This document includes a past performance survey and solicitation for the STB Building Renovation at the Mike Monroney Aeronautical Center. The past performance survey is for reference checks on contractors who previously worked on mechanical, electrical, or other subcontracting roles. It requests ratings on compliance, timeliness, terminations, cure notices, personnel performance, and recommendations.

The solicitation seeks proposals for construction project renovations at the STB Annex in accordance with attached specifications and drawings. It is a 100% 8(a) small business set-aside. The estimate price range is $1-5 million. A mandatory pre-proposal conference site visit will be held on May 16, 2023 with notice of intent to attend due by May 12. Proposals are due by email only with the solicitation number in the subject line. The opportunity is issued by the Federal Aviation Administration Mike Monroney Aeronautical Center for renovation services to be completed at that location.

View the file

Other files

File Type Posted
Attachment 25 STB Reno Q and A Log3 6.12.23.pdf PDF
Amendment 0006 6973GH-23-R-00096.pdf PDF
Attachment 24 Spec 26 51 00 INTERIOR LIGHTING Revised 06062023.pdf PDF
Attachment 22 Spec 23 04 00 COMMON REQUIREMENTS FOR HVAC Revised 06062023.pdf PDF
Attachment 23 Spec 26 05 00 BASIC REQUIREMENTS FOR ELECTRICAL SYSTEMS Revised 06062023.pdf PDF
Amendment 0005 6973GH-23-R-00096.pdf PDF
Attachment 15 08_71_00 USER-DOOR HARDWARE.pdf PDF
Attachment 20 STB Reno Q and A Log1 5.18.23.6.05.23.pdf PDF
Attachment 18 026A STB Annex ACM Photos.pdf PDF
Amendment 0004 6973GH-23-R-00096.pdf PDF
Attachment 19 STB Annex General Representative Work Areas.pdf PDF
Attachment 21 STB Reno Q and A Log2 5.18.23.6.05.23.pdf PDF
Attachment 17 026A STB Annex Asbestos Location Drawings.pdf PDF
Attachment 16 Addendum Drawings.pdf PDF
Amendment 0003 6973GH-23-R-00096.pdf PDF
Amendment 0002 6973GH-23-R-00096.pdf PDF
Attachment 14 REISSUE-100 Percent Type B FAA-MMAC STB Annex Renovation Drawings.pdf PDF
Site Visit Attendee List 6973GH-23-R-00096 STB Annex Renovation.pdf PDF
Amendment 0001 6973GH-23-R-00096.pdf PDF
SIR 6973GH-23-R-00096.pdf PDF
Attachment 11 Wage Determination OK20230049 02.10.2023.pdf PDF
Attachment 10 Contractor Release.pdf PDF
Attachment 4 SF25 - Performance Bond.pdf PDF
Attachment 13 AMP400-ENV-OC-2.4.3-CC.pdf PDF
Attachment 7 Past Performance Survey.docx DOCX document
Attachment 2 100 Percent Type B FAA-MMAC STB Annex Renovation Drawings.pdf PDF
Attachment 5 SF25A Payment Bond.pdf PDF
Attachment 12 Chapter 33 Construction Safety.pdf PDF
Attachment 3 SOW 2018-006090 STB Annex Renovation 3.13.23.pdf PDF
Attachment 6 SF24 Bid Bond.pdf PDF
Attachment 1 100 Percent Type B FAA-MMAC STB Annex Renovation Specifications.pdf PDF
Attachment 8 Past Performance Experience Form.docx DOCX document
Attachment 9 Client Authorization Letter.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROCUREMENT SENSITIVE WHEN COMPLETED

FOR OFFICIAL USE ONLY

SIR/RFO No. 6973GH-23-R-00096 STB Annex Renovation

PAST PERFORMANCE SURVEY

To: _______________________________________________________________________

Organization:_____________________________________________________________

Fax No.: _________________________ E-mail Address:_________________________

Date: __________________________ Number of Pages (including this sheet): 4 in total

Your name was provided as a past performance point of contract for the following:

Contractor Name:_________________________________________________________

Contract Number: _______________________________ Date(s)____________________

Project Title: ___________________________________________________________

Contractor Role / Responsibility (circle one):

(Prime Contractor) (Mechanical Subcontractor) (Electrical Subcontractor) (Other Subcontractor)

In regard to the above contractor’s performance on the referenced contract, please complete the attached Past Performance Questionnaire and return as follows:

Send to: Andre Casiano, Contracting Officer

E-mail Address: Andre.Casiano@faa.gov

For questions, please contact me at telephone 405-954-7850

Please provide your response no later than June 12, 2023 at 3:00 p.m. Central Time

Thank you!

A. Please complete and/or verify the following reference check information:

1. Name of Contractor: ____________________________________________________

2. Type of contract/agreement for pricing; e.g., firm fixed-price, fixed rate per hour (labor-hour, T&M), cost-reimbursable:

3. Contract Number: _________________________________

4. Total Contract Amount : $____________________________

5. Date of Contract Award: ____________________________

6. Contract Period of Performance: Start _________________ Complete_____________

B. Please complete and/or verify the following responder information:

Name of Responding Point of Contact: _____________________________________________________

Agency/Organization: _________________________________________________________________

Mailing Address: __________________________________________________________

Telephone Number: __________________________________

E-mail Address: __________________________________

1. How would you rate the contractor's overall compliance with contract requirements?

( ) Acceptable ( ) Unacceptable

2. How would you rate the timeliness of the Contractor - adhering to the required schedule?

( ) Acceptable ( ) Unacceptable `

3. Has this contract been partially or completely terminated for default, or is a termination pending?

( ) Yes / If yes, please explain and indicate the status.

( ) No/Acceptable

4. Has it ever been necessary to send this Contractor a Notice to Cure letter?

( ) Yes If yes, please explain and indicate the status.

( ) No

5. How would you rate the performance of the contractor's key personnel?

( ) Acceptable ( ) Unacceptable

6. Would you recommend awarding similar contracts or using the offeror again for future work?

( ) Yes/Acceptable ( ) No/Unacceptable

7. Did you experience any integrity problems with this Contractor?

( ) Yes If yes, please explain.

( ) No

8. Please provide any other comments you may have.