531-325 - Drawings-10-M1.pdf

PDF 4 MB Posted

Attached to
Y1DZ--TIERED EVALS - Construct Primary Care/Mental Health Building Minor Construction - Boise 531-325
Solicitation number
36C77624R0096
Issued by

About this file

This document appears to be a set of construction drawings and associated specifications for a federal contract opportunity to Construct a Primary Care/Mental Health Building Minor Construction Project at the VA Medical Center in Boise, ID.

The key details are:

  • The solicitation number is 36C77624R0096.
  • The agency is the Department of Veterans Affairs Technology Acquisition Center Austin.
  • The project involves constructing a new primary care and mental health building, including HVAC, plumbing, and electrical systems.
  • The drawings provide detailed specifications for the HVAC system, including air handling units, VAV boxes, ductwork, piping, and controls.
  • The project includes construction of various exam rooms, offices, waiting areas, and support spaces.
  • The HVAC system is designed to maintain temperature and humidity levels for the different space types.
  • The control system will integrate with the existing campus BMS.

View the file

Other files

File Type Posted
0005 - Tech Questions Tracker - Boise PCMH - 8-7-24.pdf PDF
36C77624R0096 0005.pdf PDF
36C77624R0096 0004.pdf PDF
0004 - Tech Questions Tracker - Boise PCMH - 8-5-24.pdf PDF
0004 - Brand Name Justification.pdf PDF
36C77624R0096 0003.pdf PDF
0003 - Tech Questions Tracker - Boise PCMH - 8-1-24.pdf PDF
36C77624R0096 0002.pdf PDF
0001 - Site Visit Sign-in - 7-16-24.pdf PDF
36C77624R0096 0001.pdf PDF
531-325 - Drawings-14-E3.pdf PDF
531-325 - Drawings-07-A2.pdf PDF
531-325 - SOW 4-15-24.pdf PDF
531-325 - Drawings-05-S1.pdf PDF
531-325 - Specs-Vol-1.pdf PDF
Small Business Subcontracting Plan Model.docx DOCX document
531-325 - Drawings-09-A4.pdf PDF
531-325 - Drawings-03-C2.pdf PDF
Division Cost Breakdown.xlsx XLSX spreadsheet
531-325 - Drawings-15-E4.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
Site Visit Instructions.pdf PDF
531-325 - Drawings-16-E5.pdf PDF
531-325 - Specs-Appx-B.pdf PDF
531-325 - Drawings-04-L1.pdf PDF
531-325 - Specs-Vol-2.pdf PDF
531-325 - Specs-Appx-A.pdf PDF
Site Visit Map.pdf PDF
531-325 - Drawings-01-G1.pdf PDF
RFP 36C77624R0096.docx DOCX document
531-325 - Drawings-06-A1.pdf PDF
531-325 - Drawings-02-C1.pdf PDF
531-325 - Drawings-11-P1.pdf PDF
531-325 - Drawings-13-E2.pdf PDF
531-325 - Drawings-08-A3.pdf PDF
531-325 - Specs-Appx-C.pdf PDF
531-325 - Specs-Appx-E.pdf PDF
DBA Wage Rates - Ada County - 01-12-24.pdf PDF
531-325 - Drawings-12-E1.pdf PDF
531-325 - Specs-Appx-F.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HVAC BASIS OF DESIGN

SUMMER OUTDOOR

DESIGN DB (°F)

105 STATE COUNTY CLIMATE ZONE

SUMMER OUTDOOR

DESIGN WB (°F)

62.8 IDAHO ADA 5B

WINTER OUTDOOR

DESIGN DB (°F)

0 DESIGN ALTITUDE 2,730 FT

INDOOR SPACE

SUMMER INDOOR DESIGN CONDITIONS WINTER INDOOR DESIGN CONDITIONS

TEMPERATURE DB

(°F)

RELATIVE

HUMIDITY (%)

TEMPERATURE DB

(°F)

RELATIVE

HUMIDITY (%)

GENERAL CLINIC 72 20-60 74 20-60

WAITING AREA 72 20-60 74 20-60

EXAM ROOMS 72 20-60 74 20-60

CONNECT NEW TO EXISTING

SHEET NUMBER

SECTION DESIGNATION

BLANKED FOR 1-WAY

BLANKED FOR 2-WAY

BLANKED FOR 3-WAY

STANDARD 4-WAY

SELF-CLOSING FIRE DAMPER

AUTOMATIC SMOKE DAMPER

COMBINATION SMOKE/FIRE

ROOF EXHAUST FAN SHOWN

ROOF EXHAUST FAN SHOWN

AUTOMATIC CONTROL DAMPER

RISE/DROP

TAKE-OFFSUPPLY

CEILING

DUCT MTD.

DIFF/GRILLE

BULLHEAD SPLIT

TAKEOFF

DIFF/GRILLE

TO

OR

HARD

ELBOW

SUPPLY DUCT DOWN

SUPPLY DUCT UP

OR

R w

SINGLE LINE

RETURN/EXHAUST

CONVERGE

BULLHEAD

SUPPLY/RETURN/

RISE OR DROP

SUPPLY/RETURN

RETURN/EXHAUST

TAKE-OFF

90°F

TAP

45°F

TAP

/EXHAUST

HORIZONTAL

DUCT DOWN

EXHAUST

OFFSET

RING

DUCT

RISE/DROP

DUCT

FLEXIBLE

1/4"x1/4" WMS

OPEN END

DUCT W/

RETURN/EXHAUST

ACOUSTICALLY

LINED DUCT

CEILING

DUCT MTD.

DIFF/GRILLE

DUCT UP

DOUBLE LINE

DUCTWORK SYMBOLS

REG./GRILLE

DUCT MTD.

SIDEWALL

BD

LD MF'R

BOOT BY

VD VD

UC 1/2"

LVDR 1.5 SF

OR

SUPPLY AIR FLOW

BACKDRAFT DAMPER

UNDERCUT DOOR

LOUVERED DOOR

SGD

AVS

ACD

SFD

SD

FD

VD

VD VD

SLIDE GATE DAMPER

AIR VOLUME TRAVERSE STATION

MANUAL VOLUME DAMPER

W/ACCESS DOOR

W/ACCESS DOOR

W/ACCESS DOOR

DAMPER W/ACCESS DOOR

BLOW SUPPLY DIFFUSER

BLOW SUPPLY DIFFUSER

BLOW SUPPLY DIFFUSER

BLOW SUPPLY DIFFUSER

ON FLOOR PLAN

ON ROOF

ADDITIONAL SYMBOLS

EQUIPMENT

DUCTWORK OR

TO BE REMOVED

FIRE DAMPER

M MOTORIZED DAMPER POINT OF DEMOLITION

TURNING VANES

DUCT UP

SINGLE LINE DOUBLE LINE

TEMPERATURE SENSOR OR

THERMOSTAT

RETURN OR EXHAUST AIR

FLOW DIRECTION

SUPPLY SIDEWALL

LINEAR DIFFUSER

(W/SHEET METAL

PLENUM W/1"

LINING & BRANCH

CONN FOR EVERY

4' OF LENGTH)

SUPPLY CEILING

LINEAR DIFFUSER

(W/SHEET METAL

PLENUM W/1"

LINING & BRANCH

CONN FOR EVERY

4' OF LENGTH)

STANDARD

RADIUS ELBOW (R

= W)

SUPPLY/RETURN

/EXHAUST

XxX [X] XXX,XxX,XX°

AIR OUTLET CALLOUT

BALL VALVE

UNION OR FLANGE (AS INDICATED BY PIPE SIZE - SEE SPEC.)

WATER BALANCING VALVE

AUTOMATIC CONTROL VALVE, MODULATING ACTUATOR

PIPE BREAK (SINGLE LINE)

RISE (SINGLE LINE - PLAN VIEW)

DROP (SINGLE LINE - PLAN VIEW)

BOTTOM TAKEOFF

TOP TAKEOFF

BLIND FLANGE

END CAP

BUTTERFLY VALVE

GATE VALVE THREADED

CHECK VALVE

PIPING LEGEND

INVERTED BUCKET TRAP

GATE VALVE FLANGED

BALL VALVE WITH 3/4" HOSE ADAPTER

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

FLEXIBLE CONNECTION

SAFETY RELIEF VALVE

PRESSURE GAGE

THERMOMETER

FLOAT AND THERMOSTAT TRAP

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

ECCENTRIC REDUCER

DIRECTION OF PIPE PITCH (DOWN)

PROJECT NOTES

1. VA WILL SHUT DOWN EXISTING UTILITY SYSTEM AS NECESSARY FOR CONTRACTOR TO PERFORM

REQUIRED WORK. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING WET SYSTEMS, SUCH AS

WATER, CHILLED WATER, HEATING WATER ETC. AS REQUIRED TO ACCOMPLISH NEW WORK.

CONTRACTOR IS ALSO RESPONSIBLE FOR RE-FILLING SYSTEMS INCLUDING ADDING CHEMICAL AS REQUIRED.

IT IS ACCEPTABLE TO SALVAGE EXISTING TREATED WATER IN CLEAN STORAGE CONTAINERS APPROVED BY

THE VA, AND RE-INJECT IT INTO THE SYSTEM UPON COMPLETION OF WORK. ANY TREATED WATER NOT

RE-INJECTED IS TO BE PROPERLY DISPOSED OF.

HEATING HOT WATER SUPPLY

HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLY - PROPYLENE GLYCOL

HEATING HOT WATER RETURN - PROPYLENE GLYCOL

HWHR

HWHS

PGR

PGS

1 2 3 4 5

NECK SIZE (IN)

AIR OUTLET TYPE

AIRFLOW (CFM)

SIZE (IN) OF CONNECTING BRANCH DUCT

ANGLE OF THROW, DOWN FROM HORIZONTAL (°)

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

M-001

LEGENDS, SYMBOLS,

ABBREVIATIONS, & NOTES -

MECHANICAL

JCJ DLO

Revisions: Date: 128 OF 206

1 2 2.5 3 4

AA

A.1 A.1

BB

B.8B.8

CC

DD

EE

FF

GG

HH

II

JJ

KK

LL

L.2L.2

MM

ELEC

OFFICE

OFFICE

SOILED

MED EQUIP

STAFF TLT

STAFF

LOUNGE

OIT

SERVER

MECH

STAFF

LOCKERS

STAFF

LOCKERS

STAFF

LOCKERS

STAFF

LOCKERS

EXAM

ROOM 07

EXAM

ROOM 06

EXAM

ROOM 05

124EXAM

ROOM 04

EXAM

ROOM 14

EXAM

ROOM 13

EXAM

ROOM 12

EXAM

ROOM 11

PACT

TEAM

SHELL

PUBLIC

TLT

ALCOVE

EXAM

ROOM 03

EXAM

ROOM 02

EXAM

ROOM 01

WOMEN'S

HEALTH 01

EXAM

ROOM 10

EXAM

ROOM 09

EXAM

ROOM 08

PROCEDURE

ROOM 01

ALCOVE,

H/W

WOMEN'S

HEALTH

TLT

118A

PACT

TEAM

CLEAN

SUPPLY

ALCOVE,

H/W

STORAGE

STORAGE

107A

GROUP

ROOM

PUBLIC

TLT

PUBLIC

TLT

MSA &

BUSINESS

SERVICES

HOUSEKEEPING

AND

LADDER

POLICE

FAMILY

TLT

PUBLIC

TLT

LACTATION

RECEPTION

VESTIBULE

CORRIDOR

C13

LOBBY

STAFF TLT

174 STAFF TLT

STAFF TLT

CORRIDOR

C11

CORRIDOR

C10

CORRIDOR

C12

CORRIDOR

C14

CORRIDOR

C15

16"ø

"x

16"x12" 20"x16"

14"x12"

14"x10"

36"x10"

"x

"x

"x

"x

"x

12"ø

12"ø

12"ø

12"ø

12"ø

12"ø

12"ø

"ø

"ø

"ø

12"ø

8"x6"

10"x8"

20"x20"

10"ø8"ø 8"ø8"x6"

8"x6"

8"x8"

16"ø

16"ø

"x

" 6"ø

14"ø

"ø

"ø

6"ø 12"ø 12"x12"

32"x28"

"x

14"x12"

14"x12"

8"ø

14"ø

14"ø

6"ø

"ø

6"ø

10"ø

12"x12"

10"ø

6"ø 16"ø

"x

"x

"x

"ø

8"x8"

12"x12" 7"ø

16"x14"

18"ø 16"ø

8"ø

12"ø

"x

16"x14"

22"x16"

10"ø

"ø

5"ø

8"ø

"x

8"ø 8"ø

8"x8"6"ø

16"x16"16"ø

6"ø

12"ø

"x

"x

12"ø

"x

7"ø

10"x10"

8"x8" 8"ø

10"ø

12"ø

"x

14"x14"

12"ø

"x

"x

16"x16" 16"ø

"x

7"ø

7"ø

8"ø

"x

12"ø

10"ø

31"/18"

46"x28"

8"ø

46"x28"

10"ø 8"ø

12"ø

"x

27"/18"

42"x24" ø8"

"x

16"x16"

8"ø

16"ø

8"ø

16"ø16"x16"

12"ø

"x

"x

12"x10"

8"x8"

"x

12"ø12"ø

"x

14"x14"

"ø

12"ø

16"ø

14"ø

8"x6"

6"ø ø12" 8"ø

8"ø 16"ø

"x

8"ø

8"x8"

8"ø

18"x14"

"ø

"x

12"ø

16"ø

16"x12"

12"ø

"x

8"ø

21"/18"

16"x16"

"ø

14"ø

28"x16"6"ø

8"ø

8"ø

12"ø

24"/18"31"/18"

8"x8"

8"ø

28"x16"

8"x8"

8"ø 8"ø

24"/18"

"ø

8"ø 8"ø

18"x14"

8"øø12"

18"x14"

"ø

"x

14"ø

14"ø

10"ø14"x12"

8"x8"

12"x12"

14"x12"

8"ø

8"x8"

8"ø

8"ø

10"x8"

8"x8"

10"x10"

12"x10"

8"x8"

10"x10"

16"ø 12"ø

16"x16"

"ø

"ø

"x

16"ø

8"ø

10"x10"

8"x8"

8"ø

8"ø

8"x8" 8"x8"

8"x8"

"x ø12"

18"x14"

12"ø

14"ø

"ø

6"ø

8"x8" 6"ø12"x8"

8"ø

8"x8" 6"ø

6"ø

4"ø

10"x8"

8"ø8"ø

10"x8"

8"ø8"ø

8"x6"

8"ø

10"x10"

"x

"x

"x

"ø

"ø

VDVDVDVD

VD

VD

VD

VD VD

VD

VDVD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VDVD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VDVD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VDVD

VD

VD

VD

VDVD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VDVD

VD

VD

VD VD

VD

VD VD VD

VD

VDVD

VD

VD

VD

VDVD

VD

VD VD VD

12"x12" [1] 610 CFM (TYP 6)

8X8[4]TG

8X8[4]TG

VD

8"x6"

8"x8" 10"x8"

6"ø

VD

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

12"ø

8"ø

PAC TEAM SHELL

VAV

12"X12"[4]

TG (TYP 2) 12"X12"[4] 490

12"X12"[2] 320

12"X12"[1] 380

(TYP 3)

22"X22"[3] 925

12"ø

12X12

12X10

22"X22"[3] 925

12"X12"[1] 485

(TYP 3)

12"X10"[3] 270

12"X12"[1] 270

22"X10"[3] 125

22"X10"[3] 115

22"X10"[3]

(TYP 2) TG

10"X10"[4] TG

6"X6"[1] 55

22"X10"[3] 55 6"ø

4SLOT[5]310 (TYP 3)

5SLOT[5]480 (TYP 4)

36X18[4]TRANS (TYP 2)

10X10[3] TG

22X10[3] TG

22X10[3] 245

22X10[3] TG

22X10[3] 115

12X12[6]415

(TYP 3)

8X8[1]115

12X12[1] 630

12X12[1] 550

22X10[3] 700

(TYP 4)

72X60 UP

TO AHU-1

UP

62X24 UP

TO AHU-1

UP

UP

31X18

50X22

41X22

14"x12"

8X8[1] 500

(TYP 4)

22X10[3]

TG (TYP 4)

10X10[1] 300

(TYP 2)

8X8[6] 215

22X22[3] 600

6X6[1] 30

(TYP 2)

ø12"

22X10[3] 105

(TYP 2)22X10[3] 160

6X6[1] 60

12X12[1] 520

(TYP 3)

22X22[3] 115

22X10[3] 105

(TYP 2)

6X6[1] 30

(TYP 2)

8X8[1] 150

(TYP 2)

8X6[6] 150

8X6[4] 150

12X12[2] 320

22X10[3] 150

(TYP 2)

22X22[3] 1010

22X22[3] 1280

22X22[3] 1280

12X12[1] 3708X8[1] 115

(TYP 4)

12X12[1] 425

(TYP 3)

22X10[3] 100

22X10[3] 115

(TYP 2)

12X12[1] 365

(TYP 2)

22X22[3] 1280

8X8[1] 115

(TYP 3)

22X10[3] 1150

(TYP 3)12X12[1] 360

(TYP 3) 22X22[3] 505

22X22[3] 350

12X12[1] 450

22X10[3] 135

8X8[1] 135

22X10[3] 115

22X10[3] 115

22X12[3] TG

(TYP 2)

22X22[3] 1010

8X8[1] 115

(TYP 2)

X

UP

22X22[3] 1010

8X8[1] 125

(TYP 2)

22X10[3]

TG (TYP 2) 22X10[3]125

12X12[1] 530

(TYP 3)

22X10[3] 100 8X8[4] 65

12X12[4] 360

8X8[4] TG

12X12[6] 360

22X22[3] 995

(TYP 2)

12X12[1] 610

(TYP 4)

12X12[1] 555

(TYP 2)

12X12[1] 550

(TYP 2)

22X22[3]TG

12"ø ø16"

X

22X10[2] TG

8"ø

12"ø

VAV

VAV

VAV

VAV

VAV

VAV

AC

1 1

VAV

VAV

VAV

12"ø 18"x14"

12"ø

8"x8"

VD

VD

VD

VAV

VAV

VAV

VAV

VAV

ROUTE LINE SET UP

TO CU-1 ON ROOF.

VAV

VD 8"(135) 5

8"(115) 5

VD

8"(115) 5

VD

16"(1180) 5

16"(1180) 8"(115)5

VD VD

8"(115)5

8"(115) 5

VD

VD

8"(115) 5

16"(1180) 5

8X8(250) 5

8"(115)5

VD

8"(115)5

VD

16"(1180) 5

8X8(250) 5

22X10[2] TG

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

MH101

FLOOR PLAN - HVAC

JCJ DLO

SCALE: 1/8" = 1'-0"

PROJECT

NORTH

FLOOR PLAN - HVAC

GENERAL NOTES

KEY NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE

AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT

INTERNATIONAL MECHANICAL CODE.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT

ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING

OF THE FLOOR, CEILING, OR WALL.

7. SEE MECHANICAL PIPING PLANS FOR ROOM SENSOR

LOCATIONS.

DUCT CLASSIFICATION SCHEDULE

DUCT LOCATION

SUPPLY DUCT

BETWEEN AIR

HANDLER AND

TERMINAL

UNIT

RETURN DUCT

FROM AIR

OUTLET TO

AIR

HANDLER

DOWNSTREAM

OF TERMINAL

UNITS

EXHAUST

DUCT

DUCT

CONSTRUCTION

CLASS

4" 1" 1" 1"

STATIC

PRESSURE

RATING

ABOVE 3" 1/2" TO 2" 1/2" TO 2" 1/2" TO 2"

PRESSURE POSITIVE POS OR NEG POS OR NEG

POS OR

NEG

SMACNA SEAL

CLASS

A B B B

SMACNA

LEAKAGE CLASS 6 12 12 12

VELOCITY

4000 FPM OR

LESS

2500 FPM OR

LESS

2500 FPM OR

LESS

2500 FPM

OR LESS

PROVIDE 1" DOOR UNDERCUT FOR TRANSFER AIR INTO OR OUT

OF ROOM AS INDICATED BY ARROW. MAXIMUM TRANSFER

QUANTITY TO BE 100 CFM.

20X20 EXHAUST DUCT UP TO PENTHOUSE. SEE MH102 FOR

CONTINUATION

12X12 TRANSFER DUCT UP TO PENTHOUSE. SEE MH102 FOR

CONTINUATION

32X28 RETURN DUCT UP TO PENTHOUSE. SEE MH102 FOR

CONTINUATION.

STUB OUT RETURN AS INDICATED. PROVIDE FILTER FABRIC AT

OPENING AND BALANCE TO VALUE INDICATED.

PROVIDE TERMINAL BOX FOR FUTURE ALTERNATES IN BASE BID,

PROVIDE TEMPORARY ROOM SENSOR AT TEMINAL UNIT FOR

TEMPERATURE CONTROL IN SPACE.

8. SEE ARCHITECTURAL PLAN FOR CEILING TYPES AND ELEVATIONS.

Revisions: Date:

2 2.5 3

I

J

K

L

L.2

M

20X20 DN SEE MH101

FOR CONTINUATION

32X32[4]2500 (TYP 2)32X32[4]2500 (TYP 2)

12X12[4]TG

12X12 DN THRU FLOOR. SEE

MH101 FOR CONTINUATION

32X28 RETURN DN. SEE

MH101 FOR CONTINUATION 32X28 RETURN DN. SEE MH101

FOR CONTINUATION

32X3832X28

X

20X20 M

MECH

PENTHOUSE

LV

UP

EF

M-501

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

MH102

PENTHOUSE MECHANICAL ROOM

PLAN - HVAC

JCJ DLO

GENERAL NOTES

KEY PLAN

KEY NOTES

SCALE: 1/4" = 1'-0"

PROJECT

NORTH

PENTHOUSE MECHANICAL ROOM PLAN - HVAC

DUCT CLASSIFICATION SCHEDULE

DUCT LOCATION

SUPPLY DUCT

BETWEEN AIR

HANDLER AND

TERMINAL

UNIT

RETURN DUCT

FROM AIR

OUTLET TO

AIR

HANDLER

DOWNSTREAM

OF TERMINAL

UNITS

EXHAUST

DUCT

DUCT

CONSTRUCTION

CLASS

4" 1" 1" 1"

STATIC

PRESSURE

RATING

ABOVE 3" 1/2" TO 2" 1/2" TO 2" 1/2" TO 2"

PRESSURE POSITIVE POS OR NEG POS OR NEG

POS OR

NEG

SMACNA SEAL

CLASS

A B B B

SMACNA

LEAKAGE CLASS 6 12 12 12

VELOCITY

4000 FPM OR

LESS

2500 FPM OR

LESS

2500 FPM OR

LESS

2500 FPM

OR LESS

AREA OF WORK

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE

AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT

INTERNATIONAL MECHANICAL CODE.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT

ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING

OF THE FLOOR, CEILING, OR WALL.

7. SEE MECHANICAL PIPING PLANS FOR ROOM SENSOR

LOCATIONS.

Revisions: Date: 130 OF 206

A

A.1

B

B.8

C

D

E

F

G

H

I

J

K

L

M

CONCRETE PAD. SEE STRUCTURAL

PLANS FOR THICKNESS AND

EXTENT OF PAD.

CU

AHU

M-502

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

MH103

ROOF PLAN - HVAC

JCJ DLO

DUCT CLASSIFICATION SCHEDULE

DUCT LOCATION

SUPPLY DUCT

BETWEEN AIR

HANDLER AND

TERMINAL

UNIT

RETURN DUCT

FROM AIR

OUTLET TO

AIR

HANDLER

DOWNSTREAM

OF TERMINAL

UNITS

EXHAUST

DUCT

DUCT

CONSTRUCTION

CLASS

4" 1" 1" 1"

STATIC

PRESSURE

RATING

ABOVE 3" 1/2" TO 2" 1/2" TO 2" 1/2" TO 2"

PRESSURE POSITIVE POS OR NEG POS OR NEG

POS OR

NEG

SMACNA SEAL

CLASS

A B B B

SMACNA

LEAKAGE CLASS 6 12 12 12

VELOCITY

4000 FPM OR

LESS

2500 FPM OR

LESS

2500 FPM OR

LESS

2500 FPM

OR LESS

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE

AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT

INTERNATIONAL MECHANICAL CODE.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT

ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING

OF THE FLOOR, CEILING, OR WALL.

7. SEE MECHANICAL PIPING PLANS FOR ROOM SENSOR

LOCATIONS.

GENERAL NOTES

KEY NOTES

SCALE: 1/8" = 1'-0"

PROJECT

NORTH

ROOF PLAN - HVAC

Revisions: Date: 131 OF 206

AA

A.1 A.1

BB

B.8B.8

CC

DD

EE

FF

GG

HH

II

JJ

KK

LL

L.2L.2

MM

ELEC

OFFICE

OFFICE

SOILED

MED EQUIP

STAFF TLT

STAFF

LOUNGE

OIT

SERVER

MECH

STAFF

LOCKERS

STAFF

LOCKERS

STAFF

LOCKERS

STAFF

LOCKERS

EXAM

ROOM 05

EXAM

ROOM 04

EXAM

ROOM 14

EXAM

ROOM 13

EXAM

ROOM 12

EXAM

ROOM 11

PACT

TEAM

SHELL

PUBLIC

TLT

EXAM

ROOM 03

EXAM

ROOM 02

EXAM

ROOM 01

WOMEN'S

HEALTH 01

EXAM

ROOM 10

EXAM

ROOM 09

EXAM

ROOM 08

PROCEDURE

ROOM 01

ALCOVE,

H/W

PACT

TEAM

CLEAN

SUPPLY

ALCOVE,

H/W

STORAGE

STORAGE

107A

GROUP

ROOM

PUBLIC

TLT

PUBLIC

TLT

MSA &

BUSINESS

SERVICES

HOUSEKEEPING

AND

LADDER

POLICE

FAMILY

TLT

PUBLIC

TLT

LACTATION

RECEPTION

VESTIBULE

CORRIDOR

C13

LOBBY

STAFF TLT

STAFF TLT

STAFF TLT

CORRIDOR

C11

CORRIDOR

C10

CORRIDOR

C12

CORRIDOR

C14

CORRIDOR

C15

AS

EXP

VAV

VAV

VAV

VAV

VAV

28VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV -25

VAV -28

VAV -32

VAV -24

VAV -26

VAV -27

VAV -17

VAV -13

VAV -33

VAV -1

VAV -2

VAV -3

VAV -8

VAV -4

VAV -5&6

VAV -10

VAV -7

VAV -11

VAV -12

VAV -34

VAV -19

VAV -21

VAV -18

VAV -30

VAV -29

HWHR

HWHS

HWHR

HWHS

H W

H R

H W

H S

HWHR

HWHS

HWHR

HWHS

H W

H R

H W

H S

HWHR

HWHS

H W

H R

H W

H S

H W

H S

H W

H R

H W

H R

H W

H S

HWHR

HWHS

H W

H R

H W

H S

DDC

CONTROL

PANEL

HWHR

HWHS

HWHS

HWHR

EXAM

ROOM 07

EXAM

ROOM 06

1"

3/4"

2 1/2"

1"

3/4"

3/4" 3/4"

3/4"

2 1/2"

3/4"

1"

1/2"

1/2"

1 1/4"

1/2"

1"

2 1/2"

2 1/2"

2 1/2"

1/2" 1/2"

1 1/4" 1 1/2"

3/4"

3/4"

1 1/2"

2 1/2"

1/2"

3/4" 1"

3/4" 1"

1/2"

1/2" 3/4"

1 1/2"

2"

3/4" 3/4"

1/2"

1/2"

1/2"

2"

2"

3/4"

3/4" 3/4"

3/4"

2"

1 1/2"

2"

2 1/2"

1/2"

1/2"

2 1/2"

1 1/4"

3/4"

1 1/4"

2 1/2"

2 1/2"

1 1/2"

1"

3/4"

3/4" 3/4"

1/2"

2 1/2" 2 1/2"

3/4"

3/4"

3/4"

VAV - 23

VAV - 16

VAV - 9

2 1/2" HWHS & HWHR

UP MECHANICAL PENTHOUSE

SEE MP105 FOR CONTINUATION.

VAV -25

HX

P-HWHS

P-HWHS

T

T

T

T

T

T

T

T

1T

T

T

T

T

T

T

T

T

1 2

T

T

T

T

T

T T

T

VAV - 15 T

AC-1T

1"

3/4"

T

T VAV - 31

T VAV - 20

T VAV - 22

T VAV - 14

VAV

T

T

H

AC

ROUTE LINE SET UP

TO CU-1 ON ROOF.

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

MP104

FLOOR PLAN - MECH PIPING

JCJ DLO

GENERAL NOTES

KEY PLAN

KEY NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE

AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT

INTERNATIONAL MECHANICAL CODE.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT

ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING

OF THE FLOOR, CEILING, OR WALL.

1 1/2"HWS&R TO REHEAT COIL. SEE DETAIL #1 ON M-501 FOR

COIL PIPING. SEE SCHEDULE FOR VALVE CONFIGURATION.

2 3/4"HWS&R TO REHEAT COIL. SEE DETAIL #1 ON M-501 FOR

COIL PIPING. SEE SCHEDULE FOR VALVE CONFIGURATION.

SCALE: 1/8" = 1'-0"

PROJECT

NORTH

MECHANICAL - PIPING PLAN - HVAC

Revisions: Date: 132 OF 206

2.5

I

J

K

L

L.2

M

CONCRETE PAD

CONCRETE PAD

CONCRETE PAD

2-1/2" PGS & R TO ROOFTOP

UNIT. SEE MP106 FOR

CONTINUATION

AS

EXP

1/2" PGS & R DN

TO UNIT HEATER

HWHR

2 -1/2" HWHS & R DN TO

MECHANICAL ROOM. SEE

MP104 FOR CONTINUATION.

PGS

PGR

P G

R

2 1/2"

2 1/2"

P G

R

P G

S

P-HWHS

GF

P-HWHS

HWHS

HX

2-1/2" CAMPUS HEATING SUPPLY &

RETURN AND GLYCOL HEATING SUPPLY

& RETURN DOWN TO HEAT EXCHANGER.

UH

T

MECH

PENTHOUSE

M-501

M-501

M-502

M-502

M-501

M-401

M-501

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

MP105

PENTHOUSE MECHANICAL ROOM

PLAN -MECHANICAL PIPING

JCJ DLO

GENERAL NOTES

KEY PLAN

KEY NOTES

AREA OF WORK

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE

AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT

INTERNATIONAL MECHANICAL CODE.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT

ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING

OF THE FLOOR, CEILING, OR WALL.

SCALE: 1/4" = 1'-0"

PROJECT

NORTH

PENTHOUSE MECHANICAL ROOM PLAN - MECHANICAL PIPING

Revisions: Date: 133 OF 206

A

A.1

B

B.8

C

D

E

F

G

H

I

P G

R P

G S

2 1/2" PGS & R TO MECHANICAL

PENTHOUSE. SEE MP105 FOR

CONTINUATION.

P G

R P

G S

2 1/2"

2 1/2"HWHS & R

TO AIR HANDLER

AHU

M-502

CU

ROUTE REFRIGERANT

LINES FROM OUTDOOR

UNIT DOWN THROUGH

ROOF TO FAN COIL. SEE

MP104 FOR LOCATION.

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

MP106

ROOF PLAN - MECH PIPING

JCJ DLO

GENERAL NOTES

KEY PLAN

KEY NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE

AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT

INTERNATIONAL MECHANICAL CODE.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT

ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING

OF THE FLOOR, CEILING, OR WALL.

SCALE: 1/8" = 1'-0"

PROJECT

NORTH

ROOF PLAN - MECHANICAL PIPING

Revisions: Date: 134 OF 206

1 2 3 4

B

C

D

E

F

G

H

I

J

K

L

M

N

1.1 3.9

L.2

A.1

2.1 2.92.5

B.8

A

29 SF

Staff Lockers

31 SF

Staff Lockers

280 SF

PACT Team

29 SF

Staff Lockers

31 SF

Staff Lockers

280 SF

PACT Team

280 SF

PACT Team

79 SF

ALCOVE, H/W

79 SF

ALCOVE, H/W

170 SF

Ext Team

280 SF

PACT Team

170 SF

Ext Team

FAMILY TOILET #112

(81 SF)

PRESSURE(-)

SUPPLY 0

EXHAUST 125

TRANSFER 125

AIR CHANGE 10.2

REQ. AC 10

PUBLIC TOILET #113

(74 SF)

PRESSURE(-)

SUPPLY 0

EXHAUST 115

TRANSFER 115

AIR CHANGE 10.3

REQ. AC 10

POLICE #111

(87 SF)

PRESSURE(0)

SUPPLY 55

RETURN 55

TRANSFER 0

AIR CHANGE 4.2

REQ. AC 4

PUBLIC TOILET #108

(75 SF)

PRESSURE(-)

SUPPLY 0

EXHAUST 115

TRANSFER 115

AIR CHANGE 10.2

REQ. AC 10

PUBLIC TOILET #107

(74 SF)

PRESSURE(-)

SUPPLY 0

EXHAUST 115

TRANSFER 115

AIR CHANGE 10.3

REQ. AC 10

STORAGE #114A

(100 SF)

PRESSURE(N)

SUPPLY 360

RETURN 360

TRANSFER 0

AIR CHANGE 10

STORAGE #115

(41 SF)

PRESSURE(N)

SUPPLY 0

EXHAUST 65

TRANSFER 65

AIR CHANGE 10

WOMENS HEALTH

TOILET #163A

(66 SF)

PRESSURE(-)

SUPPLY 0

EXHAUST 100

TRANSFER 100

AIR CHANGE 10

PATIENT TOILET

#159 (70 SF)

PRESSURE(-)

SUPPLY 0

EXHAUST 100

TRANSFER 100

AIR CHANGE 10

WOMENS HLTH

TOILET #118A

(66 SF)

PRESSURE(-)

SUPPLY 0

EXHAUST 100

TRANSFER 100

AIR CHANGE 10

EXAM RM 01 #119

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 03 #121

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 02 #120

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 04 #123

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 05 #124

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 06 #125

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 07 #126

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

WOMEN'S

HEALTH 01 #118

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

GROUP ROOM #114

(468 SF)

PRESSURE(0)

SUPPLY 1470

RETURN 1470

TRANSFER 0

AIR CHANGE 0

EXAM RM 28 #155

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 27 #156

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 26 #157

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 25 #158

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 24 #160

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 23 #161

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 22 #162

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

WOMEN'S

HEALTH 02 #163

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

PATIENT TOILET

#122 (65 SF)

PRESSURE(-)

SUPPLY 0

EXHAUST 100

TRANSFER 100

AIR CHANGE 10

EXAM RM 21 #152

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 20 #151

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 19 #150

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 18 #149

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 17 #148

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 16 #147

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 15 #146

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

PROCEDURE RM 02

#145

(180 SF)

PRESSURE(+)

SUPPLY 450

RETURN 350

TRANSFER 0

AIR CHANGE 16.7

REQ. AC 15

EXAM RM 14 #129

(124 SF)

PRESSURE (0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 13 #130

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 12 #131

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 11 #132

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 10 #133

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 09 #134

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

EXAM RM 08 #135

(124 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 6.7

REQ. AC 6

PROCEDURE RM 01

#136

(180 SF)

PRESSURE(+)

SUPPLY 450

RETURN 350

TRANSFER 0

AIR CHANGE 16.7

REQ. AC 15

CLEAN SUPPLY #164

(222 SF)

PRESSURE(0)

SUPPLY 135

RETURN 135

TRANSFER 0

AIR CHANGE 4

REQ. AC 4

CLEAN SUPPLY #138

223 SF

PRESSURE(0)

SUPPLY 135

RETURN 135

TRANSFER 0

AIR CHANGE 4

REQ. AC 4

LACTATION #117

(84 SF)

PRESSURE(-)

SUPPLY 270

RETURN 270

TRANSFER 0

AIR CHANGE 21.4

REQ. AC 6

MSA & BUSINESS

SERVICES #109

(173 SF)

PRESSURE(0)

SUPPLY 115

RETURN 115

TRANSFER 0

AIR CHANGE 4.4

REQ. AC 4

OFFICE #173

(109 SF)

PRESSURE(0)

SUPPLY 150

RETURN 150

TRANSFER 0

AIR CHANGE 9.2

REQ. AC 4

SOILED MED EQUIP

#176 104 SF

PRESSURE(- -)

SUPPLY 0

EXHAUST 160

TRANSFER 160

AIR CHANGE 10

REQ. AC 10

STAFF LOUNGE #179

370 SF

PRESSURE(0)

SUPPLY 600

RETURN 600

TRANSFER 0

AIR CHANGE 10.8

REQ. AC 6

STAFF TOILET #174

(68 SF)

PRESSURE(-)

SUPPLY 30

EXHAUST 105

TRANSFER 75

AIR CHANGE 10

REQ. AC 10

ELEC 170

119 SF

PRESSURE(0)

SUPPLY 150

RETURN 150

TRANSFER

AIR CHANGE 8.4

REQ. AC 6

MECH RM #201

229 SF

PRESSURE(-)

SUPPLY 215

RETURN 0

EXHAUST 490

AIR CHANGE 10

REQ. AC 10

HOUSEKEEPING &

LADDER #110

(160 SF)

PRESSURE(-)

SUPPLY 0

EXHAUST 245

TRANSFER 245

AIR CHANGE 10.2

REQ. AC 10

STAFF TOILET #178

67 SF

PRESSURE(-)

SUPPLY 30

EXHAUST 105

TRANSFER 75

AIR CHANGE 10

REQ. AC 10

VESTIBULE #101

(489 SF)

PRESSURE(+)

SUPPLY 975

RETURN 0

TRANSFER 0

AIR CHANGE 0

LOBBY #102

(1694 SF)

PRESSURE(+)

SUPPLY 2045

RETURN 0

TRANSFER 0

AIR CHANGE 0

WHEEL CHAIR

ALCOVE #101A

(69 SF)

PRESSURE(+)

SUPPLY 325

RETURN 0

TRANSFER 0

AIR CHANGE 0

WAITING #105

(417 SF)

PRESSURE(+)

SUPPLY 1820

RETURN 0

TRANSFER 0

AIR CHANGE 0

WAITING #104

(414 SF)

PRESSURE(+)

SUPPLY 1820

RETURN 0

TRANSFER 0

AIR CHANGE 0

STAFF TOILET #175

(68 SF)

PRESSURE(-)

SUPPLY 30

EXHAUST 105

TRANSFER 75

AIR CHANGE 10

REQ. AC 10

STAFF TOILET #177

67 SF

PRESSURE(-)

SUPPLY 30

EXHAUST 105

TRANSFER 75

AIR CHANGE 10

REQ. AC 10

PACT TEAM #165

(832 SF)

PRESSURE(0)

SUPPLY 1005

RETURN 1005

TRANSFER 0

AIR CHANGE 6

REQ. AC 6

EXT TEAM #166

(920 SF)

PRESSURE(0)

SUPPLY 1095

RETURN 1095

TRANSFER 0

AIR CHANGE 6

REQ. AC 6

PACT TEAM #169

(758 SF)

PRESSURE(0)

SUPPLY 1440

RETURN 1440

TRANSFER 0

AIR CHANGE 9.4

REQ. AC 6

PACT TEAM #143

(758 SF)

PRESSURE(0)

SUPPLY 1560

RETURN 1560

TRANSFER 0

AIR CHANGE 10.3

REQ. AC 6

EXT TEAM #140

(920 SF)

PRESSURE(0)

SUPPLY 1095

RETURN 1095

TRANSFER 0

AIR CHANGE 6

REQ. AC 6

PACT TEAM #139

(832 SF)

PRESSURE(0)

SUPPLY 1080

RETURN 1080

TRANSFER 0

AIR CHANGE 6.4

REQ. AC 6

CORRIDOR #C13

(679 SF)

PRESSURE(0)

SUPPLY 505

RETURN 505

TRANSFER 0

AIR CHANGE 4.4

REQ. AC 0

OFFICE #172

(109 SF)

PRESSURE(0)

SUPPLY 150

RETURN 150

TRANSFER 0

AIR CHANGE 9.2

REQ. AC 4

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

M-107

AIR FLOW & PRESSURE DIAGRAM

JCJ DLO

SCALE: 1/8" = 1'-0"

PROJECT

NORTH

AIR FLOW & PRESSURE DIAGRAM

Revisions: Date: 135 OF 206

AV

AV

HWHS

HWHS

PGr

HWHS

HWHR

HWHR

PENTHOUSE

HWHS

HWHR

H W

H S

H W

H R

P G

S

P G

R

PGS

PGR

P-HWHS

P-HWHS

P-HWHS

P-HWHS

3/4" FILL LINE FROM

BACKFLOW. SEE

PLUMBING DRAWINGS

3" CAMPUS HWS & HWR

2-1/2"

2-1/2"

2-1/2"

3/4"

2-1/2"

1"

1-1/4"

1-1/4"

1-1/2"

1-1/2"

2-1/2"

1"

3/4"

1/2"

2"

1"

3/4"

1/2"

3/4" 1"

2-1/2"

1"

2"

3/4"

1/2"

3/4"

1/2"

2"

1-1/2"

2"

2-1/2"

1-1/4"

1"

1-1/2"

3/4"

3/4"

1-1/4"

2-1/2"

HWHS

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H S

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

H W

H R

HWHS HWHS

HWHS

HWHS

HWHSHWHSHWHSHWHS

HWHS

HWHR HWHR

HWHR HWHR HWHR HWHR

HWHR

HWHR

HWHR

H W

H S

H W

H R

DIFFERENTIAL

PRESSURE SENSOR

2-1/2"

PRESSURE REDUCING

VALVE SET AT 12 PSI.

2-1/2"

H W

H R

H W

H S

PGS

MECH RM

VAV

HX

HX

VAV

UH

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

AHU

AS

AS

EXP

EXP

UH

GF

AA

A.1 A.1

BB

MECH

AS

EXP

DDC CONTROL

PANEL

2 1/2"

2 1/2"

1"

2 1/2"

2 1/2"

H W

S

H W

S

2 1/2" BUILDING HEATING WATER.

SEE MP104 FOR CONTINUATION.

2 1/2" CAMPUS HEATING WATER.

SEE MP104 FOR CONTINUATION.

DOMESTIC WATER HEATER

AND PUMPS. SEE PLUMBING

PLANS FOR PIPING.

3" CAMPUS HEATING WATER

SUPPLY AND RETURN TO

BELOW SLAB. SEE CIVIL

PLANS FOR CONTINUATION.

FIRE SERVICE

DOMESTIC

WATER SERVICE

HX

P-HWHS

P-HWHS

2-1/2" CAMPUS HEATING SUPPLY & RETURN

AND BUILDING HEATING SUPPLY &

RETURN DOWN TO HEAT EXCHANGER.

M-501

M-502

M-502

HWHS

HWHR

H W

H S

H W

H R

HWHS

HWHR

HWHS

HWHS

HWHR

H W

H S

H W

H R

H W

H S

H W

H R

HWHS

PGS

P G

S

P G

R

HWHS

HWHR HWHR

HWHS

HWHS

HWHR

H W

H S

H W

H R

H W

H R

H W

H R

H W

H S

H W

H S

HWHS

HWHR

HWHS

HWHR

HWHS

HWHR

HWHS

HWHR

H W

H R

H W

H S

H W

H S

H W

H S

H W

H R

H W

H R

HWHS

HWHR

HWHS

HWHSR

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

MP401

ENLARGED MECHANICAL ROOM &

RISER - MECH PIPING

JCJ DLO

SCALE: 1/4" = 1'-0"

PROJECT

NORTH

ENLARGED MECHANICAL ROOM PLAN - MECHANICAL PIPING

GENERAL NOTES

KEY NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE

AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT

INTERNATIONAL MECHANICAL CODE.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT

ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING

OF THE FLOOR, CEILING, OR WALL.

NOT TO SCALE

PROJECT

NORTH

HYDRONIC RISER DIAGRAM

Revisions: Date: 136 OF 206

2.5 3 4

EE

FF

GG

HH

II

12"ø 12"x12"

32"x28"

"x

14"x12"

14"x12"

8"ø

14"ø

"ø 6

"ø

"ø

12"x12"

10"ø

6"ø

16"ø

10"ø

"ø

"ø

5"ø

8"ø

8"ø

12"ø

"ø

"x

"x

6"ø

12"ø

"x

"x

16"x16"

12"ø 12"ø

"ø

8"ø

8"x8"

16"ø

"x

12"ø

8"ø

72"x60"

46"x28"

"ø

10"ø14"x14"

8"ø

10"x10"

8"ø

"ø

"ø

12"ø

"x

27"/18" ø8"

8"ø

"x

16"ø16"x16"

8"x6"

12"ø14"x14"

10"ø

"x

10"ø

"x

"x

"ø

12"x10"

18"x14"

12"ø

VD

VD

VD

VD

VD

VDVD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VDVD

VD

VD VD

VD

VD

VAV

VAV

VAV

VAV

VAV

VAV

VAV

PUBLIC

TLT

EXAM

ROOM 24

ALCOVE

EXAM

ROOM 23

EXAM

ROOM 22

CLEAN

SUPPLY

PROCEDURE

ROOM 01

EXAM

ROOM 15

EXAM

ROOM 16

EXAM

ROOM 17

PAC TEAM

MED 2

WOMEN'S

HEALTH 02

WOMEN'S

HEALTH

TLT

163A

22X10[3]100

22X10[3]TG (TYP 2)

22X22[3]925

22X10[3]115

(TYP 4)

22X22[3]925

22X10[3]TG

(TYP 2)

8X8[1]115

(TYP 4)

12X12[1]485

(TYP 3)

22X10[3]100

8X8[1]135

22X10[3]135

12X12[1]330

12X12[1]450

22X22[3]350

22X10[3]115

(TYP 3)

8X8[1]115

(TYP 3)

12X12[1]335

(TYP 2)

22X22[3]1180

8"ø

12X12[1]365

(TYP 2)

VAV -19T

VAV -18T

VAV -12T

VAV -34T

VAV -11 T

VAV -10 T

16"ø

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

MH402

ENLARGED FLOOR PLAN - PACT

(WEST) - ADD ALT 3 - HVAC

JCJ DLO

GENERAL NOTES

KEY NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE

AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT

INTERNATIONAL MECHANICAL CODE.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT

ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING

OF THE FLOOR, CEILING, OR WALL.

7. SEE MECHANICAL PIPING PLANS FOR ROOM SENSOR

LOCATIONS.

DUCT CLASSIFICATION SCHEDULE

DUCT LOCATION

SUPPLY DUCT

BETWEEN AIR

HANDLER AND

TERMINAL

UNIT

RETURN DUCT

FROM AIR

OUTLET TO

AIR

HANDLER

DOWNSTREAM

OF TERMINAL

UNITS

EXHAUST

DUCT

DUCT

CONSTRUCTION

CLASS

4" 1" 1" 1"

STATIC

PRESSURE

RATING

ABOVE 3" 1/2" TO 2" 1/2" TO 2" 1/2" TO 2"

PRESSURE POSITIVE POS OR NEG POS OR NEG

POS OR

NEG

SMACNA SEAL

CLASS

A B B B

SMACNA

LEAKAGE CLASS 6 12 12 12

VELOCITY

4000 FPM OR

LESS

2500 FPM OR

LESS

2500 FPM OR

LESS

2500 FPM

OR LESS

SCALE: 1/4" = 1'-0"

PROJECT

NORTH

ENLARGED FLOOR PLAN - PACT (WEST) - HVAC

AREA OF WORK

KEY PLAN

Revisions: Date: 137 OF 206

2.5 3 4

B.8B.8

CC

DD

EE

16"ø

"ø

"x

12"ø14"x14"

10"ø

"x

10"ø

"x

"x

"x

8"ø

8"ø

"ø

"ø

18"x14"

"ø

8"ø

"ø

"ø

"x

12"ø

16"ø

"x

"x

"12"ø

"x

"x

8"ø

"x

8"ø

8"ø

16"x16"

"ø

12"ø

18"x12"

"ø

"ø

14"ø

28"x16"

16"ø

"ø

"ø

"ø

"ø

24"/18"31"/18"

8"ø

8"ø

8"ø

18"x14"

"ø

"x

14"ø

"ø

10"ø14"x12"

8"ø

10"x10"

8"ø

8"ø

8"ø

8"x8"

8"ø

8"x8"

10"x10"

"ø

"ø

12"x10"

VD

VD

VD

VD

VD

VD

VD

VD VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VD

VDVD

VD

VD

VD

VD

VD

VD

VDVD

VAV

VAV

VAV

VAV

VAV

VAV

VAV

"ø

PACT TEAM

EXAM

ROOM 18

EXAM

ROOM 19

EXAM

ROOM 20

EXAM

ROOM 21

EXAM

ROOM 28

EXAM

ROOM 26

EXAM

ROOM 27

EXAM

ROOM 25

CORRIDOR

C15

STAFF LOCKERS

22X10[3]700

(TYP 4)

12X12[1]550

22X10[3]115

(TYP 4)

8X8[1]115

(TYP 4)

22X22[3]1180 12X12[1]370

22X22[3]1180

12X12[1]480

(TYP 3)

"ø

12X12[1]380

(TYP 3)

8X8[1]125

(TYP 4)

22X10[3]105

22X10[3]125

(TYP 4)

VAV -30T

VAV -28

T

VAV -19T

VAV -21T

VAV

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

MH403

ENLARGED FLOOR PLAN - PACT

(EAST) - ADD ALT 4 - HVAC

JCJ DLO

GENERAL NOTES

KEY NOTES

1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,

DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.

CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD

MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR

CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE

AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT

INTERNATIONAL MECHANICAL CODE.

3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE

INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING

STANDARDS AS APPROVED BY THE OWNER.

4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

5. COORDINATE EXACT LOCATION OF DUCTWORK WITH

EQUIPMENT, LIGHTING, PIPING, ETC..

6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT

ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING

OF THE FLOOR, CEILING, OR WALL.

7. SEE MECHANICAL PIPING PLANS FOR ROOM SENSOR

LOCATIONS.

DUCT CLASSIFICATION SCHEDULE

DUCT LOCATION

SUPPLY DUCT

BETWEEN AIR

HANDLER AND

TERMINAL

UNIT

RETURN DUCT

FROM AIR

OUTLET TO

AIR

HANDLER

DOWNSTREAM

OF TERMINAL

UNITS

EXHAUST

DUCT

DUCT

CONSTRUCTION

CLASS

4" 1" 1" 1"

STATIC

PRESSURE

RATING

ABOVE 3" 1/2" TO 2" 1/2" TO 2" 1/2" TO 2"

PRESSURE POSITIVE POS OR NEG POS OR NEG

POS OR

NEG

SMACNA SEAL

CLASS

A B B B

SMACNA

LEAKAGE CLASS 6 12 12 12

VELOCITY

4000 FPM OR

LESS

2500 FPM OR

LESS

2500 FPM OR

LESS

2500 FPM

OR LESS

SCALE: 1/4" = 1'-0"

PROJECT

NORTH

ENLARGED FLOOR PLAN - PACT (EAST) - HVAC

AREA OF WORK

KEY PLAN

Revisions: Date: 138 OF 206 m m

M A

X

NOTE:

SEE SPECIFER FOR DETAILED HANGER

REQUIREMENTS

COIL

WATER RETURN

WATER SUPPLY

MV

NOTES:

1. SEE EXPANSION TANK SYSTEM

SCHEDULE FOR COMPONENT SIZES.

2. FOR HOT WATER SYSTEMS 50mm [2"] AND

SMALLER USE IN-LINE AIR PURGER IN

LIEU OF AIR SEPARATOR.

3. SET PRESSURE REDUCING VALVE SO

PRESSURE AT HIGHEST POINT IN SYSTEM

HAS A MINIMUM OF 28kPa [4 PSIG].

4. PROVIDE STRAINER IN AIR SEPARATOR IF

INDICATED IN EXPANSION TANK

SCHEDULE.

DRAIN

DRAIN

TO PUMP

SUCTION

NCD

AV

PI

BUTTERFLY OR

BALL ISOLATION

VALVE

AIR SEPARATOR,

SEE NOTES 1 & 2

HANGER RODS

(TYP)

CONNECTOR PIPE

AUTO AIR VENT TO

DRAIN

ELEVATION

THREADED PIPING

ELEVATION

WELDED PIPING

NOTES:

1. DRAIN ALL LOW POINTS AS INDICATED

ABOVE.

2. WHERE SCALE POCKETS ARE SHOWN ON

PIPE RISER DIAGRAMS AND/OR PLANS

LOCATE DRAIN AT BOTTOM OF SCALE

POCKET.

ELEVATION

NOTES:

1. VENT ALL HIGH POINTS INDICATED ABOVE.

2. IF AUTOMATIC AIR VENTS ARE USED, PIPE

DISCHARGE TO DRAIN.

MV

OR

AV

TYPICAL WATER PIPING

REDUCER, IF REQUIRED

3/4"[20mm] BALL VALVE

ADAPTER TO 3/4"[20mm]

HOSE THREAD. PROVIDE

HOSE CAP NUT

1/4"[8mm] COPPER

TUBING

1/2"[15mm] x 4"[100mm]

NIPPLE

AIR VENT

1/2"[15mm] BALL VALVE

CIRCULATING WATER PIPING

VANE VANE

NOTES:

1. THE INTERIOR SURFACE OF ALL RADIUS

ELBOWS SHALL BE MADE ROUND.

2. ALL STANDARD RADIUS ELBOWS CAN

BE SUBSTITUTED WITH SHORT RADIUS

ELBOWS. ALL SHORT RADIUS ELBOWS

SHALL HAVE VANES. VANES SHALL BE

CONSTRUCTED, SUPPORTED AND

FASTENED AS RECOMMENDED BY

SMACNA.

R SHALL

EQUAL

OR BE

GREATER

THAN W.

R SHALL

EQUAL

OR BE

GREATER

THAN

1/3W.

W

R

R

2/3W 1 /3

W

R SHALL

EQUAL

OR BE

GREATER

THAN

1/6W.

STANDARD

RADIUS OR LONG

RADIUS ELBOW

SHORT RADIUS

ELBOW WITH ONE

VANE

SHORT RADIUS

ELBOW WITH TWO

VANES

1/2W 1 /3

W

1/6W

R

NOTE:

UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.

M A X

M A

X

E Q

U

IP

M E

N T

AIR

FLOW

AIR

FLOW

TYPICAL DUCTWORK TRANSITION

PLAN OR SIDE VIEWTYPICAL DUCTWORK TRANSITION WITH

EQUIPMENT MOUNTED IN DUCT

PLAN OR SIDE VIEW

M A X

M A

X

M A

X

M A

X

MAIN SUPPLY

PLAN VIEW

FLOW

F L

O W

SMACNA FIGURE 4-6 45° LEED IN

RIGID DUCT TO AIR TERMINAL UNIT.

SIDE VIEW TRAPEZE HANGER FOR UP TO

453KG [1000 LB.] UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

NOM. SIZE

PIPE

TUBING

mm

[IN]

mm

[FT]

mm

[FT]

THRU 20

[THRU 3/4]

[7]

[5]

[1]

[7]

[6]

[11/4]

[7]

[7]

[11/2]

[9]

[8]

[2]

[10]

[8]

[21/2]

[11]

[9]

[3]

[12]

[10]

[4]

[14]

[12]

[5]

[16]

[13]

[6]

[17]

[14]

[8]

[19]

[16]

[10]

[22]

[12]

[23]

[14]

[25]

[16]

[27]

[18]

[28]

[20]

[30]

[24]

[32]

NOTE:

1.

2.

DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.

DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR

MULTI-BLADE DAMPERS & ROUND DAMPERS.

SIDE ELEVATION SECTION

12"

NOTE:

THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR

THE DEDICATED AHU SERVING THE SURGICAL SUITE.

NOTE:

1. RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A

MINIMUM OF 3 TIMES THE DIAMETER OF INLET

2. A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX, BUT ALLOWED TO

ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH 3'-0" [900mm].

3. A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE BOX INLET, PROVIDED THE

EQUIVALENT LENGTH OF THE BRANCH DUCT, AS SHOWN, DOES NOT EXCEED 10 FEET (3 METERS). FOR

LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A DUCT TRANSITION TO MAINTAIN THE DUCT

STATIC PRESSURE DROP AT OR BELOW 0.2"/100' [1.64Pa/m].

4. FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0" [1500mm]. USE RIGID ELBOWS FOR CHANGE OF DIRECTION GREATER THAN 45°.

5. COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE

INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.

6. USE OF THE FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE DEDICATED AHU SERVING

THE SURGICAL SUITE.

S E

E N

O T

E

SEE NOTE 3

SEE NOTE 2

SEE NOTE 1

T

ISOLATION VALVE (BALL)

CALIBRATED BALANCING VALVE

3-WAY MODULATING

CONTROL VALVE

REDUCER, IF REQUIRED (TYP)

TEMPERATURE SENSOR (TYP)

MANUAL AIR VENT

BALL DRAIN VALVE WITH

HOSE CONNECTION AND

CAP (TYP) STRAINER WITH BALL

DRAIN VALVE AND HOSE

CONNECTION WITH CAP

UNION (TYP)

T

P&T TEST PORT

COIL

WATER RETURN

WATER SUPPLY

MV

T

ISOLATION VALVE (BALL)

CALIBRATED BALANCING VALVE

2-WAY MODULATING

CONTROL VALVE

REDUCER, IF REQUIRED (TYP)

TEMPERATURE SENSOR (TYP)

MANUAL AIR VENT

BALL DRAIN VALVE WITH

HOSE CONNECTION AND

CAP (TYP) STRAINER WITH BALL

DRAIN VALVE AND HOSE

CONNECTION WITH CAP

UNION (TYP)

T

P&T TEST PORT

NOTES:

1. PROVIDE LOW WATER LEVEL ALARM. PROVIDE A LOW

WATER LEVEL AT ECC. RELIEF VALVE DRAIN SHALL RETURN

TO TANK AS SHOWN ON THIS DETAIL.

2. SET REGULATING VALVE TO MAINTAIN MAKE-UP PRESSURE

AT 15 PSIG [103 kPa] ABOVE HIGHEST SYSTEM PRV SETTING.

3. MAKE-UP PIPING SYSTEM DOES NOT REQUIRE INSULATION.

4. OPERATE PUMP MANUALLY AS REQUIRED TO FILL.

D

PUMP

SUCTION

LOW WATER LEVEL ALARM

(SEE NOTE 1)

HANGER ROD

DIFFUSER (TYP.)

FLEXIBLE AIR DUCT CONNECTOR.

SEE DETAIL

SOUND ATTENUATOR. SEE

EQUIPMENT SCHEDULE

REHEAT COIL

SEE NOTE 5

AIR TERMINAL

UNIT (CV OR VAV)SEE SPECIFICATIONS FOR

CLAMPS AND SEALANT (TYP.)

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

43mm[1-5/8"] 12 GAUGE CHANNEL OR 50X50X6.4mm [2"X2"X1/4"] ANGLE

BAND

15mm [1/2"] DIA. HANGER RODS WITH 900mm [36"]

MAX. SPACING ON EACH

CHANNEL

SADDLE

WELD

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION (9

PSF MIN. DENSITY) UNDER

INSULATION SHIELD

INSULATION SHIELD

AT HANGER

PROVIDE INSULATION

SHIELD & INSERT FOR ALL

PIPING (200mm [8"] MIN.)

OMIT PRESSURE GAUGE

LINE IF STRAINER IS NOT

INCLUDED.

FROM SYSTEM

REDUCED PRESSURE ZONE

BACKFLOW PREVENTER

RUN DRAIN LINE

TO NEAREST FD

COLD WATER FILL LINE.

SEE EXPANSION TANK

SCHEDULE FOR SIZE

AIR CHARGING

SCHRADER VALVE

BLADDER

EXPANSION

TANK

150mm [6"]

HOUSEKEEPING

PAD

FLOOR MOUNTING BASE RING

WITH DRAIN ACCESS OPENING

SHOWN. ANGLE IRON LEGS MAY

BE USED AS AN OPTION.

THERMAL INSULATION

SEE SPECIFICATIONS

CONICAL OUTLET

BRANCH DUCT

SEE SPECIFICATIONS FOR

CLAMPS AND SEALANT (TYP.)

SUPPORT SADDLE

FROM STRUCTURE

FLEXIBLE DUCT SIZE SAME AS

DIFFUSER INLET: 5'-0" MAX

LENGTH

USE RIGID ELBOWS FOR

CHANGE OF DIRECTION

GREATER THAN 45°

VOLUME DAMPER W/

LOCKING QUAD

SHEET

METAL

SADDLE

[300mm]

CEILINGTYPICAL DIFFUSER OR

REGISTER IN LAY-IN CLG.

AIR SEPARATOR

BACK PRESSURE

REGULATING VALVE

SEE NOTE NO. 2

55 GALLON [208L]

GLYCOL-WATER

STORAGE TANK

FLOOR

3/4" [20mm]

WALL MOUNTED "ON-OFF"

MOTOR CONTROL -

SEE NOTE NO. 4

GLYCOL-WATER

MAKE-UP PUMP

5 GPM @ 30 PSIG

[18 LPM @ 206 kPa]

3/4" [20mm]

INSULATION

SEE

SPECIFICATIONSTIFFEN BLADE

AS REQUIRED 1/2" [15mm]

ROUND ROD PIN

OUTSIDE END

BEARING

1/8" [6mm]

CLEARANCE

ALL AROUND

INSIDE END BEARING

DUCT

DAMPER BLADE

HANDLE WITH

LOCKING

QUADRANT

INSULATION

STAND-OFF

DRAINAIR CHARGING

SCHRADER VALVE

BLADDER

EXPANSION

TANK

150mm [6"]

HOUSEKEEPING

PAD

FLOOR MOUNTING BASE RING

WITH DRAIN ACCESS OPENING

SHOWN. ANGLE IRON LEGS MAY

BE USED AS AN OPTION.

TERMINAL UNIT - PIPING CONNECTIONS

SCALE: NOT TO SCALE

TWO-WAY VALVE

THREE-WAY VALVE

FLOOR MOUNTED EXPANSION TANK - PIPING CONNECTIONS

SCALE: NOT TO SCALE

TYPICAL MANUAL AIR VENT

TYPICAL HOT WATER PIPING DRAIN

VALVE CONNECTIONS

DRAIN VALVE AND AIR VENT CONNECTIONS (HYDRONIC SYSTEMS)

SCALE: NOT TO SCALE

DUCTWORK RADIUS ELBOWS

SCALE: NOT TO SCALE

DUCTWORK TRANSITION (WITH EQUIPMENT MOUNTED IN DUCT)

SCALE: NOT TO SCALE

SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS

SCALE: NOT TO SCALE

VOLUME DAMPER DETAIL

SCALE: NOT TO SCALE

FLEXIBLE AIR DUCT CONNECTOR

SCALE: NOT TO SCALE

DUCT CONNECTIONS - AIR TERMINAL UNITS

SCALE: NOT TO SCALE

PIPE HANGERS

SCALE: NOT TO SCALE

INDIRECT GLYCOL MAKE-UP SYSTEM DIAGRAM

SCALE: NOT TO SCALE

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

M-501

MECHANICAL DETAILS

Revisions: Date: 139 OF 206

C C

CC

AIR

FLOWAD

AD

FAN

INLINE

NOTE: REFER TO CONSTRUCTION SPECIFICATIONS FOR MATERIALS,

EQUIPMENT, AND INSTALLATION REQUIREMENTS.

M

MOTORIZED DAMPER AT

CONNECTION TO LOUVER

TO OPEN WHEN FAN IS

ENERGIZED

24"X24" ACCESS DOOR

(BOTH SIDES) FOR ALL FANS

WITH DUCT CONNECTIONS LARGER

THAN 36" (ROUND OR SQUARE)

WASHER (TYP.)

3/16" THICK FRAME W/EYELET

WELDED TO FAN HOUSING,

PRIMED AND PAINTED (TYP.)

2"X2"X1/8" ANGLE

REINFORCEMENT

CONN TO DUCT

FLEX CONNECTION (TYP)

VIBRATION ISOLATOR

SPRING ASSEMBLY

SUPPORT ROD

HUNG FROM CEILING

DUCT SUPPORT

(TYP)

NUT (TYP)

ROD

RUBBER GROMMET (TYP.)

ANCHOR DUCT

TO PREVENT

LATERAL

MOVEMENT

PIPE SUPPORT (TYP)

SHUTOFF VALVE (TYP)

SILENT CHECK VALVE

CALIBRATED

BALANCING

VALVE

PRESSURE TUBE AND

VALVES (TYP)

DRAIN VALVE W/

HOSE CONNECTION

& CAP

THERMOMETER

PIPE SUPPORT (TYP)

NEOPRENE PAD (TYP)

PRESSURE

GAUGE

PUMP

HOUSEKEEPING

PAD

SUCTION DIFFUSER

WATER COIL

WATER COIL

MV

MV

MV

TI

MV

NOTES:

1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE

FIRST 2 HANGERS FOR EACH PIPE SHALL BE SPRING & NEOPRENE TYPE. TYPE "H"

FOR 100mm [4"]∅ PIPE & SMALLER. TYPE "H-P" FOR 125mm [5"]∅ PIPE & LARGER.

2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE

SWING OR USE OF ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE

SERVICING OF FILTERS, VALES, OR EQUIPMENT.

3. THE FLOW ELEMENT MAY BE INSTALLED IN THE SUPPLY PIPING IF THE REQUIRED

MINIMUM UPSTREAM AND DOWNSTREAM DIMENSIONS CANNOT BE OBTAINED IN

THE RETURN PIPING.

REDUCER (IF REQUIRED)

CALIBRATED BALANCING

VALVE (TYP)

DRAIN

DRAIN WHEN COIL IS

NOT SELF-DRAINING

PIPE HANGER SHALL SUPPORT

PIPING INDEPENDENT OF COIL

TEST PLUG

(TYP)

AIR VENT WHEN COIL

IS NOT SELF-VENTING

TEMPERATURE INDICATION TO

ECC, SEE CONTROL DIAGRAM

ELEVATION

PLAN VIEW

473"

.7

A T

P E

A K

16" (406 )

MAX

8" (203 )

MAX

WALL: STEEL OR WOOD

STUD OR MASONRY

GRILL (BY OTHER) OPTIONAL

FASTENERS

1/4" (6) THICK

INSULATION(FACTORY

INSTALLED)

DUCT SLEEVE

CONNECTION

DAMPER

RETURN AIR OPENING

RETURN FAN ARRAY FANS (QTY 3)

RELIEF DAMPER

RELIEF HOOD

SERVICE ACCESS DOOR

SERVICE LIGHT

RETURN DAMPER

INTAKE HOOD

INTAKE DAMPER

PRE FILTER MERV 8

FINAL FILTER MERV 11

HOT WATER HEATING COIL (2)

DX COOLING COIL (2)

SUPPLY FAN ARRAY (QTY 4)

ELECTRICAL PANEL

FINAL FILTER MERV 14

SUPPLY OPENING WITH GRATE

CONDENSING UNIT

FILTER BANK MAGNAHELIC

KEY NOTES:

131415161718

55555

19 1920

AIR HANDLER DETAIL

SCALE: NOT TO SCALE

INLINE EXHAUST FAN DETAIL

SCALE: NOT TO SCALE

PUMP DETAIL

SCALE: NOT TO SCALE

AIR HANDLER GLYCOL HEATING COIL PIPING DETAIL

SCALE: NOT TO SCALE

OUT OF WALL FIRE DAMPER DETAIL

SCALE: NOT TO SCALE

NECIL

CE D

S

T A

T

E I

FO

D A

H O

NOISSEF

O

R P

ENG

NI

E E

R

R

N

E

HCTRAK

KR

A

M

A

A L

P-14003

2-20-22

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE

07/23/2021

MEDICAL CENTER DIRECTOR

M-502

MECHANICAL DETAILS

Revisions: Date: 140 OF 206

POINTS LIST

TYPE OF EQUIPMENT:

CONTROL GRAPHIC DISPLAYS

NOTES

VAV REHEAT BOX

ITEMS TO CONTROL AN MONITOR: POINT ID

S T

A R

T /S

T O

P

O P

E N

/C L O

S E

M O

D U

L A

T

IN

G /V

A R

Y

IN

G

S T

A T

U S

W A

T E

R P

R E

S S

U R

E

A

IR

P R

E S

S U

R E

T E

M P

E R

A T

U R

E

F L

O W

C

F M

H U

M

ID

IT

Y

S P

E E

D P

E R

C E

N T

A G

E

P O

S

IT

IO

N

A L A

R M

P E

R C

E N

T

SPACE TEMPERATURE SENSOR AI-01 - - - - - - ● - - - - - - - -

SUPPLY AIR TEMPERATURE AI-02 - - - - - - ● - - - - - - - -

HEATING WATER VALVE CONTROL BO-01 - - ● - - - - - - - ● - - - -

POSITION CONTROL AIR…

This is the start of the file's text. The full file is on GovTribe.