This document describes a federal solicitation for construction services. The Federal Aviation Administration's Mike Monroney Aeronautical Center is seeking proposals to complete renovation work at its STB Annex building according to the specifications and drawings provided. This is a 100% small business set-aside reserved for eligible 8(a) certified small disadvantaged businesses. The estimated price range for the contract is $1,000,000 to $5,000,000. Offerors must attend a mandatory pre-proposal conference on May 16th, 2023 and notify the contracting officer of their intent to attend by May 12th. Proposals are due by email only by the date specified in the solicitation. The selected offeror will be responsible for renovating the STB Annex at the Mike Monroney Aeronautical Center per the requirements outlined in the solicitation.

View the file

Other files

File Type Posted
Attachment 25 STB Reno Q and A Log3 6.12.23.pdf PDF
Amendment 0006 6973GH-23-R-00096.pdf PDF
Attachment 24 Spec 26 51 00 INTERIOR LIGHTING Revised 06062023.pdf PDF
Attachment 22 Spec 23 04 00 COMMON REQUIREMENTS FOR HVAC Revised 06062023.pdf PDF
Attachment 23 Spec 26 05 00 BASIC REQUIREMENTS FOR ELECTRICAL SYSTEMS Revised 06062023.pdf PDF
Amendment 0005 6973GH-23-R-00096.pdf PDF
Attachment 15 08_71_00 USER-DOOR HARDWARE.pdf PDF
Attachment 20 STB Reno Q and A Log1 5.18.23.6.05.23.pdf PDF
Attachment 18 026A STB Annex ACM Photos.pdf PDF
Amendment 0004 6973GH-23-R-00096.pdf PDF
Attachment 19 STB Annex General Representative Work Areas.pdf PDF
Attachment 21 STB Reno Q and A Log2 5.18.23.6.05.23.pdf PDF
Attachment 17 026A STB Annex Asbestos Location Drawings.pdf PDF
Attachment 16 Addendum Drawings.pdf PDF
Amendment 0003 6973GH-23-R-00096.pdf PDF
Attachment 7 Past Performance Survey Revision 1.1 5.24.23.docx DOCX document
Amendment 0002 6973GH-23-R-00096.pdf PDF
Attachment 14 REISSUE-100 Percent Type B FAA-MMAC STB Annex Renovation Drawings.pdf PDF
Site Visit Attendee List 6973GH-23-R-00096 STB Annex Renovation.pdf PDF
Amendment 0001 6973GH-23-R-00096.pdf PDF
SIR 6973GH-23-R-00096.pdf PDF
Attachment 11 Wage Determination OK20230049 02.10.2023.pdf PDF
Attachment 10 Contractor Release.pdf PDF
Attachment 4 SF25 - Performance Bond.pdf PDF
Attachment 13 AMP400-ENV-OC-2.4.3-CC.pdf PDF
Attachment 7 Past Performance Survey.docx DOCX document
Attachment 5 SF25A Payment Bond.pdf PDF
Attachment 12 Chapter 33 Construction Safety.pdf PDF
Attachment 3 SOW 2018-006090 STB Annex Renovation 3.13.23.pdf PDF
Attachment 6 SF24 Bid Bond.pdf PDF
Attachment 1 100 Percent Type B FAA-MMAC STB Annex Renovation Specifications.pdf PDF
Attachment 8 Past Performance Experience Form.docx DOCX document
Attachment 9 Client Authorization Letter.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 63

11/26/2022

2 63

3 63

4 63

5 63

8 63

9 63

10 63

11 63

12 63

13 63

14 63

16 63

18 63

20 63

No ve mb er

, 2

:28 am

8_

M-

0.d wg lm or iar ty

NOTE:

DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS

and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE

PRIOR TO VERIFICATION OF CLEARANCE FOR ALL

TRADES. READ SPECIFICATIONS.

COPYRIGHT 2022C

Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.

AE# 2022 9198

SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.

DEMOLITION NOTES:

1. THE OWNER SHALL HAVE THE FIRST RIGHT OF SALVAGE FOR ALL MECHANICAL,

ELECTRICAL, AND PLUMBING ITEMS BEING REMOVED. IF OWNER DECLINES, THE

CONTRACTOR SHALL REMOVE FROM THE PREMISES AND DISPOSE OF PROPERLY.

VERIFY OWNER'S INTENT PRIOR TO REMOVAL OR DEMOLITION.

2. INFORMATION PERTAINING TO THE EXISTING BUILDING HAS BEEN OBTAINED

THROUGH THE BUILDINGS ORIGINAL DRAWINGS WHERE AVAILABLE. REPORT

DISCREPANCIES TO THE ARCHITECT/ENGINEER PRIOR TO ANY DEMOLITION.

CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO

COMMENCING WORK.

3. COORDINATE SHUT DOWN OF ALL UTILITIES FOR DEMOLITION WORK WITH THE

OWNER.

4. DISCONNECT AND REMOVE MECHANICAL SYSTEMS, EQUIPMENT, AND

COMPONENTS AS INDICATED TO BE REMOVED, SHOWN HATCHED.

PIPING TO BE REMOVED: REMOVE PORTION OF PIPING INDICATED TO BE REMOVED

AND CAP REMAINING PIPING WITH THE SAME OR COMPATIBLE PIPING MATERIAL.

PIPING TO BE ABANDONED IN PLACE: DRAIN PIPING AND CAP WITH THE SAME OR

COMPATIBLE PIPING MATERIAL.

DUCTS TO BE REMOVED: REMOVE PORTIONS OF DUCT AND CAP REMAINING DUCTS

WITH THE SAME OR COMPATIBLE DUCTWORK MATERIAL.

DUCTS TO BE ABANDONED IN PLACE: CAP DUCTS WITH THE SAME OR COMPATIBLE

DUCTWORK MATERIAL.

EQUIPMENT TO BE REMOVED: DISCONNECT AND CAP SERVICES AND REMOVE

EQUIPMENT.

EQUIPMENT TO BE REMOVED AND REINSTALLED: DISCONNECT AND CAP SERVICES

AND REMOVE, CLEAN, AND STORE EQUIPMENT. WHEN APPROPRIATE, REINSTALL,

RECONNECT, AND MAKE EQUIPMENT FULLY OPERATIONAL.

EQUIPMENT TO BE REMOVED AND SALVAGED: DISCONNECT AND CAP SERVICES

AND REMOVE EQUIPMENT AND DELIVER TO OWNER.

5. IF PIPE OR EQUIPMENT INSULATION TO REMAIN IS DAMAGED IN APPEARANCE OR IS

UNSERVICEABLE, REMOVE DAMAGED OR UNSERVICEABLE PORTIONS AND REPLACE

WITH NEW PRODUCTS OF EQUAL CAPACITY AND QUALITY.

6. CONTRACTOR IS REQUIRED TO VISIT SITE AND FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO BIDDING PROJECT.

7. COORDINATE DEMOLITION WITH THE WORK OF OTHER TRADES. PROVIDE

TEMPORARY UTILITIES AS REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO

PROCEED.

HVAC GENERAL NOTES:

1. DO NOT RUN DUCTWORK AND PIPING ABOVE ELECTRICAL PANELS OR IN CODE

REQUIRED CLEARANCE SPACES. COORDINATE ALL ROUTING WORK WITH ALL

OTHER TRADES.

2. DO NOT RUN DUCTWORK AND PIPING ABOVE OR THROUGH INFORMATION

TECHNOLOGY AND DATA CLOSETS, IDF, AND MDF ROOMS. COORDINATE ALL

ROUTING WITH ALL OTHER TRADES.

3. DRAWINGS, PLANS, SCHEMATICS, AND DIAGRAMS INDICATE THE GENERAL

LOCATIONS AND THE ARRANGEMENT OF SYSTEMS. WHEREVER PRACTICAL,

INSTALL SYSTEMS AS INDICATED. PROVIDE OFFSETS AND ELEVATION CHANGES TO

DUCTWORK, PIPING, AND PLUMBING AS REQUIRED TO COMPLETE THE LAYOUT AND

COORDINATION PROCESS AS WELL AS MEET ALL REQUIREMENTS OF THE

CONTRACT DOCUMENTS.

4. CONTRACTOR SHALL COORDINATE LOCATION OF DUCTWORK IN CEILING SPACE

WITH ALL TRADES PRIOR TO FABRICATION AND INSTALLATION OF DUCTWORK.

5. FOR GENERAL DUCTWORK CONSTRUCTION, SEE DUCT FITTING DETAILS.

6. DUCTWORK AND EQUIPMENT SHOWN WITH THIN LINES INDICATES EXISTING TO

REMAIN. DUCTWORK AND EQUIPMENT SHOWN WITH BOLD LINES INDICATES NEW.

7. PROVIDE VOLUME DAMPER IN ALL BRANCH TAKEOFFS CONNECTING TO DIFFUSERS,

REGISTERS, OR GRILLES AND IN LOCATIONS INDICATED.

8. PROVIDE CLEARANCES TO ALL EQUIPMENT AS REQUIRED BY MANUFACTURERS'

INSTALLATION AND OPERATION REQUIREMENTS AND/OR BY CODE.

9. INSTALL ALL DUCT AND PIPING IN MECHANICAL ROOMS AS HIGH AS POSSIBLE.

PROVIDE 7'-0" MINIMUM HIGH ACCESS PATHWAYS TO ALL EQUIPMENT.

10. COORDINATE LOCATIONS OF ALL EQUIPMENT HOUSEKEEPING PADS WITH GENERAL

CONTRACTOR. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF

EQUIPMENT HOUSEKEEPING PADS.

11. CAP ENDS OF ALL INSTALLED DUCTWORK DURING CONSTRUCTION TO MINIMIZE

DIRT, DEBRIS, AND FOREIGN OBJECTS FROM ENTERING THE DUCT SYSTEM.

12. COORDINATE SCHEDULE OF SHUTDOWN FOR EXISTING HVAC SYSTEMS, FOR

INSTALLATION OF NEW HVAC SYSTEMS, WITH THE OWNER'S REPRESENTATIVE

PRIOR TO SHUTDOWN.

13. COORDINATE LOCATION OF DUCTWORK WITH ELECTRICAL CABLE TRAYS.

14. ALL INSULATION SHALL MEET THE ENERGY CODE'S INSTALLED R VALUE

REQUIREMENTS.

PIPING GENERAL NOTES:

1. ROUTE ALL HORIZONTAL HVAC PIPING IN MECHANICAL ROOMS AT A MINIMUM OF

7'-6" ABOVE FINISHED FLOOR.

2. INSTALL PIPING TO TERMINAL UNIT REHEAT COILS AND/OR HEAT PUMPS TO

PROVIDE EASY ACCESS AND REMOVAL OF REHEAT COIL OR HEAT PUMP. DO NOT

ROUTE PIPING UNDER TERMINAL UNIT OR HEAT PUMP.

3. PIPING AND EQUIPMENT SHOWN WITH THIN LINES INDICATES EXISTING TO REMAIN.

PIPING AND EQUIPMENT SHOWN WITH BOLD LINES INDICATES NEW.

4. ALL PIPING INSULATION SHALL MEET THE ENERGY CODE'S INSTALLED R VALUE

REQUIREMENTS.

5. DIELECTRIC NIPPLES OR FLANGE INSULATION KITS SHALL BE UTILIZED FOR ALL

DISSIMILAR PIPE CONNECTIONS. DIELECTRIC UNIONS WILL NOT BE ACCEPTED.

PLUMBING GENERAL NOTES:

1. DO NOT RUN PLUMBING PIPING ABOVE ELECTRICAL PANELS OR IN CODE REQUIRED

CLEARANCE SPACES. COORDINATE ALL ROUTING WORK WITH ALL OTHER TRADES.

2. DO NOT RUN PLUMBING PIPING ABOVE OR THROUGH INFORMATION TECHNOLOGY

AND DATA CLOSETS, IDF, AND MDF ROOMS. COORDINATE ALL ROUTING WITH ALL

OTHER TRADES.

3. DRAWINGS, PLANS, SCHEMATICS, AND DIAGRAMS INDICATE THE GENERAL

LOCATIONS AND THE ARRANGEMENT OF SYSTEMS. WHEREVER PRACTICAL,

INSTALL SYSTEMS AS INDICATED. PROVIDE OFFSETS AND ELEVATION CHANGES TO

PLUMBING, PIPING, AND DUCTWORK AS REQUIRED TO COMPLETE THE LAYOUT AND

COORDINATION PROCESS AS WELL AS MEET ALL REQUIREMENTS OF THE

CONTRACT DOCUMENTS.

4. SEE SPECIFICATIONS OR PLUMBING FIXTURE SCHEDULE FOR ALL PLUMBING

CONNECTION SIZES TO ALL PLUMBING FIXTURES.

5. PROVIDE WALL AND FLOOR MOUNTED SEWER CLEANOUTS AS REQUIRED BY CODE

AND AS INDICATED. COORDINATE LOCATION IN FIELD.

6. DO NOT ROUTE PLUMBING BRANCHES OR MAINS WITHIN SPACE REQUIRED TO

SERVICE ALL HVAC EQUIPMENT ABOVE CEILINGS.

7. PIPING AND FIXTURES SHOWN WITH THIN LINES INDICATES EXISTING TO REMAIN.

PIPING AND FIXTURES SHOWN WITH BOLD LINES INDICATES NEW.

8. FURNISH AND INSTALL SHUT-OFF VALVES FOR WATER SUPPLY AT ALL EQUIPMENT

ITEMS.

9. COORDINATE FINISH FLOOR ELEVATIONS TO SET FLOOR DRAINS AND FLOOR SINKS.

10. SAW CUT AND REMOVE FLOOR AS REQUIRED FOR INSTALLATION OF NEW PIPING.

11. PVC PIPING SHALL NOT BE INSTALLED IN RETURN AIR PLENUMS.

MECHANICAL SYMBOLS MECHANICAL SYMBOLS

SYMBOLS INDICATED HERE AND NOT USED IN THE

CONTRACT DOCUMENTS DO NOT APPLY TO THIS

PROJECT. ADDITIONAL SYMBOLS AND ABBREVIATIONS

MAY BE INDICATED IN THE CONTRACT DOCUMENTS.

FINTUBE-TYPE (SHADED AREA INDICATES

CAPACITY MBH ELEMENT LOCATION)

VOLUME DAMPER

DESCRIPTIONSYMBOLSYMBOL DESCRIPTION SYMBOL DESCRIPTION

HEATING - VENTILATING - AIR-CONDITIONING

T RS

T

H

A

S

P T

FS

AD

L"

D"

FT-1

MBH

XØ

X/X

SD

M

CFM

SIZE TYPE

CFM

SIZE TYPE

FRD

FSD

M

MCO2

CHILLED WATER SUPPLY

CHILLED WATER RETURN

CONDENSATE OR BOILER FEED PUMP DISCHARGE

CONDENSER WATER SUPPLY FROM TOWER

CONDENSER WATER RETURN TO TOWER

COIL OR EQUIPMENT DRAIN

GLYCOL SUPPLY

GLYCOL RETURN

FUEL OIL SUPPLY

FUEL OIL RETURN

FUEL OIL VENT

NATURAL GAS

HEAT PUMP WATER SUPPLY

HEAT PUMP WATER RETURN

HIGH PRESSURE CONDENSATE RETURN

HIGH PRESSURE STEAM

HOT WATER SUPPLY

HOT WATER RETURN

LOW PRESSURE CONDENSATE RETURN

LOW PRESSURE STEAM

MEDIUM PRESSURE CONDENSATE RETURN

MEDIUM PRESSURE STEAM

REFRIGERANT LIQUID

REFRIGERANT SUCTION

REFRIGERANT HOT GAS DISCHARGE

BACK-DRAFT DAMPER (COUNTER BALANCED)B.D.D.

LPS

MPS

HPS

LPR

MPR

HPR

HWS

HWR

GS

GR

CWS

CWR

PC

FOS

FOR

FOV

G

RL

RS

RD

CS

CR

CD

#/HR

HPWS

HPWR

PIPE IN SLEEVE

VALVE IN VERTICAL PIPE

F AND T TRAP CAP LBS/HR

BUCKET TRAP CAP LBS/HR

AIR QUALITY SENSOR

C02 SENSOR

HUMIDISTAT

REMOTE SENSOR

THERMOSTAT

THERMOSTAT WITH REMOTE SENSOR

AQUASTAT

SOLENOID VALVE (REFRIGERANT)

THERMOSTATIC EXPANSION VALVE (REFRIGERANT)

SIGHT GLASS

MANUAL AIR VENT

PRESSURE OR TEMPERATURE MEASURING POINTS

FLOW SWITCH

HEATING RISER

ACCESS DOOR - SIZE AS SHOWN OR PER SPEC.

EXPANSION LOOP, LENGTH AND DEPTH

NEW TO EXISTING CONNECTION

#/HR

AQ

RECTANGULAR DUCTWORK

(FIRST NUMBER IS SIDE SHOWN)X/X

ROUND DUCT

FLAT OVAL (FIRST NUMBER IS THE SIDE SHOWN)

MOTORIZED DAMPER

FIRE DAMPER WITH ACCESS DOOR

COMBINATION FIRE AND SMOKE DAMPER

WITH ACCESS DOOR

SMOKE DAMPER WITH ACCESS DOOR

SOUND ATTENUATOR

FLEX CONNECTION

SUPPLY REGISTER OR GRILLE

RETURN REGISTER OR GRILLE

SA

TYP DIFFUSER NECK SIZE, MARK

CFM

X X X

X X X

SUPPLY, OUTDOOR, OR MIXED AIR DUCT

END OR RISER (SA) (OA) (MA)

RETURN EXHAUST OR RELIEF AIR DUCT

END OR RISER (RA) (EA) (RLFA)

TYP EXHAUST/RETURN GRILLE NECK SIZE, MARK

CFM

TURNING VANES

MECHANICAL/ELECTRICAL COORDINATION SCHEDULE

MECHANICAL EQUIPMENT WITH ELEC CONNECTION SEE

AUTOMATIC CONTROL VALVE, 2-WAY

AUTOMATIC CONTROL VALVE, 3-WAY

PRESSURE REGULATING VALVE (PRV)

X X

POINT OF DISCONNECT BREAK / CONTINUATION

T

OR

DESCRIPTIONSYMBOLSYMBOL DESCRIPTION SYMBOL DESCRIPTION

PIPING

R

PTT

TEE

ELBOW

UNION

STRAINER WITH DRAIN VALVE AND HOSE END

BALANCING VALVE

ISOLATION VALVE (BALL OR BUTTERFLY)

PRESSURE RELIEF VALVE

ELBOW UP

ELBOW DOWN

GLOBE VALVE

PRESS / TEMP TEST PORT

GATE VALVE

CHECK VALVE (ARROW INDICATES FLOW)

FLEXIBLE PIPING

AUTOMATIC AIR VENT

MANUAL AIR VENT WITH ISOLATION VALVE

CONCENTRIC REDUCER

ECCENTRIC REDUCER

PRESSURE GAUGE WITH GAUGE COCK

THERMOMETER, SIDE FEED

THERMOMETER, BOTTOM FEED

ARROW INDICATES FLOW DIRECTION

ARROW INDICATES DOWNWARD PIPE PITCH

WATER METERM

S

S

SS

AW

AW

S

S

OF

OF

SS

AW

AW

AV

V

140°

140°

SS

W

S

S

S

A

V

GCO

HB

WH

Y.H.

BFP

_ FD-X

_ FS-X

_ RD-X

DS

MH

VTR

SH

EXISTING SANITARY DRAIN (ABOVE FLOOR)

VENT

DESCRIPTIONSYMBOLSYMBOL DESCRIPTION SYMBOL DESCRIPTION

PLUMBING

EXISTING SANITARY SEWER (BELOW FLOOR)

HOT WATER CIRCULATING 140°

GRADE CLEAN OUT

EXISTING STORM DRAIN (ABOVE FLOOR)

OVERFLOW STORM DRAIN (ABOVE FLOOR)

DOUBLE GRADE CLEAN-OUT

EXISTING STORM DRAIN (BELOW FLOOR)

OVERFLOW STORM DRAIN (BELOW FLOOR)

HOSE BIBB

EXISTING SUB SOIL DRAIN

SANITARY DRAIN (ABOVE FLOOR)

WALL HYDRANT (NON-FREEZE TYPE)

EXISTING ACID WASTE (ABOVE FLOOR)

SANITARY SEWER (BELOW FLOOR)

YARD HYDRANT

EXISTING ACID WASTE (BELOW FLOOR)

BACK FLOW PREVENTER

SITE STORM SEWER

FLOOR DRAIN SIZE-TYPE

SITE WATER PIPING

FLOOR SINK SIZE-TYPE

STORM DRAIN (BELOW FLOOR)

ROOF DRAIN SIZE-TYPE

SUB SOIL DRAIN

DOWN SPOUT

MANHOLE

ACID WASTE (ABOVE FLOOR)

VACUUM BREAKER

ACID WASTE (BELOW FLOOR)

GAS COCK

ACID VENT

RUNNING TRAP

VENT THROUGH ROOF ON RISER

PLUMBING RISER NUMBER

SHOWER

COLD WATER (CW)

COLD SOFT WATER

COMPRESSED AIR

HOT WATER (HW)

HOT WATER CIRCULATING (HWC)

HOT SOFT WATER

HOT SOFT WATER RECIRCULATING

STORM DRAIN (ABOVE FLOOR)

HOT WATER 140°

CLEAN OUT

NATURAL GASG

ORCO CO

BLDG BUILDING

BTUH BRITISH THERMAL UNIT PER HOUR

CFM CUBIC FEET PER MINUTE

CL CENTER LINE

CLG CEILING

CLR CLEAR

CRAC

CV CONSTANT VOLUME

DIAMETER

DISC DISCONNECT

DIST DISTRIBUTION

DN DOWN

DWG DRAWING

EA EXHAUST AIR

EL ELEVATION

EHC ELECTRIC HEATING COIL

EQUIP EQUIPMENT

EXH EXHAUST

EXIST EXISTING

FA FIRE ALARM

FL FLOOR

FT FEET

PWR POWER

PVC POLYVINYL CHLORIDE

PSI POUNDS PER SQUARE INCH

PSF POUNDS PER SQUARE FOOT

PNL PANEL

PLBG PLUMBING

PIV POST INDICATOR VALVE

RM ROOM

RH RELATIVE HUMIDITY

REQD REQUIRED

RLFA RELIEF AIR

RA RETURN AIR

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTIBLE POWER SUPPLY

UL UNDERWRITERS LABORATORY

UG UNDERGROUND

TYP TYPICAL

TEMP TEMPERATURE

STD STANDARD

SS STAINLESS STEEL

SPECS SPECIFICATIONS

SIM SIMILAR

SCHD SCHEDULE

SAN SANITARY

SA SUPPLY AIR

NC NORMALLY CLOSED

MTD MOUNTED

MISC MISCELLANEOUS

MIN MINIMUM

MECH MECHANICAL

MAX MAXIMUM

LBS POUNDS

KW KILOWATT

OC ON CENTER

OA OUTDOOR AIR

NTS NOT TO SCALE

NOM NOMINAL

NO NORMALLY OPEN

NIC NOT IN CONTRACT

GA GAUGE

HVAC HEATING, VENTILATING

HTG HEATING

HP HORSEPOWER

HGT HEIGHT

GPM GALLONS PER MINUTE

GEN GENERATOR

GALV GALVANIZED

AND AIR CONDITIONING

ELEC ELECTRICAL

DIA

CPVC

DX DIRECT EXPANSION

EPO EMERGENCY POWER OFF

F FIRE WATER

FCO FLOOR CLEAN OUT

FDC FIRE DEPARTMENT CONNECTION

FHC FIRE HOSE CABINET

FW FILTERED WATER

GC GENERAL CONTRACTOR

MBH 1000 BTU/HOUR

NPW NON-POTABLE WATER

PS PLASTER SINK

RO REVERSE OSMOSIS WATER

SCW SOFT COLD WATER

SM SPRINKLER MAIN

SMACNA SHEET METAL AND AIR

CONDITIONING CONTRACTORS'

BTU BRITISH THERMAL UNIT

PERP PERPENDICULAR

RGS RIGID GALVANIZED STEEL

HZ HERTZ, HIGH ZONE WET STANDPIPE

CFH CUBIC FEET PER HOUR

SHW SOFT HOT WATER

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MOA MINIMUM OUTDOOR AIR

EOA ECONOMIZER OUTDOOR AIR

IE INVERT ELEVATION

NATIONAL ASSOCIATION

AHJ

ASHRAE

AUX

AV

AW

AWG

BFP

AUTHORITY HAVING JURISDICTION

AMERICAN SOCIETY OF HEATING,

REFRIGERATING AND

AIR-CONDITIONING ENGINEERS

AUXILIARY

ACID VENT

ACID WASTE

AMERICAN WIRE GAUGE

DOUBLE CHECK BACKFLOW

VOLT-AMPS

VERTICAL

VARIABLE FREQUENCY CONTROL

VENT THROUGH ROOF

WATT

WEATHERPROOF

TRANSFORMER

VA

VERT

VFC

VTR

W

WP

XFMR

AFF ABOVE FINISHED FLOOR

AMERICAN SOCIETY OF

MECHANICAL ENGINEERS

STANDARD SPECIFICATIONS OF

THE AMERICAN SOCIETY FOR

ASME

ASTM

TESTING MATERIALS

AVG AVERAGE

BMCS BUILDING MANAGEMENT

EMS ENERGY MANAGEMENT SYSTEM

IP INTERNET PROTOCOL

NATIONAL FIRE PROTECTION

ASSOCIATION

NFPA

WATER GAUGEWG

CHLORINATED POLYVINYL CHLORIDE

COMPUTER ROOM AIR CONDITIONER

MA MIXED AIR

CONTROL SYSTEM

ABBREVIATIONS

OFCI OWNER FURNISHED

CONTRACTOR INSTALLED

PREVENTER RPZ REDUCED PRESSURE ZONE

BACKFLOW PREVENTER

LZ LOW ZONE WET STANDPIPE

GW GARAGE WASTE

FHV FIRE HOSE VALVE

DDCV DOUBLE DETECTOR CHECK VALVE

ASSEMBLY BACKFLOW PREVENTER

DPAC DRY PIPE AIR COMPRESSOR

DPV DRY PIPE VALVE

F

SM

FHC

FVC

PIV

FS

DESCRIPTIONSYMBOLSYMBOL DESCRIPTION SYMBOL DESCRIPTION

FIRE PROTECTION

FIRE LINE

CEILING CLEAN AGENT NOZZLE FLUSH FIRE PUMP TEST HEADERSPRINKLER MAIN

SUB-FLOOR CLEAN AGENT NOZZLE FREE-STANDING FIRE PUMP TEST HEADERCLEAN AGENT

CEILING DETECTOR FREE-STANDING FIRE DEPARTMENT CONNECTIONSPRINKLER BRANCH AND HEADS

SUB-FLOOR DETECTOR FLUSH FIRE DEPARTMENT CONNECTIONRECESSED PENDANT SPRINKLER

CLEAN AGENT ALARM BELL FIRE DEPARTMENT CONNECTIONCONCEALED PENDANT SPRINKLER

CLEAN AGENT HORN WITH STROBE FIRE HOSE CABINETUPRIGHT SPRINKLER

ELECTRIC PULL STATION FIRE HOSE VALVE CABINETDRY PENDANT SPRINKLER

ABORT PULL STATION POST INDICATOR VALVEHORIZONTAL SIDEWALL SPRINKLER

CLEAN AGENT PRESSURE SWITCH ISOLATION VALVE WITH TAMPER SWITCHDRY HORIZONTAL SIDEWALL SPRINKLER

WARNING LIGHT ALARM CHECK VALVEPRE-ACTION HEAT DETECTOR

CLEAN AGENT PANEL DRY PIPE VALVEPRE-ACTION PULL STATION

FIRE HYDRANT FLOW SWITCHPRE-ACTION ALARM BELL

ALARM BELL WATER FLOW SWITCHPRE-ACTION TROUBLE STROBE

ALARM STROBEDELUGE VALVE FOR PRE-ACTION SYSTEM

PRE-ACTION RELEASING PANEL FIRE DEPARTMENT HOSE VALVE

CA

PA

CAP

11/22/2022

C.A. NO. 842

EXPIRES 30/JUNE/2024

21 63

BSMT CORR

BSMT ELECTRICAL

2085 2085

20Ø SA

22Ø SA

14Ø SA

14Ø SA

14Ø S/A

4Ø S/A

14Ø S/A

60/26 OA UP TO

PLENUM

/26

O A

60/26 OA

22Ø SA

36Ø SA

32Ø SA, UP TO

FIRST FLOOR

14Ø SA

36/10 RA

HWR

HWS

CWR

CWS

1 1

12/6 E/A

12/6 E/A

4"

2-1/2"

STAIR

ELEVATOR

CORRIDOR

EXISTING ELECTRICAL ROOM

EXISTING SIMULATOR HYDRAULICS

TOILET OFFICE - -

EXISTING MECHANICAL ROOM

2"

2-1/2"

1"

24/18 RA

3"

2"

DEMOLITION

HAUL ROUTE

M001 B

TYP.

RA

R

S

R

S

R

S

R

S

D

SA

/26

R A

60/26 OA

Ø

SA

22Ø SA

EXISTING HOUSEKEEPING

PAD TO REMAIN.

36/10 RA

24/18 RA

No ve mb er

, 2

:28 am

8_

M-

1.d wg lm or iar ty

NOTE:

DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS

and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE

PRIOR TO VERIFICATION OF CLEARANCE FOR ALL

TRADES. READ SPECIFICATIONS.

COPYRIGHT 2022C

Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.

AE# 2022 9198

SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.

FLAG NOTES

REMOVE EXISTING SUPPLY AIR TERMINAL UNIT AND ASSOCIATED

HYDRONIC PIPING TRIM AND THERMOSTAT. REFER TO DETAILS 3 AND 4

ON SHEET M-200. TYPICAL OF ALL DEMOLISHED TERMINAL UNITS.

REMOVE EXISTING SEWAGE EJECTOR. BASIN TO REMAIN.

REMOVE EXISTING SUMP PUMP. BASIN TO REMAIN.

PROVIDE NEW MOTORIZED ACTUATOR AT EXISTING OA DAMPER. REFER

SEQUENCE OF OPERATION FOR CONTROL.

EXISTING AIR HANDLING UNIT TO BE REMOVED, DISCONNECT HWS/HWR,

CWS/CWR, REMOVE HWS/HWR, CWS/CWR PIPING AND APPURTENANCES

BACK TO ISOLATION VALVES AS REQUIRED AND COORDINATED WITH NEW

AIR HANDLING UNIT. DISCONNECT SA, RA, AND OA DUCTWORK AS

REQUIRED AND COORDINATED WITH NEW AIR HANDLING UNIT.

PROVIDE NEW MOTORIZED ACTUATOR AT EXISTING RETURN AIR DAMPER.

REFER SEQUENCE OF OPERATION FOR CONTROL.

ALL EXISTING AIR DEVICES LOCATED IN CEILING TO BE REPLACED, WITH

SAME SIZE FACE AND DUCT CONNECTION DIFFUSER EQUAL TO TITUS

TMSA, LOUVER FACE DIFFUSER, WITH MATCHING CEILING MOUNT TYPE.

NEW EXHAUST GRILLE EQUAL TO TITUS MODEL 350 RL WITH INTEGRAL

BALANCING DAMPER, 8/8 DUCT. BALANCE TO 75 CFM.

8 16 24 32 4042 2 6 8 124 16 20

11/22/2022

C.A. NO. 842

22 63

(DEDICATED AC UNIT TO REMAIN)

(DEDICATED AC UNIT TO REMAIN)

175 175

11570

270270

270270

12/12 EX FROM

BELOW AND UP

VAV-B

VAV-B

6"Ø

7"Ø

13"Ø SA

6"Ø

7"Ø

12"Ø SA

10"Ø10"Ø

VAV-F

VAV-A

VA

V-

A

VAV-B

6"Ø

VAV-E

13"Ø SA

13"Ø SA6(TYP)

20/11 30/12 34/14 44/14

34/12

48/16

STAIR

JANITOR

OPEN OFFICEELEVATOR

ELECTRICAL

CHASE

CORRIDOR

OPEN OFFICE

SIMULATOR

- - ENTRY VEST.

9/9 EA FROM BELOW

TO EA ABOVE

12/12 EF FROM

BELOW TO ABOVE

FRD

12/12 EA UP TO

EF ON ROOF FR

DFR

D

VAV-A

4"Ø9

CORRIDOR

STOR

WOMENMEN

CORRIDOR

CORRIDOR

C M-012

VAV-F VAV-F

700700

700 700

16/12 SA

26/12 SA

16/12 SA

26/12 SA

26/12 UP INTO SPACE

ABOVE CEILING

26/12 UP INTO SPACE

ABOVE CEILING

VAV-A

8"Ø

5"Ø

VAV-A

8"Ø

5"Ø

12"Ø SA

VAV-D

20/10 Ф SA21/12 Ф SA

21/12 Ф SA 37/12 Ф SA

9/9 EA FROM BELOW

TO EA ABOVE

12/12 EF FROM

BELOW TO ABOVE

11570

VAV-B

VAV-G

VAV-G

VAV-G

VAV-G

VAV-D

VAV-D

8"Ø

10"Ø

/12

Ф

/12

Ф

/12

Ф

6(TYP)

24/14 RA W/ FIRE DAMPER

36/14 RA W/ FIRE DAMPER

STAIR

CONFERENCE

CHASE

CORRIDOR

ELEVATOR

SIMULATOR

TRNG LAB

TRNG LAB

TRNG LAB

OPEN OFFICE

OPEN OFFICE

FRD

12/12 EA UP TO

EF ON ROOF

FR

D

FR

D

FR

D

VAV-A

CORRIDOR

CORRIDOR

CORRIDOR

WOMEN

MEN

D M-012

10 10

VA

V-

A

VA

V-

A

WOMENMEN

WOMEN

MEN

EXISTING 12/12 EA UP THRU ROOF

TO EXISTING ROOF MOUNTED

EXHAUST FAN TO REMAIN

No ve mb er

, 2

:29 am

8_

M-

2.d wg lm or iar ty

NOTE:

DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS

and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE

PRIOR TO VERIFICATION OF CLEARANCE FOR ALL

TRADES. READ SPECIFICATIONS.

COPYRIGHT 2022C

Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.

AE# 2022 9198

SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.

FLAG NOTES

EXISTING PLUMBING FIXTURE TO BE REMOVED. REMOVE HW/CW, VENT

AND WASTE.

EXISTING 2" CW, 4" VENT AND 4" WASTE RISERS TO BE RELOCATED.

PROTECT FROM DAMAGE FOR NEW CONNECTION.

EXISTING 3/4" HW RISER TO BE RELOCATED. PROTECT FROM DAMAGE

FOR NEW CONNECTION.

EXISTING MOP SINK TO BE REMOVED. REMOVE 3/4" CW/HW RISERS,1-1/2"

VENT RISER AND 2" WASTE RISER SERVING MOP SINKS. REPAIR FLOOR TO

MATCH EXISTING.

EXISTING WATER COOLER TO BE REMOVED. REMOVE 3/4" CW RISER, 2"

WASTE AND VENT RISER SERVING WATER COOLERS. REPAIR FLOOR TO

MATCH EXISTING.

REMOVE EXISTING SUPPLY AIR TERMINAL UNIT, ASSOCIATED HYDRONIC

PIPING TRIM AND THERMOSTAT. EXISTING THERMOSTAT AND CONTROL

WIRING TO BE REPLACED. REFER TO DETAILS 3 AND 4 ON SHEET M-200.

TYPICAL OF ALL DEMOLISHED TERMINAL UNITS.

EXISTING 54/26 RA UP THRU ROOF THRU MOTORIZED RELIEF DAMPER,

EXISTING MOTORIZED DAMPER TO BE REPLACED, VERIFY EXACT SIZE

REQUIRED, VERIFY ACCESS AND INSTALLATION PRIOR TO PURCHASE.

EXISTING EA GRILLES TO BE REMOVED.

EXISTING MOP SINK TO BE REPLACED. REMOVE MOP SINK, PROTECT

HW/CW WASTE AND VENT FOR CONNECTION TO NEW MOP SINK.

CAP EXISTING RUNOUT WITH INSULATED SHEET METAL AT DUCT.

8 16 24 32 4042

8 16 24 32 4042

2 6 8 124 16 202 6 8 124 16 20

11/22/2022

C.A. NO. 842

23 63

AHU

2"

3"

2085 2085

20Ø SA

22Ø SA

14Ø SA 14Ø SA

14Ø S/A

32Ø SA, UP TO

FIRST FLOOR

14Ø SA

36/10 RA

22Ø SA

VAV

04 VAV

03(TYP)

VAV

VAV

12/6 E/A

12/6 E/A UP

4"

2-1/2"

32Ø SA

HW1

CW1

RA

4" 2"

2-1/2"

1"

60/26 RA, UP

TO FIRST

FLOOR

BM

CSBMCS

/18

R A3

HWR

HWS

CWR

CWS

M001 B

STAIR

ELEVATOR

CORRIDOR

EXISTING ELECTRICAL ROOM

EXISTING SIMULATOR HYDRAULICS

OFFICE - -

EXISTING MECHANICAL ROOM

TOILET

EXISTING DEDICATED

AC FOR ROOM ABOVE

TO REMAIN

2 1/2"

CWS

CWR

HWR

HWS

1"

14" Ø

26/54 RA

32"Ø

EXISTING 32" Ø SA

EXISTING 26/54 RA

EXISTING 26/60 OA

FAN SECTION

ACCESS DOOR (TYP) 4" HOUSEKEEPING CURB

EXTEND AS REQUIRED FOR

NEW AHU DIMENSIONS-

REFER SPECIFICATIONS

FOR CONCRETE MIX AND

REBAR REQUIREMENTS.

FLOOR

22"Ø

SA

R

S

R

S

R

S

R

S

D

RA

6'-11 1/2" 3926 lbs

5'-5"5'-5 1/2" 3403 lbs2157 lbs

6"

6'-9"

3'-3" 2'-0"

5"

5'-0"

5"

3'-0" 3'-9" 17'-10"

FILTER SECTION

M-200

M-200

36/10 RA24/18 RA

UVC

LIGHTING

26/60

PROVIDE NEW OA FLOW STATION

EQUAL TO OAFE-2000, 26/60, 10.83 FT2,

17,510 TOTAL AIRFLOW, 1.616 FT/MIN

No ve mb er

, 2

:29 am

8_

M-

1.d wg lm or iar ty

NOTE:

DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS

and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE

PRIOR TO VERIFICATION OF CLEARANCE FOR ALL

TRADES. READ SPECIFICATIONS.

COPYRIGHT 2022C

Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.

AE# 2022 9198

SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.

8 16 24 32 4042 2 6 8 124 16 20

FLAG NOTES

INSTALL AHU-01 ON 4" HOUSEKEEPING PAD, ENLARGE AS REQUIRED.

RECONNECT HEATING WATER AND CHILLED WATER PIPING. PROVIDE

CONDENSATE DRAIN PIPING TO NEARBY EXISTING FLOOR DRAIN. INSTALL

WITH 1" MINIMUM AIR GAP. REFER TO DETAIL 5 ON SHEET M200.

NEW VAV TERMINAL UNIT TO REPLACE EXISTING. REFER TO DETAILS 3

AND 4 ON SHEET M200. VERIFY LOCATION, REMOVE AND REPLACE

EXISTING THERMOSTATS AND THERMOSTAT WIRING. TYPICAL OF ALL

NEW TERMINALS SHOWN.

NEW 26/60 MOTORIZED ACTUATOR FOR OA DAMPER.

INSTALL NEW ISOLATION BALL VALVES ON BOTH HWS/HWR, CWS,CWR

HYDRONIC PIPING.

EXISTING 26/60 MIXED AIR DUCT DOWN TO NEW AHU, TRANSITION AS

REQUIRED TO NEW INTAKE AIR OPENING.

11/22/2022

C.A. NO. 842

24 63

1RST MAINTENANCE

1RST COMPUTER ROOM

(DEDICATED AC UNIT IN

BASEMENT TO REMAIN)

1RST SIMULATOR

SECONDARY COMPUTER ROOM

(DEDICATED AC UNIT IN

BASEMENT TO REMAIN)

VAV

VAV

VAV

VAV

VAV

175 175

11570

270270

270270

12/12 EA FROM

BELOW AND UP

6"Ø

7"Ø

13"Ø SA

6"Ø

7"Ø

12"Ø SA

10"Ø10"Ø

6"Ø 6"Ø

13"Ø SA

1 TYP.

9/9 EA FROM BELOW

TO EA ABOVE

12/12 EA UP TO

EF ON ROOF

12/12 EA FROM

BELOW TO ABOVE

FRD

FR

DFR

D

STAIR

JANITOR

OPEN OFFICEELEVATOR

ELECTRICAL

CHASE

CORRIDOR

OPEN OFFICE

SIMULATOR

- - ENTRY VEST.

CORRIDOR

STOR

WOMENMEN

CORRIDOR

CORRIDOR

CU

CU

BU

BU

DISCHARGE 500 CFM

THRU 12" DIA SA

DISCHARGE WITH

MANUAL BALANCING

DAMPER (TYP OF FOUR)

14/14

20/20

3 20/20

M200

T T

RS/RL

20/12 30/12 30/14 40/14

34/12

54/26

9 910/10

12/12

FR

D

ACCESS

PANEL

10/10

TYP.

TYP.

2ND BRIEFING ROOM WEST

1RST SIMULATOR

2ND BRIEFING ROOM EAST

2ND CLASSROOM WEST

2ND CLASSROOM EAST

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

700700

700 700

16/12 SA

26/12 SA

16/12 SA

26/12 SA

26/12 UP INTO SPACE

ABOVE CEILING

26/12 UP INTO SPACE

ABOVE CEILING

290 290

8"Ø 5"Ø

12"Ø SA

20/10 Ф SA

21/12 Ф SA

21/12 Ф SA 37/12 Ф SA

9/9 EA FROM BELOW

TO EA ABOVE

12/12 EA UP TO

EF ON ROOF

8"Ø

10"Ø

/12

Ф S

A

/12

Ф S

A

/12

Ф S

A

12/12 EA FROM

BELOW TO ABOVE

2FRD

FR

D

FR

D

FR

D

STAIR

CONFERENCE

CHASE

CORRIDOR

ELEVATOR

SIMULATOR

TRNG LAB

TRNG LAB

TRNG LAB

OPEN OFFICE

OPEN OFFICE

CORRIDOR

CORRIDOR

CORRIDOR

WOMEN

MEN

12/12

12/12

FR

D

10/10

9 9

11TYP.

10TYP.

8"Ø10/10

TYP.

No ve mb er

, 2

:29 am

8_

M-

2.d wg lm or iar ty

NOTE:

DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS

and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE

PRIOR TO VERIFICATION OF CLEARANCE FOR ALL

TRADES. READ SPECIFICATIONS.

COPYRIGHT 2022C

Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.

AE# 2022 9198

SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.

8 16 24 32 40428 16 24 32 4042

FLAG NOTES

NEW VAV TERMINAL UNIT TO REPLACE EXISTING. REFER TO DETAILS 3

AND 4 ON SHEET M-200. VERIFY LOCATION, REMOVE AND REPLACE

EXISTING THERMOSTATS, IN SAME LOCATION. TYPICAL OF ALL NEW

TERMINALS SHOWN.

EXISTING MOTORIZED RELIEF DAMPER TO BE REPLACED, VERIFY EXACT

SIZE REQUIRED, VERIFY ACCESS AND INSTALLATION PRIOR TO

PURCHASE.

EXTENT OF TEMPORARY DUCTWORK REQUIRED TO CONDITION SPACE

DURING AIR HANDLING UNIT REPLACEMENT. SUSPEND DUCTWORK FROM

WALKWAY STRUCTURE.

REMOVE AND PROVIDE NEW HYDRONIC PIPING AND SA DUCTWORK

INSULATION AT EXISTING HYDRONIC PIPING AND SUPPLY AIR DUCTWORK

IN ROOM 108C ONLY.

PROVIDE CONDENSATE PUMP AND ROUTE 1" CONDENSATE DRAIN OVER

WALKWAY AND DISCHARGE TO SINK AS SHOWN.

ROUTE TWO SETS RS/RL PIPING SIZE AS REQUIRED AS SHOWN AND

THROUGH EXISTING WALL LOUVER TO EXTERIOR CONDENSING UNITS.

12/12 EA DOWN IN CHASE, THRU FIRE DAMPER AT CHASE WALL.

CONNECT NEW 12/12 EA TO EXISTING 12/12 EA UP THRU ROOF TO

EXHAUST FAN ON ROOF.

NEW EXHAUST GRILLE EQUAL TO TITUS MODEL 350 RL WITH INTEGRAL

BALANCING DAMPER, 10/10 DUCT. BALANCE TO 150 CFM.

ALL EXISTING AIR DEVICES LOCATED IN CEILINGS TO BE REPLACED, WITH

SAME SIZE FACE AND DUCT CONNECTION DIFFUSER EQUAL TO TITUS

TMSA, LOUVER FACE DIFFUSER, WITH MATCHING CEILING MOUNT TYPE.

NEW RETURN AIR GRILLE EQUAL TO TITUS 350 RL, 1/2" BLADE SPACING, 30

DEG. DEFLECTION AND MOUNTING TO MATCH CEILING TYPE.

11/22/2022

C.A. NO. 842

25 63 mb er

, 2

:29 am

8_

M-

0.d wg lm or iar ty

NOTE:

DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS

and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE

PRIOR TO VERIFICATION OF CLEARANCE FOR ALL

TRADES. READ SPECIFICATIONS.

COPYRIGHT 2022C

Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.

AE# 2022 9198

SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.

M-200

RETURN

SUPPLY

TERMINAL

UNIT HOT WATER COIL

NO SCALE (2-WAY VALVE DUCT COIL)

STRAINER WITH HOSE

END AND VALVE

PRESSURE/TEMPERATURE

TEST PORT (PTT)

CONTROL VALVE

BALANCE VALVE

ISOLATION

VALVES

UNION (TYP)

MANUAL AIR

VENT

DRAIN

M-200

SINGLE DUCT AIR TERMINAL UNIT

NO SCALE

BOX INLET SIZE

BRANCH DUCT

DUCT INSULATION

(AS INDICATED)

FLEXIBLE

CONNECTION

12" LONG (MAX)

STRAIGHT SECTION OF INLET

DUCT PER MANUFACTURER'S

REQUIREMENTS

MI

NI

MU

M

PROVIDE MANUFACTURER'S

RECOMMENDED SERVICE

CLEARANCES ON SIDES TOP AND

BOTTOM, 18" MINIMUM (AS INDICATED)

CONTROL ENCLOSURE

HEATING COIL (AS INDICATED)

SUPPLY

AIR

LINER SECTION

AS SPECIFIED

HEATING COIL ACCESS

DOORS (AS INDICATED)

HEATING COIL ACCESS (AS INDICATED)

VELOCITY SENSOR

M-200

CONDENSATE DRAIN

NO SCALE

OPEN

VENT

A B

A = 1" (MIN)

B = EQUAL TO STATIC PRESSURE

OF UNIT x 1.25

BLOW-THROUGH UNIT

TO FLOOR

DRAIN

X"

NOTE:

1. TYPICAL AT EACH AIR HANDLING UNIT DRAIN PAN OR SECTION

DRAIN.

M-200

AIR

FLOW

SUPPLY

RETURN

HEATING WATER COIL

NO SCALE

TWO-WAY

CONTROL VALVE

THERMOMETER (TYP)

UNION (TYP)

BALANCING

VALVE (TYP)

ISOLATION VALVE (TYP)

STRAINER WITH HOSE END AND VALVE

SEE TEMPERATURE

CONTROL

SEQUENCEMANUAL AIR VENT

PRESSURE/TEMPERATURE

TEST PORT (PTT) (TYP)

DRAIN

M-200

AIR

FLOW

SUPPLY

RETURN

COOLING WATER COIL

NO SCALE

THERMOMETER (TYP)

UNION (TYP)

BALANCING

VALVE (TYP)TWO-WAY CONTROL VALVE

ISOLATION VALVE (TYP)

STRAINER WITH HOSE END AND VALVE

SEE TEMPERATURE

CONTROL

SEQUENCEMANUAL AIR VENT

PRESSURE/TEMPERATURE

TEST PORT (PTT) (TYP)

DRAIN

AIR

FLOW

EXISTING 3/4" OR 1/2"

HWS/HWR PIPING NEW INLET DUCT,

SIZE AND LENGTH

AS REQUIRED

NEW TERMINAL UNIT

FIELD FABRICATED

TRANSITION SIZE AS

REQUIRED

EXISTING 3"EXISTING 2"

M-200

DUCT FITTING DETAILS

NO SCALE

D = WIDTH

OF DUCT

R = 1 X D

(UNLESS

SHOWN

OTHERWISE)

R

"Y" BRANCH FITTING 90° ELBOW

R = 1.5 X D

(UNLESS

SHOWN

OTHERWISE)

D

DUCTWORK MAIN

VOLUME DAMPER H.E.T. (HI-EFFICIENCY TAKEOFF)

WITH VOLUME DAMPER

ROUND DUCT TO DIFFUSER

SEE PLAN FOR SIZE

DIFFUSER TAKE-OFF

RECTANGULAR DUCT

36"

(MAX)FLEXIBLE DUCT

DIFFUSER

SUPPLY AIR DIFFUSER

30° (MAX)

45° ENTRY BRANCH

CONVERGING TEE

DOUBLE BRANCH TAKE-OFFSINGLE BRANCH TAKE-OFF

30°

(MAX)

NOTE:

WHERE FITTING NOT

POSSIBLE, USE EXTRACTOR

S

X

X+4"

4" 1"

45° LATERAL CROSS WITH REDUCER 45° ROUND TAKE-OFF SUPPLY AIR DIFFUSER

45° ENTRY BRANCH

CONVERGING TEE

(ROUND)

30° (MAX)

SHEET METAL

90° ELBOW

36" (MAX)

ROUND DUCT

FLEXIBLE DUCT

DIFFUSER

M200

TYPICAL TEMPORARY COOLING UNIT DETAIL

NO SCALE

FILTER

FLOOR

CD

CONDENSATE DRAIN CONNECT

TO SERVICE SINK.

REFRIGERANT PIPING

TO CONDENSING UNIT

COOLING COIL

FLEXIBLE CONNECTION

FLEXIBLE CONNECTION

FIELD FABRICATED 24" WIDE X 18" TALL X LENGTH

AS REQUIRED INSULATED SHEET METAL RETURN

AIR PLENUM AND MOUNTING STRUCTURE WITH

ANGLE. TTTT STEEL FRAMING FOR SUPPORT OF

TWO TEMPORARY SERVICE BLOWER COIL UNITS.

MOUNT ENTIRE ASSEMBLY ON 1/4" NEO-PRENE

VIBRATE PAD, SIZE AS REQUIRED.

CD

CONDENSATE DRAIN CONNECT

TO AND SPLIT TO ADJACENT

SERVICE SINK.

REFRIGERANT PIPING

TO CONDENSING UNIT

COOLING COIL

FLEXIBLE CONNECTION

FLEXIBLE CONNECTION

20X20 RA

BU-01 BU-02

CONDENSATE PUMP EQUAL TO LITTLE

GIANT VCMA-20UL, 115/1/60, 1.5 AMPS, 48

GPH AT 10" HEAD. DISCHARGE TO SPILL

TO ADJACENT SINK. REFER FLOOR PLAN.

1/2" 1/2"

1/2" CD, REFER FLOOR PLAN

FOR CONT.

1/2"

CD

SAME SIZE AS UNIT DISCHARGE CONNECTION

SEE DETAIL NUMBER "3"

THIS SHEET

11/22/2022

C.A. NO. 842

26 63 mb er

, 2

:29 am

8_

M-

1.d wg lm or iar ty

NOTE:

DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS

and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE

PRIOR TO VERIFICATION OF CLEARANCE FOR ALL

TRADES. READ SPECIFICATIONS.

COPYRIGHT 2022C

Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.

AE# 2022 9198

SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.

AIR HANDLING UNIT SCHEDULE

GENERAL DATA FILTER DATA UVC LIGHTING

MANUFACTURER MODEL

REFERENCE

SPECIFICATION

REMARKS

MARK SERVES LOCATION CONFIG.

TOTAL

AIRFLOW

(CFM)

MAX OUTSIDE

AIRFLOW (CFM)

MIN OUTSIDE

AIRFLOW (CFM)

DIMENSIONS

(LxWxH) (IN)

MAX

WEIGHT

(LBS)

FAN

TYPE/QTY

EXTERNAL

S.P. (IN.

W.C.)

TOTAL S.P.

(IN. W.C.) MAX. RPM

MAX. BHP

(SA./Tot)

MERV

NO.

TYPE

THICKNESS

(IN) WATTS ROWS

FIXTURES

PER ROW

AHU 01 ANNEX BASEMENT HORIZ 17510 17510 2050 174 X 103 X 66 3595 PLENUM/ 2 2.5 4.5 1858 15 / 30.0 13 CART. 2 740 2 2 VENTUS ATS 237323 1,2,3

REMARKS:

1. PROVIDE WITH UNIT MOUNTED VARIABLE SPEED CONTROLLERS, TWO REQUIRED, ONE PER EACH OF TWO MOTORS, EQUAL TO ABB ACH580-3PDR-044A-4+2G405, 460/3/60, 15 HP, 100 KA MIN SCCR.

2. VERIFY AND PROVIDE AHU KNOCKDOWN COMPONENT SIZES AS REQUIRED TO COORDINATE AND FIT THROUGH ACCESS TO BASEMENT MECHANICAL ROOM.

3. PROVIDE UVC LIGHTS AT CHILLED WATER COIL WITH LAMP LIFE INDICATOR AND INTERLOCK SAFETY SWITCH EQUAL TO STERIL AIRE SE 50, WITH (6) EGTS 50 VO SINGLE ENDED EMITTER, MOUNTING FRAME, INTERLOCK SWITCH KIT. 120/1/60, 6.5 AMPS. FRAME AND LAMPS MOUNTED 12" DOWNSTREAM OF COOLING COIL.

4. PROVIDE RETURN AIR SMOKE DETECTOR TO SHUT DOWN UNIT UPON DETECTION OF SMOKE

5. 460/3/60, MCA 45.3, MOP 58.8, FLA 36.2, TWO 15 HP FANS WITH VFD FOR EACH.

CHILLED WATER COOLING COIL SCHEDULE

MARK SERVES LOCATION

AIRFLOW

(CFM)

MIN

ROWS

MAX FINS

PER IN

MAXIMUM FACE

VELOCITY (FPM)

ENTERING AIR

CONDITIONS

LEAVING AIR

CONDITIONS

SENSIBLE

CAPACITY

(MBH)

TOTAL

CAPACITY

(MBH)

MAXIMUM

APD (IN.

W.C.)

FLUID DATA

DIMENSIONS

(LxWxH) (IN)

REFERENCE

SPECIFICATIONFLUID

TYPE

EWT

(°F)

LWT

(°F) GPM

MAX WPD

(FT)DB (°F) WB (°F) DB (°F) WB (°F)

CC-01 AHU 01 BASEMENT 17510 6 8 502 82.6 66.5 53.6 52.8 558.1 737.0 0.61 WTR 45.0 55.4 141.0 7.0 (2) 90X56 237323

HOT WATER HEATING COIL SCHEDULE

MARK SERVES LOCATION

AIRFLOW

(CFM)

MIN

ROWS

MAX

FINS/IN

MAX FACE ENTERING AIR

CONDITIONS

LEAVING AIR

CONDITIONS

TOTAL MAX FLUID DATA

REFERENCE

SPECIFICATION

VELOCITY CAPACITY APD FLUID

TYPE

EWT LWT

GPM

MAX WPD

(FPM) DB (°F) DB (°F) (MBH) (IN. W.C.) (°F) (°F) (FT)

HC-01 AHU-01 AHU-01 17,510 1 6 505.0 62.0 72.0 382.1 0.09 WTR 160 130 25.4 1.10 237323

TEMPORARY AIR COOLED CONDENSING UNIT SCHEDULE

MARK SERVES LOCATION

TOT CAP

(MBH)

SENS CAP

CAPACITY

(MBH)

EAT

COMPRESSOR

TYPE

REFRIGERANT

AMBIENT

VLTS/PH/HZ

DIMENSIONS OPERATING

MANUFACTURER MODEL REMARKSTEMP TEMP (LxWxH) WEIGHT

DB/WB (°F) (°F) (IN) (LBS)

CU-01 BU-01 SEE PLANS 54.6 43.2 80/67 SCROLL R410 105 208/3/60 38 X 35 X 51 275 TRANE 4TWA40 60 A 1,2,3 CU-02 BU-02 SEE PLANS 54.6 43.2 80/67 SCROLL R410 105 208/3/60 38 X 35 X 51 275 TRANE 4TWA40 60 A 1,2,3

REMARKS:

1. SEE ELECTRICAL FOR TEMPORARY POWER CONNECTION. 208/3/60, MCA 21 AMPS, MOP 35 AMPS, 15.9 R L AMPS.

2. TOTAL AND SENSIBLE CAPACITY AT LISTED ENTERING AIR TEMPERATRUE WITH MATCHING COOLING COIL AT AMBIANT TEMPERATURE LISTED.

3. TO BE INSTALLED AND OPERATING DURING AIR HANDLING UNIT REPLACEMENT WORK. ASSEMBLY TO BE REMOVED UPON COMPLETION OF WORK.

TEMPORARY DX AHU SCHEDULE

MARK LOCATION CONFIGURATION

AIRFLOW

(CFM)

OUTDOOR EXT COOLING DIMENSIONS OPERATING

MANUFACTURER MODEL REMARKSAIR S.P. TOTAL SENSIBLE (LxWxH) WEIGHT V/PH/HZ - AMPS

(CFM) (IN. W.C.) (MBH) (MBH) (IN) (LBS)

BU-01 SEE PLAN UPFLOW 2000 80 0.30 54.6 43.2 25X28X34 152 TRANE 4PXC+S8X1D 120/1/60-12A 1,2,3,4,5 BU-02 SEE PLAN UPFLOW 2000 80 0.30 54.6 43.2 25X28X34 152 TRANE 4PXC+S8X1D 120/1/60-12A 1,2,3,4,5

REMARKS:

1. SEE ELECTRICAL FOR TEMPORARY POWER CONNECTION. 120/1/60, 12 AMPS.

2. PROVIDE MATCHING COOLING COIL TO PROVIDE COOLING CAPACITY INDICATED. SIZE AND ROUTE REFIGERANT PIPING FOR LISTED CAPACITY AND EQUIVILANT LENGTH OF PIPING RUN PER MANUFACTURERS RECOMMENDATION.

3. PROVIDE DUCT SMOKE DETECTOR AT UNIT RA TO SHUT DOWN UNIT UPON DETECTION OF SMOKE.

4. DIRECT EXPANSION VERTICAL BLOWER UNIT.

5. TO BE INSTALLED AND OPERATING DURING AIR HANDLING UNIT REPLACEMENT WORK. ASSEMBLY TO BE REMOVED UPON COMPLETION OF WORK

AIR TERMINAL UNIT SCHEDULE

MARK SERVES TYPE

CFM MAXIMUM

S.P. IN. W.G.

[3]

NC @

MINS.P.

BOX INLET

DIAMETER

(IN)

INLET

BRANCH

DUCT SIZE

(IN)

OUTLET

DUCT

SIZE (IN)

MINIMUM

HEATING

COIL MBH

[1]

MAXIMUM

HEATING

COIL FLOW

(GPM)

HEATING

COIL MAX

P.D. (FT)

REHEAT

BRANCH

PIPE SIZE

(IN)

LAT

COIL

ROWS

MFGT MODEL

REFERENCE

SPECIFICATION

REMARKS

MAX MAX

COOLING HEATING

VAV-01 B06A SINGLE DUCT 185 100 0.11 33 4 6 EXISTING 4.40 0.4 0.10 0.50 95 1 TITUS DESV 233600 2,4,5,7,9 VAV-02 B05 SINGLE DUCT 1800 900 0.46 27 12 14 EXISTING 39.10 1.9 0.10 0.75 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-03 B03 SINGLE DUCT 1800 900 0.46 27 12 14 EXISTING TITUS DESV 233600 2,4,5,6,7,8 VAV-04 B03 SINGLE DUCT 1800 900 0.46 27 12 14 EXISTING TITUS DESV 233600 2,4,5,6,7,8 VAV-05 100 SINGLE DUCT 1800 900 0.46 27 12 14 EXISTING 39.10 1.9 0.10 0.75 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-06 100E SINGLE DUCT 350 160 0.12 29 5 6 EXISTING 6.90 2.4 0.20 0.75 95 1 TITUS DESV 233600 2,4,5,7,9

VAV-07 NOT USED

VAV-08 NOT USED

VAV-9 108C SINGLE DUCT 1200 600 0.40 29 10 12 EXISTING 26.00 1.4 0.23 0.75 95 2 TITUS DESV 233600 2,4,5,7,9

VAV-10 100E SINGLE DUCT 320 160 0.12 29 5 6 EXISTING 6.90 2.4 0.20 0.75 95 1 TITUS DESV 233600 2,4,5,7,9 VAV-11 108 SINGLE DUCT 320 160 0.12 29 5 6 EXISTING 6.90 2.4 0.20 0.75 95 1 TITUS DESV 233600 2,4,5,7,9 VAV-12 201 SINGLE DUCT 500 250 0.48 25 6 8 EXISTING 11.90 0.7 0.02 0.50 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-13 202 SINGLE DUCT 500 250 0.48 25 6 8 EXISTING 11.90 0.7 0.02 0.50 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-14 204 SINGLE DUCT 500 250 0.48 25 6 8 EXISTING 11.90 0.7 0.02 0.50 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-15 205 SINGLE DUCT 500 250 0.48 25 6 8 EXISTING 11.90 0.7 0.02 0.50 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-16 200A SINGLE DUCT 800 400 0.40 27 8 10 EXISTING 17.40 1.0 0.23 0.75 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-17 200A SINGLE DUCT 800 400 0.40 27 8 10 EXISTING 17.40 1.0 0.23 0.75 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-18 200 SINGLE DUCT 800 400 0.40 27 8 10 EXISTING 17.40 1.0 0.23 0.75 95 2 TITUS DESV 233600 2,4,5,7,9

VAV-19 NOT USED

VAV-20 NOT USED

VAV-21 200C SINGLE DUCT 350 160 0.12 29 5 6 EXISTING 6.90 2.4 0.20 0.75 95 1 TITUS DESV 233600 2,4,5,7,9 VAV-22 200C SINGLE DUCT 185 100 0.11 33 4 6 EXISTING 4.40 0.4 0.10 0.50 95 1 TITUS DESV 233600 2,4,5,7,9 VAV-23 212 SINGLE DUCT 800 400 0.40 27 8 10 EXISTING 17.40 1.0 0.23 0.75 95 2 TITUS DESV 233600 2,4,5,7,9 VAV-24 108B SINGLE DUCT 1800 900 0.46 27 12 14 EXISTING 39.10 1.9 0.10 0.75 95 2 TITUS DESV 233600 2,4,5,7,8,9

VAV-25 108B SINGLE DUCT 1800 900 0.46 27 12 14 EXISTING 39.10 1.9 0.10 0.75 95 2 TITUS DESV 233600 2,4,5,7,8,9

REMARKS:

1. HEATING CAPACITY BASED ON HEATING CFM, EWT = 180 DEG. F, MAX WTD = 30 DEG. F, AND EAT = 55 DEG. F.

2. PROVIDE STRERILOCK LINER ONLY, NO EXCEPTIONS

3. TOTAL AIR PRESSURE DIFFERENCE ACROSS BOX AND COIL AT MAXIMUM CFM.

4. TERMINAL UNIT UNIT TO BE CONTROLLED FROM NEW DIGITAL ROOM SENSOR AT EXISTING THERMOSTAT LOCATION. PROVIDE NEW WIRING TO/FROM EXISTING T-STAT LOCATION AS REQUIRED, VERIFY EXACT LOCATION.

5. FIELD VERIFY EXISTING ELECTRICAL CONNECTION AT TERMINAL PRIOR TO PURCHASE AND INSTALLATION. PROVIDE NEW TRANSFORMER AS REQUIRED.

6. COOLING ONLY.

7. PROVIDE FIELD FABRICATED TRANSITION TO EXISTING PRIMARY AIR DUCT AND DISCHARGE SA DUCT. VERIFY EXACT SIZE REQUIRED FOR EXISTING DUCT AND TERMINAL INLET/OUTLET.

8. PROVIDE TWO-STAGE THERMOSTAT/SENSOR TO CONTROL TWO INDICATED TERMINALS.

9. FIELD VERIFY LEFTHAND /RIGHTHAND COIL CONNECTION PRIOR TO PURCHASE AND INSTALLATION AND PROVIDE AS REQUIRED.

11/22/2022

C.A. NO. 842

27 63 mb er

, 2

:29 am

8_

M-

0.d wg lm or iar ty

NOTE:

DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS

and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE

PRIOR TO VERIFICATION OF CLEARANCE FOR ALL

TRADES. READ SPECIFICATIONS.

COPYRIGHT 2022C

Permission to reproduce all or part of this drawing is hereby granted solely for the limited purpose of construction of this project or archiving. Unauthorized copying, disclosure or construction use without written permission of Alvine Engineering is prohibited by copyright law.

AE# 2022 9198

SENSITIVE SECURITY INFORMATION WARNING: This record contains Sensitive Security Information that is controlled under 49 CFR parts 15 and 1520. No part of this record may be disclosed to persons without a "need to know", as defined in 49 CFR parts 15 and 1520, except with written permission of the Secretary of Transportation. Unauthorized release may result in civil penalty or other action. For U.S. government agencies, public disclosure is governed by 5 U.S.C. 552 and 49 CFR parts 15 and 1520.

Variable Air Volume ï AHU Sequence of Operation

Supply Air Duct Static Pressure Control:

The controller shall measure duct static pressure and modulate the supply fan VFD speed to maintain a duct static pressure setpoint. The speed shall not drop below 30% (adj.). The static pressure setpoint shall be reset based on zone cooling requirements.

Å The initial duct static pressure setpoint shall be 1.5in H2O (adj.).

Å As cooling demand increases, the setpoint shall incrementally reset up to a maximum of 2.3in H2O (adj.).

Å As cooling demand decreases, the setpoint shall incrementally reset down to a minimum of 1.7in H2O (adj.) .

Alarms shall be provided as follows:

Å High Supply Air Static Pressure: If the supply air static pressure is 25% (adj.) greater than setpoint.

Å Low Supply Air Static Pressure: If the supply air static pressure is 25% (adj.) less than setpoint.

Å Supply Fan VFD Fault.

Preheating Coil Steam Valves:

The controller shall measure the mixed air temperature and modulate the two heating water coil valves to maintain its setpoint 5ÁF (adj.) less than the supply air temperature setpoint.

The preheating shall be enabled whenever:

Å Outside air temperature is less than 60ÁF (adj.).

Å AND the economizer (if present) is disabled.

Å AND the supply fan status is on.

The preheating coil water valves shall open for freeze protection whenever:

Å Mixed air temperature drops from 40ÁF to 35ÁF (adj.).

Å OR the freezestat (if present) is on.

Minimum Outside Air Damper:

The minimum outside air damper shall open when CO2 limit is exceeded, and close when the unit is shutdown.

Economizer:

The controller shall measure the mixed air temperature and modulate the economizer dampers in sequence to maintain a setpoint 2ÁF (adj.) less than the supply air temperature setpoint. The outside air dampers shall maintain a minimum adjustable position of 5% (adj.) open whenever occupied.

The economizer shall be enabled whenever:

Å Outside air temperature is less than 65ÁF (adj.).

Å AND the outside air temperature is less than the return air temperature.

Å AND the supply fan status is on.

The economizer shall close whenever:

Å Mixed air temperature drops from 40ÁF to 35ÁF (adj.).

Å OR the freezestat (if present) is on.

Å OR on loss of supply fan status.

The outside air dampers shall close and the return air damper shall open when the unit is off. If Optimal Start Up is available the mixed air damper shall operate as described in the occupied mode except that the outside air damper shall modulate to fully closed.

Prefilter Differential Pressure Monitor:

The controller shall monitor the differential pressure across the prefilter.

Alarms shall be provided as follows:

Å Prefilter Change Required: Prefilter differential pressure exceeds a user definable limit (adj.).

Mixed Air Temperature:

The controller shall monitor the mixed air temperature and use as required for economizer control (if present) or preheating control (if present).

Alarms shall be provided as follows:

Å High Mixed Air Temp: If the mixed air temperature is greater than 90ÁF (adj.).

Å Low Mixed Air Temp: If the mixed air temperature is less than 45ÁF (adj.).

Return Air Temperature:

The controller shall monitor the return air temperature and use as required for setpoint control or economizer control (if present).

Alarms shall be provided as follows:

Å High Return Air Temp: If the return air temperature is greater than 90ÁF (adj.).

Å Low Return Air Temp: If the return air temperature is less than 45ÁF (adj.).

Supply Air Temperature:

The controller shall monitor the supply air temperature.

Alarms shall be provided as follows:

Å High Supply Air Temp: If the supply air temperature is greater than 120ÁF (adj.).

Å Low Supply Air Temp: If the supply air temperature is less than 45ÁF (adj.).

Supply Air Temperature Setpoint - Optimized:

The controller shall monitor the supply air temperature and shall maintain a supply air temperature setpoint reset based on zone cooling requirements.

The supply air temperature setpoint shall be reset based on zone cooling requirements as follows:

Å The initial supply air temperature setpoint shall be 55ÁF (adj.).

Å As cooling demand increases, the setpoint shall incrementally reset down to a minimum of 53ÁF (adj.).

Å As cooling demand decreases, the setpoint shall incrementally reset up to a maximum of 60ÁF (adj.) .

Cooling Coil Valve:

The controller shall measure the supply air temperature and modulate the cooling coil valve to maintain its cooling setpoint.

The cooling shall be enabled whenever:

Å Outside air temperature is greater than 60ÁF (adj.).

Å AND the economizer (if present) is disabled or fully open.

Å AND the supply fan status is on.

Å AND the heating (if present) is not active.

The cooling coil valve shall open to 50% (adj.) whenever the freezestat (if present) is on.

Alarms shall be provided as follows:

Å High Supply Air Temp: If the supply air temperature is 5ÁF (adj.) greater than setpoint.

Low Supply Air Temperature Alarm:

The controller shall alarm if the supply air temperature is less than 45ÁF (adj.).

HWS

HWR

CWR

CWS

AO - Cooling Valve M

AO - HEATING VALVE

M

N.C.

OA

M

AO - OA Damper

VFD

BO - Supply Fan Start/Stop

AO - Supply Fan VFD Speed

BI - Supply Fan VFD Fault

BI - Supply Fan Status

CT

M

H C

HWS

T T

SFCHW

H

L

AI - Supply Air Static Pressure

Locate IJ distance down longest duct

SA

T H L

AO - Return Air Damper M N.O.

Run Conditions - Scheduled:

The unit shall run based on a user defined schedule.

Freeze Protection:

The unit shall shut down and generate an alarm upon receiving a freezestat status.

High Static Shutdown:

The unit shall shut down and generate an alarm upon receiving an high static shutdown signal.

Return Air Smoke Detection:

The unit shall shut down and generate an alarm upon receiving a return air smoke detector status.

Supply Fan:

The supply fan shall run anytime the unit is commanded to run, unless shutdown on safeties. To prevent short cycling, the supply fan shall have a user definable (adj.) minimum runtime.

Alarms shall be provided as follows:

Å Supply Fan Failure: Commanded on, but the status is off.

Å Supply Fan in Hand: Commanded off, but the status is on.

Å Supply Fan Runtime Exceeded: Status runtime exceeds a user definable limit (adj.).

N.C.

RLFA

C AI - Return Air CO2

RA

T

BI - Return Air Smoke Detector

AI - Return Air Temp

BI - Freezestat

AI - Prefilter Differential Pressure

AI - Mixed Air Temp

AI - Supply Air Temp

BI - High Static Shutdown

H

AI - Return Air Humidify

H AI - Outside Air Humidity

M-300

ZONE VARIABLE AIR VOLUME AIR HANDLING UNIT (AHU)

NO SCALE

Minimum Ventilation on Carbon Dioxide (CO2) Concentration (indicated units only):

When in the occupied mode, the controller shall measure the zone CO2 levels and modulate the zone damper open on rising CO2 concentrations, overriding normal damper operation to maintain a CO2 setpoint of not more than 750 ppm (adj.).

Alarms shall be provided as follows:

Å High Zone Carbon Dioxide Concentration: if the zone CO2 concentration is greater than 1000 ppm (adj.).

AI Outdoor Air Measuring Station

CONTROLS GENERAL NOTES:

A. AI- ANALOG INPUT, BI-BINARY INPUT.

B. AO- ANALOG OUTPUT.

C. REFER SPECIFICATION SECTION 23 09 13,13

FOR REQUIREMENTS OF CONTROL DEVICES.

D. REFER SPECIFICATION SECTION 23 09 93 FOR

SEQUENCE OF OPERATIONS POINTS LIST

E. REFER SPECIFICATION SECTION 23 09 23 FOR

CONTROLS SYSTEM REQUIREMENTS.

11/22/2022

C.A. NO. 842

28 63 mb er

, 2

:29 am

8_

M-

1.d wg lm or iar ty

NOTE:

DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS

and clearances from ARCHITECTURAL, STRUCTURAL, shop and other appropriate drawing or at site. lay out and coordinate all work prior to installation to provide clearances required for operation, maintenance, and codes and verify non-interference with other work. DO NOT FABRICATE

PRIOR TO VERIFICATION OF CLEARANCE FOR ALL

TRADES. READ…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .