531-325 - Drawings-13-E2.pdf
PDF 9 MB Posted
- Attached to
- Y1DZ--TIERED EVALS - Construct Primary Care/Mental Health Building Minor Construction - Boise 531-325
- Solicitation number
- 36C77624R0096
About this file
This document appears to be a series of electrical drawings for a federal construction project to build a Primary Care/Mental Health Building at the Boise VA Medical Center. The drawings include power plans for the 1st floor, roof/mechanical penthouse, and special systems such as security, data, and audio/visual. Key details include:
The project is identified as Project 531-325, with the solicitation number 36C77624R0096. It is a minor construction project being procured by the VA Technology Acquisition Center in Austin. The drawings show the electrical layouts and specifications for the new building, including power distribution, lighting, data/communications, security, and audio/visual systems. The drawings indicate the project will have several bid alternates, including additions for a future x-ray room, a solar PV system, and other changes. No specific timeline or pricing information is provided in the documents.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4
B
C
D
E
1.1 3.9
A.1
2.1 2.9
2.5
B.8
A
E-401
E-401
48"AFF
A
A
A
A
A
A
A
A
A
A
A
A
A
A
W W
W
W W
A
A
A
A
P-HWHS-1
P-HWHS-2
P-HW-1
P-HW-2
12-36
12-50
12-48
12-36
12-59 12-46
12-36
12-44
12-24
11-36
11-36
11-36 11-36
11-42
11-36
12-24
11-42
11-44
11-46
11-46
12-57
12-1
12-1
12-24
12-38
12-3
12-3
12-3
12-3
12-5
12-5712-5
12-5
12-5
12-7
12-7
12-7
12-7
12-9
12-9
12-9
12-9
12-38
12-27 12-27
12-27 12-27
12-26 12-26
12-29 12-29
12-29 12-29
12-31 12-31
12-31 12-31
12-34
12-33 12-33
12-33 12-33
12-35 12-35
12-51
12-51
12-5112-51
12-53
12-53
12-53
12-40
12-55
12-55
12-5512-55
12-59
12-2
12-2
12-212-2
12-4
12-4
12-412-4
12-6
12-6
12-8
12-8
12-8 12-8
12-10
12-10 12-10
11-44
12-22 12-24
P-HW-3
P-HW-4
REFRIGERATOR
MICROWAVE
A
48"AFF
11-38
11-40
PN-014
PN-013
12-26 12-26 12-28
12-53
12-2
12-55
12-53
12-5112-10
12-8
12-4
12-3
12-5
12-7
12-9
CONPOINT4
A 11-44
A 11-44
12-6
12-10
12-6
48"AFF
11-42
48"AFF
11-42
48"AFF
11-42
48"AFF
11-42
AC-1
12-1 11-46
ELEC
170 OFFICE
OFFICE
SOILED MED
EQUIP
S TLT
STAFF LOUNGE
OIT SERVER
171 MECH
STAFF LOCKERS
STAFF LOCKERS
STAFF LOCKERS
STAFF LOCKERS
EXAM ROOM 07
EXAM ROOM 06
EXAM ROOM 05
EXAM ROOM 04
EXAM ROOM 14
EXAM ROOM 13
EXAM ROOM 12
EXAM ROOM 11
EXAM ROOM 21
EXAM ROOM 20
EXAM ROOM 19
EXAM ROOM 18
EXAM ROOM 28
EXAM ROOM 27
EXAM ROOM 26
EXAM ROOM 25
PACT TEAM
P TLT
P TLT
ALCOVE
ALCOVE
S TLT
CORRIDOR
C13
S TLT
S TLT
CORRIDOR
C15
PACT TEAM
WH-1
TYP
ADD ALT 4
ADD ALT 3
TP-1
PN-019
TV
DDC CONTROL
PANEL
21-2
12-59
PN-018
PN-017
PN-020
48"AFF
11-34
11-34
48"AFF
PN-016
PN-015
12-34
12-3412-34
12-57
12-38
12-38
12-57
12-57
12-40
12-44
12-4412-44
12-44
12-46
12-46
12-4612-46
12-48
12-48
12-4812-48
12-59 12-59 12-50
12-50
12-50 12-50
12-3612-28
12-28
12-28
11-36
12-6
12-35 12-35
12-15
PRINTER
12-65
12-15
12-15
T
T
T
T
T
T
TT
T
T
T
T
T
T
T
T
T
T
TYP3
TYP
TYP
1 12-42
PRINTER
12-67
12-42
12-42
+48" AFF
+48" AFF
+48" AFF
+48" AFF
+48" AFF
+48" AFF
LEVEL 1 - POWER PLAN -
EAST (ADD ALT #3, #4)
EP101A
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
CONTRACTOR SHALL ROUTE POWER FLOOR BOX RACEWAY
TO NEAREST WALL TO FACILITATE CONDUIT ROUTING
THROUGH CEILING SPACE & FUTURE ACCESS.
AC-1 IS INTERLOCKED WITH CU-1. PROVIDE (1) 3/4" C. W/(2) 12
AWG & (1) 12 AWG GND.
VAV LOW-VOLTAGE TRANSFORMER. CIRCUIT TO
PANELBOARD '21', CIRCUITS 4, 6, 30, 32, 34, OR 36 AS
REQUIRED. COORDINATE WITH MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
GENERAL SHEET NOTES
1. ALL MECHANICAL VAVs ARE POWERED VIA 120-24V
TRANSFORMERS; PROVIDE (1) TRANSFORMER FOR EACH
VAV. COORDINATE WITH MECHANICAL DRAWINGS AND
CONTRACTOR AS REQUIRED.
2. ALL MECHANICAL EQUIPMENT DISCONNECTS SHALL BE
MOUNTED TO ADJACENT WALL OR TO AN ADJACENT
STAINLESS STEEL UNISTRUT RACK WITH STAINLESS STEEL
FASTENING HARDWARE. CONTRACTOR SHALL PROVIDE
SHOP DRAWINGS OF PROPOSED DISCONNECT MOUNTING
DURING SUBMITTAL PROCESS.
3. REFERENCE CONDUIT AND WIRE SCHEDULE ON SHEET E-603
FOR ADDITIONAL CIRCUITING INFORMATION.
4. COORDINATE FINAL FLOOR BOX LOCATIONS WITH
ARCHITECT PRIOR TO INSTALLATION.
MATCHLINE TO SHEET EP102AMATCHLINE TO SHEET EP102A
0 2' 4' 8'
EP101A
1/4" = 1'-0"1 LEVEL 1 - POWER PLAN - EAST (ADD ALT #3, #4)
PROJECT
NORTH
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
07/23/2021
BOISE VA MEDICAL CENTER - BOISE, ID
531-325 A/E:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT
Approved:
Office of
Approved: CHIEF, FACILITY MANAGEMENT SERVICE
LRL/BJR JPS/FEB
E
F
G
H
I
OPEN
CEILING
OPEN
CEILING
A
48"AFF
A
48"AFF
A A
A
W W
A
A
A
12-40 12-40
11-2
12-40
11-51 11-51
11-2
11-8 11-8
12-58
12-58
12-58
12-58
12-36
12-13
12-17
12-19
12-21
12-21
12-38
12-23 12-23
12-23 12-23
12-25 12-25
12-25 12-25
12-32 12-30
12-39 12-39
12-39 12-39
12-43
12-41
12-43
12-45 12-45
12-47
12-47
12-12
12-12
12-14
12-16
12-16 12-16
12-18
12-18
12-20
12-2212-24
12-45
11-811-12
OMNICELLS
12-19
A
A
A
A
12-9
12-9
12-13 12-49
12-51 12-51
12-5112-5112-1012-10
12-61
12-28
12-5112-10 12-10
EXAM ROOM 04
EXAM ROOM 11
EXAM ROOM 18
EXAM ROOM 25
PACT TEAM
CORRIDOR
C13
PACT TEAM
EXAM ROOM 03
EXAM ROOM 02
EXAM ROOM 01
WOMEN'S
HEALTH 01
EXAM ROOM 09
EXAM ROOM 08
PROCEDURE
ROOM 01
WH TLT
118A
PROCEDURE
ROOM 01
EXAM ROOM 15
EXAM ROOM 16
PACT TEAM
EXAM ROOM 23
EXAM ROOM 22
WH TLT
163A
WOMEN'S
HEALTH 02
CLEAN SUPPLY
138 CLEAN SUPPLY
ALCOVE, H/W
ALCOVE, H/W
CORRIDOR
C11
CORRIDOR
C12
CORRIDOR
C14
CORRIDOR
C13
PACT TEAM
TYP
12-20
11-16
11-2
11-6
OMNICELLS
1 1
11-14
11-8 A
ADD ALT 3
12-58
A
12-52
12-37 12-37
12-52
EXAM ROOM 24
EXAM ROOM 17
12-49 12-49
12-49
12-12
EXAM ROOM 10
12-12
A 12-13
11-4
PATIENT
LIFT
12-60
UTILITY
FRIDGE
UC
11-20
DISPENSING
SYSTEM
BLANKET
WARMER
PATIENT
LIFT
12-60
A 12-41
PATIENT
LIFT
12-60
PATIENT
LIFT
12-60
A 12-18 12-20 12-4112-41
A 11-2
A 12-21
12-19
48"AFF
12-21
12-21
A 12-14
12-16 12-16
12-14
12-45
12-45
12-47
12-54
AA
12-13
12-17 12-17
12-13
12-17 12-38
12-19 12-19
12-17
A 12-56
12-4712-4712-40
12-63 12-49
12-12 12-14
12-14
12-20 12-43
UTILITY
FRIDGE
UC
11-18
12-28
12-2812-28
12-52
12-5212-52
12-37 12-37
12-63
12-54
12-54
12-5412-54
12-56
12-56
12-56 12-56
12-30
12-30
12-30
12-63
11-10
DISPENSING
SYSTEM
DISPENSING
SYSTEM
BLANKET
WARMER
12-61
12-61
12-32
12-3212-32
A 11-2
11-8 A
A
12-51
12-51
12-51
12-10
12-28
12-5112-10
12-9
EXAM ROOM 04
EXAM ROOM 11
EXAM ROOM 18
EXAM ROOM 25
PACT TEAM
CORRIDOR
C13
PACT TEAM
139 12-50
12-50
12-28
12-50
12-63
TYP
TYP
T
TYP
5T
T
T T
T
T T
T
T
T
T
48"AFF
12-3812-38 P TLT
ALCOVE
12-26 12-26
12-26 12-26
12-15
PRINTER
12-65
12-15
12-15
A
12-36
P TLT
159ALCOVE
12-3612-42
PRINTER
12-67
12-42
12-42
+48" AFF
T
T
+48" AFF
+48" AFF
+48" AFF+48"AFF
+48"AFF
+48"AFF
12-36
LEVEL 1 - POWER PLAN -
CENTER (ADD ALT #3)
EP102A
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
RECEPTACLE FOR OMNICELLS. LOCATE ABOVE OMNICELLS,
COORDINATE WITH EQUIPMENT MANUFACTURER AS
REQUIRED.
PANELBOARD "13".
CONTRACTOR SHALL ROUTE POWER FLOOR BOX RACEWAY
TO NEAREST WALL TO FACILITATE CONDUIT ROUTING
THROUGH CEILING SPACE & FUTURE ACCESS.
PATIENT LIFT TRANSFORMER SHALL BE HARDWIRED AND
MOUNTED IN ACCESSIBLE CEILING SPACE; CONTRACTOR
SHALL COORDINATE INSTALLATION LOCATION WITH
MANUFACTURER. PROVIDE LOCAL SNAP SWITCH
DISCONNECT AS SHOWN.
VAV LOW-VOLTAGE TRANSFORMER. CIRCUIT TO
PANELBOARD '21', CIRCUITS 4, 6, 30, 32, 34, OR 36 AS
REQUIRED. COORDINATE WITH MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
GENERAL SHEET NOTES
1. ALL MECHANICAL VAVs ARE POWERED VIA 120-24V
TRANSFORMERS; PROVIDE (1) TRANSFORMER FOR EACH
VAV. COORDINATE WITH MECHANICAL DRAWINGS AND
CONTRACTOR AS REQUIRED.
2. REFERENCE CONDUIT AND WIRE SCHEDULE ON SHEET E-603
FOR ADDITIONAL CIRCUITING INFORMATION.
3. COORDINATE FINAL FLOOR BOX LOCATIONS WITH
ARCHITECT PRIOR TO INSTALLATION.
MATCHLINE TO SHEET EP101A
MATCHLINE TO SHEET EP103AMATCHLINE TO SHEET EP103A
0 2' 4' 8'
EP102A
MATCHLINE TO SHEET EP101A
1/4" = 1'-0"1 LEVEL 1 - POWER PLAN - CENTER (ADD ALT #3)
PROJECT
NORTH
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
07/23/2021
BOISE VA MEDICAL CENTER - BOISE, ID
531-325 A/E:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT
Approved:
Office of
Approved: CHIEF, FACILITY MANAGEMENT SERVICE
LRL/BJR JPS/FEB
OPEN
CEILING
OPEN
CEILING
OVERHEAD
PROJECTOR
AUTOMATIC
DOOR
OPENER
11-28
AUTOMATIC
DOOR
OPENER
11-28
STORAGE
STORAGE
107A
GROUP ROOM
MSA & BUSINESS
SERVICES
HOUSEKEEPING
AND LADDER
POLICE
FAMILY TLT
TLT PUBLIC
LACTATION
RECEPTION
VESTIBULE
LOBBY
CORRIDOR
C10
TLT PUBLIC
109TLT PUBLIC
CORRIDOR
C11
P R
W R
W R
P R4
FOR FUTURE
X-RAY
MACHINE
48"AFF
48"AFF
C
USB
USB
USB
W W
11-9 11-27
11-27
11-27
11-29 11-25
11-25
11-25
11-25
11-31
11-29
11-3111-31
11-31
11-33
12-2212-22
11-33
11-33
11-37
12-40
11-31
12-40
11-41
11-41
11-43
AC
11-5011-4811-48
11-47
11-47
11-49
11-49 11-49
12-40
11-48 11-50
11-50 u u u u u u
AC AC AC
21-28
WATER
COOLER
P-608
48"AFF
11-25
PRINTER
11-51
11-45
11-39
A 11-37
48"AFF
11-37
48"AFF
11-37
USB
11-3311-33 11-33
USB
11-29
USB
11-29
11-43
11-41
+48" AFF
11-27
11-27
MEDIA
CABINET
11-22
USB
11-45 11-45
11-28
11-39
11-39
11-24 11-26
AC
T TYP5
T
T
T
T
T
TT
FACP
EMDP1-4
LEVEL 1 - POWER PLAN - WEST
EP103
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
SECURITY DOOR. PROVIDE POWER PROVISIONS AS
REQUIRED. COMPLY WITH BOISE SECURITY DOOR
INFRASTRUCTURE REQUIREMENTS.
PUSH BUTTON DOOR OPERATORS SHALL BE PEDESTAL
MOUNTED.
INSTALL FLOOR BOX IN CORNER. PROVIDE FLOOR BOXES AS
REQUIRED TO MEET NEC REQUIREMENTS IN GLAZING
AREAS.
MOUNT RECEPTACLE IN CEILING AREA OR WALL SPACE
ABOVE DOOR.
VAV LOW-VOLTAGE TRANSFORMER. CIRCUIT TO
PANELBOARD '21', CIRCUITS 4, 6, 30, 32, 34, OR 36 AS
REQUIRED. COORDINATE WITH MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
GENERAL SHEET NOTES
1. ALL MECHANICAL VAVs ARE POWERED VIA 120-24V
TRANSFORMERS; PROVIDE (1) TRANSFORMER FOR EACH
VAV. COORDINATE WITH MECHANICAL DRAWINGS AND
CONTRACTOR AS REQUIRED.
2. REFERENCE CONDUIT AND WIRE SCHEDULE ON SHEET E-603
FOR ADDITIONAL CIRCUITING INFORMATION.
3. COORDINATE FINAL FLOOR BOX LOCATIONS WITH
ARCHITECT PRIOR TO INSTALLATION.
EP103
MATCHLINE
TO SHEET EP102MATCHLINE TO SHEET EP102
0 2' 4' 8' 1/4" = 1'-0"1 LEVEL 1 - POWER PLAN - WEST
PROJECT
NORTH
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
07/23/2021
BOISE VA MEDICAL CENTER - BOISE, ID
531-325 A/E:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT
Approved:
Approved: CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
LRL / BJR JPS / FEB
I
J
K
L
M
N
L.2
OPEN
CEILING
OPEN
CEILING
OVERHEAD
PROJECTOR
AUTOMATIC
DOOR
OPENER
11-28
AUTOMATIC
DOOR
OPENER
11-28
48"AFF
48"AFF
C
USB
USB
USB
W W
11-9 11-27
11-27
11-27
11-27
11-29 11-2511-25
11-25
11-25
11-31
11-29
11-3111-31
11-31
11-33
12-2212-22
11-37
12-40
11-31
11-39
12-40
11-41
11-41
11-4311-43
AC
11-47
11-47
11-49
11-4911-49
12-40
11-50 u u u u u u
AC
21-28
WATER
COOLER
P-608
STORAGE
STORAGE
107A
GROUP ROOM
MSA & BUSINESS
SERVICES
HOUSEKEEPING
AND LADDER
POLICE
FAMILY TLT
TLT PUBLIC
LACTATION
RECEPTION
VESTIBULE
LOBBY
CORRIDOR
C10
TLT PUBLIC
109TLT PUBLIC
CORRIDOR
C11
48"AFF
11-25
PRINTER
11-51
11-41
+48" AFF
11-45
11-39
11-39 A
11-37
48"AFF
11-37
48"AFF
11-37
USB
11-3311-33 11-33
USB
11-29
USB
11-29
P R
W R
W R
P R4
ADD ALT 1
FOR FUTURE
X-RAY MACHINE
A 13-21
ICE CADDY BLENDER A
13-4
FRIDGE
13-27
OVEN
13-23,25
+48"
AFF
13-15
COFFEE
BREWER
13-9,11
UC
UC
REGISTER
13-19A
13-4
A 13-4
COFFEE
BREWER
13-9,11
UTILITY
FRIDGE
13-29 UC
ESPRESSO
13-5,7 DISPLAY
CASE
13-15
MEDIA
CABINET
11-22
11-27
USB
11-28
AC
11-45
AC
11-45
11-50 11-5011-48
11-48 11-48
11-24 11-26
13-4
13-4 A
T TYP6
T
T
T
T
T
TT
A
AC
FACP
EMDP1-4
LEVEL 1 - POWER PLAN -
WEST (ADD ALT #1)
EP103A
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
SECURITY DOOR. PROVIDE POWER PROVISIONS AS
REQUIRED. COMPLY WITH BOISE SECURITY DOOR
INFRASTRUCTURE REQUIREMENTS.
PUSH BUTTON DOOR OPERATORS SHALL BE PEDESTAL
MOUNTED.
INSTALL FLOOR BOX IN CORNER. PROVIDE FLOOR BOXES AS
REQUIRED TO MEET NEC REQUIREMENTS IN GLAZING
AREAS.
MOUNT RECEPTACLE IN CEILING AREA OR WALL SPACE
ABOVE DOOR.
COORDINATE WITH ARCHITECTURAL PLANS FOR EXACT
EQUIPMENT/RECEPTACLE PLACEMENTS.
VAV LOW-VOLTAGE TRANSFORMER. CIRCUIT TO
PANELBOARD '21', CIRCUITS 4, 6, 30, 32, 34, OR 36 AS
REQUIRED. COORDINATE WITH MECHANICAL DRAWINGS
FOR ADDITIONAL INFORMATION.
GENERAL SHEET NOTES
1. ALL MECHANICAL VAVs ARE POWERED VIA 120-24V
TRANSFORMERS; PROVIDE (1) TRANSFORMER FOR EACH
VAV. COORDINATE WITH MECHANICAL DRAWINGS AND
CONTRACTOR AS REQUIRED.
2. REFERENCE CONDUIT AND WIRE SCHEDULE ON SHEET E-603
FOR ADDITIONAL CIRCUITING INFORMATION.
3. COORDINATE FINAL FLOOR BOX LOCATIONS WITH
ARCHITECT PRIOR TO INSTALLATION.
MATCHLINE
TO SHEET EP102AMATCHLINE TO SHEET EP102A
EP103A
1/4" = 1'-0"1 LEVEL 1 - POWER PLAN - WEST (ADD ALT #1)
0 2' 4' 8'
PROJECT
NORTH
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
07/23/2021
BOISE VA MEDICAL CENTER - BOISE, ID
531-325 A/E:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT
Approved:
Approved: CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
LRL / BJR JPS / FEB
8056 SF
MECH
PENTHOUSE
W
21-28 21-28
21-2821-28
21-22
W 21-22
P-HWHS-3
P-HWHS-4
UH-1
EF-1
GF-1
B
C
D
E
F
G
H
I
J
K
L
M
A 1 2 3 42.5
EP104
AHU-1
CU-1
J 21-33
21-22
21-2221-22
21-22
E-502
W 21-26
W 21-24
W 21-24
W 21-24
W 21-24
W 21-26
W 21-26
PN-024
PN-009
PN-010
ROOF AND MECHANICAL PENTHOUSE -
POWER PLANS
EP104
EP104
EP104
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
DISCONNECT SHALL BE MOUNTED VIA HOT-DIPPED
GALVANIZED UNISTRUT UTILIZING SS FASTENING
HARDWARE.
HEAT TRACE GFCI RECEPTACLE. COORDINATE FINAL
LOCATION WITH ROOF DRAIN AND OVERFLOW PIPING PER
ARCHITECTURAL AND MECHANICAL DRAWINGS.
GENERAL SHEET NOTES
1. ALL MECHANICAL EQUIPMENT DISCONNECTS SHALL BE
MOUNTED TO ADJACENT WALL OR TO AN ADJACENT
STAINLESS STEEL UNISTRUT RACK WITH STAINLESS STEEL
FASTENING HARDWARE. CONTRACTOR SHALL PROVIDE
SHOP DRAWINGS OF PROPOSED DISCONNECT MOUNTING
DURING SUBMITTAL PROCESS
2. REFERENCE CONDUIT AND WIRE SCHEDULE ON SHEET E-603
FOR ADDITIONAL CIRCUITING INFORMATION.
PN-008
PN-012
PN-021
PN-022
PN-023
1/8" = 1'-0"1 ROOF AND MECHANICAL PENTHOUSE - POWER PLAN
3/8" = 1'-0"1 ENLARGED MECHANICAL PENTHOUSE - POWER PLAN
0 2' 4' 8'
PROJECT
NORTH
0 2' 4' 8'
PROJECT
NORTH
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
07/23/2021
BOISE VA MEDICAL CENTER - BOISE, ID
531-325 A/E:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT
Approved:
Office of
Approved: CHIEF, FACILITY MANAGEMENT SERVICE
LRL/BJR JPS/FEB
PN-011
1 2 3 42.5
3TYP
E-502
J
PN-009
PN-010
PN-024
CU-1
21-22
21-2221-22
21-22
W 21-26
W 21-26
W 21-26
AHU-1
21-33
EP-104A
8056 SF
MECH
PENTHOUSE
W
21-28 21-28
21-2821-28
21-22
CON_CENTERCON_TYPE
CON_WIDTH
CON_LENGTH
W 21-22
P-HWHS-3
P-HWHS-4
UH-1
EF-1
GF-1
INVERTER 'A'
INVERTER 'B'
PV1
B
C
D
E
F
G
H
I
J
K
L
M
A
ROOF AND MECHANICAL PENTHOUSE -
POWER PLANS (ADD ALT #2)
EP104A
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
REFERENCE SOLAR SHEETS EY104 AND EY601 FOR MORE
INFORMATION ON EQUIPMENT AND LOCATIONS. SOLAR
SYSTEM SHALL BE ADD ALT 2.
SOLAR PV EQUIPMENT, REFERENCE SHEET EY501 AND
EY601.
HEAT TRACE GFCI RECEPTACLE.
DISCONNECT SHALL BE MOUNTED VIA HOT-DIPPED
GALVANIZED UNISTRUT UTILIZING SS FASTENING
HARDWARE.
GENERAL SHEET NOTES
1. ALL MECHANICAL EQUIPMENT DISCONNECTS SHALL BE
MOUNTED TO ADJACENT WALL OR TO AN ADJACENT
STAINLESS STEEL UNISTRUT RACK WITH STAINLESS STEEL
FASTENING HARDWARE. CONTRACTOR SHALL PROVIDE
SHOP DRAWINGS OF PROPOSED DISCONNECT MOUNTING
DURING SUBMITTAL PROCESS
2. REFERENCE CONDUIT AND WIRE SCHEDULE ON SHEET E-603
FOR ADDITIONAL CIRCUITING INFORMATION.
PN-008
PN-004
W W
WW
TYPICAL
ADD ALT 2
EP104A
EP104A
PN-011
PN-012
PN-021
PN-022
PN-023
1/8" = 1'-0"1 ROOF AND MECHANICAL PENTHOUSE - POWER PLAN (ADD ALT #2)
3/8" = 1'-0"1 ENLARGED MECHANICAL PENTHOUSE - POWER PLAN (ADD ALT #2)
ADD ALT 2
ADD ALT 2
0 4' 8' 16'
PROJECT
NORTH
0 4' 8' 16'
PROJECT
NORTH
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
07/23/2021
BOISE VA MEDICAL CENTER - BOISE, ID
531-325 A/E:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT
Approved:
Approved: CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
LRL / BJR JPS / FEB 177 OF 206
1 2 3 4
B
C
D
E
F
1.1 3.9
A.1
2.1 2.9
2.5
B.8
A
N
N
N
N
N
N
N
N
N
N
N
N
N
2 2
2 2
2 2
W
W
W
E-401
E-401
W
W
W W
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
FS
FS
W
360°
2 2
48" AFF
TV
TYPICAL
S
S
S
E-501
S
S
E-401
2 2
2 2
ELEC
OFFICE
OFFICE
SOILED MED
EQUIP
S TLT
STAFF LOUNGE
OIT SERVER
MECH
STAFF LOCKERS
STAFF LOCKERS
STAFF LOCKERS
STAFF LOCKERS
EXAM ROOM 07
EXAM ROOM 06
EXAM ROOM 05
EXAM ROOM 04
EXAM ROOM 14
EXAM ROOM 13
EXAM ROOM 12
EXAM ROOM 11
EXAM ROOM 21
EXAM ROOM 20
EXAM ROOM 19
EXAM ROOM 18
EXAM ROOM 28
EXAM ROOM 27
EXAM ROOM 26
EXAM ROOM 25
PACT TEAM
P TLT
P TLT
159ALCOVE
142 ALCOVE
S TLT
CORRIDOR
C13
S TLT
177S TLT
CORRIDOR
C15
PACT TEAM
A
S S
2 2
S
WAP S
4 4
N 1
N 1
N 1
N 1N
1 N
N 4
N 4
N
1 N
1 N
1N
1N
1N
1N 1 N
1 N
1 N
1 N
TYP
ADD ALT 4
ADD ALT 3
TSTS
NCS 4
DDC CONTROL
PANEL 6
TYP
TYP
TYP
2 2
EXAM ROOM 03
EXAM ROOM 10
133 EXAM ROOM 17
EXAM ROOM 24
2 2
2 2
2 2
2 2
2 2
2 2
WAPS
LEVEL 1 - SPECIAL SYSTEMS PLAN -
EAST (ADD ALT #3, #4)
ET101A
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
PIN PAD READER TO BE LENEL MTK15 READER OR
APPROVED EQUAL, TYPICAL FOR ALL SHOWN.
CONTRACTOR SHALL ROUTE DATA FLOOR BOX RACEWAY
TO NEAREST WALL TO FACILITATE CONDUIT ROUTING
THROUGH CEILING SPACE AND FUTURE ACCESS.
MINIMUM CONDUIT SIZE SHALL BE 1-1/4".
ROUTE ALL DATA CABLING TO AVOID HIGH CEILING AREAS
AS REQUIRED.
COORDINATE FINAL LOCATION FOR NURSE CALL STATION
WITH VA AS REQUIRED.
PROVIDE CONTROLS AS REQUIRED TO OPEN ACCESS
CONTROL DOOR DURING FIRE ALARM EVENT.
PROVIDE NETWORK CONNECTION TO OIT SERVER ROOM 171
AS REQUIRED. COORDINATE ALL OTHER REQUIREMENTS
WITH MECHANICAL DRAWINGS AS REQUIRED.
PROVIDE DATA CONNECTIONS TO VAV ACTUATOR AND
VALVE FROM DDC CONTROLLER LOCATED IN ROOM 180.
COORDINATE WITH MECHANICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
GENERAL SHEET NOTES
1. CONTRACTOR SHALL COORDINATE THERMOSTAT LOCATIONS
WITH MECHANICAL CONTRACTOR AND PROVIDE CONDUIT, BOX
AND PULL STRING.
2. DATA CABLING SHALL ROUTE BACK TO OIT SERVER ROOM 171.
3. FIRE ALARM CABLING SHALL ROUTE TO FACP LOCATED IN
VESTIBULE 101.
4. ALL MECHANICAL VAVs SHALL HAVE DATA CONNECTION RAN
BACK TO DDC CONTROLLER FOR CONTROL. COORDINATE
WITH MECHANICAL DRAWINGS AND CONTRACTOR AS
REQUIRED.
5. COORDINATE FINAL FLOOR BOX LOCATIONS WITH ARCHITECT
PRIOR TO INSTALLATION.
MATCHLINE TO SHEET ET102A
MATCHLINE TO SHEET ET102A
ET101A
1/4" = 1'-0"1 LEVEL 1 - SPECIAL SYSTEMS PLAN - EAST (ADD ALT #3, #4)
0 2' 4' 8'
PROJECT
NORTH
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
07/23/2021
BOISE VA MEDICAL CENTER - BOISE, ID
531-325 A/E:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT
Approved:
Office of
Approved: CHIEF, FACILITY MANAGEMENT SERVICE
LRL/BJR JPS/FEB
Xref ..\..\..\..\X-Ref's\A-402.dwg
N
N
N
N
N
N
N
N
N
N
N
N
N
N
W
N N
WAPWAP WAP WAP
WAP WAP
WAPWAP
WAP
1 TYPICAL
W
S2 2
E-501
EXAM ROOM 03
EXAM ROOM 02
EXAM ROOM 01
WOMEN'S
HEALTH 01
EXAM ROOM 10
EXAM ROOM 09
EXAM ROOM 08
PROCEDURE
ROOM 01
WH TLT
118A
PROCEDURE
ROOM 01
EXAM ROOM 15
EXAM ROOM 16
EXAM ROOM 17
PACT TEAM
EXAM ROOM 24
EXAM ROOM 23
EXAM ROOM 22
WH TLT
163A
WOMEN'S
HEALTH 02
CLEAN SUPPLY
138 CLEAN SUPPLY
ALCOVE, H/W
ALCOVE, H/W
CORRIDOR
C11
CORRIDOR
C12
CORRIDOR
C14
CORRIDOR
C13
PACT TEAM
EM
TYP.
TYP.
S
TYP.
TYP.
E
F
G
H
I
OPEN
CEILING
OPEN
CEILING
N
N
N
N
N
N
N
N
NN
N
N
N
N
N
N
N
N N
N
4 4
2EM EM
S
S S
S
S S
S
S
2 2
2 2
2 2
S
2 A
A
EM
2 2
2 2
2 2
2 2
2 2
2 2
WAP
WAP S
WAP
LEVEL 1 - SPECIAL SYSTEMS PLAN -
CENTER (ADD ALT #3)
ET102A
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
PIN PAD READER TO BE LENEL MTK15 READER OR
APPROVED EQUAL, TYPICAL FOR ALL SHOWN.
72" HEIGHT FOR OMNICELL. COORDINATE WITH EQUIPMENT
MANUFACTURER AS REQUIRED.
CONTRACTOR SHALL ROUTE DATA FLOOR BOX RACEWAY
TO NEAREST WALL TO FACILITATE CONDUIT ROUTING
THROUGH CEILING SPACE AND FUTURE ACCESS. MINIMUM
CONDUIT SIZE SHALL BE 1-1/4".
PROVIDE DATA CONNECTIONS TO VAV ACTUATOR AND
VALVE FROM DDC CONTROLLER LOCATED IN ROOM 180.
COORDINATE WITH MECHANICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
MATCHLINE TO SHEET ET101AMATCHLINE TO SHEET ET101A
MATCHLINE TO SHEET ET103AMATCHLINE TO SHEET ET103A
ET102A
ADD ALT 3
1/4" = 1'-0"1 LEVEL 1 - SPECIAL SYSTEMS PLAN - CENTER (ADD ALT #3)
0 4' 8' 16'
PROJECT
NORTH
GENERAL SHEET NOTES
1. DATA CABLING SHALL ROUTE BACK TO OIT SERVER ROOM
171.
2. FIRE ALARM CABLING SHALL ROUTE TO FACP LOCATED IN
VESTIBULE 101.
3. CONTRACTOR SHALL COORDINATE THERMOSTAT LOCATIONS
WITH MECHANICAL CONTRACTOR AND PROVIDE CONDUIT,
BOX AND PULL STRING.
4. ALL MECHANICAL VAVs SHALL HAVE DATA CONNECTION RAN
BACK TO DDC CONTROLLER FOR CONTROL. COORDINATE
WITH MECHANICAL DRAWINGS AND CONTRACTOR AS
REQUIRED.
5. COORDINATE FINAL FLOOR BOX LOCATIONS WITH
ARCHITECT PRIOR TO INSTALLATION.
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
07/23/2021
BOISE VA MEDICAL CENTER - BOISE, ID
531-325 A/E:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT
Approved:
Approved: CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
LRL / BJR JPS / FEB 181 OF 206
I
J
K
L
M
N
L.2
OPEN
CEILING
OPEN
CEILING
S
NS
W D
C
WAP WAP
WAP
WAP WAP
W
W W
W
W
FACP
FS
S
WAP G
WAP G
S
UC
UC UC UC UC
UC
W D
WAP G
S
STORAGE
108STORAGE
107A
GROUP ROOM
MSA & BUSINESS
SERVICES
HOUSEKEEPING
AND LADDER
POLICE
FAMILY TLT
TLT PUBLIC
LACTATION
RECEPTION
VESTIBULE
LOBBY
CORRIDOR
C10
TLT PUBLIC
TLT PUBLIC
CORRIDOR
C11
S
WAP S
FS
S
MEDIA
CABINET
AC
S
S
OVERHEAD
PROJECTOR
TYP
2 2 2
2 2 2
2 2
72" AFF
TV
22 2
LEVEL 1 - SPECIAL SYSTEMS PLAN -
WEST
ET103
KEY PLAN
KEY NOTES (THIS SHEET ONLY)
CONTRACTOR SHALL PROVIDE J-BOX IN WALL AND ROUTE 2"
CONDUIT TO COMM ROOM 171 FOR FUTURE COFFEE SHOP
SPACE. COORDINATE WITH OWNER FOR FINAL LOCATION.
PROVIDE PUSH BUTTON TO ELECTRONICALLY LOCK
BUILDING FRONT ENTRANCE
AUDIO/VISUAL CONTROLLER AND INPUT DEVICE. PROVIDE
COMPLETE AND FULLY FUNCTIONAL AUDIO SYSTEM. AUDIO
SYSTEM SHALL INTEGRATE WITH OVERHEAD PROJECTOR
AND SPEAKER SYSTEM. COORDINATE WITH A/V
CONTRACTOR AND ARCHITECT FOR FINAL INSTALLATION
LOCATIONS.
PROVIDE DATA CONNECTIONS TO VAV ACTUATOR AND
VALVE FROM DDC CONTROLLER LOCATED IN ROOM 180.
COORDINATE WITH MECHANICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
GENERAL SHEET NOTES
ET103
MATCHLINE
TO SHEET ET102MATCHLINE TO SHEET ET102
1/4" = 1'-0"1 LEVEL 1 - SPECIAL SYSTEMS PLAN - WEST
0 4' 8' 16'
PROJECT
NORTH
1. DATA CABLING SHALL ROUTE BACK TO OIT SERVER ROOM
171.
2. FIRE ALARM CABLING SHALL ROUTE TO FACP LOCATED IN
VESTIBULE 101.
3. CONTRACTOR SHALL COORDINATE THERMOSTAT LOCATIONS
WITH MECHANICAL CONTRACTOR AND PROVIDE CONDUIT,
BOX AND PULL STRING.
4. ALL MECHANICAL VAVs SHALL HAVE DATA CONNECTION RAN
BACK TO DDC CONTROLLER FOR CONTROL. COORDINATE
WITH MECHANICAL DRAWINGS AND CONTRACTOR AS
REQUIRED.
5. COORDINATE FINAL FLOOR BOX LOCATIONS WITH
ARCHITECT PRIOR TO INSTALLATION.
PhaseARCHITECT/ENGINEER OF RECORD
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
07/23/2021
BOISE VA MEDICAL CENTER - BOISE, ID
531-325 A/E:
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590 - 2118
RAY SPEES, PRESIDENT
Approved:
Approved: CHIEF, FACILITY MANAGEMENT SERVICE
MEDICAL CENTER DIRECTOR
LRL / BJR JPS / FEB
File details come from the government source that posted it. Updated .