This document appears to be a series of electrical drawings for a federal construction project to build a Primary Care/Mental Health Building at the Boise VA Medical Center. The drawings include power plans for the 1st floor, roof/mechanical penthouse, and special systems such as security, data, and audio/visual. Key details include:

The project is identified as Project 531-325, with the solicitation number 36C77624R0096. It is a minor construction project being procured by the VA Technology Acquisition Center in Austin. The drawings show the electrical layouts and specifications for the new building, including power distribution, lighting, data/communications, security, and audio/visual systems. The drawings indicate the project will have several bid alternates, including additions for a future x-ray room, a solar PV system, and other changes. No specific timeline or pricing information is provided in the documents.

View the file

Other files

File Type Posted
0005 - Tech Questions Tracker - Boise PCMH - 8-7-24.pdf PDF
36C77624R0096 0005.pdf PDF
36C77624R0096 0004.pdf PDF
0004 - Tech Questions Tracker - Boise PCMH - 8-5-24.pdf PDF
0004 - Brand Name Justification.pdf PDF
36C77624R0096 0003.pdf PDF
0003 - Tech Questions Tracker - Boise PCMH - 8-1-24.pdf PDF
36C77624R0096 0002.pdf PDF
0001 - Site Visit Sign-in - 7-16-24.pdf PDF
36C77624R0096 0001.pdf PDF
531-325 - Drawings-14-E3.pdf PDF
531-325 - Drawings-07-A2.pdf PDF
531-325 - SOW 4-15-24.pdf PDF
531-325 - Drawings-05-S1.pdf PDF
531-325 - Specs-Vol-1.pdf PDF
Small Business Subcontracting Plan Model.docx DOCX document
531-325 - Drawings-09-A4.pdf PDF
531-325 - Drawings-03-C2.pdf PDF
Division Cost Breakdown.xlsx XLSX spreadsheet
531-325 - Drawings-15-E4.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
Site Visit Instructions.pdf PDF
531-325 - Drawings-16-E5.pdf PDF
531-325 - Specs-Appx-B.pdf PDF
531-325 - Drawings-04-L1.pdf PDF
531-325 - Specs-Vol-2.pdf PDF
531-325 - Drawings-10-M1.pdf PDF
531-325 - Specs-Appx-A.pdf PDF
Site Visit Map.pdf PDF
531-325 - Drawings-01-G1.pdf PDF
RFP 36C77624R0096.docx DOCX document
531-325 - Drawings-06-A1.pdf PDF
531-325 - Drawings-02-C1.pdf PDF
531-325 - Drawings-11-P1.pdf PDF
531-325 - Drawings-08-A3.pdf PDF
531-325 - Specs-Appx-C.pdf PDF
531-325 - Specs-Appx-E.pdf PDF
DBA Wage Rates - Ada County - 01-12-24.pdf PDF
531-325 - Drawings-12-E1.pdf PDF
531-325 - Specs-Appx-F.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4

B

C

D

E

1.1 3.9

A.1

2.1 2.9

2.5

B.8

A

E-401

E-401

48"AFF

A

A

A

A

A

A

A

A

A

A

A

A

A

A

W W

W

W W

A

A

A

A

P-HWHS-1

P-HWHS-2

P-HW-1

P-HW-2

12-36

12-50

12-48

12-36

12-59 12-46

12-36

12-44

12-24

11-36

11-36

11-36 11-36

11-42

11-36

12-24

11-42

11-44

11-46

11-46

12-57

12-1

12-1

12-24

12-38

12-3

12-3

12-3

12-3

12-5

12-5712-5

12-5

12-5

12-7

12-7

12-7

12-7

12-9

12-9

12-9

12-9

12-38

12-27 12-27

12-27 12-27

12-26 12-26

12-29 12-29

12-29 12-29

12-31 12-31

12-31 12-31

12-34

12-33 12-33

12-33 12-33

12-35 12-35

12-51

12-51

12-5112-51

12-53

12-53

12-53

12-40

12-55

12-55

12-5512-55

12-59

12-2

12-2

12-212-2

12-4

12-4

12-412-4

12-6

12-6

12-8

12-8

12-8 12-8

12-10

12-10 12-10

11-44

12-22 12-24

P-HW-3

P-HW-4

REFRIGERATOR

MICROWAVE

A

48"AFF

11-38

11-40

PN-014

PN-013

12-26 12-26 12-28

12-53

12-2

12-55

12-53

12-5112-10

12-8

12-4

12-3

12-5

12-7

12-9

CONPOINT4

A 11-44

A 11-44

12-6

12-10

12-6

48"AFF

11-42

48"AFF

11-42

48"AFF

11-42

48"AFF

11-42

AC-1

12-1 11-46

ELEC

170 OFFICE

OFFICE

SOILED MED

EQUIP

S TLT

STAFF LOUNGE

OIT SERVER

171 MECH

STAFF LOCKERS

STAFF LOCKERS

STAFF LOCKERS

STAFF LOCKERS

EXAM ROOM 07

EXAM ROOM 06

EXAM ROOM 05

EXAM ROOM 04

EXAM ROOM 14

EXAM ROOM 13

EXAM ROOM 12

EXAM ROOM 11

EXAM ROOM 21

EXAM ROOM 20

EXAM ROOM 19

EXAM ROOM 18

EXAM ROOM 28

EXAM ROOM 27

EXAM ROOM 26

EXAM ROOM 25

PACT TEAM

P TLT

P TLT

ALCOVE

ALCOVE

S TLT

CORRIDOR

C13

S TLT

S TLT

CORRIDOR

C15

PACT TEAM

WH-1

TYP

ADD ALT 4

ADD ALT 3

TP-1

PN-019

TV

DDC CONTROL

PANEL

21-2

12-59

PN-018

PN-017

PN-020

48"AFF

11-34

11-34

48"AFF

PN-016

PN-015

12-34

12-3412-34

12-57

12-38

12-38

12-57

12-57

12-40

12-44

12-4412-44

12-44

12-46

12-46

12-4612-46

12-48

12-48

12-4812-48

12-59 12-59 12-50

12-50

12-50 12-50

12-3612-28

12-28

12-28

11-36

12-6

12-35 12-35

12-15

PRINTER

12-65

12-15

12-15

T

T

T

T

T

T

TT

T

T

T

T

T

T

T

T

T

T

TYP3

TYP

TYP

1 12-42

PRINTER

12-67

12-42

12-42

+48" AFF

+48" AFF

+48" AFF

+48" AFF

+48" AFF

+48" AFF

LEVEL 1 - POWER PLAN -

EAST (ADD ALT #3, #4)

EP101A

KEY PLAN

KEY NOTES (THIS SHEET ONLY)

CONTRACTOR SHALL ROUTE POWER FLOOR BOX RACEWAY

TO NEAREST WALL TO FACILITATE CONDUIT ROUTING

THROUGH CEILING SPACE & FUTURE ACCESS.

AC-1 IS INTERLOCKED WITH CU-1. PROVIDE (1) 3/4" C. W/(2) 12

AWG & (1) 12 AWG GND.

VAV LOW-VOLTAGE TRANSFORMER. CIRCUIT TO

PANELBOARD '21', CIRCUITS 4, 6, 30, 32, 34, OR 36 AS

REQUIRED. COORDINATE WITH MECHANICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

GENERAL SHEET NOTES

1. ALL MECHANICAL VAVs ARE POWERED VIA 120-24V

TRANSFORMERS; PROVIDE (1) TRANSFORMER FOR EACH

VAV. COORDINATE WITH MECHANICAL DRAWINGS AND

CONTRACTOR AS REQUIRED.

2. ALL MECHANICAL EQUIPMENT DISCONNECTS SHALL BE

MOUNTED TO ADJACENT WALL OR TO AN ADJACENT

STAINLESS STEEL UNISTRUT RACK WITH STAINLESS STEEL

FASTENING HARDWARE. CONTRACTOR SHALL PROVIDE

SHOP DRAWINGS OF PROPOSED DISCONNECT MOUNTING

DURING SUBMITTAL PROCESS.

3. REFERENCE CONDUIT AND WIRE SCHEDULE ON SHEET E-603

FOR ADDITIONAL CIRCUITING INFORMATION.

4. COORDINATE FINAL FLOOR BOX LOCATIONS WITH

ARCHITECT PRIOR TO INSTALLATION.

MATCHLINE TO SHEET EP102AMATCHLINE TO SHEET EP102A

0 2' 4' 8'

EP101A

1/4" = 1'-0"1 LEVEL 1 - POWER PLAN - EAST (ADD ALT #3, #4)

PROJECT

NORTH

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

07/23/2021

BOISE VA MEDICAL CENTER - BOISE, ID

531-325 A/E:

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590 - 2118

RAY SPEES, PRESIDENT

Approved:

Office of

Approved: CHIEF, FACILITY MANAGEMENT SERVICE

LRL/BJR JPS/FEB

E

F

G

H

I

OPEN

CEILING

OPEN

CEILING

A

48"AFF

A

48"AFF

A A

A

W W

A

A

A

12-40 12-40

11-2

12-40

11-51 11-51

11-2

11-8 11-8

12-58

12-58

12-58

12-58

12-36

12-13

12-17

12-19

12-21

12-21

12-38

12-23 12-23

12-23 12-23

12-25 12-25

12-25 12-25

12-32 12-30

12-39 12-39

12-39 12-39

12-43

12-41

12-43

12-45 12-45

12-47

12-47

12-12

12-12

12-14

12-16

12-16 12-16

12-18

12-18

12-20

12-2212-24

12-45

11-811-12

OMNICELLS

12-19

A

A

A

A

12-9

12-9

12-13 12-49

12-51 12-51

12-5112-5112-1012-10

12-61

12-28

12-5112-10 12-10

EXAM ROOM 04

EXAM ROOM 11

EXAM ROOM 18

EXAM ROOM 25

PACT TEAM

CORRIDOR

C13

PACT TEAM

EXAM ROOM 03

EXAM ROOM 02

EXAM ROOM 01

WOMEN'S

HEALTH 01

EXAM ROOM 09

EXAM ROOM 08

PROCEDURE

ROOM 01

WH TLT

118A

PROCEDURE

ROOM 01

EXAM ROOM 15

EXAM ROOM 16

PACT TEAM

EXAM ROOM 23

EXAM ROOM 22

WH TLT

163A

WOMEN'S

HEALTH 02

CLEAN SUPPLY

138 CLEAN SUPPLY

ALCOVE, H/W

ALCOVE, H/W

CORRIDOR

C11

CORRIDOR

C12

CORRIDOR

C14

CORRIDOR

C13

PACT TEAM

TYP

12-20

11-16

11-2

11-6

OMNICELLS

1 1

11-14

11-8 A

ADD ALT 3

12-58

A

12-52

12-37 12-37

12-52

EXAM ROOM 24

EXAM ROOM 17

12-49 12-49

12-49

12-12

EXAM ROOM 10

12-12

A 12-13

11-4

PATIENT

LIFT

12-60

UTILITY

FRIDGE

UC

11-20

DISPENSING

SYSTEM

BLANKET

WARMER

PATIENT

LIFT

12-60

A 12-41

PATIENT

LIFT

12-60

PATIENT

LIFT

12-60

A 12-18 12-20 12-4112-41

A 11-2

A 12-21

12-19

48"AFF

12-21

12-21

A 12-14

12-16 12-16

12-14

12-45

12-45

12-47

12-54

AA

12-13

12-17 12-17

12-13

12-17 12-38

12-19 12-19

12-17

A 12-56

12-4712-4712-40

12-63 12-49

12-12 12-14

12-14

12-20 12-43

UTILITY

FRIDGE

UC

11-18

12-28

12-2812-28

12-52

12-5212-52

12-37 12-37

12-63

12-54

12-54

12-5412-54

12-56

12-56

12-56 12-56

12-30

12-30

12-30

12-63

11-10

DISPENSING

SYSTEM

DISPENSING

SYSTEM

BLANKET

WARMER

12-61

12-61

12-32

12-3212-32

A 11-2

11-8 A

A

12-51

12-51

12-51

12-10

12-28

12-5112-10

12-9

EXAM ROOM 04

EXAM ROOM 11

EXAM ROOM 18

EXAM ROOM 25

PACT TEAM

CORRIDOR

C13

PACT TEAM

139 12-50

12-50

12-28

12-50

12-63

TYP

TYP

T

TYP

5T

T

T T

T

T T

T

T

T

T

48"AFF

12-3812-38 P TLT

ALCOVE

12-26 12-26

12-26 12-26

12-15

PRINTER

12-65

12-15

12-15

A

12-36

P TLT

159ALCOVE

12-3612-42

PRINTER

12-67

12-42

12-42

+48" AFF

T

T

+48" AFF

+48" AFF

+48" AFF+48"AFF

+48"AFF

+48"AFF

12-36

LEVEL 1 - POWER PLAN -

CENTER (ADD ALT #3)

EP102A

KEY PLAN

KEY NOTES (THIS SHEET ONLY)

RECEPTACLE FOR OMNICELLS. LOCATE ABOVE OMNICELLS,

COORDINATE WITH EQUIPMENT MANUFACTURER AS

REQUIRED.

PANELBOARD "13".

CONTRACTOR SHALL ROUTE POWER FLOOR BOX RACEWAY

TO NEAREST WALL TO FACILITATE CONDUIT ROUTING

THROUGH CEILING SPACE & FUTURE ACCESS.

PATIENT LIFT TRANSFORMER SHALL BE HARDWIRED AND

MOUNTED IN ACCESSIBLE CEILING SPACE; CONTRACTOR

SHALL COORDINATE INSTALLATION LOCATION WITH

MANUFACTURER. PROVIDE LOCAL SNAP SWITCH

DISCONNECT AS SHOWN.

VAV LOW-VOLTAGE TRANSFORMER. CIRCUIT TO

PANELBOARD '21', CIRCUITS 4, 6, 30, 32, 34, OR 36 AS

REQUIRED. COORDINATE WITH MECHANICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

GENERAL SHEET NOTES

1. ALL MECHANICAL VAVs ARE POWERED VIA 120-24V

TRANSFORMERS; PROVIDE (1) TRANSFORMER FOR EACH

VAV. COORDINATE WITH MECHANICAL DRAWINGS AND

CONTRACTOR AS REQUIRED.

2. REFERENCE CONDUIT AND WIRE SCHEDULE ON SHEET E-603

FOR ADDITIONAL CIRCUITING INFORMATION.

3. COORDINATE FINAL FLOOR BOX LOCATIONS WITH

ARCHITECT PRIOR TO INSTALLATION.

MATCHLINE TO SHEET EP101A

MATCHLINE TO SHEET EP103AMATCHLINE TO SHEET EP103A

0 2' 4' 8'

EP102A

MATCHLINE TO SHEET EP101A

1/4" = 1'-0"1 LEVEL 1 - POWER PLAN - CENTER (ADD ALT #3)

PROJECT

NORTH

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

07/23/2021

BOISE VA MEDICAL CENTER - BOISE, ID

531-325 A/E:

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590 - 2118

RAY SPEES, PRESIDENT

Approved:

Office of

Approved: CHIEF, FACILITY MANAGEMENT SERVICE

LRL/BJR JPS/FEB

OPEN

CEILING

OPEN

CEILING

OVERHEAD

PROJECTOR

AUTOMATIC

DOOR

OPENER

11-28

AUTOMATIC

DOOR

OPENER

11-28

STORAGE

STORAGE

107A

GROUP ROOM

MSA & BUSINESS

SERVICES

HOUSEKEEPING

AND LADDER

POLICE

FAMILY TLT

TLT PUBLIC

LACTATION

RECEPTION

VESTIBULE

LOBBY

CORRIDOR

C10

TLT PUBLIC

109TLT PUBLIC

CORRIDOR

C11

P R

W R

W R

P R4

FOR FUTURE

X-RAY

MACHINE

48"AFF

48"AFF

C

USB

USB

USB

W W

11-9 11-27

11-27

11-27

11-29 11-25

11-25

11-25

11-25

11-31

11-29

11-3111-31

11-31

11-33

12-2212-22

11-33

11-33

11-37

12-40

11-31

12-40

11-41

11-41

11-43

AC

11-5011-4811-48

11-47

11-47

11-49

11-49 11-49

12-40

11-48 11-50

11-50 u u u u u u

AC AC AC

21-28

WATER

COOLER

P-608

48"AFF

11-25

PRINTER

11-51

11-45

11-39

A 11-37

48"AFF

11-37

48"AFF

11-37

USB

11-3311-33 11-33

USB

11-29

USB

11-29

11-43

11-41

+48" AFF

11-27

11-27

MEDIA

CABINET

11-22

USB

11-45 11-45

11-28

11-39

11-39

11-24 11-26

AC

T TYP5

T

T

T

T

T

TT

FACP

EMDP1-4

LEVEL 1 - POWER PLAN - WEST

EP103

KEY PLAN

KEY NOTES (THIS SHEET ONLY)

SECURITY DOOR. PROVIDE POWER PROVISIONS AS

REQUIRED. COMPLY WITH BOISE SECURITY DOOR

INFRASTRUCTURE REQUIREMENTS.

PUSH BUTTON DOOR OPERATORS SHALL BE PEDESTAL

MOUNTED.

INSTALL FLOOR BOX IN CORNER. PROVIDE FLOOR BOXES AS

REQUIRED TO MEET NEC REQUIREMENTS IN GLAZING

AREAS.

MOUNT RECEPTACLE IN CEILING AREA OR WALL SPACE

ABOVE DOOR.

VAV LOW-VOLTAGE TRANSFORMER. CIRCUIT TO

PANELBOARD '21', CIRCUITS 4, 6, 30, 32, 34, OR 36 AS

REQUIRED. COORDINATE WITH MECHANICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

GENERAL SHEET NOTES

1. ALL MECHANICAL VAVs ARE POWERED VIA 120-24V

TRANSFORMERS; PROVIDE (1) TRANSFORMER FOR EACH

VAV. COORDINATE WITH MECHANICAL DRAWINGS AND

CONTRACTOR AS REQUIRED.

2. REFERENCE CONDUIT AND WIRE SCHEDULE ON SHEET E-603

FOR ADDITIONAL CIRCUITING INFORMATION.

3. COORDINATE FINAL FLOOR BOX LOCATIONS WITH

ARCHITECT PRIOR TO INSTALLATION.

EP103

MATCHLINE

TO SHEET EP102MATCHLINE TO SHEET EP102

0 2' 4' 8' 1/4" = 1'-0"1 LEVEL 1 - POWER PLAN - WEST

PROJECT

NORTH

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

07/23/2021

BOISE VA MEDICAL CENTER - BOISE, ID

531-325 A/E:

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590 - 2118

RAY SPEES, PRESIDENT

Approved:

Approved: CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

LRL / BJR JPS / FEB

I

J

K

L

M

N

L.2

OPEN

CEILING

OPEN

CEILING

OVERHEAD

PROJECTOR

AUTOMATIC

DOOR

OPENER

11-28

AUTOMATIC

DOOR

OPENER

11-28

48"AFF

48"AFF

C

USB

USB

USB

W W

11-9 11-27

11-27

11-27

11-27

11-29 11-2511-25

11-25

11-25

11-31

11-29

11-3111-31

11-31

11-33

12-2212-22

11-37

12-40

11-31

11-39

12-40

11-41

11-41

11-4311-43

AC

11-47

11-47

11-49

11-4911-49

12-40

11-50 u u u u u u

AC

21-28

WATER

COOLER

P-608

STORAGE

STORAGE

107A

GROUP ROOM

MSA & BUSINESS

SERVICES

HOUSEKEEPING

AND LADDER

POLICE

FAMILY TLT

TLT PUBLIC

LACTATION

RECEPTION

VESTIBULE

LOBBY

CORRIDOR

C10

TLT PUBLIC

109TLT PUBLIC

CORRIDOR

C11

48"AFF

11-25

PRINTER

11-51

11-41

+48" AFF

11-45

11-39

11-39 A

11-37

48"AFF

11-37

48"AFF

11-37

USB

11-3311-33 11-33

USB

11-29

USB

11-29

P R

W R

W R

P R4

ADD ALT 1

FOR FUTURE

X-RAY MACHINE

A 13-21

ICE CADDY BLENDER A

13-4

FRIDGE

13-27

OVEN

13-23,25

+48"

AFF

13-15

COFFEE

BREWER

13-9,11

UC

UC

REGISTER

13-19A

13-4

A 13-4

COFFEE

BREWER

13-9,11

UTILITY

FRIDGE

13-29 UC

ESPRESSO

13-5,7 DISPLAY

CASE

13-15

MEDIA

CABINET

11-22

11-27

USB

11-28

AC

11-45

AC

11-45

11-50 11-5011-48

11-48 11-48

11-24 11-26

13-4

13-4 A

T TYP6

T

T

T

T

T

TT

A

AC

FACP

EMDP1-4

LEVEL 1 - POWER PLAN -

WEST (ADD ALT #1)

EP103A

KEY PLAN

KEY NOTES (THIS SHEET ONLY)

SECURITY DOOR. PROVIDE POWER PROVISIONS AS

REQUIRED. COMPLY WITH BOISE SECURITY DOOR

INFRASTRUCTURE REQUIREMENTS.

PUSH BUTTON DOOR OPERATORS SHALL BE PEDESTAL

MOUNTED.

INSTALL FLOOR BOX IN CORNER. PROVIDE FLOOR BOXES AS

REQUIRED TO MEET NEC REQUIREMENTS IN GLAZING

AREAS.

MOUNT RECEPTACLE IN CEILING AREA OR WALL SPACE

ABOVE DOOR.

COORDINATE WITH ARCHITECTURAL PLANS FOR EXACT

EQUIPMENT/RECEPTACLE PLACEMENTS.

VAV LOW-VOLTAGE TRANSFORMER. CIRCUIT TO

PANELBOARD '21', CIRCUITS 4, 6, 30, 32, 34, OR 36 AS

REQUIRED. COORDINATE WITH MECHANICAL DRAWINGS

FOR ADDITIONAL INFORMATION.

GENERAL SHEET NOTES

1. ALL MECHANICAL VAVs ARE POWERED VIA 120-24V

TRANSFORMERS; PROVIDE (1) TRANSFORMER FOR EACH

VAV. COORDINATE WITH MECHANICAL DRAWINGS AND

CONTRACTOR AS REQUIRED.

2. REFERENCE CONDUIT AND WIRE SCHEDULE ON SHEET E-603

FOR ADDITIONAL CIRCUITING INFORMATION.

3. COORDINATE FINAL FLOOR BOX LOCATIONS WITH

ARCHITECT PRIOR TO INSTALLATION.

MATCHLINE

TO SHEET EP102AMATCHLINE TO SHEET EP102A

EP103A

1/4" = 1'-0"1 LEVEL 1 - POWER PLAN - WEST (ADD ALT #1)

0 2' 4' 8'

PROJECT

NORTH

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

07/23/2021

BOISE VA MEDICAL CENTER - BOISE, ID

531-325 A/E:

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590 - 2118

RAY SPEES, PRESIDENT

Approved:

Approved: CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

LRL / BJR JPS / FEB

8056 SF

MECH

PENTHOUSE

W

21-28 21-28

21-2821-28

21-22

W 21-22

P-HWHS-3

P-HWHS-4

UH-1

EF-1

GF-1

B

C

D

E

F

G

H

I

J

K

L

M

A 1 2 3 42.5

EP104

AHU-1

CU-1

J 21-33

21-22

21-2221-22

21-22

E-502

W 21-26

W 21-24

W 21-24

W 21-24

W 21-24

W 21-26

W 21-26

PN-024

PN-009

PN-010

ROOF AND MECHANICAL PENTHOUSE -

POWER PLANS

EP104

EP104

EP104

KEY PLAN

KEY NOTES (THIS SHEET ONLY)

DISCONNECT SHALL BE MOUNTED VIA HOT-DIPPED

GALVANIZED UNISTRUT UTILIZING SS FASTENING

HARDWARE.

HEAT TRACE GFCI RECEPTACLE. COORDINATE FINAL

LOCATION WITH ROOF DRAIN AND OVERFLOW PIPING PER

ARCHITECTURAL AND MECHANICAL DRAWINGS.

GENERAL SHEET NOTES

1. ALL MECHANICAL EQUIPMENT DISCONNECTS SHALL BE

MOUNTED TO ADJACENT WALL OR TO AN ADJACENT

STAINLESS STEEL UNISTRUT RACK WITH STAINLESS STEEL

FASTENING HARDWARE. CONTRACTOR SHALL PROVIDE

SHOP DRAWINGS OF PROPOSED DISCONNECT MOUNTING

DURING SUBMITTAL PROCESS

2. REFERENCE CONDUIT AND WIRE SCHEDULE ON SHEET E-603

FOR ADDITIONAL CIRCUITING INFORMATION.

PN-008

PN-012

PN-021

PN-022

PN-023

1/8" = 1'-0"1 ROOF AND MECHANICAL PENTHOUSE - POWER PLAN

3/8" = 1'-0"1 ENLARGED MECHANICAL PENTHOUSE - POWER PLAN

0 2' 4' 8'

PROJECT

NORTH

0 2' 4' 8'

PROJECT

NORTH

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

07/23/2021

BOISE VA MEDICAL CENTER - BOISE, ID

531-325 A/E:

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590 - 2118

RAY SPEES, PRESIDENT

Approved:

Office of

Approved: CHIEF, FACILITY MANAGEMENT SERVICE

LRL/BJR JPS/FEB

PN-011

1 2 3 42.5

3TYP

E-502

J

PN-009

PN-010

PN-024

CU-1

21-22

21-2221-22

21-22

W 21-26

W 21-26

W 21-26

AHU-1

21-33

EP-104A

8056 SF

MECH

PENTHOUSE

W

21-28 21-28

21-2821-28

21-22

CON_CENTERCON_TYPE

CON_WIDTH

CON_LENGTH

W 21-22

P-HWHS-3

P-HWHS-4

UH-1

EF-1

GF-1

INVERTER 'A'

INVERTER 'B'

PV1

B

C

D

E

F

G

H

I

J

K

L

M

A

ROOF AND MECHANICAL PENTHOUSE -

POWER PLANS (ADD ALT #2)

EP104A

KEY PLAN

KEY NOTES (THIS SHEET ONLY)

REFERENCE SOLAR SHEETS EY104 AND EY601 FOR MORE

INFORMATION ON EQUIPMENT AND LOCATIONS. SOLAR

SYSTEM SHALL BE ADD ALT 2.

SOLAR PV EQUIPMENT, REFERENCE SHEET EY501 AND

EY601.

HEAT TRACE GFCI RECEPTACLE.

DISCONNECT SHALL BE MOUNTED VIA HOT-DIPPED

GALVANIZED UNISTRUT UTILIZING SS FASTENING

HARDWARE.

GENERAL SHEET NOTES

1. ALL MECHANICAL EQUIPMENT DISCONNECTS SHALL BE

MOUNTED TO ADJACENT WALL OR TO AN ADJACENT

STAINLESS STEEL UNISTRUT RACK WITH STAINLESS STEEL

FASTENING HARDWARE. CONTRACTOR SHALL PROVIDE

SHOP DRAWINGS OF PROPOSED DISCONNECT MOUNTING

DURING SUBMITTAL PROCESS

2. REFERENCE CONDUIT AND WIRE SCHEDULE ON SHEET E-603

FOR ADDITIONAL CIRCUITING INFORMATION.

PN-008

PN-004

W W

WW

TYPICAL

ADD ALT 2

EP104A

EP104A

PN-011

PN-012

PN-021

PN-022

PN-023

1/8" = 1'-0"1 ROOF AND MECHANICAL PENTHOUSE - POWER PLAN (ADD ALT #2)

3/8" = 1'-0"1 ENLARGED MECHANICAL PENTHOUSE - POWER PLAN (ADD ALT #2)

ADD ALT 2

ADD ALT 2

0 4' 8' 16'

PROJECT

NORTH

0 4' 8' 16'

PROJECT

NORTH

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

07/23/2021

BOISE VA MEDICAL CENTER - BOISE, ID

531-325 A/E:

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590 - 2118

RAY SPEES, PRESIDENT

Approved:

Approved: CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

LRL / BJR JPS / FEB 177 OF 206

1 2 3 4

B

C

D

E

F

1.1 3.9

A.1

2.1 2.9

2.5

B.8

A

N

N

N

N

N

N

N

N

N

N

N

N

N

2 2

2 2

2 2

W

W

W

E-401

E-401

W

W

W W

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

FS

FS

W

360°

2 2

48" AFF

TV

TYPICAL

S

S

S

E-501

S

S

E-401

2 2

2 2

ELEC

OFFICE

OFFICE

SOILED MED

EQUIP

S TLT

STAFF LOUNGE

OIT SERVER

MECH

STAFF LOCKERS

STAFF LOCKERS

STAFF LOCKERS

STAFF LOCKERS

EXAM ROOM 07

EXAM ROOM 06

EXAM ROOM 05

EXAM ROOM 04

EXAM ROOM 14

EXAM ROOM 13

EXAM ROOM 12

EXAM ROOM 11

EXAM ROOM 21

EXAM ROOM 20

EXAM ROOM 19

EXAM ROOM 18

EXAM ROOM 28

EXAM ROOM 27

EXAM ROOM 26

EXAM ROOM 25

PACT TEAM

P TLT

P TLT

159ALCOVE

142 ALCOVE

S TLT

CORRIDOR

C13

S TLT

177S TLT

CORRIDOR

C15

PACT TEAM

A

S S

2 2

S

WAP S

4 4

N 1

N 1

N 1

N 1N

1 N

N 4

N 4

N

1 N

1 N

1N

1N

1N

1N 1 N

1 N

1 N

1 N

TYP

ADD ALT 4

ADD ALT 3

TSTS

NCS 4

DDC CONTROL

PANEL 6

TYP

TYP

TYP

2 2

EXAM ROOM 03

EXAM ROOM 10

133 EXAM ROOM 17

EXAM ROOM 24

2 2

2 2

2 2

2 2

2 2

2 2

WAPS

LEVEL 1 - SPECIAL SYSTEMS PLAN -

EAST (ADD ALT #3, #4)

ET101A

KEY PLAN

KEY NOTES (THIS SHEET ONLY)

PIN PAD READER TO BE LENEL MTK15 READER OR

APPROVED EQUAL, TYPICAL FOR ALL SHOWN.

CONTRACTOR SHALL ROUTE DATA FLOOR BOX RACEWAY

TO NEAREST WALL TO FACILITATE CONDUIT ROUTING

THROUGH CEILING SPACE AND FUTURE ACCESS.

MINIMUM CONDUIT SIZE SHALL BE 1-1/4".

ROUTE ALL DATA CABLING TO AVOID HIGH CEILING AREAS

AS REQUIRED.

COORDINATE FINAL LOCATION FOR NURSE CALL STATION

WITH VA AS REQUIRED.

PROVIDE CONTROLS AS REQUIRED TO OPEN ACCESS

CONTROL DOOR DURING FIRE ALARM EVENT.

PROVIDE NETWORK CONNECTION TO OIT SERVER ROOM 171

AS REQUIRED. COORDINATE ALL OTHER REQUIREMENTS

WITH MECHANICAL DRAWINGS AS REQUIRED.

PROVIDE DATA CONNECTIONS TO VAV ACTUATOR AND

VALVE FROM DDC CONTROLLER LOCATED IN ROOM 180.

COORDINATE WITH MECHANICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

GENERAL SHEET NOTES

1. CONTRACTOR SHALL COORDINATE THERMOSTAT LOCATIONS

WITH MECHANICAL CONTRACTOR AND PROVIDE CONDUIT, BOX

AND PULL STRING.

2. DATA CABLING SHALL ROUTE BACK TO OIT SERVER ROOM 171.

3. FIRE ALARM CABLING SHALL ROUTE TO FACP LOCATED IN

VESTIBULE 101.

4. ALL MECHANICAL VAVs SHALL HAVE DATA CONNECTION RAN

BACK TO DDC CONTROLLER FOR CONTROL. COORDINATE

WITH MECHANICAL DRAWINGS AND CONTRACTOR AS

REQUIRED.

5. COORDINATE FINAL FLOOR BOX LOCATIONS WITH ARCHITECT

PRIOR TO INSTALLATION.

MATCHLINE TO SHEET ET102A

MATCHLINE TO SHEET ET102A

ET101A

1/4" = 1'-0"1 LEVEL 1 - SPECIAL SYSTEMS PLAN - EAST (ADD ALT #3, #4)

0 2' 4' 8'

PROJECT

NORTH

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: Project Director

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

07/23/2021

BOISE VA MEDICAL CENTER - BOISE, ID

531-325 A/E:

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590 - 2118

RAY SPEES, PRESIDENT

Approved:

Office of

Approved: CHIEF, FACILITY MANAGEMENT SERVICE

LRL/BJR JPS/FEB

Xref ..\..\..\..\X-Ref's\A-402.dwg

N

N

N

N

N

N

N

N

N

N

N

N

N

N

W

N N

WAPWAP WAP WAP

WAP WAP

WAPWAP

WAP

1 TYPICAL

W

S2 2

E-501

EXAM ROOM 03

EXAM ROOM 02

EXAM ROOM 01

WOMEN'S

HEALTH 01

EXAM ROOM 10

EXAM ROOM 09

EXAM ROOM 08

PROCEDURE

ROOM 01

WH TLT

118A

PROCEDURE

ROOM 01

EXAM ROOM 15

EXAM ROOM 16

EXAM ROOM 17

PACT TEAM

EXAM ROOM 24

EXAM ROOM 23

EXAM ROOM 22

WH TLT

163A

WOMEN'S

HEALTH 02

CLEAN SUPPLY

138 CLEAN SUPPLY

ALCOVE, H/W

ALCOVE, H/W

CORRIDOR

C11

CORRIDOR

C12

CORRIDOR

C14

CORRIDOR

C13

PACT TEAM

EM

TYP.

TYP.

S

TYP.

TYP.

E

F

G

H

I

OPEN

CEILING

OPEN

CEILING

N

N

N

N

N

N

N

N

NN

N

N

N

N

N

N

N

N N

N

4 4

2EM EM

S

S S

S

S S

S

S

2 2

2 2

2 2

S

2 A

A

EM

2 2

2 2

2 2

2 2

2 2

2 2

WAP

WAP S

WAP

LEVEL 1 - SPECIAL SYSTEMS PLAN -

CENTER (ADD ALT #3)

ET102A

KEY PLAN

KEY NOTES (THIS SHEET ONLY)

PIN PAD READER TO BE LENEL MTK15 READER OR

APPROVED EQUAL, TYPICAL FOR ALL SHOWN.

72" HEIGHT FOR OMNICELL. COORDINATE WITH EQUIPMENT

MANUFACTURER AS REQUIRED.

CONTRACTOR SHALL ROUTE DATA FLOOR BOX RACEWAY

TO NEAREST WALL TO FACILITATE CONDUIT ROUTING

THROUGH CEILING SPACE AND FUTURE ACCESS. MINIMUM

CONDUIT SIZE SHALL BE 1-1/4".

PROVIDE DATA CONNECTIONS TO VAV ACTUATOR AND

VALVE FROM DDC CONTROLLER LOCATED IN ROOM 180.

COORDINATE WITH MECHANICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

MATCHLINE TO SHEET ET101AMATCHLINE TO SHEET ET101A

MATCHLINE TO SHEET ET103AMATCHLINE TO SHEET ET103A

ET102A

ADD ALT 3

1/4" = 1'-0"1 LEVEL 1 - SPECIAL SYSTEMS PLAN - CENTER (ADD ALT #3)

0 4' 8' 16'

PROJECT

NORTH

GENERAL SHEET NOTES

1. DATA CABLING SHALL ROUTE BACK TO OIT SERVER ROOM

171.

2. FIRE ALARM CABLING SHALL ROUTE TO FACP LOCATED IN

VESTIBULE 101.

3. CONTRACTOR SHALL COORDINATE THERMOSTAT LOCATIONS

WITH MECHANICAL CONTRACTOR AND PROVIDE CONDUIT,

BOX AND PULL STRING.

4. ALL MECHANICAL VAVs SHALL HAVE DATA CONNECTION RAN

BACK TO DDC CONTROLLER FOR CONTROL. COORDINATE

WITH MECHANICAL DRAWINGS AND CONTRACTOR AS

REQUIRED.

5. COORDINATE FINAL FLOOR BOX LOCATIONS WITH

ARCHITECT PRIOR TO INSTALLATION.

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

07/23/2021

BOISE VA MEDICAL CENTER - BOISE, ID

531-325 A/E:

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590 - 2118

RAY SPEES, PRESIDENT

Approved:

Approved: CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

LRL / BJR JPS / FEB 181 OF 206

I

J

K

L

M

N

L.2

OPEN

CEILING

OPEN

CEILING

S

NS

W D

C

WAP WAP

WAP

WAP WAP

W

W W

W

W

FACP

FS

S

WAP G

WAP G

S

UC

UC UC UC UC

UC

W D

WAP G

S

STORAGE

108STORAGE

107A

GROUP ROOM

MSA & BUSINESS

SERVICES

HOUSEKEEPING

AND LADDER

POLICE

FAMILY TLT

TLT PUBLIC

LACTATION

RECEPTION

VESTIBULE

LOBBY

CORRIDOR

C10

TLT PUBLIC

TLT PUBLIC

CORRIDOR

C11

S

WAP S

FS

S

MEDIA

CABINET

AC

S

S

OVERHEAD

PROJECTOR

TYP

2 2 2

2 2 2

2 2

72" AFF

TV

22 2

LEVEL 1 - SPECIAL SYSTEMS PLAN -

WEST

ET103

KEY PLAN

KEY NOTES (THIS SHEET ONLY)

CONTRACTOR SHALL PROVIDE J-BOX IN WALL AND ROUTE 2"

CONDUIT TO COMM ROOM 171 FOR FUTURE COFFEE SHOP

SPACE. COORDINATE WITH OWNER FOR FINAL LOCATION.

PROVIDE PUSH BUTTON TO ELECTRONICALLY LOCK

BUILDING FRONT ENTRANCE

AUDIO/VISUAL CONTROLLER AND INPUT DEVICE. PROVIDE

COMPLETE AND FULLY FUNCTIONAL AUDIO SYSTEM. AUDIO

SYSTEM SHALL INTEGRATE WITH OVERHEAD PROJECTOR

AND SPEAKER SYSTEM. COORDINATE WITH A/V

CONTRACTOR AND ARCHITECT FOR FINAL INSTALLATION

LOCATIONS.

PROVIDE DATA CONNECTIONS TO VAV ACTUATOR AND

VALVE FROM DDC CONTROLLER LOCATED IN ROOM 180.

COORDINATE WITH MECHANICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

GENERAL SHEET NOTES

ET103

MATCHLINE

TO SHEET ET102MATCHLINE TO SHEET ET102

1/4" = 1'-0"1 LEVEL 1 - SPECIAL SYSTEMS PLAN - WEST

0 4' 8' 16'

PROJECT

NORTH

1. DATA CABLING SHALL ROUTE BACK TO OIT SERVER ROOM

171.

2. FIRE ALARM CABLING SHALL ROUTE TO FACP LOCATED IN

VESTIBULE 101.

3. CONTRACTOR SHALL COORDINATE THERMOSTAT LOCATIONS

WITH MECHANICAL CONTRACTOR AND PROVIDE CONDUIT,

BOX AND PULL STRING.

4. ALL MECHANICAL VAVs SHALL HAVE DATA CONNECTION RAN

BACK TO DDC CONTROLLER FOR CONTROL. COORDINATE

WITH MECHANICAL DRAWINGS AND CONTRACTOR AS

REQUIRED.

5. COORDINATE FINAL FLOOR BOX LOCATIONS WITH

ARCHITECT PRIOR TO INSTALLATION.

PhaseARCHITECT/ENGINEER OF RECORD

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Revisions: Date:

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

07/23/2021

BOISE VA MEDICAL CENTER - BOISE, ID

531-325 A/E:

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590 - 2118

RAY SPEES, PRESIDENT

Approved:

Approved: CHIEF, FACILITY MANAGEMENT SERVICE

MEDICAL CENTER DIRECTOR

LRL / BJR JPS / FEB

File details come from the government source that posted it. Updated .