Attachment 2 100 Percent Type B FAA-MMAC STB Annex Renovation Drawings.pdf
PDF 32 MB Posted
- Solicitation number
- 6973GH-23-R-00096
About this file
This document describes a federal solicitation for construction services. The Federal Aviation Administration's Mike Monroney Aeronautical Center is seeking proposals to complete renovation work at its STB Annex building according to the specifications and drawings provided. This is a 100% small business set-aside reserved for eligible 8(a) certified small disadvantaged businesses. The estimated price range for the contract is $1,000,000 to $5,000,000. Offerors must attend a mandatory pre-proposal conference on May 16th, 2023 and notify the contracting officer of their intent to attend by May 12th. Proposals are due by email only by the date specified in the solicitation. The selected offeror will be responsible for renovating the STB Annex at the Mike Monroney Aeronautical Center per the requirements outlined in the solicitation.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 63
11/26/2022
2 63
3 63
4 63
5 63
8 63
9 63
10 63
11 63
12 63
13 63
14 63
16 63
18 63
20 63
No ve mb er
, 2
:28 am
8_
M-
0.d wg lm or iar ty
NOTE:
DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS
and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE
PRIOR TO VERIFICATION OF CLEARANCE FOR ALL
TRADES. READ SPECIFICATIONS.
COPYRIGHT 2022C
Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.
AE# 2022 9198
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
DEMOLITION NOTES:
1. THE OWNER SHALL HAVE THE FIRST RIGHT OF SALVAGE FOR ALL MECHANICAL,
ELECTRICAL, AND PLUMBING ITEMS BEING REMOVED. IF OWNER DECLINES, THE
CONTRACTOR SHALL REMOVE FROM THE PREMISES AND DISPOSE OF PROPERLY.
VERIFY OWNER'S INTENT PRIOR TO REMOVAL OR DEMOLITION.
2. INFORMATION PERTAINING TO THE EXISTING BUILDING HAS BEEN OBTAINED
THROUGH THE BUILDINGS ORIGINAL DRAWINGS WHERE AVAILABLE. REPORT
DISCREPANCIES TO THE ARCHITECT/ENGINEER PRIOR TO ANY DEMOLITION.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO
COMMENCING WORK.
3. COORDINATE SHUT DOWN OF ALL UTILITIES FOR DEMOLITION WORK WITH THE
OWNER.
4. DISCONNECT AND REMOVE MECHANICAL SYSTEMS, EQUIPMENT, AND
COMPONENTS AS INDICATED TO BE REMOVED, SHOWN HATCHED.
PIPING TO BE REMOVED: REMOVE PORTION OF PIPING INDICATED TO BE REMOVED
AND CAP REMAINING PIPING WITH THE SAME OR COMPATIBLE PIPING MATERIAL.
PIPING TO BE ABANDONED IN PLACE: DRAIN PIPING AND CAP WITH THE SAME OR
COMPATIBLE PIPING MATERIAL.
DUCTS TO BE REMOVED: REMOVE PORTIONS OF DUCT AND CAP REMAINING DUCTS
WITH THE SAME OR COMPATIBLE DUCTWORK MATERIAL.
DUCTS TO BE ABANDONED IN PLACE: CAP DUCTS WITH THE SAME OR COMPATIBLE
DUCTWORK MATERIAL.
EQUIPMENT TO BE REMOVED: DISCONNECT AND CAP SERVICES AND REMOVE
EQUIPMENT.
EQUIPMENT TO BE REMOVED AND REINSTALLED: DISCONNECT AND CAP SERVICES
AND REMOVE, CLEAN, AND STORE EQUIPMENT. WHEN APPROPRIATE, REINSTALL,
RECONNECT, AND MAKE EQUIPMENT FULLY OPERATIONAL.
EQUIPMENT TO BE REMOVED AND SALVAGED: DISCONNECT AND CAP SERVICES
AND REMOVE EQUIPMENT AND DELIVER TO OWNER.
5. IF PIPE OR EQUIPMENT INSULATION TO REMAIN IS DAMAGED IN APPEARANCE OR IS
UNSERVICEABLE, REMOVE DAMAGED OR UNSERVICEABLE PORTIONS AND REPLACE
WITH NEW PRODUCTS OF EQUAL CAPACITY AND QUALITY.
6. CONTRACTOR IS REQUIRED TO VISIT SITE AND FIELD VERIFY ALL EXISTING
CONDITIONS PRIOR TO BIDDING PROJECT.
7. COORDINATE DEMOLITION WITH THE WORK OF OTHER TRADES. PROVIDE
TEMPORARY UTILITIES AS REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO
PROCEED.
HVAC GENERAL NOTES:
1. DO NOT RUN DUCTWORK AND PIPING ABOVE ELECTRICAL PANELS OR IN CODE
REQUIRED CLEARANCE SPACES. COORDINATE ALL ROUTING WORK WITH ALL
OTHER TRADES.
2. DO NOT RUN DUCTWORK AND PIPING ABOVE OR THROUGH INFORMATION
TECHNOLOGY AND DATA CLOSETS, IDF, AND MDF ROOMS. COORDINATE ALL
ROUTING WITH ALL OTHER TRADES.
3. DRAWINGS, PLANS, SCHEMATICS, AND DIAGRAMS INDICATE THE GENERAL
LOCATIONS AND THE ARRANGEMENT OF SYSTEMS. WHEREVER PRACTICAL,
INSTALL SYSTEMS AS INDICATED. PROVIDE OFFSETS AND ELEVATION CHANGES TO
DUCTWORK, PIPING, AND PLUMBING AS REQUIRED TO COMPLETE THE LAYOUT AND
COORDINATION PROCESS AS WELL AS MEET ALL REQUIREMENTS OF THE
CONTRACT DOCUMENTS.
4. CONTRACTOR SHALL COORDINATE LOCATION OF DUCTWORK IN CEILING SPACE
WITH ALL TRADES PRIOR TO FABRICATION AND INSTALLATION OF DUCTWORK.
5. FOR GENERAL DUCTWORK CONSTRUCTION, SEE DUCT FITTING DETAILS.
6. DUCTWORK AND EQUIPMENT SHOWN WITH THIN LINES INDICATES EXISTING TO
REMAIN. DUCTWORK AND EQUIPMENT SHOWN WITH BOLD LINES INDICATES NEW.
7. PROVIDE VOLUME DAMPER IN ALL BRANCH TAKEOFFS CONNECTING TO DIFFUSERS,
REGISTERS, OR GRILLES AND IN LOCATIONS INDICATED.
8. PROVIDE CLEARANCES TO ALL EQUIPMENT AS REQUIRED BY MANUFACTURERS'
INSTALLATION AND OPERATION REQUIREMENTS AND/OR BY CODE.
9. INSTALL ALL DUCT AND PIPING IN MECHANICAL ROOMS AS HIGH AS POSSIBLE.
PROVIDE 7'-0" MINIMUM HIGH ACCESS PATHWAYS TO ALL EQUIPMENT.
10. COORDINATE LOCATIONS OF ALL EQUIPMENT HOUSEKEEPING PADS WITH GENERAL
CONTRACTOR. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF
EQUIPMENT HOUSEKEEPING PADS.
11. CAP ENDS OF ALL INSTALLED DUCTWORK DURING CONSTRUCTION TO MINIMIZE
DIRT, DEBRIS, AND FOREIGN OBJECTS FROM ENTERING THE DUCT SYSTEM.
12. COORDINATE SCHEDULE OF SHUTDOWN FOR EXISTING HVAC SYSTEMS, FOR
INSTALLATION OF NEW HVAC SYSTEMS, WITH THE OWNER'S REPRESENTATIVE
PRIOR TO SHUTDOWN.
13. COORDINATE LOCATION OF DUCTWORK WITH ELECTRICAL CABLE TRAYS.
14. ALL INSULATION SHALL MEET THE ENERGY CODE'S INSTALLED R VALUE
REQUIREMENTS.
PIPING GENERAL NOTES:
1. ROUTE ALL HORIZONTAL HVAC PIPING IN MECHANICAL ROOMS AT A MINIMUM OF
7'-6" ABOVE FINISHED FLOOR.
2. INSTALL PIPING TO TERMINAL UNIT REHEAT COILS AND/OR HEAT PUMPS TO
PROVIDE EASY ACCESS AND REMOVAL OF REHEAT COIL OR HEAT PUMP. DO NOT
ROUTE PIPING UNDER TERMINAL UNIT OR HEAT PUMP.
3. PIPING AND EQUIPMENT SHOWN WITH THIN LINES INDICATES EXISTING TO REMAIN.
PIPING AND EQUIPMENT SHOWN WITH BOLD LINES INDICATES NEW.
4. ALL PIPING INSULATION SHALL MEET THE ENERGY CODE'S INSTALLED R VALUE
REQUIREMENTS.
5. DIELECTRIC NIPPLES OR FLANGE INSULATION KITS SHALL BE UTILIZED FOR ALL
DISSIMILAR PIPE CONNECTIONS. DIELECTRIC UNIONS WILL NOT BE ACCEPTED.
PLUMBING GENERAL NOTES:
1. DO NOT RUN PLUMBING PIPING ABOVE ELECTRICAL PANELS OR IN CODE REQUIRED
CLEARANCE SPACES. COORDINATE ALL ROUTING WORK WITH ALL OTHER TRADES.
2. DO NOT RUN PLUMBING PIPING ABOVE OR THROUGH INFORMATION TECHNOLOGY
AND DATA CLOSETS, IDF, AND MDF ROOMS. COORDINATE ALL ROUTING WITH ALL
OTHER TRADES.
3. DRAWINGS, PLANS, SCHEMATICS, AND DIAGRAMS INDICATE THE GENERAL
LOCATIONS AND THE ARRANGEMENT OF SYSTEMS. WHEREVER PRACTICAL,
INSTALL SYSTEMS AS INDICATED. PROVIDE OFFSETS AND ELEVATION CHANGES TO
PLUMBING, PIPING, AND DUCTWORK AS REQUIRED TO COMPLETE THE LAYOUT AND
COORDINATION PROCESS AS WELL AS MEET ALL REQUIREMENTS OF THE
CONTRACT DOCUMENTS.
4. SEE SPECIFICATIONS OR PLUMBING FIXTURE SCHEDULE FOR ALL PLUMBING
CONNECTION SIZES TO ALL PLUMBING FIXTURES.
5. PROVIDE WALL AND FLOOR MOUNTED SEWER CLEANOUTS AS REQUIRED BY CODE
AND AS INDICATED. COORDINATE LOCATION IN FIELD.
6. DO NOT ROUTE PLUMBING BRANCHES OR MAINS WITHIN SPACE REQUIRED TO
SERVICE ALL HVAC EQUIPMENT ABOVE CEILINGS.
7. PIPING AND FIXTURES SHOWN WITH THIN LINES INDICATES EXISTING TO REMAIN.
PIPING AND FIXTURES SHOWN WITH BOLD LINES INDICATES NEW.
8. FURNISH AND INSTALL SHUT-OFF VALVES FOR WATER SUPPLY AT ALL EQUIPMENT
ITEMS.
9. COORDINATE FINISH FLOOR ELEVATIONS TO SET FLOOR DRAINS AND FLOOR SINKS.
10. SAW CUT AND REMOVE FLOOR AS REQUIRED FOR INSTALLATION OF NEW PIPING.
11. PVC PIPING SHALL NOT BE INSTALLED IN RETURN AIR PLENUMS.
MECHANICAL SYMBOLS MECHANICAL SYMBOLS
SYMBOLS INDICATED HERE AND NOT USED IN THE
CONTRACT DOCUMENTS DO NOT APPLY TO THIS
PROJECT. ADDITIONAL SYMBOLS AND ABBREVIATIONS
MAY BE INDICATED IN THE CONTRACT DOCUMENTS.
FINTUBE-TYPE (SHADED AREA INDICATES
CAPACITY MBH ELEMENT LOCATION)
VOLUME DAMPER
DESCRIPTIONSYMBOLSYMBOL DESCRIPTION SYMBOL DESCRIPTION
HEATING - VENTILATING - AIR-CONDITIONING
T RS
T
H
A
S
P T
FS
AD
L"
D"
FT-1
MBH
XØ
X/X
SD
M
CFM
SIZE TYPE
CFM
SIZE TYPE
FRD
FSD
M
MCO2
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE OR BOILER FEED PUMP DISCHARGE
CONDENSER WATER SUPPLY FROM TOWER
CONDENSER WATER RETURN TO TOWER
COIL OR EQUIPMENT DRAIN
GLYCOL SUPPLY
GLYCOL RETURN
FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL VENT
NATURAL GAS
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
HIGH PRESSURE CONDENSATE RETURN
HIGH PRESSURE STEAM
HOT WATER SUPPLY
HOT WATER RETURN
LOW PRESSURE CONDENSATE RETURN
LOW PRESSURE STEAM
MEDIUM PRESSURE CONDENSATE RETURN
MEDIUM PRESSURE STEAM
REFRIGERANT LIQUID
REFRIGERANT SUCTION
REFRIGERANT HOT GAS DISCHARGE
BACK-DRAFT DAMPER (COUNTER BALANCED)B.D.D.
LPS
MPS
HPS
LPR
MPR
HPR
HWS
HWR
GS
GR
CWS
CWR
PC
FOS
FOR
FOV
G
RL
RS
RD
CS
CR
CD
#/HR
HPWS
HPWR
PIPE IN SLEEVE
VALVE IN VERTICAL PIPE
F AND T TRAP CAP LBS/HR
BUCKET TRAP CAP LBS/HR
AIR QUALITY SENSOR
C02 SENSOR
HUMIDISTAT
REMOTE SENSOR
THERMOSTAT
THERMOSTAT WITH REMOTE SENSOR
AQUASTAT
SOLENOID VALVE (REFRIGERANT)
THERMOSTATIC EXPANSION VALVE (REFRIGERANT)
SIGHT GLASS
MANUAL AIR VENT
PRESSURE OR TEMPERATURE MEASURING POINTS
FLOW SWITCH
HEATING RISER
ACCESS DOOR - SIZE AS SHOWN OR PER SPEC.
EXPANSION LOOP, LENGTH AND DEPTH
NEW TO EXISTING CONNECTION
#/HR
AQ
RECTANGULAR DUCTWORK
(FIRST NUMBER IS SIDE SHOWN)X/X
ROUND DUCT
FLAT OVAL (FIRST NUMBER IS THE SIDE SHOWN)
MOTORIZED DAMPER
FIRE DAMPER WITH ACCESS DOOR
COMBINATION FIRE AND SMOKE DAMPER
WITH ACCESS DOOR
SMOKE DAMPER WITH ACCESS DOOR
SOUND ATTENUATOR
FLEX CONNECTION
SUPPLY REGISTER OR GRILLE
RETURN REGISTER OR GRILLE
SA
TYP DIFFUSER NECK SIZE, MARK
CFM
X X X
X X X
SUPPLY, OUTDOOR, OR MIXED AIR DUCT
END OR RISER (SA) (OA) (MA)
RETURN EXHAUST OR RELIEF AIR DUCT
END OR RISER (RA) (EA) (RLFA)
TYP EXHAUST/RETURN GRILLE NECK SIZE, MARK
CFM
TURNING VANES
MECHANICAL/ELECTRICAL COORDINATION SCHEDULE
MECHANICAL EQUIPMENT WITH ELEC CONNECTION SEE
AUTOMATIC CONTROL VALVE, 2-WAY
AUTOMATIC CONTROL VALVE, 3-WAY
PRESSURE REGULATING VALVE (PRV)
X X
POINT OF DISCONNECT BREAK / CONTINUATION
T
OR
DESCRIPTIONSYMBOLSYMBOL DESCRIPTION SYMBOL DESCRIPTION
PIPING
R
PTT
TEE
ELBOW
UNION
STRAINER WITH DRAIN VALVE AND HOSE END
BALANCING VALVE
ISOLATION VALVE (BALL OR BUTTERFLY)
PRESSURE RELIEF VALVE
ELBOW UP
ELBOW DOWN
GLOBE VALVE
PRESS / TEMP TEST PORT
GATE VALVE
CHECK VALVE (ARROW INDICATES FLOW)
FLEXIBLE PIPING
AUTOMATIC AIR VENT
MANUAL AIR VENT WITH ISOLATION VALVE
CONCENTRIC REDUCER
ECCENTRIC REDUCER
PRESSURE GAUGE WITH GAUGE COCK
THERMOMETER, SIDE FEED
THERMOMETER, BOTTOM FEED
ARROW INDICATES FLOW DIRECTION
ARROW INDICATES DOWNWARD PIPE PITCH
WATER METERM
S
S
SS
AW
AW
S
S
OF
OF
SS
AW
AW
AV
V
140°
140°
SS
W
S
S
S
A
V
GCO
HB
WH
Y.H.
BFP
_ FD-X
_ FS-X
_ RD-X
DS
MH
VTR
SH
EXISTING SANITARY DRAIN (ABOVE FLOOR)
VENT
DESCRIPTIONSYMBOLSYMBOL DESCRIPTION SYMBOL DESCRIPTION
PLUMBING
EXISTING SANITARY SEWER (BELOW FLOOR)
HOT WATER CIRCULATING 140°
GRADE CLEAN OUT
EXISTING STORM DRAIN (ABOVE FLOOR)
OVERFLOW STORM DRAIN (ABOVE FLOOR)
DOUBLE GRADE CLEAN-OUT
EXISTING STORM DRAIN (BELOW FLOOR)
OVERFLOW STORM DRAIN (BELOW FLOOR)
HOSE BIBB
EXISTING SUB SOIL DRAIN
SANITARY DRAIN (ABOVE FLOOR)
WALL HYDRANT (NON-FREEZE TYPE)
EXISTING ACID WASTE (ABOVE FLOOR)
SANITARY SEWER (BELOW FLOOR)
YARD HYDRANT
EXISTING ACID WASTE (BELOW FLOOR)
BACK FLOW PREVENTER
SITE STORM SEWER
FLOOR DRAIN SIZE-TYPE
SITE WATER PIPING
FLOOR SINK SIZE-TYPE
STORM DRAIN (BELOW FLOOR)
ROOF DRAIN SIZE-TYPE
SUB SOIL DRAIN
DOWN SPOUT
MANHOLE
ACID WASTE (ABOVE FLOOR)
VACUUM BREAKER
ACID WASTE (BELOW FLOOR)
GAS COCK
ACID VENT
RUNNING TRAP
VENT THROUGH ROOF ON RISER
PLUMBING RISER NUMBER
SHOWER
COLD WATER (CW)
COLD SOFT WATER
COMPRESSED AIR
HOT WATER (HW)
HOT WATER CIRCULATING (HWC)
HOT SOFT WATER
HOT SOFT WATER RECIRCULATING
STORM DRAIN (ABOVE FLOOR)
HOT WATER 140°
CLEAN OUT
NATURAL GASG
ORCO CO
BLDG BUILDING
BTUH BRITISH THERMAL UNIT PER HOUR
CFM CUBIC FEET PER MINUTE
CL CENTER LINE
CLG CEILING
CLR CLEAR
CRAC
CV CONSTANT VOLUME
DIAMETER
DISC DISCONNECT
DIST DISTRIBUTION
DN DOWN
DWG DRAWING
EA EXHAUST AIR
EL ELEVATION
EHC ELECTRIC HEATING COIL
EQUIP EQUIPMENT
EXH EXHAUST
EXIST EXISTING
FA FIRE ALARM
FL FLOOR
FT FEET
PWR POWER
PVC POLYVINYL CHLORIDE
PSI POUNDS PER SQUARE INCH
PSF POUNDS PER SQUARE FOOT
PNL PANEL
PLBG PLUMBING
PIV POST INDICATOR VALVE
RM ROOM
RH RELATIVE HUMIDITY
REQD REQUIRED
RLFA RELIEF AIR
RA RETURN AIR
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UL UNDERWRITERS LABORATORY
UG UNDERGROUND
TYP TYPICAL
TEMP TEMPERATURE
STD STANDARD
SS STAINLESS STEEL
SPECS SPECIFICATIONS
SIM SIMILAR
SCHD SCHEDULE
SAN SANITARY
SA SUPPLY AIR
NC NORMALLY CLOSED
MTD MOUNTED
MISC MISCELLANEOUS
MIN MINIMUM
MECH MECHANICAL
MAX MAXIMUM
LBS POUNDS
KW KILOWATT
OC ON CENTER
OA OUTDOOR AIR
NTS NOT TO SCALE
NOM NOMINAL
NO NORMALLY OPEN
NIC NOT IN CONTRACT
GA GAUGE
HVAC HEATING, VENTILATING
HTG HEATING
HP HORSEPOWER
HGT HEIGHT
GPM GALLONS PER MINUTE
GEN GENERATOR
GALV GALVANIZED
AND AIR CONDITIONING
ELEC ELECTRICAL
DIA
CPVC
DX DIRECT EXPANSION
EPO EMERGENCY POWER OFF
F FIRE WATER
FCO FLOOR CLEAN OUT
FDC FIRE DEPARTMENT CONNECTION
FHC FIRE HOSE CABINET
FW FILTERED WATER
GC GENERAL CONTRACTOR
MBH 1000 BTU/HOUR
NPW NON-POTABLE WATER
PS PLASTER SINK
RO REVERSE OSMOSIS WATER
SCW SOFT COLD WATER
SM SPRINKLER MAIN
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS'
BTU BRITISH THERMAL UNIT
PERP PERPENDICULAR
RGS RIGID GALVANIZED STEEL
HZ HERTZ, HIGH ZONE WET STANDPIPE
CFH CUBIC FEET PER HOUR
SHW SOFT HOT WATER
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MOA MINIMUM OUTDOOR AIR
EOA ECONOMIZER OUTDOOR AIR
IE INVERT ELEVATION
NATIONAL ASSOCIATION
AHJ
ASHRAE
AUX
AV
AW
AWG
BFP
AUTHORITY HAVING JURISDICTION
AMERICAN SOCIETY OF HEATING,
REFRIGERATING AND
AIR-CONDITIONING ENGINEERS
AUXILIARY
ACID VENT
ACID WASTE
AMERICAN WIRE GAUGE
DOUBLE CHECK BACKFLOW
VOLT-AMPS
VERTICAL
VARIABLE FREQUENCY CONTROL
VENT THROUGH ROOF
WATT
WEATHERPROOF
TRANSFORMER
VA
VERT
VFC
VTR
W
WP
XFMR
AFF ABOVE FINISHED FLOOR
AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
STANDARD SPECIFICATIONS OF
THE AMERICAN SOCIETY FOR
ASME
ASTM
TESTING MATERIALS
AVG AVERAGE
BMCS BUILDING MANAGEMENT
EMS ENERGY MANAGEMENT SYSTEM
IP INTERNET PROTOCOL
NATIONAL FIRE PROTECTION
ASSOCIATION
NFPA
WATER GAUGEWG
CHLORINATED POLYVINYL CHLORIDE
COMPUTER ROOM AIR CONDITIONER
MA MIXED AIR
CONTROL SYSTEM
ABBREVIATIONS
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
PREVENTER RPZ REDUCED PRESSURE ZONE
BACKFLOW PREVENTER
LZ LOW ZONE WET STANDPIPE
GW GARAGE WASTE
FHV FIRE HOSE VALVE
DDCV DOUBLE DETECTOR CHECK VALVE
ASSEMBLY BACKFLOW PREVENTER
DPAC DRY PIPE AIR COMPRESSOR
DPV DRY PIPE VALVE
F
SM
FHC
FVC
PIV
FS
DESCRIPTIONSYMBOLSYMBOL DESCRIPTION SYMBOL DESCRIPTION
FIRE PROTECTION
FIRE LINE
CEILING CLEAN AGENT NOZZLE FLUSH FIRE PUMP TEST HEADERSPRINKLER MAIN
SUB-FLOOR CLEAN AGENT NOZZLE FREE-STANDING FIRE PUMP TEST HEADERCLEAN AGENT
CEILING DETECTOR FREE-STANDING FIRE DEPARTMENT CONNECTIONSPRINKLER BRANCH AND HEADS
SUB-FLOOR DETECTOR FLUSH FIRE DEPARTMENT CONNECTIONRECESSED PENDANT SPRINKLER
CLEAN AGENT ALARM BELL FIRE DEPARTMENT CONNECTIONCONCEALED PENDANT SPRINKLER
CLEAN AGENT HORN WITH STROBE FIRE HOSE CABINETUPRIGHT SPRINKLER
ELECTRIC PULL STATION FIRE HOSE VALVE CABINETDRY PENDANT SPRINKLER
ABORT PULL STATION POST INDICATOR VALVEHORIZONTAL SIDEWALL SPRINKLER
CLEAN AGENT PRESSURE SWITCH ISOLATION VALVE WITH TAMPER SWITCHDRY HORIZONTAL SIDEWALL SPRINKLER
WARNING LIGHT ALARM CHECK VALVEPRE-ACTION HEAT DETECTOR
CLEAN AGENT PANEL DRY PIPE VALVEPRE-ACTION PULL STATION
FIRE HYDRANT FLOW SWITCHPRE-ACTION ALARM BELL
ALARM BELL WATER FLOW SWITCHPRE-ACTION TROUBLE STROBE
ALARM STROBEDELUGE VALVE FOR PRE-ACTION SYSTEM
PRE-ACTION RELEASING PANEL FIRE DEPARTMENT HOSE VALVE
CA
PA
CAP
11/22/2022
C.A. NO. 842
EXPIRES 30/JUNE/2024
21 63
BSMT CORR
BSMT ELECTRICAL
2085 2085
20Ø SA
22Ø SA
14Ø SA
14Ø SA
14Ø S/A
4Ø S/A
14Ø S/A
60/26 OA UP TO
PLENUM
/26
O A
60/26 OA
22Ø SA
36Ø SA
32Ø SA, UP TO
FIRST FLOOR
14Ø SA
36/10 RA
HWR
HWS
CWR
CWS
1 1
12/6 E/A
12/6 E/A
4"
2-1/2"
STAIR
ELEVATOR
CORRIDOR
EXISTING ELECTRICAL ROOM
EXISTING SIMULATOR HYDRAULICS
TOILET OFFICE - -
EXISTING MECHANICAL ROOM
2"
2-1/2"
1"
24/18 RA
3"
2"
DEMOLITION
HAUL ROUTE
M001 B
TYP.
RA
R
S
R
S
R
S
R
S
D
SA
/26
R A
60/26 OA
Ø
SA
22Ø SA
EXISTING HOUSEKEEPING
PAD TO REMAIN.
36/10 RA
24/18 RA
No ve mb er
, 2
:28 am
8_
M-
1.d wg lm or iar ty
NOTE:
DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS
and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE
PRIOR TO VERIFICATION OF CLEARANCE FOR ALL
TRADES. READ SPECIFICATIONS.
COPYRIGHT 2022C
Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.
AE# 2022 9198
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
FLAG NOTES
REMOVE EXISTING SUPPLY AIR TERMINAL UNIT AND ASSOCIATED
HYDRONIC PIPING TRIM AND THERMOSTAT. REFER TO DETAILS 3 AND 4
ON SHEET M-200. TYPICAL OF ALL DEMOLISHED TERMINAL UNITS.
REMOVE EXISTING SEWAGE EJECTOR. BASIN TO REMAIN.
REMOVE EXISTING SUMP PUMP. BASIN TO REMAIN.
PROVIDE NEW MOTORIZED ACTUATOR AT EXISTING OA DAMPER. REFER
SEQUENCE OF OPERATION FOR CONTROL.
EXISTING AIR HANDLING UNIT TO BE REMOVED, DISCONNECT HWS/HWR,
CWS/CWR, REMOVE HWS/HWR, CWS/CWR PIPING AND APPURTENANCES
BACK TO ISOLATION VALVES AS REQUIRED AND COORDINATED WITH NEW
AIR HANDLING UNIT. DISCONNECT SA, RA, AND OA DUCTWORK AS
REQUIRED AND COORDINATED WITH NEW AIR HANDLING UNIT.
PROVIDE NEW MOTORIZED ACTUATOR AT EXISTING RETURN AIR DAMPER.
REFER SEQUENCE OF OPERATION FOR CONTROL.
ALL EXISTING AIR DEVICES LOCATED IN CEILING TO BE REPLACED, WITH
SAME SIZE FACE AND DUCT CONNECTION DIFFUSER EQUAL TO TITUS
TMSA, LOUVER FACE DIFFUSER, WITH MATCHING CEILING MOUNT TYPE.
NEW EXHAUST GRILLE EQUAL TO TITUS MODEL 350 RL WITH INTEGRAL
BALANCING DAMPER, 8/8 DUCT. BALANCE TO 75 CFM.
8 16 24 32 4042 2 6 8 124 16 20
11/22/2022
C.A. NO. 842
22 63
(DEDICATED AC UNIT TO REMAIN)
(DEDICATED AC UNIT TO REMAIN)
175 175
11570
270270
270270
12/12 EX FROM
BELOW AND UP
VAV-B
VAV-B
6"Ø
7"Ø
13"Ø SA
6"Ø
7"Ø
12"Ø SA
10"Ø10"Ø
VAV-F
VAV-A
VA
V-
A
VAV-B
6"Ø
VAV-E
13"Ø SA
13"Ø SA6(TYP)
20/11 30/12 34/14 44/14
34/12
48/16
STAIR
JANITOR
OPEN OFFICEELEVATOR
ELECTRICAL
CHASE
CORRIDOR
OPEN OFFICE
SIMULATOR
- - ENTRY VEST.
9/9 EA FROM BELOW
TO EA ABOVE
12/12 EF FROM
BELOW TO ABOVE
FRD
12/12 EA UP TO
EF ON ROOF FR
DFR
D
VAV-A
4"Ø9
CORRIDOR
STOR
WOMENMEN
CORRIDOR
CORRIDOR
C M-012
VAV-F VAV-F
700700
700 700
16/12 SA
26/12 SA
16/12 SA
26/12 SA
26/12 UP INTO SPACE
ABOVE CEILING
26/12 UP INTO SPACE
ABOVE CEILING
VAV-A
8"Ø
5"Ø
VAV-A
8"Ø
5"Ø
12"Ø SA
VAV-D
20/10 Ф SA21/12 Ф SA
21/12 Ф SA 37/12 Ф SA
9/9 EA FROM BELOW
TO EA ABOVE
12/12 EF FROM
BELOW TO ABOVE
11570
VAV-B
VAV-G
VAV-G
VAV-G
VAV-G
VAV-D
VAV-D
8"Ø
10"Ø
/12
Ф
/12
Ф
/12
Ф
6(TYP)
24/14 RA W/ FIRE DAMPER
36/14 RA W/ FIRE DAMPER
STAIR
CONFERENCE
CHASE
CORRIDOR
ELEVATOR
SIMULATOR
TRNG LAB
TRNG LAB
TRNG LAB
OPEN OFFICE
OPEN OFFICE
FRD
12/12 EA UP TO
EF ON ROOF
FR
D
FR
D
FR
D
VAV-A
CORRIDOR
CORRIDOR
CORRIDOR
WOMEN
MEN
D M-012
10 10
VA
V-
A
VA
V-
A
WOMENMEN
WOMEN
MEN
EXISTING 12/12 EA UP THRU ROOF
TO EXISTING ROOF MOUNTED
EXHAUST FAN TO REMAIN
No ve mb er
, 2
:29 am
8_
M-
2.d wg lm or iar ty
NOTE:
DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS
and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE
PRIOR TO VERIFICATION OF CLEARANCE FOR ALL
TRADES. READ SPECIFICATIONS.
COPYRIGHT 2022C
Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.
AE# 2022 9198
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
FLAG NOTES
EXISTING PLUMBING FIXTURE TO BE REMOVED. REMOVE HW/CW, VENT
AND WASTE.
EXISTING 2" CW, 4" VENT AND 4" WASTE RISERS TO BE RELOCATED.
PROTECT FROM DAMAGE FOR NEW CONNECTION.
EXISTING 3/4" HW RISER TO BE RELOCATED. PROTECT FROM DAMAGE
FOR NEW CONNECTION.
EXISTING MOP SINK TO BE REMOVED. REMOVE 3/4" CW/HW RISERS,1-1/2"
VENT RISER AND 2" WASTE RISER SERVING MOP SINKS. REPAIR FLOOR TO
MATCH EXISTING.
EXISTING WATER COOLER TO BE REMOVED. REMOVE 3/4" CW RISER, 2"
WASTE AND VENT RISER SERVING WATER COOLERS. REPAIR FLOOR TO
MATCH EXISTING.
REMOVE EXISTING SUPPLY AIR TERMINAL UNIT, ASSOCIATED HYDRONIC
PIPING TRIM AND THERMOSTAT. EXISTING THERMOSTAT AND CONTROL
WIRING TO BE REPLACED. REFER TO DETAILS 3 AND 4 ON SHEET M-200.
TYPICAL OF ALL DEMOLISHED TERMINAL UNITS.
EXISTING 54/26 RA UP THRU ROOF THRU MOTORIZED RELIEF DAMPER,
EXISTING MOTORIZED DAMPER TO BE REPLACED, VERIFY EXACT SIZE
REQUIRED, VERIFY ACCESS AND INSTALLATION PRIOR TO PURCHASE.
EXISTING EA GRILLES TO BE REMOVED.
EXISTING MOP SINK TO BE REPLACED. REMOVE MOP SINK, PROTECT
HW/CW WASTE AND VENT FOR CONNECTION TO NEW MOP SINK.
CAP EXISTING RUNOUT WITH INSULATED SHEET METAL AT DUCT.
8 16 24 32 4042
8 16 24 32 4042
2 6 8 124 16 202 6 8 124 16 20
11/22/2022
C.A. NO. 842
23 63
AHU
2"
3"
2085 2085
20Ø SA
22Ø SA
14Ø SA 14Ø SA
14Ø S/A
32Ø SA, UP TO
FIRST FLOOR
14Ø SA
36/10 RA
22Ø SA
VAV
04 VAV
03(TYP)
VAV
VAV
12/6 E/A
12/6 E/A UP
4"
2-1/2"
32Ø SA
HW1
CW1
RA
4" 2"
2-1/2"
1"
60/26 RA, UP
TO FIRST
FLOOR
BM
CSBMCS
/18
R A3
HWR
HWS
CWR
CWS
M001 B
STAIR
ELEVATOR
CORRIDOR
EXISTING ELECTRICAL ROOM
EXISTING SIMULATOR HYDRAULICS
OFFICE - -
EXISTING MECHANICAL ROOM
TOILET
EXISTING DEDICATED
AC FOR ROOM ABOVE
TO REMAIN
2 1/2"
CWS
CWR
HWR
HWS
1"
14" Ø
26/54 RA
32"Ø
EXISTING 32" Ø SA
EXISTING 26/54 RA
EXISTING 26/60 OA
FAN SECTION
ACCESS DOOR (TYP) 4" HOUSEKEEPING CURB
EXTEND AS REQUIRED FOR
NEW AHU DIMENSIONS-
REFER SPECIFICATIONS
FOR CONCRETE MIX AND
REBAR REQUIREMENTS.
FLOOR
22"Ø
SA
R
S
R
S
R
S
R
S
D
RA
6'-11 1/2" 3926 lbs
5'-5"5'-5 1/2" 3403 lbs2157 lbs
6"
6'-9"
3'-3" 2'-0"
5"
5'-0"
5"
3'-0" 3'-9" 17'-10"
FILTER SECTION
M-200
M-200
36/10 RA24/18 RA
UVC
LIGHTING
26/60
PROVIDE NEW OA FLOW STATION
EQUAL TO OAFE-2000, 26/60, 10.83 FT2,
17,510 TOTAL AIRFLOW, 1.616 FT/MIN
No ve mb er
, 2
:29 am
8_
M-
1.d wg lm or iar ty
NOTE:
DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS
and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE
PRIOR TO VERIFICATION OF CLEARANCE FOR ALL
TRADES. READ SPECIFICATIONS.
COPYRIGHT 2022C
Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.
AE# 2022 9198
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
8 16 24 32 4042 2 6 8 124 16 20
FLAG NOTES
INSTALL AHU-01 ON 4" HOUSEKEEPING PAD, ENLARGE AS REQUIRED.
RECONNECT HEATING WATER AND CHILLED WATER PIPING. PROVIDE
CONDENSATE DRAIN PIPING TO NEARBY EXISTING FLOOR DRAIN. INSTALL
WITH 1" MINIMUM AIR GAP. REFER TO DETAIL 5 ON SHEET M200.
NEW VAV TERMINAL UNIT TO REPLACE EXISTING. REFER TO DETAILS 3
AND 4 ON SHEET M200. VERIFY LOCATION, REMOVE AND REPLACE
EXISTING THERMOSTATS AND THERMOSTAT WIRING. TYPICAL OF ALL
NEW TERMINALS SHOWN.
NEW 26/60 MOTORIZED ACTUATOR FOR OA DAMPER.
INSTALL NEW ISOLATION BALL VALVES ON BOTH HWS/HWR, CWS,CWR
HYDRONIC PIPING.
EXISTING 26/60 MIXED AIR DUCT DOWN TO NEW AHU, TRANSITION AS
REQUIRED TO NEW INTAKE AIR OPENING.
11/22/2022
C.A. NO. 842
24 63
1RST MAINTENANCE
1RST COMPUTER ROOM
(DEDICATED AC UNIT IN
BASEMENT TO REMAIN)
1RST SIMULATOR
SECONDARY COMPUTER ROOM
(DEDICATED AC UNIT IN
BASEMENT TO REMAIN)
VAV
VAV
VAV
VAV
VAV
175 175
11570
270270
270270
12/12 EA FROM
BELOW AND UP
6"Ø
7"Ø
13"Ø SA
6"Ø
7"Ø
12"Ø SA
10"Ø10"Ø
6"Ø 6"Ø
13"Ø SA
1 TYP.
9/9 EA FROM BELOW
TO EA ABOVE
12/12 EA UP TO
EF ON ROOF
12/12 EA FROM
BELOW TO ABOVE
FRD
FR
DFR
D
STAIR
JANITOR
OPEN OFFICEELEVATOR
ELECTRICAL
CHASE
CORRIDOR
OPEN OFFICE
SIMULATOR
- - ENTRY VEST.
CORRIDOR
STOR
WOMENMEN
CORRIDOR
CORRIDOR
CU
CU
BU
BU
DISCHARGE 500 CFM
THRU 12" DIA SA
DISCHARGE WITH
MANUAL BALANCING
DAMPER (TYP OF FOUR)
14/14
20/20
3 20/20
M200
T T
RS/RL
20/12 30/12 30/14 40/14
34/12
54/26
9 910/10
12/12
FR
D
ACCESS
PANEL
10/10
TYP.
TYP.
2ND BRIEFING ROOM WEST
1RST SIMULATOR
2ND BRIEFING ROOM EAST
2ND CLASSROOM WEST
2ND CLASSROOM EAST
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
700700
700 700
16/12 SA
26/12 SA
16/12 SA
26/12 SA
26/12 UP INTO SPACE
ABOVE CEILING
26/12 UP INTO SPACE
ABOVE CEILING
290 290
8"Ø 5"Ø
12"Ø SA
20/10 Ф SA
21/12 Ф SA
21/12 Ф SA 37/12 Ф SA
9/9 EA FROM BELOW
TO EA ABOVE
12/12 EA UP TO
EF ON ROOF
8"Ø
10"Ø
/12
Ф S
A
/12
Ф S
A
/12
Ф S
A
12/12 EA FROM
BELOW TO ABOVE
2FRD
FR
D
FR
D
FR
D
STAIR
CONFERENCE
CHASE
CORRIDOR
ELEVATOR
SIMULATOR
TRNG LAB
TRNG LAB
TRNG LAB
OPEN OFFICE
OPEN OFFICE
CORRIDOR
CORRIDOR
CORRIDOR
WOMEN
MEN
12/12
12/12
FR
D
10/10
9 9
11TYP.
10TYP.
8"Ø10/10
TYP.
No ve mb er
, 2
:29 am
8_
M-
2.d wg lm or iar ty
NOTE:
DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS
and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE
PRIOR TO VERIFICATION OF CLEARANCE FOR ALL
TRADES. READ SPECIFICATIONS.
COPYRIGHT 2022C
Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.
AE# 2022 9198
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
8 16 24 32 40428 16 24 32 4042
FLAG NOTES
NEW VAV TERMINAL UNIT TO REPLACE EXISTING. REFER TO DETAILS 3
AND 4 ON SHEET M-200. VERIFY LOCATION, REMOVE AND REPLACE
EXISTING THERMOSTATS, IN SAME LOCATION. TYPICAL OF ALL NEW
TERMINALS SHOWN.
EXISTING MOTORIZED RELIEF DAMPER TO BE REPLACED, VERIFY EXACT
SIZE REQUIRED, VERIFY ACCESS AND INSTALLATION PRIOR TO
PURCHASE.
EXTENT OF TEMPORARY DUCTWORK REQUIRED TO CONDITION SPACE
DURING AIR HANDLING UNIT REPLACEMENT. SUSPEND DUCTWORK FROM
WALKWAY STRUCTURE.
REMOVE AND PROVIDE NEW HYDRONIC PIPING AND SA DUCTWORK
INSULATION AT EXISTING HYDRONIC PIPING AND SUPPLY AIR DUCTWORK
IN ROOM 108C ONLY.
PROVIDE CONDENSATE PUMP AND ROUTE 1" CONDENSATE DRAIN OVER
WALKWAY AND DISCHARGE TO SINK AS SHOWN.
ROUTE TWO SETS RS/RL PIPING SIZE AS REQUIRED AS SHOWN AND
THROUGH EXISTING WALL LOUVER TO EXTERIOR CONDENSING UNITS.
12/12 EA DOWN IN CHASE, THRU FIRE DAMPER AT CHASE WALL.
CONNECT NEW 12/12 EA TO EXISTING 12/12 EA UP THRU ROOF TO
EXHAUST FAN ON ROOF.
NEW EXHAUST GRILLE EQUAL TO TITUS MODEL 350 RL WITH INTEGRAL
BALANCING DAMPER, 10/10 DUCT. BALANCE TO 150 CFM.
ALL EXISTING AIR DEVICES LOCATED IN CEILINGS TO BE REPLACED, WITH
SAME SIZE FACE AND DUCT CONNECTION DIFFUSER EQUAL TO TITUS
TMSA, LOUVER FACE DIFFUSER, WITH MATCHING CEILING MOUNT TYPE.
NEW RETURN AIR GRILLE EQUAL TO TITUS 350 RL, 1/2" BLADE SPACING, 30
DEG. DEFLECTION AND MOUNTING TO MATCH CEILING TYPE.
11/22/2022
C.A. NO. 842
25 63 mb er
, 2
:29 am
8_
M-
0.d wg lm or iar ty
NOTE:
DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS
and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE
PRIOR TO VERIFICATION OF CLEARANCE FOR ALL
TRADES. READ SPECIFICATIONS.
COPYRIGHT 2022C
Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.
AE# 2022 9198
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
M-200
RETURN
SUPPLY
TERMINAL
UNIT HOT WATER COIL
NO SCALE (2-WAY VALVE DUCT COIL)
STRAINER WITH HOSE
END AND VALVE
PRESSURE/TEMPERATURE
TEST PORT (PTT)
CONTROL VALVE
BALANCE VALVE
ISOLATION
VALVES
UNION (TYP)
MANUAL AIR
VENT
DRAIN
M-200
SINGLE DUCT AIR TERMINAL UNIT
NO SCALE
BOX INLET SIZE
BRANCH DUCT
DUCT INSULATION
(AS INDICATED)
FLEXIBLE
CONNECTION
12" LONG (MAX)
STRAIGHT SECTION OF INLET
DUCT PER MANUFACTURER'S
REQUIREMENTS
MI
NI
MU
M
PROVIDE MANUFACTURER'S
RECOMMENDED SERVICE
CLEARANCES ON SIDES TOP AND
BOTTOM, 18" MINIMUM (AS INDICATED)
CONTROL ENCLOSURE
HEATING COIL (AS INDICATED)
SUPPLY
AIR
LINER SECTION
AS SPECIFIED
HEATING COIL ACCESS
DOORS (AS INDICATED)
HEATING COIL ACCESS (AS INDICATED)
VELOCITY SENSOR
M-200
CONDENSATE DRAIN
NO SCALE
OPEN
VENT
A B
A = 1" (MIN)
B = EQUAL TO STATIC PRESSURE
OF UNIT x 1.25
BLOW-THROUGH UNIT
TO FLOOR
DRAIN
X"
NOTE:
1. TYPICAL AT EACH AIR HANDLING UNIT DRAIN PAN OR SECTION
DRAIN.
M-200
AIR
FLOW
SUPPLY
RETURN
HEATING WATER COIL
NO SCALE
TWO-WAY
CONTROL VALVE
THERMOMETER (TYP)
UNION (TYP)
BALANCING
VALVE (TYP)
ISOLATION VALVE (TYP)
STRAINER WITH HOSE END AND VALVE
SEE TEMPERATURE
CONTROL
SEQUENCEMANUAL AIR VENT
PRESSURE/TEMPERATURE
TEST PORT (PTT) (TYP)
DRAIN
M-200
AIR
FLOW
SUPPLY
RETURN
COOLING WATER COIL
NO SCALE
THERMOMETER (TYP)
UNION (TYP)
BALANCING
VALVE (TYP)TWO-WAY CONTROL VALVE
ISOLATION VALVE (TYP)
STRAINER WITH HOSE END AND VALVE
SEE TEMPERATURE
CONTROL
SEQUENCEMANUAL AIR VENT
PRESSURE/TEMPERATURE
TEST PORT (PTT) (TYP)
DRAIN
AIR
FLOW
EXISTING 3/4" OR 1/2"
HWS/HWR PIPING NEW INLET DUCT,
SIZE AND LENGTH
AS REQUIRED
NEW TERMINAL UNIT
FIELD FABRICATED
TRANSITION SIZE AS
REQUIRED
EXISTING 3"EXISTING 2"
M-200
DUCT FITTING DETAILS
NO SCALE
D = WIDTH
OF DUCT
R = 1 X D
(UNLESS
SHOWN
OTHERWISE)
R
"Y" BRANCH FITTING 90° ELBOW
R = 1.5 X D
(UNLESS
SHOWN
OTHERWISE)
D
DUCTWORK MAIN
VOLUME DAMPER H.E.T. (HI-EFFICIENCY TAKEOFF)
WITH VOLUME DAMPER
ROUND DUCT TO DIFFUSER
SEE PLAN FOR SIZE
DIFFUSER TAKE-OFF
RECTANGULAR DUCT
36"
(MAX)FLEXIBLE DUCT
DIFFUSER
SUPPLY AIR DIFFUSER
30° (MAX)
45° ENTRY BRANCH
CONVERGING TEE
DOUBLE BRANCH TAKE-OFFSINGLE BRANCH TAKE-OFF
30°
(MAX)
NOTE:
WHERE FITTING NOT
POSSIBLE, USE EXTRACTOR
S
X
X+4"
4" 1"
45° LATERAL CROSS WITH REDUCER 45° ROUND TAKE-OFF SUPPLY AIR DIFFUSER
45° ENTRY BRANCH
CONVERGING TEE
(ROUND)
30° (MAX)
SHEET METAL
90° ELBOW
36" (MAX)
ROUND DUCT
FLEXIBLE DUCT
DIFFUSER
M200
TYPICAL TEMPORARY COOLING UNIT DETAIL
NO SCALE
FILTER
FLOOR
CD
CONDENSATE DRAIN CONNECT
TO SERVICE SINK.
REFRIGERANT PIPING
TO CONDENSING UNIT
COOLING COIL
FLEXIBLE CONNECTION
FLEXIBLE CONNECTION
FIELD FABRICATED 24" WIDE X 18" TALL X LENGTH
AS REQUIRED INSULATED SHEET METAL RETURN
AIR PLENUM AND MOUNTING STRUCTURE WITH
ANGLE. TTTT STEEL FRAMING FOR SUPPORT OF
TWO TEMPORARY SERVICE BLOWER COIL UNITS.
MOUNT ENTIRE ASSEMBLY ON 1/4" NEO-PRENE
VIBRATE PAD, SIZE AS REQUIRED.
CD
CONDENSATE DRAIN CONNECT
TO AND SPLIT TO ADJACENT
SERVICE SINK.
REFRIGERANT PIPING
TO CONDENSING UNIT
COOLING COIL
FLEXIBLE CONNECTION
FLEXIBLE CONNECTION
20X20 RA
BU-01 BU-02
CONDENSATE PUMP EQUAL TO LITTLE
GIANT VCMA-20UL, 115/1/60, 1.5 AMPS, 48
GPH AT 10" HEAD. DISCHARGE TO SPILL
TO ADJACENT SINK. REFER FLOOR PLAN.
1/2" 1/2"
1/2" CD, REFER FLOOR PLAN
FOR CONT.
1/2"
CD
SAME SIZE AS UNIT DISCHARGE CONNECTION
SEE DETAIL NUMBER "3"
THIS SHEET
11/22/2022
C.A. NO. 842
26 63 mb er
, 2
:29 am
8_
M-
1.d wg lm or iar ty
NOTE:
DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS
and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE
PRIOR TO VERIFICATION OF CLEARANCE FOR ALL
TRADES. READ SPECIFICATIONS.
COPYRIGHT 2022C
Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.
AE# 2022 9198
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
AIR HANDLING UNIT SCHEDULE
GENERAL DATA FILTER DATA UVC LIGHTING
MANUFACTURER MODEL
REFERENCE
SPECIFICATION
REMARKS
MARK SERVES LOCATION CONFIG.
TOTAL
AIRFLOW
(CFM)
MAX OUTSIDE
AIRFLOW (CFM)
MIN OUTSIDE
AIRFLOW (CFM)
DIMENSIONS
(LxWxH) (IN)
MAX
WEIGHT
(LBS)
FAN
TYPE/QTY
EXTERNAL
S.P. (IN.
W.C.)
TOTAL S.P.
(IN. W.C.) MAX. RPM
MAX. BHP
(SA./Tot)
MERV
NO.
TYPE
THICKNESS
(IN) WATTS ROWS
FIXTURES
PER ROW
AHU 01 ANNEX BASEMENT HORIZ 17510 17510 2050 174 X 103 X 66 3595 PLENUM/ 2 2.5 4.5 1858 15 / 30.0 13 CART. 2 740 2 2 VENTUS ATS 237323 1,2,3
REMARKS:
1. PROVIDE WITH UNIT MOUNTED VARIABLE SPEED CONTROLLERS, TWO REQUIRED, ONE PER EACH OF TWO MOTORS, EQUAL TO ABB ACH580-3PDR-044A-4+2G405, 460/3/60, 15 HP, 100 KA MIN SCCR.
2. VERIFY AND PROVIDE AHU KNOCKDOWN COMPONENT SIZES AS REQUIRED TO COORDINATE AND FIT THROUGH ACCESS TO BASEMENT MECHANICAL ROOM.
3. PROVIDE UVC LIGHTS AT CHILLED WATER COIL WITH LAMP LIFE INDICATOR AND INTERLOCK SAFETY SWITCH EQUAL TO STERIL AIRE SE 50, WITH (6) EGTS 50 VO SINGLE ENDED EMITTER, MOUNTING FRAME, INTERLOCK SWITCH KIT. 120/1/60, 6.5 AMPS. FRAME AND LAMPS MOUNTED 12" DOWNSTREAM OF COOLING COIL.
4. PROVIDE RETURN AIR SMOKE DETECTOR TO SHUT DOWN UNIT UPON DETECTION OF SMOKE
5. 460/3/60, MCA 45.3, MOP 58.8, FLA 36.2, TWO 15 HP FANS WITH VFD FOR EACH.
CHILLED WATER COOLING COIL SCHEDULE
MARK SERVES LOCATION
AIRFLOW
(CFM)
MIN
ROWS
MAX FINS
PER IN
MAXIMUM FACE
VELOCITY (FPM)
ENTERING AIR
CONDITIONS
LEAVING AIR
CONDITIONS
SENSIBLE
CAPACITY
(MBH)
TOTAL
CAPACITY
(MBH)
MAXIMUM
APD (IN.
W.C.)
FLUID DATA
DIMENSIONS
(LxWxH) (IN)
REFERENCE
SPECIFICATIONFLUID
TYPE
EWT
(°F)
LWT
(°F) GPM
MAX WPD
(FT)DB (°F) WB (°F) DB (°F) WB (°F)
CC-01 AHU 01 BASEMENT 17510 6 8 502 82.6 66.5 53.6 52.8 558.1 737.0 0.61 WTR 45.0 55.4 141.0 7.0 (2) 90X56 237323
HOT WATER HEATING COIL SCHEDULE
MARK SERVES LOCATION
AIRFLOW
(CFM)
MIN
ROWS
MAX
FINS/IN
MAX FACE ENTERING AIR
CONDITIONS
LEAVING AIR
CONDITIONS
TOTAL MAX FLUID DATA
REFERENCE
SPECIFICATION
VELOCITY CAPACITY APD FLUID
TYPE
EWT LWT
GPM
MAX WPD
(FPM) DB (°F) DB (°F) (MBH) (IN. W.C.) (°F) (°F) (FT)
HC-01 AHU-01 AHU-01 17,510 1 6 505.0 62.0 72.0 382.1 0.09 WTR 160 130 25.4 1.10 237323
TEMPORARY AIR COOLED CONDENSING UNIT SCHEDULE
MARK SERVES LOCATION
TOT CAP
(MBH)
SENS CAP
CAPACITY
(MBH)
EAT
COMPRESSOR
TYPE
REFRIGERANT
AMBIENT
VLTS/PH/HZ
DIMENSIONS OPERATING
MANUFACTURER MODEL REMARKSTEMP TEMP (LxWxH) WEIGHT
DB/WB (°F) (°F) (IN) (LBS)
CU-01 BU-01 SEE PLANS 54.6 43.2 80/67 SCROLL R410 105 208/3/60 38 X 35 X 51 275 TRANE 4TWA40 60 A 1,2,3 CU-02 BU-02 SEE PLANS 54.6 43.2 80/67 SCROLL R410 105 208/3/60 38 X 35 X 51 275 TRANE 4TWA40 60 A 1,2,3
REMARKS:
1. SEE ELECTRICAL FOR TEMPORARY POWER CONNECTION. 208/3/60, MCA 21 AMPS, MOP 35 AMPS, 15.9 R L AMPS.
2. TOTAL AND SENSIBLE CAPACITY AT LISTED ENTERING AIR TEMPERATRUE WITH MATCHING COOLING COIL AT AMBIANT TEMPERATURE LISTED.
3. TO BE INSTALLED AND OPERATING DURING AIR HANDLING UNIT REPLACEMENT WORK. ASSEMBLY TO BE REMOVED UPON COMPLETION OF WORK.
TEMPORARY DX AHU SCHEDULE
MARK LOCATION CONFIGURATION
AIRFLOW
(CFM)
OUTDOOR EXT COOLING DIMENSIONS OPERATING
MANUFACTURER MODEL REMARKSAIR S.P. TOTAL SENSIBLE (LxWxH) WEIGHT V/PH/HZ - AMPS
(CFM) (IN. W.C.) (MBH) (MBH) (IN) (LBS)
BU-01 SEE PLAN UPFLOW 2000 80 0.30 54.6 43.2 25X28X34 152 TRANE 4PXC+S8X1D 120/1/60-12A 1,2,3,4,5 BU-02 SEE PLAN UPFLOW 2000 80 0.30 54.6 43.2 25X28X34 152 TRANE 4PXC+S8X1D 120/1/60-12A 1,2,3,4,5
REMARKS:
1. SEE ELECTRICAL FOR TEMPORARY POWER CONNECTION. 120/1/60, 12 AMPS.
2. PROVIDE MATCHING COOLING COIL TO PROVIDE COOLING CAPACITY INDICATED. SIZE AND ROUTE REFIGERANT PIPING FOR LISTED CAPACITY AND EQUIVILANT LENGTH OF PIPING RUN PER MANUFACTURERS RECOMMENDATION.
3. PROVIDE DUCT SMOKE DETECTOR AT UNIT RA TO SHUT DOWN UNIT UPON DETECTION OF SMOKE.
4. DIRECT EXPANSION VERTICAL BLOWER UNIT.
5. TO BE INSTALLED AND OPERATING DURING AIR HANDLING UNIT REPLACEMENT WORK. ASSEMBLY TO BE REMOVED UPON COMPLETION OF WORK
AIR TERMINAL UNIT SCHEDULE
MARK SERVES TYPE
CFM MAXIMUM
S.P. IN. W.G.
[3]
NC @
MINS.P.
BOX INLET
DIAMETER
(IN)
INLET
BRANCH
DUCT SIZE
(IN)
OUTLET
DUCT
SIZE (IN)
MINIMUM
HEATING
COIL MBH
[1]
MAXIMUM
HEATING
COIL FLOW
(GPM)
HEATING
COIL MAX
P.D. (FT)
REHEAT
BRANCH
PIPE SIZE
(IN)
LAT
COIL
ROWS
MFGT MODEL
REFERENCE
SPECIFICATION
REMARKS
MAX MAX
COOLING HEATING
VAV-01 B06A SINGLE DUCT 185 100 0.11 33 4 6 EXISTING 4.40 0.4 0.10 0.50 95 1 TITUS DESV 233600 2,4,5,7,9 VAV-02 B05 SINGLE DUCT 1800 900 0.46 27 12 14 EXISTING 39.10 1.9 0.10 0.75 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-03 B03 SINGLE DUCT 1800 900 0.46 27 12 14 EXISTING TITUS DESV 233600 2,4,5,6,7,8 VAV-04 B03 SINGLE DUCT 1800 900 0.46 27 12 14 EXISTING TITUS DESV 233600 2,4,5,6,7,8 VAV-05 100 SINGLE DUCT 1800 900 0.46 27 12 14 EXISTING 39.10 1.9 0.10 0.75 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-06 100E SINGLE DUCT 350 160 0.12 29 5 6 EXISTING 6.90 2.4 0.20 0.75 95 1 TITUS DESV 233600 2,4,5,7,9
VAV-07 NOT USED
VAV-08 NOT USED
VAV-9 108C SINGLE DUCT 1200 600 0.40 29 10 12 EXISTING 26.00 1.4 0.23 0.75 95 2 TITUS DESV 233600 2,4,5,7,9
VAV-10 100E SINGLE DUCT 320 160 0.12 29 5 6 EXISTING 6.90 2.4 0.20 0.75 95 1 TITUS DESV 233600 2,4,5,7,9 VAV-11 108 SINGLE DUCT 320 160 0.12 29 5 6 EXISTING 6.90 2.4 0.20 0.75 95 1 TITUS DESV 233600 2,4,5,7,9 VAV-12 201 SINGLE DUCT 500 250 0.48 25 6 8 EXISTING 11.90 0.7 0.02 0.50 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-13 202 SINGLE DUCT 500 250 0.48 25 6 8 EXISTING 11.90 0.7 0.02 0.50 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-14 204 SINGLE DUCT 500 250 0.48 25 6 8 EXISTING 11.90 0.7 0.02 0.50 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-15 205 SINGLE DUCT 500 250 0.48 25 6 8 EXISTING 11.90 0.7 0.02 0.50 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-16 200A SINGLE DUCT 800 400 0.40 27 8 10 EXISTING 17.40 1.0 0.23 0.75 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-17 200A SINGLE DUCT 800 400 0.40 27 8 10 EXISTING 17.40 1.0 0.23 0.75 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-18 200 SINGLE DUCT 800 400 0.40 27 8 10 EXISTING 17.40 1.0 0.23 0.75 95 2 TITUS DESV 233600 2,4,5,7,9
VAV-19 NOT USED
VAV-20 NOT USED
VAV-21 200C SINGLE DUCT 350 160 0.12 29 5 6 EXISTING 6.90 2.4 0.20 0.75 95 1 TITUS DESV 233600 2,4,5,7,9 VAV-22 200C SINGLE DUCT 185 100 0.11 33 4 6 EXISTING 4.40 0.4 0.10 0.50 95 1 TITUS DESV 233600 2,4,5,7,9 VAV-23 212 SINGLE DUCT 800 400 0.40 27 8 10 EXISTING 17.40 1.0 0.23 0.75 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-24 108B SINGLE DUCT 1800 900 0.46 27 12 14 EXISTING 39.10 1.9 0.10 0.75 95 2 TITUS DESV 233600 2,4,5,7,8,9
VAV-25 108B SINGLE DUCT 1800 900 0.46 27 12 14 EXISTING 39.10 1.9 0.10 0.75 95 2 TITUS DESV 233600 2,4,5,7,8,9
REMARKS:
1. HEATING CAPACITY BASED ON HEATING CFM, EWT = 180 DEG. F, MAX WTD = 30 DEG. F, AND EAT = 55 DEG. F.
2. PROVIDE STRERILOCK LINER ONLY, NO EXCEPTIONS
3. TOTAL AIR PRESSURE DIFFERENCE ACROSS BOX AND COIL AT MAXIMUM CFM.
4. TERMINAL UNIT UNIT TO BE CONTROLLED FROM NEW DIGITAL ROOM SENSOR AT EXISTING THERMOSTAT LOCATION. PROVIDE NEW WIRING TO/FROM EXISTING T-STAT LOCATION AS REQUIRED, VERIFY EXACT LOCATION.
5. FIELD VERIFY EXISTING ELECTRICAL CONNECTION AT TERMINAL PRIOR TO PURCHASE AND INSTALLATION. PROVIDE NEW TRANSFORMER AS REQUIRED.
6. COOLING ONLY.
7. PROVIDE FIELD FABRICATED TRANSITION TO EXISTING PRIMARY AIR DUCT AND DISCHARGE SA DUCT. VERIFY EXACT SIZE REQUIRED FOR EXISTING DUCT AND TERMINAL INLET/OUTLET.
8. PROVIDE TWO-STAGE THERMOSTAT/SENSOR TO CONTROL TWO INDICATED TERMINALS.
9. FIELD VERIFY LEFTHAND /RIGHTHAND COIL CONNECTION PRIOR TO PURCHASE AND INSTALLATION AND PROVIDE AS REQUIRED.
11/22/2022
C.A. NO. 842
27 63 mb er
, 2
:29 am
8_
M-
0.d wg lm or iar ty
NOTE:
DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS
and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE
PRIOR TO VERIFICATION OF CLEARANCE FOR ALL
TRADES. READ SPECIFICATIONS.
COPYRIGHT 2022C
Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.
AE# 2022 9198
SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.
Variable Air Volume ï AHU Sequence of Operation
Supply Air Duct Static Pressure Control:
The controller shall measure duct static pressure and modulate the supply fan VFD speed to maintain a duct static pressure setpoint. The speed shall not drop below 30% (adj.). The static pressure setpoint shall be reset based on zone cooling requirements.
Å The initial duct static pressure setpoint shall be 1.5in H2O (adj.).
Å As cooling demand increases, the setpoint shall incrementally reset up to a maximum of 2.3in H2O (adj.).
Å As cooling demand decreases, the setpoint shall incrementally reset down to a minimum of 1.7in H2O (adj.) .
Alarms shall be provided as follows:
Å High Supply Air Static Pressure: If the supply air static pressure is 25% (adj.) greater than setpoint.
Å Low Supply Air Static Pressure: If the supply air static pressure is 25% (adj.) less than setpoint.
Å Supply Fan VFD Fault.
Preheating Coil Steam Valves:
The controller shall measure the mixed air temperature and modulate the two heating water coil valves to maintain its setpoint 5ÁF (adj.) less than the supply air temperature setpoint.
The preheating shall be enabled whenever:
Å Outside air temperature is less than 60ÁF (adj.).
Å AND the economizer (if present) is disabled.
Å AND the supply fan status is on.
The preheating coil water valves shall open for freeze protection whenever:
Å Mixed air temperature drops from 40ÁF to 35ÁF (adj.).
Å OR the freezestat (if present) is on.
Minimum Outside Air Damper:
The minimum outside air damper shall open when CO2 limit is exceeded, and close when the unit is shutdown.
Economizer:
The controller shall measure the mixed air temperature and modulate the economizer dampers in sequence to maintain a setpoint 2ÁF (adj.) less than the supply air temperature setpoint. The outside air dampers shall maintain a minimum adjustable position of 5% (adj.) open whenever occupied.
The economizer shall be enabled whenever:
Å Outside air temperature is less than 65ÁF (adj.).
Å AND the outside air temperature is less than the return air temperature.
Å AND the supply fan status is on.
The economizer shall close whenever:
Å Mixed air temperature drops from 40ÁF to 35ÁF (adj.).
Å OR the freezestat (if present) is on.
Å OR on loss of supply fan status.
The outside air dampers shall close and the return air damper shall open when the unit is off. If Optimal Start Up is available the mixed air damper shall operate as described in the occupied mode except that the outside air damper shall modulate to fully closed.
Prefilter Differential Pressure Monitor:
The controller shall monitor the differential pressure across the prefilter.
Alarms shall be provided as follows:
Å Prefilter Change Required: Prefilter differential pressure exceeds a user definable limit (adj.).
Mixed Air Temperature:
The controller shall monitor the mixed air temperature and use as required for economizer control (if present) or preheating control (if present).
Alarms shall be provided as follows:
Å High Mixed Air Temp: If the mixed air temperature is greater than 90ÁF (adj.).
Å Low Mixed Air Temp: If the mixed air temperature is less than 45ÁF (adj.).
Return Air Temperature:
The controller shall monitor the return air temperature and use as required for setpoint control or economizer control (if present).
Alarms shall be provided as follows:
Å High Return Air Temp: If the return air temperature is greater than 90ÁF (adj.).
Å Low Return Air Temp: If the return air temperature is less than 45ÁF (adj.).
Supply Air Temperature:
The controller shall monitor the supply air temperature.
Alarms shall be provided as follows:
Å High Supply Air Temp: If the supply air temperature is greater than 120ÁF (adj.).
Å Low Supply Air Temp: If the supply air temperature is less than 45ÁF (adj.).
Supply Air Temperature Setpoint - Optimized:
The controller shall monitor the supply air temperature and shall maintain a supply air temperature setpoint reset based on zone cooling requirements.
The supply air temperature setpoint shall be reset based on zone cooling requirements as follows:
Å The initial supply air temperature setpoint shall be 55ÁF (adj.).
Å As cooling demand increases, the setpoint shall incrementally reset down to a minimum of 53ÁF (adj.).
Å As cooling demand decreases, the setpoint shall incrementally reset up to a maximum of 60ÁF (adj.) .
Cooling Coil Valve:
The controller shall measure the supply air temperature and modulate the cooling coil valve to maintain its cooling setpoint.
The cooling shall be enabled whenever:
Å Outside air temperature is greater than 60ÁF (adj.).
Å AND the economizer (if present) is disabled or fully open.
Å AND the supply fan status is on.
Å AND the heating (if present) is not active.
The cooling coil valve shall open to 50% (adj.) whenever the freezestat (if present) is on.
Alarms shall be provided as follows:
Å High Supply Air Temp: If the supply air temperature is 5ÁF (adj.) greater than setpoint.
Low Supply Air Temperature Alarm:
The controller shall alarm if the supply air temperature is less than 45ÁF (adj.).
HWS
HWR
CWR
CWS
AO - Cooling Valve M
AO - HEATING VALVE
M
N.C.
OA
M
AO - OA Damper
VFD
BO - Supply Fan Start/Stop
AO - Supply Fan VFD Speed
BI - Supply Fan VFD Fault
BI - Supply Fan Status
CT
M
H C
HWS
T T
SFCHW
H
L
AI - Supply Air Static Pressure
Locate IJ distance down longest duct
SA
T H L
AO - Return Air Damper M N.O.
Run Conditions - Scheduled:
The unit shall run based on a user defined schedule.
Freeze Protection:
The unit shall shut down and generate an alarm upon receiving a freezestat status.
High Static Shutdown:
The unit shall shut down and generate an alarm upon receiving an high static shutdown signal.
Return Air Smoke Detection:
The unit shall shut down and generate an alarm upon receiving a return air smoke detector status.
Supply Fan:
The supply fan shall run anytime the unit is commanded to run, unless shutdown on safeties. To prevent short cycling, the supply fan shall have a user definable (adj.) minimum runtime.
Alarms shall be provided as follows:
Å Supply Fan Failure: Commanded on, but the status is off.
Å Supply Fan in Hand: Commanded off, but the status is on.
Å Supply Fan Runtime Exceeded: Status runtime exceeds a user definable limit (adj.).
N.C.
RLFA
C AI - Return Air CO2
RA
T
BI - Return Air Smoke Detector
AI - Return Air Temp
BI - Freezestat
AI - Prefilter Differential Pressure
AI - Mixed Air Temp
AI - Supply Air Temp
BI - High Static Shutdown
H
AI - Return Air Humidify
H AI - Outside Air Humidity
M-300
ZONE VARIABLE AIR VOLUME AIR HANDLING UNIT (AHU)
NO SCALE
Minimum Ventilation on Carbon Dioxide (CO2) Concentration (indicated units only):
When in the occupied mode, the controller shall measure the zone CO2 levels and modulate the zone damper open on rising CO2 concentrations, overriding normal damper operation to maintain a CO2 setpoint of not more than 750 ppm (adj.).
Alarms shall be provided as follows:
Å High Zone Carbon Dioxide Concentration: if the zone CO2 concentration is greater than 1000 ppm (adj.).
AI Outdoor Air Measuring Station
CONTROLS GENERAL NOTES:
A. AI- ANALOG INPUT, BI-BINARY INPUT.
B. AO- ANALOG OUTPUT.
C. REFER SPECIFICATION SECTION 23 09 13,13
FOR REQUIREMENTS OF CONTROL DEVICES.
D. REFER SPECIFICATION SECTION 23 09 93 FOR
SEQUENCE OF OPERATIONS POINTS LIST
E. REFER SPECIFICATION SECTION 23 09 23 FOR
CONTROLS SYSTEM REQUIREMENTS.
11/22/2022
C.A. NO. 842
28 63 mb er
, 2
:29 am
8_
M-
1.d wg lm or iar ty
NOTE:
DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS
and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE
PRIOR TO VERIFICATION OF CLEARANCE FOR ALL
TRADES. READ…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .