Informational File 4 Historic Plans-Information Purposes Only.pdf
PDF 2 MB Posted
- Attached to
- Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades
- Solicitation number
- 6973GH-27-R-00005
About this file
Document Summary
This document is a comprehensive architectural and engineering drawing set for a federal aviation facility project located in Oklahoma City, Oklahoma. The plans depict the design of a storage building and associated infrastructure improvements for the Federal Aviation Administration (FAA) Aeronautical Center. The project includes structural details for a multi-bay storage facility with corrugated metal siding and gabled roof construction, foundation specifications, floor plans showing interior layout and mechanical systems, and detailed cross-sectional views of wall assemblies, footings, and gutter installations.
The drawing set encompasses architectural elevations (south, west, and east), building sections with foundation details, typical wall details, structural specifications including rebar sizing and concrete strength requirements, mechanical and plumbing systems plans showing HVAC equipment positioning and piping configurations, electrical and lighting plans with fixture schedules and power distribution layouts, and site-specific foundation and drainage details. Construction notes emphasize that contractors are responsible for field verification of all conditions. The project was prepared by PSA Consulting Engineers and TRIBD Design Group, with coordination references to various design phases. The plans include standard FAA project markings and professional engineering certification stamps, indicating this represents a formal design package for federal construction purposes in Oklahoma.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS D
OCUMENT IS
PROVID
ED FOR IN
FORMATIO
NAL P
URPOSES O
NLY
CONTRACTOR IS
R
ESPONSIBLE
FOR FIELD
VERIFIC
ATIO
N
PROVID
ED FOR IN
FORMATIO
NAL P
ESPONSIBLE
FOR FIELD
VERIFIC
PROVID
ED FOR IN
FORMATIO
NAL P
ESPONSIBLE
FOR FIELD
VERIFIC
PROVID
ED FOR IN
FORMATIO
NAL P
ESPONSIBLE
FOR FIELD
VERIFIC
PROVID
ED FOR IN
FORMATIO
NAL P
ESPONSIBLE
FOR FIELD
VERIFIC
PROVID
ED FOR IN
FORMATIO
NAL P
ESPONSIBLE
FOR FIELD
VERIFIC
PROVID
ED FOR IN
FORMATIO
NAL P
ESPONSIBLE
FOR FIELD
VERIFIC
PROVID
ED FOR IN
FORMATIO
NAL P
ESPONSIBLE
FOR FIELD
VERIFIC
PROVID
ED FOR IN
FORMATIO
NAL P
ESPONSIBLE
FOR FIELD
VERIFIC
File details come from the government source that posted it. Updated .