not receive further consideration.

(3) All proposals determined to be timely and that conform to the SIR will be evaluated in accordance with Section M

(c) The Government reserves the right to award without communications/discussions. Offerors are not to assume that they will be contacted or afforded an opportunity to clarify, discuss, or revise their proposal if Government evaluators identify omissions or lack of detail. Therefore, each initial offer should contain the Offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct communications/discussions if later determined by the Contracting Officer (CO) to be necessary.

(d) The Government intends to award one (1) Firm-Fixed-Price contract; however, the Government reserves the right not to award any contract at all, depending on the quality of the proposals and prices submitted and the availability of funds.

M.2 Number of Contracts Awarded

The Government intends to award one (1) contracts for this acquisition, However, the Government reserves the right not to award any contract at all, depending on the quality of the proposals and prices submitted and the availability of funds.

M.3 Elimination from Competition

During the evaluation process, the SSO may determine to eliminate one or more Offerors from the competition. This determination can be based on any single evaluation factor or a combination of factors. An Offeror may be eliminated from competition following initial proposal evaluation, after discussions (if necessary), or prior to submission of any proposal revisions. Offerors eliminated from the competition may request a post-award debriefing in accordance with AMS 3.2.2.3.1.4.

M.4 Scoring

All offerors will receive an Acceptable or Unacceptable rating for each factor according to the evaluation criteria outlined at M.5. All vendors will be rated according to the rating methodology outlined in this section. Each evaluator will use the following criteria to measure and score each proposal. Scoring will reflect the extent to which the vendor has met the overall factor requirements. Upon completion of the evaluation of each factor by a member of the evaluation team, the lead technical evaluator will summarize the proposals in a manner that determines which proposals are acceptable and which are unacceptable to support. Evaluation factors will be scored as outlined below to which the Offeror has met the overall factor requirements.

Rating Description and/or Definition ACCEPTABLE Offeror’s proposal meets all requirements of the factor and evaluation criteria, without exception

UNACCEPTABLE Offeror’s proposal is lacking one or more of the requirements of the factor and evaluation criteria

M.5 Evaluation Factors

CAUTION: Offerors are cautioned that the FAA may use the data provided by other sources in evaluating Factors 1 through 5. Offerors will be given an opportunity to rebut information considered negative and relevant to the evaluation. While the FAA may consider data from other sources, the burden of providing thorough and complete data rests with the Offeror.

All references to the term 'wastewater' throughout Section L & Section M shall be construed as synonymous with “industrial process wastewater”.

I. Factor 1 -- Relevant Experience - Evaluation Criteria

The Government's Source Evaluation Team will review the project experience of the offeror and/or proposed team on projects provided in response to Factor 1. Offerors must meet all of the following minimum acceptability standards to receive an "ACCEPTABLE" on this factor:

- Offeror must have at least two (2) multi-discipline construction projects valued at or over $5,000,000 and at least one (1) wastewater treatment related project valued at or over $2,000,000, submitted on the SIR attached PPEI form, that are similar to that of the work required in the project specifications and this solicitation; The wastewater project must be a different project from the multi-discipline projects; AND

- Projects submitted must have been completed, or underway, within the last seven (7) years

Failure to demonstrate the minimally acceptability standards under this factor will result in an "UNACCEPTABLE" rating and possible elimination from further consideration for contract award.

II. Factor 2 - Past Performance - Evaluation Criteria

The Government's Source Evaluation Team will review all CPARS Reports/PPS Forms submitted and may use any/all other sources of past performance information for same / similar work, or other projects (to include any subcontractors identified in an offerors proposal), available to the Government to include but not limited to the Past Performance Experience information from Factor 1, the Contractor Performance Assessment Reporting System, and/or the FAA’s first-hand knowledge of an Offeror’s past performance on similar projects The Government may contact Past Performance POC’s submitted for both Factors 1 and 2. Offerors must demonstrate the following minimum acceptability standards to receive an “ACCEPTABLE” rating on this factor:

- A minimum of three (3) CPARS report(s) and/or PPS(s) for each of the projects that are similar scope to that of the work required in the project specifications and this solicitation; AND

- At least two (2) CPARS reports and/or PPS(s) for the multi-discipline construction projects valued at or over $5,000,000 and at least one (1) CPARS report and/or PPS for the wastewater treatment related project valued at or over $2,000,000; AND

- CPARS report(s) must contain “Satisfactory” or higher ratings in all Evaluation Areas/PPS(s) received directly from an offeror’s client/customer must have received a response of “Acceptable” in all areas; AND

- All CPARs report(s)/PPS(s) submitted must show the projects are underway or completed within the last seven (7) years through the closing date identified on the SIR; AND

- All past or current references must recommend awarding similar contracts or using the offeror again for future work and reflect positive performance of the work requirements.

CAUTION: Offerors are cautioned that the FAA may use the data provided by other sources in evaluating past performance. Offerors will be given an opportunity to rebut information considered negative and relevant to the evaluation. While the FAA may consider data from other sources, the burden of providing thorough and complete past performance data rests with the Offeror.

Failure to demonstrate the minimally acceptability standards under this factor will result in an "UNACCEPTABLE" rating and possible elimination from further consideration for contract award.

Offerors with no past performance information will receive an “UNACCEPTABLE” rating for this factor.

The FAA will not be held responsible for those Offeror’s customers who refuse to respond or provide past performance information. If the Contracting Officer fails to receive any completed forms for an offeror, the FAA will attempt to follow up with the customers once, in order to retrieve the information. Offeror’s must ensure that current and accurate point of contact information is provided with their submission for all clients contacted to complete and submit a PPS.

III. Factor 3 - Key Personnel: Key Personnel Qualifications - Evaluation Criteria

The Government will review “Key Personnel Experience Forms” submitted under Factor 3. To receive an “ACCEPTABLE” rating under this subfactor, the offeror’s Key Personnel Experience Forms document the qualifications and experience for the Project Manager AND Superintendent that meet the requirements in the table below.

Construction Project Manager

-Evidence showing the Construction Project Manager has a minimum of seven (7) years of experience in serving as Construction Project Manager on multi-discipline construction projects with at least two projects valued at or over $5 million within the last 7 years

- Construction Project Manager must be employed by the offeror, however past project experience is not required to have been completed while employed by the offeror

Construction Superintendent

-Evidence showing the Construction Superintendent has a minimum of seven (7) years of experience in serving as a Construction Superintendent on multi-discipline construction projects with at least two projects valued at or over $5 million within the last 7 years.

- Construction Superintendent must be employed by the offeror, however past project experience is not required to have been completed while employed by the offeror

Failure to demonstrate the minimally acceptability standards under this factor will result in an "UNACCEPTABLE" rating and possible elimination from further consideration for contract award

IV. Factor 4 – Packaged Wastewater Treatment Installer - Evaluation Criteria

The Government will review all documentation submitted under Factor 4 within the page limit identified. To receive an “ACCEPTABLE” rating under this subfactor, the offeror’s proposal must document the qualifications from specification section 46 07 53, 1.9 Quality Assurance B as listed in the table below

Installers Qualifications

Company specializing in performing Work identified under specification section 46 07 53 with minimum Three (3) years' documented experience.

Failure to demonstrate the minimally acceptable qualifications under this factor will result in an "UNACCEPTABLE" rating and possible elimination from further consideration for contract award

V. Factor 5 - Site Infrastructure Subcontractor(s) Experience - Evaluation Criteria

Andre Casiano Cross-Out

The Government's Source Evaluation Team will review the project experience of the subcontractor(s) on projects provided in response to…