This amendment modifies solicitation 6973GH-23-R-00096 for the STB Building Renovation at the Mike Monroney Aeronautical Center. The Federal Aviation Administration is seeking proposals to complete construction and renovation projects at the facility in accordance with the revised specifications. Proposals are due by June 15, 2023. The estimated value of the contract is between $1 million to $5 million. This is a 100% small business set-aside for 8(a) certified firms. Revisions include updated specifications for HVAC, electrical, and lighting requirements. A mandatory pre-proposal site visit will be held on May 16, 2023 to review the scope of work.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 3
0005 06/09/2023
AAQ-730 FAC. & AVIATION SAFETY ACQ
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
OKLAHOMA CITY OK 73125
AAQ730-AFN
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x
6973GH-23-R-00096
1 copies to the issuing office.
05/04/2023
(x)
The purpose of this amendment is to incorporate revised Specification Section 23 04 00
COMMON REQUIREMENTS FOR HVAC, Section 26 05 00 BASIC REQUIREMENTS FOR ELECTRICAL SYSTEMS, Section 26 51 00 INTERIOR LIGHTING, and extend the proposal due date to June 15, 2023 at
3:00 p.m. Central Time.
FIRST: Specification Sections 23 04 00, 26 05 00, and 26 51 00 have been revised to remove conflicting language with Section SECTION 01.60.00 regarding substitution requests, and change some responsibilities from the Architect to the Contracting Officer
SECOND: Attachment 22 Spec 23 04 00 COMMON REQUIREMENTS FOR HVAC Revised 06062023 is hereby incorporated and replaces previous 23 04 00 specification section
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Andre Casiano
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-23-R-00096/0005
THIRD: Attachment 23 Spec 26 05 00 BASIC
REQUIREMENTS FOR ELECTRICAL SYSTEMS Revised
06062023 is hereby incorporated and replaces previous 26 05 00 specification section
FOURTH: Attachment 24 Spec 26 51 00 INTERIOR
LIGHTING Revised 06062023 is hereby incorporated and replaces previous 26 51 00 specification
FIFTH: Due to this Amendment, the proposal due date has been extended to June 15, 2023 at 3:00 p.m. Central Time. This extension also applies to
Past Performance Survey submissions
FIFTH: All other SIR terms and conditions remain unchanged
LIST OF CHANGES:
Section J - List of Documents, Exhibits and Other Attachments was revised as follows.
Attachment List was revised as follows.
Table has been revised and now reads as follows:
ATTACHMENT TITLE DATE NO. OF
PAGES
01 Attachment 1 100% Type B FAA-MMAC STB Annex Renovation Specifications 11/26/2022 456 02 Attachment 2 100% Type B FAA-MMAC STB Annex Renovation Drawings 11/22/2022 63 03 Attachment 3 SOW 2018-006090 STB Annex Renovation 3.13.23 03/13/2023 9 04 Attachment 4 SF 25 Performance Bond 08/01/2016 2 05 Attachment 5 SF25A Payment Bond 08/01/2016 2 06 Attachment 6 SF24 Bid Bond 08/01/2016 2 07 Attachment 7 Past Performance Survey 03/08/2023 5 07 Attachment 7 Past Performance Survey Revision 1.1 5.24.23 05/24/2023 4 08 Attachment 8 Past Performance Experience Form 03/08/2023 1 09 Attachment 9 Client Authorization Letter 03/08/2023 1 10 Attachment 10 Contractor Release 05/05/2005 1 11 Attachment 11 Wage Determination OK20230049 02.10.2023 02/10/2023 10 12 Attachment 12 Chapter 33 Construction Safety 05/16/2014 9 13 Attachment 13 AMP400-ENV-OC-2.4.3-CC 05/15/2017 14
14 Attachment 14 REISSUE-100 Percent Type B FAA-MMAC STB Annex Renovation Drawings 11/22/2022 63
15 Attachment 15 08_71_00 USER-DOOR HARDWARE 06/05/2023 18 16 Attachment 16 Addendum Drawings 06/02/2023 4 17 Attachment 17 026A STB Annex Asbestos Location Drawings 12/06/2022 4 18 Attachment 18 026A STB Annex ACM Photos 06/05/2023 9 19 Attachment 19 STB Annex General Representive Work Areas 06/05/2023 10 20 Attachment 20 STB Reno Q&A Log #1 5.18.23.6.05.23 06/05/2023 4 21 Attachment 21 STB Reno Q&A Log #2 5.18.23.6.05.23 06/05/2023 3
22 Attachment 22 Spec 23 04 00 COMMON REQUIREMENTS FOR HVAC Revised 06062023 06/06/2023 30
23 Attachment 23 Spec 26 05 00 BASIC REQUIREMENTS FOR ELECTRICAL SYSTEMS Revised 06062023 06/06/2023 6
24 Attachment 24 Spec 26 51 00 INTERIOR LIGHTING Revised 06062023 06/06/2023 4
File details come from the government source that posted it. Updated .