This document outlines a federal solicitation for construction services. The Federal Aviation Administration Mike Monroney Aeronautical Center is seeking proposals to complete renovation of the STB Annex building in accordance with the specifications and drawings provided. This is a 100% 8(a) small business set-aside. The estimated price range for the contract is $1 million to $5 million. Proposals are due by email only by the closing date specified in the solicitation. Offerors must attend a mandatory pre-proposal conference and site visit scheduled for May 16, 2023 to be eligible for award. Proposals from offerors who do not attend will not be considered.

View the file

Other files

File Type Posted
Attachment 25 STB Reno Q and A Log3 6.12.23.pdf PDF
Amendment 0006 6973GH-23-R-00096.pdf PDF
Attachment 24 Spec 26 51 00 INTERIOR LIGHTING Revised 06062023.pdf PDF
Attachment 22 Spec 23 04 00 COMMON REQUIREMENTS FOR HVAC Revised 06062023.pdf PDF
Attachment 23 Spec 26 05 00 BASIC REQUIREMENTS FOR ELECTRICAL SYSTEMS Revised 06062023.pdf PDF
Amendment 0005 6973GH-23-R-00096.pdf PDF
Attachment 15 08_71_00 USER-DOOR HARDWARE.pdf PDF
Attachment 20 STB Reno Q and A Log1 5.18.23.6.05.23.pdf PDF
Attachment 18 026A STB Annex ACM Photos.pdf PDF
Amendment 0004 6973GH-23-R-00096.pdf PDF
Attachment 19 STB Annex General Representative Work Areas.pdf PDF
Attachment 21 STB Reno Q and A Log2 5.18.23.6.05.23.pdf PDF
Attachment 17 026A STB Annex Asbestos Location Drawings.pdf PDF
Attachment 16 Addendum Drawings.pdf PDF
Amendment 0003 6973GH-23-R-00096.pdf PDF
Attachment 7 Past Performance Survey Revision 1.1 5.24.23.docx DOCX document
Amendment 0002 6973GH-23-R-00096.pdf PDF
Attachment 14 REISSUE-100 Percent Type B FAA-MMAC STB Annex Renovation Drawings.pdf PDF
Site Visit Attendee List 6973GH-23-R-00096 STB Annex Renovation.pdf PDF
Amendment 0001 6973GH-23-R-00096.pdf PDF
SIR 6973GH-23-R-00096.pdf PDF
Attachment 11 Wage Determination OK20230049 02.10.2023.pdf PDF
Attachment 10 Contractor Release.pdf PDF
Attachment 4 SF25 - Performance Bond.pdf PDF
Attachment 7 Past Performance Survey.docx DOCX document
Attachment 2 100 Percent Type B FAA-MMAC STB Annex Renovation Drawings.pdf PDF
Attachment 5 SF25A Payment Bond.pdf PDF
Attachment 12 Chapter 33 Construction Safety.pdf PDF
Attachment 3 SOW 2018-006090 STB Annex Renovation 3.13.23.pdf PDF
Attachment 6 SF24 Bid Bond.pdf PDF
Attachment 1 100 Percent Type B FAA-MMAC STB Annex Renovation Specifications.pdf PDF
Attachment 8 Past Performance Experience Form.docx DOCX document
Attachment 9 Client Authorization Letter.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMP400-ENV-OC-2.4.3-CC

(Storm and Surface Water Discharges - Construction Contractors)

Document Revision Log

Status (Baseline/ Revision/

Admin Change/

Canceled)

Document Revision

Effective Date Description

Baseline 0.0 11/9/2016 Initial Release Revision 1.0 5/15/17 Update

NO CHANGE 03/02/22 KC

Revision: 0.0 Document Number: AMP400-ENV-OC-2.4.3-CC

UNCONTROLLED COPY WHEN DOWNLOADED

Verify That This Is The Correct Revision Before Use

Operational Control Document

1. Significant Environmental Aspect and/or Significant OSH Hazard:

Storm and Surface Water Discharges - Construction Contractors

2. Document Control Code:

AMP400-ENV-OC-2.4.3-CC

3. Source of Aspect/Hazard (activities):

Construction activities causing land disturbances/ Storage of construction material

4. Compliance Obligations (specific to activities):

MMAC-EMP-2.4.3

5. Operational Controls (such as engineering, administrative where applicable):

Comply with OPDES permit, City OF OKC ordinances and MMAC SWPP Construction contractor training on the MMAC stormwater pollution prevention policy Inspection of construction worksites

6. Maintenance plan(s) for the operational controls:

Review this document annually and update as necessary

7. Actions to be taken if controls fail:

AMP-400 inspectors send advisory notices if environmental protection measures are not maintained.

8. Record(s):

Advisory notices.

Construction contractor training (required for badging).

Stormwater awareness training.

9. Responsibility:

Controls (from Section 5 above) Responsible Individual

Comply with OPDES permit, City OF OKC ordinances and MMAC SWPP

Site Supervisor – Construction Contractor

Contractor awareness training Site Supervisor – Construction Contractor Construction site inspections AMP-400 Inspectors – Contract Support

10. Competency (as evidenced by training, experience, or education.)

Title or Name Competence

Construction Contractor See signature in Section K (Clause 4560 of contract) (Certification of Contractor Conformance to the MMAC EOSHMS)

AMP-400 Inspectors See signature in Section K (Clause 4560 of contract) (Certification of Contractor Conformance to the MMAC EOSHMS)

1.0

Revision: 0.0 Document Number: AMP400-ENV-OC-2.4.3-CC

UNCONTROLLED COPY WHEN DOWNLOADED

Verify That This Is The Correct Revision Before Use

Authorization DateJONATHAN

C BERKMAN

Digitally signed by

JONATHAN C BERKMAN

Date: 2021.03.22 10:54:43 -05'00'

3/22/21

AMP400-ENV-OC-2.5-CC

(Solid Waste Generation – Construction Contractor)

Document Revision Log

Status (Baseline/ Revision/

Admin Change/

Canceled)

Document Revision

Effective Date Description

Baseline 0.0 11/9/2016 Initial Release

Revision: 1.0 Document Number: AMP400-ENV-OC-2.5-CC

UNCONTROLLED COPY WHEN DOWNLOADED

Verify That This Is The Correct Revision Before Use

Operational Control Document

1. Significant Environmental Aspect and/or Significant OSH Hazard:

Solid Waste Generation - Construction Contractor

2. Document Control Code:

AMP400-ENV-OC-2.5-CC

3. Source of Aspect/Hazard (activities):

Generation of construction debris

4. Compliance Obligations (specific to activities):

MMAC-EMP-2.5

5. Operational Controls (such as engineering, administrative where applicable):

Reduce the amount of construction waste where possible Recycle construction materials where possible.

Submit monthly waste management report to AMP-100 for projects over $100,000

6. Maintenance plan(s) for the operational controls:

Review this document annually and update as necessary

7. Actions to be taken if controls fail:

Conduct after-action meetings to discuss necessary corrective actions.

8. Record(s):

Certificate of contractor conformance (AAQ record) Monthly waste management reports

9. Responsibility:

Controls (from Section 5 above) Responsible Individual

Reduce construction waste and recycle where possible

Construction Contractor

Monthly waste management report Construction Contractor

10. Competency (as evidenced by training, experience, or education.)

Title or Name Competence

Construction Contractor See signature in Section K (Clause 4560 of contract) (Certification of Contractor Conformance to the MMAC EOSHMS)

Authorization DateJONATHAN

C BERKMAN

Digitally signed by

JONATHAN C BERKMAN

Date: 2021.03.22 10:56:06 -05'00'

AMP400-OSH-OC-3.1-CC

(Electrical – Construction Contractor)

Document Revision Log

Status (Baseline/ Revision/

Admin Change/

Canceled)

Document Revision

Effective Date Description

Baseline 0.0 11/9/2016 Initial Release

Revision: 0.0 Document Number: AMP400-OSH-OC-3.1-CC

UNCONTROLLED COPY WHEN DOWNLOADED

Verify That This Is The Correct Revision Before Use

Operational Control Document

1. Significant Environmental Aspect and/or Significant OSH Hazard:

Electrical – Construction Contractor

2. Document Control Code:

AMP400-OSH-OC-3.1-CC

3. Source of Aspect/Hazard (activities):

Removal and installation of circuits and equipment during the demolition, construction or remodeling phases. Unknown circuits may be energized during the demolition phase

4. Compliance Obligations (specific to activities):

MMAC-OSHMP-3.1

5. Operational Controls (such as engineering, administrative where applicable):

Circuits are de-energized and locked or tagged out prior to work Electrical systems and componenets are installed by certified electricians.

Electrical plans and safety concerns are discussed during pre-construction meetings Construction inspections

6. Maintenance plan(s) for the operational controls:

Review this document annually and update as necessary

7. Actions to be taken if controls fail:

AMP-400 inspector will initiate an advisory notice if safety hazards are observed and not immediately corrected

8. Record(s):

Construction contractor training (required for badging) Advisory notices

9. Responsibility:

Controls (from Section 5 above) Responsible Individual

Ensure personnel are trained to appropriate levels of electrical safety

Site Supervisor - Construction Contractor

System lockout/tagout Site Supervisor - Construction Contractor Construction site inspections AMP-400 Inspectors – Contract Support

10. Competency (as evidenced by training, experience, or education.)

Title or Name Competence Construction Contractor

See signature in Section K (Clause 4560 of contract) (Certification of Contractor Conformance to the MMAC EOSHMS)

Revision: 0.0 Document Number: AMP400-OSH-OC-3.1-CC

UNCONTROLLED COPY WHEN DOWNLOADED

Verify That This Is The Correct Revision Before Use

AMP-400 Inspectors See signature in Section K (Clause 4560 of contract) (Certification of Contractor Conformance to the MMAC EOSHMS)

Authorization DateJONATHAN

C BERKMAN

Digitally signed by

JONATHAN C BERKMAN

Date: 2021.03.22 10:59:42 -05'00'

AMP400-OSH-OC-5.1-CC

(Falls – Construction Contractors)

Document Revision Log

Status (Baseline/ Revision/

Admin Change/

Canceled)

Document Revision

Effective Date Description

Baseline 0.0 11/9/16 Initial Release

Revision: 0.0 Document Number: AMP400-OSH-OC-5.1-CC

UNCONTROLLED COPY WHEN DOWNLOADED

Verify That This Is The Correct Revision Before Use

Operational Control Document

1. Significant Environmental Aspect and/or Significant OSH Hazard:

Falls - Construction Contractors

2. Document Control Code:

AMP400-OSH-OC-5.1-CC

3. Source of Aspect/Hazard (activities):

Work on elevated surfaces Work on ladders and scaffolding Use of stairs and ramps Trip hazards from equipment, tools, cords, stairs, curbs, uneven surfaces, etc.

Slip hazards from wet floors, ice on ground, leaking equipment, etc.

4. Compliance Obligations (specific to activities):

MMAC-OSHMP-5.1

5. Operational Controls (such as engineering, administrative where applicable):

Ensure personnel are trained to levels appropriate to their exposure to fall hazards Visual inspection of portable ladders prior to each use Scaffolds are inspected by competent person qualified in scaffold erection prior to use and daily thereafter Inspections of construction worksites

6. Maintenance plan(s) for the operational controls:

Review this document annually and update as necessary

7. Actions to be taken if controls fail:

AMP-400 inspector will initiate an advisory notices if safety hazards are observed and not immediately corrected.

Conduct after-action meetings to discuss necessary corrective actions.

8. Record(s):

Construction contractor training (required for badging) Advisory notices

9. Responsibility:

Controls (from Section 5 above) Responsible Individual Ensure personnel are trained to appropriate levels of fall protection

Site Supervisor - Construction Contractor

Visual inspection of portable ladders Site Supervisor - Construction Contractor Scaffold inspections Site Supervisor - Construction Contractor Construction site inspections AMP-400 Inspectors – Contract Support

10. Competency (as evidenced by training, experience, or education.)

Revision: 0.0 Document Number: AMP400-OSH-OC-5.1-CC

UNCONTROLLED COPY WHEN DOWNLOADED

Verify That This Is The Correct Revision Before Use

Construction Contractor See signature in Section K (Clause 4560 of contract) (Certification of Contractor Conformance to the MMAC EOSHMS)

AMP-400 Inspectors See signature in Section K (Clause 4560 of contract) (Certification of Contractor Conformance to the MMAC EOSHMS)

Authorization DateJONATHAN

C BERKMAN

Digitally signed by

JONATHAN C BERKMAN

Date: 2021.03.22 11:08:38 -05'00'

AMP400-OSH-OC-8.1-CC

(Physical – Construction Contractor)

Document Revision Log

Status (Baseline/ Revision/

Admin Change/

Canceled)

Document Revision

Effective Date Description

Baseline 0.0 11/9/16 Initial Release Revision 1.0 5/8/19 Changed maximum wind speeds

Revision: 1.0 Document Number: AMP400-OSH-OC-8.1-CC

UNCONTROLLED COPY WHEN DOWNLOADED

Verify That This Is The Correct Revision Before Use

Operational Control Document

1. Significant Environmental Aspect and/or Significant OSH Hazard:

Physical – Construction Contractor

2. Document Control Code:

AMP400-OSH-OC-8.1-CC

3. Source of Aspect/Hazard (activities):

Sharp edges are exposed during construction, demolition and remodeling on sheet metal, glass edges, broken tile, and tools Flying debris and particles may be emitted during drilling, grinding, sawing, welding, and wind gusts Crushing may occur from hammering activities, heavy equipment operation, falling structures and equipment, and excavation cave-in Use of power tools, powder actuated tools, jack hammers, sledge hammers, saws, etc…

4. Compliance Obligations (specific to activities):

MMAC-OSHMP-8.1

5. Operational Controls (such as engineering, administrative where applicable):

Appropriate Personal Protective Equipment (PPE) is worn as necessary (gloves, hard hats, safety glasses, steel toed boots, etc.).

Roof work prohibited in winds of 23 MPH sustained / 35 MPH gusts or more.

Trench boxes / shoring or 1.5:1 slope of occupied trenches.

Power tools are used in accordance with manufacturer guidelines.

Machine and tool guards are used as appropriate.

Inspection of construction worksites.

6. Maintenance plan(s) for the operational controls:

Review this document annually and update as necessary

7. Actions to be taken if controls fail:

AMP-400 inspector will initiate an advisory notices if safety hazards are observed and not immediately corrected.

8. Record(s):

Construction contractor training (required for badging) Advisory notices

9. Responsibility:

Controls (from Section 5 above) Responsible Individual

PPE is worn as necessary Site Supervisor - Construction Contractor Construction site inspections AMP-400 Inspectors – Contract Support

10. Competency (as evidenced by training, experience, or education.)

Revision: 1.0 Document Number: AMP400-OSH-OC-8.1-CC

UNCONTROLLED COPY WHEN DOWNLOADED

Verify That This Is The Correct Revision Before Use

Construction Contractor See signature in Section K (Clause 4560 of contract) (Certification of Contractor Conformance to the MMAC EOSHMS)

AMP-400 Inspectors See signature in Section K (Clause 4560 of contract) (Certification of Contractor Conformance to the MMAC EOSHMS)

Authorization DateJONATHAN

C BERKMAN

Digitally signed by

JONATHAN C BERKMAN

Date: 2021.03.22 11:13:23 -05'00'

File details come from the government source that posted it. Updated .