531-325 - Drawings-10-M1.pdf
PDF 4 MB Posted
- Attached to
- Y1DZ--TIERED EVALS - Construct Primary Care/Mental Health Building Minor Construction - Boise 531-325
- Solicitation number
- 36C77624R0096
About this file
This document appears to be a set of construction drawings and associated specifications for a federal contract opportunity to Construct a Primary Care/Mental Health Building Minor Construction Project at the VA Medical Center in Boise, ID.
The key details are:
- The solicitation number is 36C77624R0096.
- The agency is the Department of Veterans Affairs Technology Acquisition Center Austin.
- The project involves constructing a new primary care and mental health building, including HVAC, plumbing, and electrical systems.
- The drawings provide detailed specifications for the HVAC system, including air handling units, VAV boxes, ductwork, piping, and controls.
- The project includes construction of various exam rooms, offices, waiting areas, and support spaces.
- The HVAC system is designed to maintain temperature and humidity levels for the different space types.
- The control system will integrate with the existing campus BMS.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC BASIS OF DESIGN
SUMMER OUTDOOR
DESIGN DB (°F)
105 STATE COUNTY CLIMATE ZONE
SUMMER OUTDOOR
DESIGN WB (°F)
62.8 IDAHO ADA 5B
WINTER OUTDOOR
DESIGN DB (°F)
0 DESIGN ALTITUDE 2,730 FT
INDOOR SPACE
SUMMER INDOOR DESIGN CONDITIONS WINTER INDOOR DESIGN CONDITIONS
TEMPERATURE DB
(°F)
RELATIVE
HUMIDITY (%)
TEMPERATURE DB
(°F)
RELATIVE
HUMIDITY (%)
GENERAL CLINIC 72 20-60 74 20-60
WAITING AREA 72 20-60 74 20-60
EXAM ROOMS 72 20-60 74 20-60
CONNECT NEW TO EXISTING
SHEET NUMBER
SECTION DESIGNATION
BLANKED FOR 1-WAY
BLANKED FOR 2-WAY
BLANKED FOR 3-WAY
STANDARD 4-WAY
SELF-CLOSING FIRE DAMPER
AUTOMATIC SMOKE DAMPER
COMBINATION SMOKE/FIRE
ROOF EXHAUST FAN SHOWN
ROOF EXHAUST FAN SHOWN
AUTOMATIC CONTROL DAMPER
RISE/DROP
TAKE-OFFSUPPLY
CEILING
DUCT MTD.
DIFF/GRILLE
BULLHEAD SPLIT
TAKEOFF
DIFF/GRILLE
TO
OR
HARD
ELBOW
SUPPLY DUCT DOWN
SUPPLY DUCT UP
OR
R w
SINGLE LINE
RETURN/EXHAUST
CONVERGE
BULLHEAD
SUPPLY/RETURN/
RISE OR DROP
SUPPLY/RETURN
RETURN/EXHAUST
TAKE-OFF
90°F
TAP
45°F
TAP
/EXHAUST
HORIZONTAL
DUCT DOWN
EXHAUST
OFFSET
RING
DUCT
RISE/DROP
DUCT
FLEXIBLE
1/4"x1/4" WMS
OPEN END
DUCT W/
RETURN/EXHAUST
ACOUSTICALLY
LINED DUCT
CEILING
DUCT MTD.
DIFF/GRILLE
DUCT UP
DOUBLE LINE
DUCTWORK SYMBOLS
REG./GRILLE
DUCT MTD.
SIDEWALL
BD
LD MF'R
BOOT BY
VD VD
UC 1/2"
LVDR 1.5 SF
OR
SUPPLY AIR FLOW
BACKDRAFT DAMPER
UNDERCUT DOOR
LOUVERED DOOR
SGD
AVS
ACD
SFD
SD
FD
VD
VD VD
SLIDE GATE DAMPER
AIR VOLUME TRAVERSE STATION
MANUAL VOLUME DAMPER
W/ACCESS DOOR
W/ACCESS DOOR
W/ACCESS DOOR
DAMPER W/ACCESS DOOR
BLOW SUPPLY DIFFUSER
BLOW SUPPLY DIFFUSER
BLOW SUPPLY DIFFUSER
BLOW SUPPLY DIFFUSER
ON FLOOR PLAN
ON ROOF
ADDITIONAL SYMBOLS
EQUIPMENT
DUCTWORK OR
TO BE REMOVED
FIRE DAMPER
M MOTORIZED DAMPER POINT OF DEMOLITION
TURNING VANES
DUCT UP
SINGLE LINE DOUBLE LINE
TEMPERATURE SENSOR OR
THERMOSTAT
RETURN OR EXHAUST AIR
FLOW DIRECTION
SUPPLY SIDEWALL
LINEAR DIFFUSER
(W/SHEET METAL
PLENUM W/1"
LINING & BRANCH
CONN FOR EVERY
4' OF LENGTH)
SUPPLY CEILING
LINEAR DIFFUSER
(W/SHEET METAL
PLENUM W/1"
LINING & BRANCH
CONN FOR EVERY
4' OF LENGTH)
STANDARD
RADIUS ELBOW (R
= W)
SUPPLY/RETURN
/EXHAUST
XxX [X] XXX,XxX,XX°
AIR OUTLET CALLOUT
BALL VALVE
UNION OR FLANGE (AS INDICATED BY PIPE SIZE - SEE SPEC.)
WATER BALANCING VALVE
AUTOMATIC CONTROL VALVE, MODULATING ACTUATOR
PIPE BREAK (SINGLE LINE)
RISE (SINGLE LINE - PLAN VIEW)
DROP (SINGLE LINE - PLAN VIEW)
BOTTOM TAKEOFF
TOP TAKEOFF
BLIND FLANGE
END CAP
BUTTERFLY VALVE
GATE VALVE THREADED
CHECK VALVE
PIPING LEGEND
INVERTED BUCKET TRAP
GATE VALVE FLANGED
BALL VALVE WITH 3/4" HOSE ADAPTER
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
SAFETY RELIEF VALVE
PRESSURE GAGE
THERMOMETER
FLOAT AND THERMOSTAT TRAP
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
ECCENTRIC REDUCER
DIRECTION OF PIPE PITCH (DOWN)
PROJECT NOTES
1. VA WILL SHUT DOWN EXISTING UTILITY SYSTEM AS NECESSARY FOR CONTRACTOR TO PERFORM
REQUIRED WORK. CONTRACTOR IS RESPONSIBLE FOR DRAINING EXISTING WET SYSTEMS, SUCH AS
WATER, CHILLED WATER, HEATING WATER ETC. AS REQUIRED TO ACCOMPLISH NEW WORK.
CONTRACTOR IS ALSO RESPONSIBLE FOR RE-FILLING SYSTEMS INCLUDING ADDING CHEMICAL AS REQUIRED.
IT IS ACCEPTABLE TO SALVAGE EXISTING TREATED WATER IN CLEAN STORAGE CONTAINERS APPROVED BY
THE VA, AND RE-INJECT IT INTO THE SYSTEM UPON COMPLETION OF WORK. ANY TREATED WATER NOT
RE-INJECTED IS TO BE PROPERLY DISPOSED OF.
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY - PROPYLENE GLYCOL
HEATING HOT WATER RETURN - PROPYLENE GLYCOL
HWHR
HWHS
PGR
PGS
1 2 3 4 5
NECK SIZE (IN)
AIR OUTLET TYPE
AIRFLOW (CFM)
SIZE (IN) OF CONNECTING BRANCH DUCT
ANGLE OF THROW, DOWN FROM HORIZONTAL (°)
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
M-001
LEGENDS, SYMBOLS,
ABBREVIATIONS, & NOTES -
MECHANICAL
JCJ DLO
Revisions: Date: 128 OF 206
1 2 2.5 3 4
AA
A.1 A.1
BB
B.8B.8
CC
DD
EE
FF
GG
HH
II
JJ
KK
LL
L.2L.2
MM
ELEC
OFFICE
OFFICE
SOILED
MED EQUIP
STAFF TLT
STAFF
LOUNGE
OIT
SERVER
MECH
STAFF
LOCKERS
STAFF
LOCKERS
STAFF
LOCKERS
STAFF
LOCKERS
EXAM
ROOM 07
EXAM
ROOM 06
EXAM
ROOM 05
124EXAM
ROOM 04
EXAM
ROOM 14
EXAM
ROOM 13
EXAM
ROOM 12
EXAM
ROOM 11
PACT
TEAM
SHELL
PUBLIC
TLT
ALCOVE
EXAM
ROOM 03
EXAM
ROOM 02
EXAM
ROOM 01
WOMEN'S
HEALTH 01
EXAM
ROOM 10
EXAM
ROOM 09
EXAM
ROOM 08
PROCEDURE
ROOM 01
ALCOVE,
H/W
WOMEN'S
HEALTH
TLT
118A
PACT
TEAM
CLEAN
SUPPLY
ALCOVE,
H/W
STORAGE
STORAGE
107A
GROUP
ROOM
PUBLIC
TLT
PUBLIC
TLT
MSA &
BUSINESS
SERVICES
HOUSEKEEPING
AND
LADDER
POLICE
FAMILY
TLT
PUBLIC
TLT
LACTATION
RECEPTION
VESTIBULE
CORRIDOR
C13
LOBBY
STAFF TLT
174 STAFF TLT
STAFF TLT
CORRIDOR
C11
CORRIDOR
C10
CORRIDOR
C12
CORRIDOR
C14
CORRIDOR
C15
16"ø
"x
16"x12" 20"x16"
14"x12"
14"x10"
36"x10"
"x
"x
"x
"x
"x
12"ø
12"ø
12"ø
12"ø
12"ø
12"ø
12"ø
"ø
"ø
"ø
12"ø
8"x6"
10"x8"
20"x20"
10"ø8"ø 8"ø8"x6"
8"x6"
8"x8"
16"ø
16"ø
"x
" 6"ø
14"ø
"ø
"ø
6"ø 12"ø 12"x12"
32"x28"
"x
14"x12"
14"x12"
8"ø
14"ø
14"ø
6"ø
"ø
6"ø
10"ø
12"x12"
10"ø
6"ø 16"ø
"x
"x
"x
"ø
8"x8"
12"x12" 7"ø
16"x14"
18"ø 16"ø
8"ø
12"ø
"x
16"x14"
22"x16"
10"ø
"ø
5"ø
8"ø
"x
8"ø 8"ø
8"x8"6"ø
16"x16"16"ø
6"ø
12"ø
"x
"x
12"ø
"x
7"ø
10"x10"
8"x8" 8"ø
10"ø
12"ø
"x
14"x14"
12"ø
"x
"x
16"x16" 16"ø
"x
7"ø
7"ø
8"ø
"x
12"ø
10"ø
31"/18"
46"x28"
8"ø
46"x28"
10"ø 8"ø
12"ø
"x
27"/18"
42"x24" ø8"
"x
16"x16"
8"ø
16"ø
8"ø
16"ø16"x16"
12"ø
"x
"x
12"x10"
8"x8"
"x
12"ø12"ø
"x
14"x14"
"ø
12"ø
16"ø
14"ø
8"x6"
6"ø ø12" 8"ø
8"ø 16"ø
"x
8"ø
8"x8"
8"ø
18"x14"
"ø
"x
12"ø
16"ø
16"x12"
12"ø
"x
8"ø
21"/18"
16"x16"
"ø
14"ø
28"x16"6"ø
8"ø
8"ø
12"ø
24"/18"31"/18"
8"x8"
8"ø
28"x16"
8"x8"
8"ø 8"ø
24"/18"
"ø
8"ø 8"ø
18"x14"
8"øø12"
18"x14"
"ø
"x
14"ø
14"ø
10"ø14"x12"
8"x8"
12"x12"
14"x12"
8"ø
8"x8"
8"ø
8"ø
10"x8"
8"x8"
10"x10"
12"x10"
8"x8"
10"x10"
16"ø 12"ø
16"x16"
"ø
"ø
"x
16"ø
8"ø
10"x10"
8"x8"
8"ø
8"ø
8"x8" 8"x8"
8"x8"
"x ø12"
18"x14"
12"ø
14"ø
"ø
6"ø
8"x8" 6"ø12"x8"
8"ø
8"x8" 6"ø
6"ø
4"ø
10"x8"
8"ø8"ø
10"x8"
8"ø8"ø
8"x6"
8"ø
10"x10"
"x
"x
"x
"ø
"ø
VDVDVDVD
VD
VD
VD
VD VD
VD
VDVD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VDVD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VDVD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VDVD
VD
VD
VD
VDVD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VDVD
VD
VD
VD VD
VD
VD VD VD
VD
VDVD
VD
VD
VD
VDVD
VD
VD VD VD
12"x12" [1] 610 CFM (TYP 6)
8X8[4]TG
8X8[4]TG
VD
8"x6"
8"x8" 10"x8"
6"ø
VD
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
12"ø
8"ø
PAC TEAM SHELL
VAV
12"X12"[4]
TG (TYP 2) 12"X12"[4] 490
12"X12"[2] 320
12"X12"[1] 380
(TYP 3)
22"X22"[3] 925
12"ø
12X12
12X10
22"X22"[3] 925
12"X12"[1] 485
(TYP 3)
12"X10"[3] 270
12"X12"[1] 270
22"X10"[3] 125
22"X10"[3] 115
22"X10"[3]
(TYP 2) TG
10"X10"[4] TG
6"X6"[1] 55
22"X10"[3] 55 6"ø
4SLOT[5]310 (TYP 3)
5SLOT[5]480 (TYP 4)
36X18[4]TRANS (TYP 2)
10X10[3] TG
22X10[3] TG
22X10[3] 245
22X10[3] TG
22X10[3] 115
12X12[6]415
(TYP 3)
8X8[1]115
12X12[1] 630
12X12[1] 550
22X10[3] 700
(TYP 4)
72X60 UP
TO AHU-1
UP
62X24 UP
TO AHU-1
UP
UP
31X18
50X22
41X22
14"x12"
8X8[1] 500
(TYP 4)
22X10[3]
TG (TYP 4)
10X10[1] 300
(TYP 2)
8X8[6] 215
22X22[3] 600
6X6[1] 30
(TYP 2)
ø12"
22X10[3] 105
(TYP 2)22X10[3] 160
6X6[1] 60
12X12[1] 520
(TYP 3)
22X22[3] 115
22X10[3] 105
(TYP 2)
6X6[1] 30
(TYP 2)
8X8[1] 150
(TYP 2)
8X6[6] 150
8X6[4] 150
12X12[2] 320
22X10[3] 150
(TYP 2)
22X22[3] 1010
22X22[3] 1280
22X22[3] 1280
12X12[1] 3708X8[1] 115
(TYP 4)
12X12[1] 425
(TYP 3)
22X10[3] 100
22X10[3] 115
(TYP 2)
12X12[1] 365
(TYP 2)
22X22[3] 1280
8X8[1] 115
(TYP 3)
22X10[3] 1150
(TYP 3)12X12[1] 360
(TYP 3) 22X22[3] 505
22X22[3] 350
12X12[1] 450
22X10[3] 135
8X8[1] 135
22X10[3] 115
22X10[3] 115
22X12[3] TG
(TYP 2)
22X22[3] 1010
8X8[1] 115
(TYP 2)
X
UP
22X22[3] 1010
8X8[1] 125
(TYP 2)
22X10[3]
TG (TYP 2) 22X10[3]125
12X12[1] 530
(TYP 3)
22X10[3] 100 8X8[4] 65
12X12[4] 360
8X8[4] TG
12X12[6] 360
22X22[3] 995
(TYP 2)
12X12[1] 610
(TYP 4)
12X12[1] 555
(TYP 2)
12X12[1] 550
(TYP 2)
22X22[3]TG
12"ø ø16"
X
22X10[2] TG
8"ø
12"ø
VAV
VAV
VAV
VAV
VAV
VAV
AC
1 1
VAV
VAV
VAV
12"ø 18"x14"
12"ø
8"x8"
VD
VD
VD
VAV
VAV
VAV
VAV
VAV
ROUTE LINE SET UP
TO CU-1 ON ROOF.
VAV
VD 8"(135) 5
8"(115) 5
VD
8"(115) 5
VD
16"(1180) 5
16"(1180) 8"(115)5
VD VD
8"(115)5
8"(115) 5
VD
VD
8"(115) 5
16"(1180) 5
8X8(250) 5
8"(115)5
VD
8"(115)5
VD
16"(1180) 5
8X8(250) 5
22X10[2] TG
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
MH101
FLOOR PLAN - HVAC
JCJ DLO
SCALE: 1/8" = 1'-0"
PROJECT
NORTH
FLOOR PLAN - HVAC
GENERAL NOTES
KEY NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.
CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE
AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT
INTERNATIONAL MECHANICAL CODE.
3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING
STANDARDS AS APPROVED BY THE OWNER.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF DUCTWORK WITH
EQUIPMENT, LIGHTING, PIPING, ETC..
6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT
ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING
OF THE FLOOR, CEILING, OR WALL.
7. SEE MECHANICAL PIPING PLANS FOR ROOM SENSOR
LOCATIONS.
DUCT CLASSIFICATION SCHEDULE
DUCT LOCATION
SUPPLY DUCT
BETWEEN AIR
HANDLER AND
TERMINAL
UNIT
RETURN DUCT
FROM AIR
OUTLET TO
AIR
HANDLER
DOWNSTREAM
OF TERMINAL
UNITS
EXHAUST
DUCT
DUCT
CONSTRUCTION
CLASS
4" 1" 1" 1"
STATIC
PRESSURE
RATING
ABOVE 3" 1/2" TO 2" 1/2" TO 2" 1/2" TO 2"
PRESSURE POSITIVE POS OR NEG POS OR NEG
POS OR
NEG
SMACNA SEAL
CLASS
A B B B
SMACNA
LEAKAGE CLASS 6 12 12 12
VELOCITY
4000 FPM OR
LESS
2500 FPM OR
LESS
2500 FPM OR
LESS
2500 FPM
OR LESS
PROVIDE 1" DOOR UNDERCUT FOR TRANSFER AIR INTO OR OUT
OF ROOM AS INDICATED BY ARROW. MAXIMUM TRANSFER
QUANTITY TO BE 100 CFM.
20X20 EXHAUST DUCT UP TO PENTHOUSE. SEE MH102 FOR
CONTINUATION
12X12 TRANSFER DUCT UP TO PENTHOUSE. SEE MH102 FOR
CONTINUATION
32X28 RETURN DUCT UP TO PENTHOUSE. SEE MH102 FOR
CONTINUATION.
STUB OUT RETURN AS INDICATED. PROVIDE FILTER FABRIC AT
OPENING AND BALANCE TO VALUE INDICATED.
PROVIDE TERMINAL BOX FOR FUTURE ALTERNATES IN BASE BID,
PROVIDE TEMPORARY ROOM SENSOR AT TEMINAL UNIT FOR
TEMPERATURE CONTROL IN SPACE.
8. SEE ARCHITECTURAL PLAN FOR CEILING TYPES AND ELEVATIONS.
Revisions: Date:
2 2.5 3
I
J
K
L
L.2
M
20X20 DN SEE MH101
FOR CONTINUATION
32X32[4]2500 (TYP 2)32X32[4]2500 (TYP 2)
12X12[4]TG
12X12 DN THRU FLOOR. SEE
MH101 FOR CONTINUATION
32X28 RETURN DN. SEE
MH101 FOR CONTINUATION 32X28 RETURN DN. SEE MH101
FOR CONTINUATION
32X3832X28
X
20X20 M
MECH
PENTHOUSE
LV
UP
EF
M-501
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
MH102
PENTHOUSE MECHANICAL ROOM
PLAN - HVAC
JCJ DLO
GENERAL NOTES
KEY PLAN
KEY NOTES
SCALE: 1/4" = 1'-0"
PROJECT
NORTH
PENTHOUSE MECHANICAL ROOM PLAN - HVAC
DUCT CLASSIFICATION SCHEDULE
DUCT LOCATION
SUPPLY DUCT
BETWEEN AIR
HANDLER AND
TERMINAL
UNIT
RETURN DUCT
FROM AIR
OUTLET TO
AIR
HANDLER
DOWNSTREAM
OF TERMINAL
UNITS
EXHAUST
DUCT
DUCT
CONSTRUCTION
CLASS
4" 1" 1" 1"
STATIC
PRESSURE
RATING
ABOVE 3" 1/2" TO 2" 1/2" TO 2" 1/2" TO 2"
PRESSURE POSITIVE POS OR NEG POS OR NEG
POS OR
NEG
SMACNA SEAL
CLASS
A B B B
SMACNA
LEAKAGE CLASS 6 12 12 12
VELOCITY
4000 FPM OR
LESS
2500 FPM OR
LESS
2500 FPM OR
LESS
2500 FPM
OR LESS
AREA OF WORK
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.
CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE
AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT
INTERNATIONAL MECHANICAL CODE.
3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING
STANDARDS AS APPROVED BY THE OWNER.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF DUCTWORK WITH
EQUIPMENT, LIGHTING, PIPING, ETC..
6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT
ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING
OF THE FLOOR, CEILING, OR WALL.
7. SEE MECHANICAL PIPING PLANS FOR ROOM SENSOR
LOCATIONS.
Revisions: Date: 130 OF 206
A
A.1
B
B.8
C
D
E
F
G
H
I
J
K
L
M
CONCRETE PAD. SEE STRUCTURAL
PLANS FOR THICKNESS AND
EXTENT OF PAD.
CU
AHU
M-502
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
MH103
ROOF PLAN - HVAC
JCJ DLO
DUCT CLASSIFICATION SCHEDULE
DUCT LOCATION
SUPPLY DUCT
BETWEEN AIR
HANDLER AND
TERMINAL
UNIT
RETURN DUCT
FROM AIR
OUTLET TO
AIR
HANDLER
DOWNSTREAM
OF TERMINAL
UNITS
EXHAUST
DUCT
DUCT
CONSTRUCTION
CLASS
4" 1" 1" 1"
STATIC
PRESSURE
RATING
ABOVE 3" 1/2" TO 2" 1/2" TO 2" 1/2" TO 2"
PRESSURE POSITIVE POS OR NEG POS OR NEG
POS OR
NEG
SMACNA SEAL
CLASS
A B B B
SMACNA
LEAKAGE CLASS 6 12 12 12
VELOCITY
4000 FPM OR
LESS
2500 FPM OR
LESS
2500 FPM OR
LESS
2500 FPM
OR LESS
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.
CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE
AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT
INTERNATIONAL MECHANICAL CODE.
3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING
STANDARDS AS APPROVED BY THE OWNER.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF DUCTWORK WITH
EQUIPMENT, LIGHTING, PIPING, ETC..
6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT
ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING
OF THE FLOOR, CEILING, OR WALL.
7. SEE MECHANICAL PIPING PLANS FOR ROOM SENSOR
LOCATIONS.
GENERAL NOTES
KEY NOTES
SCALE: 1/8" = 1'-0"
PROJECT
NORTH
ROOF PLAN - HVAC
Revisions: Date: 131 OF 206
AA
A.1 A.1
BB
B.8B.8
CC
DD
EE
FF
GG
HH
II
JJ
KK
LL
L.2L.2
MM
ELEC
OFFICE
OFFICE
SOILED
MED EQUIP
STAFF TLT
STAFF
LOUNGE
OIT
SERVER
MECH
STAFF
LOCKERS
STAFF
LOCKERS
STAFF
LOCKERS
STAFF
LOCKERS
EXAM
ROOM 05
EXAM
ROOM 04
EXAM
ROOM 14
EXAM
ROOM 13
EXAM
ROOM 12
EXAM
ROOM 11
PACT
TEAM
SHELL
PUBLIC
TLT
EXAM
ROOM 03
EXAM
ROOM 02
EXAM
ROOM 01
WOMEN'S
HEALTH 01
EXAM
ROOM 10
EXAM
ROOM 09
EXAM
ROOM 08
PROCEDURE
ROOM 01
ALCOVE,
H/W
PACT
TEAM
CLEAN
SUPPLY
ALCOVE,
H/W
STORAGE
STORAGE
107A
GROUP
ROOM
PUBLIC
TLT
PUBLIC
TLT
MSA &
BUSINESS
SERVICES
HOUSEKEEPING
AND
LADDER
POLICE
FAMILY
TLT
PUBLIC
TLT
LACTATION
RECEPTION
VESTIBULE
CORRIDOR
C13
LOBBY
STAFF TLT
STAFF TLT
STAFF TLT
CORRIDOR
C11
CORRIDOR
C10
CORRIDOR
C12
CORRIDOR
C14
CORRIDOR
C15
AS
EXP
VAV
VAV
VAV
VAV
VAV
28VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV -25
VAV -28
VAV -32
VAV -24
VAV -26
VAV -27
VAV -17
VAV -13
VAV -33
VAV -1
VAV -2
VAV -3
VAV -8
VAV -4
VAV -5&6
VAV -10
VAV -7
VAV -11
VAV -12
VAV -34
VAV -19
VAV -21
VAV -18
VAV -30
VAV -29
HWHR
HWHS
HWHR
HWHS
H W
H R
H W
H S
HWHR
HWHS
HWHR
HWHS
H W
H R
H W
H S
HWHR
HWHS
H W
H R
H W
H S
H W
H S
H W
H R
H W
H R
H W
H S
HWHR
HWHS
H W
H R
H W
H S
DDC
CONTROL
PANEL
HWHR
HWHS
HWHS
HWHR
EXAM
ROOM 07
EXAM
ROOM 06
1"
3/4"
2 1/2"
1"
3/4"
3/4" 3/4"
3/4"
2 1/2"
3/4"
1"
1/2"
1/2"
1 1/4"
1/2"
1"
2 1/2"
2 1/2"
2 1/2"
1/2" 1/2"
1 1/4" 1 1/2"
3/4"
3/4"
1 1/2"
2 1/2"
1/2"
3/4" 1"
3/4" 1"
1/2"
1/2" 3/4"
1 1/2"
2"
3/4" 3/4"
1/2"
1/2"
1/2"
2"
2"
3/4"
3/4" 3/4"
3/4"
2"
1 1/2"
2"
2 1/2"
1/2"
1/2"
2 1/2"
1 1/4"
3/4"
1 1/4"
2 1/2"
2 1/2"
1 1/2"
1"
3/4"
3/4" 3/4"
1/2"
2 1/2" 2 1/2"
3/4"
3/4"
3/4"
VAV - 23
VAV - 16
VAV - 9
2 1/2" HWHS & HWHR
UP MECHANICAL PENTHOUSE
SEE MP105 FOR CONTINUATION.
VAV -25
HX
P-HWHS
P-HWHS
T
T
T
T
T
T
T
T
1T
T
T
T
T
T
T
T
T
1 2
T
T
T
T
T
T T
T
VAV - 15 T
AC-1T
1"
3/4"
T
T VAV - 31
T VAV - 20
T VAV - 22
T VAV - 14
VAV
T
T
H
AC
ROUTE LINE SET UP
TO CU-1 ON ROOF.
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
MP104
FLOOR PLAN - MECH PIPING
JCJ DLO
GENERAL NOTES
KEY PLAN
KEY NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.
CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE
AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT
INTERNATIONAL MECHANICAL CODE.
3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING
STANDARDS AS APPROVED BY THE OWNER.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF DUCTWORK WITH
EQUIPMENT, LIGHTING, PIPING, ETC..
6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT
ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING
OF THE FLOOR, CEILING, OR WALL.
1 1/2"HWS&R TO REHEAT COIL. SEE DETAIL #1 ON M-501 FOR
COIL PIPING. SEE SCHEDULE FOR VALVE CONFIGURATION.
2 3/4"HWS&R TO REHEAT COIL. SEE DETAIL #1 ON M-501 FOR
COIL PIPING. SEE SCHEDULE FOR VALVE CONFIGURATION.
SCALE: 1/8" = 1'-0"
PROJECT
NORTH
MECHANICAL - PIPING PLAN - HVAC
Revisions: Date: 132 OF 206
2.5
I
J
K
L
L.2
M
CONCRETE PAD
CONCRETE PAD
CONCRETE PAD
2-1/2" PGS & R TO ROOFTOP
UNIT. SEE MP106 FOR
CONTINUATION
AS
EXP
1/2" PGS & R DN
TO UNIT HEATER
HWHR
2 -1/2" HWHS & R DN TO
MECHANICAL ROOM. SEE
MP104 FOR CONTINUATION.
PGS
PGR
P G
R
2 1/2"
2 1/2"
P G
R
P G
S
P-HWHS
GF
P-HWHS
HWHS
HX
2-1/2" CAMPUS HEATING SUPPLY &
RETURN AND GLYCOL HEATING SUPPLY
& RETURN DOWN TO HEAT EXCHANGER.
UH
T
MECH
PENTHOUSE
M-501
M-501
M-502
M-502
M-501
M-401
M-501
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
MP105
PENTHOUSE MECHANICAL ROOM
PLAN -MECHANICAL PIPING
JCJ DLO
GENERAL NOTES
KEY PLAN
KEY NOTES
AREA OF WORK
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.
CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE
AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT
INTERNATIONAL MECHANICAL CODE.
3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING
STANDARDS AS APPROVED BY THE OWNER.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF DUCTWORK WITH
EQUIPMENT, LIGHTING, PIPING, ETC..
6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT
ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING
OF THE FLOOR, CEILING, OR WALL.
SCALE: 1/4" = 1'-0"
PROJECT
NORTH
PENTHOUSE MECHANICAL ROOM PLAN - MECHANICAL PIPING
Revisions: Date: 133 OF 206
A
A.1
B
B.8
C
D
E
F
G
H
I
P G
R P
G S
2 1/2" PGS & R TO MECHANICAL
PENTHOUSE. SEE MP105 FOR
CONTINUATION.
P G
R P
G S
2 1/2"
2 1/2"HWHS & R
TO AIR HANDLER
AHU
M-502
CU
ROUTE REFRIGERANT
LINES FROM OUTDOOR
UNIT DOWN THROUGH
ROOF TO FAN COIL. SEE
MP104 FOR LOCATION.
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
MP106
ROOF PLAN - MECH PIPING
JCJ DLO
GENERAL NOTES
KEY PLAN
KEY NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.
CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE
AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT
INTERNATIONAL MECHANICAL CODE.
3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING
STANDARDS AS APPROVED BY THE OWNER.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF DUCTWORK WITH
EQUIPMENT, LIGHTING, PIPING, ETC..
6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT
ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING
OF THE FLOOR, CEILING, OR WALL.
SCALE: 1/8" = 1'-0"
PROJECT
NORTH
ROOF PLAN - MECHANICAL PIPING
Revisions: Date: 134 OF 206
1 2 3 4
B
C
D
E
F
G
H
I
J
K
L
M
N
1.1 3.9
L.2
A.1
2.1 2.92.5
B.8
A
29 SF
Staff Lockers
31 SF
Staff Lockers
280 SF
PACT Team
29 SF
Staff Lockers
31 SF
Staff Lockers
280 SF
PACT Team
280 SF
PACT Team
79 SF
ALCOVE, H/W
79 SF
ALCOVE, H/W
170 SF
Ext Team
280 SF
PACT Team
170 SF
Ext Team
FAMILY TOILET #112
(81 SF)
PRESSURE(-)
SUPPLY 0
EXHAUST 125
TRANSFER 125
AIR CHANGE 10.2
REQ. AC 10
PUBLIC TOILET #113
(74 SF)
PRESSURE(-)
SUPPLY 0
EXHAUST 115
TRANSFER 115
AIR CHANGE 10.3
REQ. AC 10
POLICE #111
(87 SF)
PRESSURE(0)
SUPPLY 55
RETURN 55
TRANSFER 0
AIR CHANGE 4.2
REQ. AC 4
PUBLIC TOILET #108
(75 SF)
PRESSURE(-)
SUPPLY 0
EXHAUST 115
TRANSFER 115
AIR CHANGE 10.2
REQ. AC 10
PUBLIC TOILET #107
(74 SF)
PRESSURE(-)
SUPPLY 0
EXHAUST 115
TRANSFER 115
AIR CHANGE 10.3
REQ. AC 10
STORAGE #114A
(100 SF)
PRESSURE(N)
SUPPLY 360
RETURN 360
TRANSFER 0
AIR CHANGE 10
STORAGE #115
(41 SF)
PRESSURE(N)
SUPPLY 0
EXHAUST 65
TRANSFER 65
AIR CHANGE 10
WOMENS HEALTH
TOILET #163A
(66 SF)
PRESSURE(-)
SUPPLY 0
EXHAUST 100
TRANSFER 100
AIR CHANGE 10
PATIENT TOILET
#159 (70 SF)
PRESSURE(-)
SUPPLY 0
EXHAUST 100
TRANSFER 100
AIR CHANGE 10
WOMENS HLTH
TOILET #118A
(66 SF)
PRESSURE(-)
SUPPLY 0
EXHAUST 100
TRANSFER 100
AIR CHANGE 10
EXAM RM 01 #119
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 03 #121
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 02 #120
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 04 #123
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 05 #124
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 06 #125
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 07 #126
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
WOMEN'S
HEALTH 01 #118
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
GROUP ROOM #114
(468 SF)
PRESSURE(0)
SUPPLY 1470
RETURN 1470
TRANSFER 0
AIR CHANGE 0
EXAM RM 28 #155
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 27 #156
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 26 #157
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 25 #158
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 24 #160
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 23 #161
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 22 #162
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
WOMEN'S
HEALTH 02 #163
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
PATIENT TOILET
#122 (65 SF)
PRESSURE(-)
SUPPLY 0
EXHAUST 100
TRANSFER 100
AIR CHANGE 10
EXAM RM 21 #152
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 20 #151
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 19 #150
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 18 #149
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 17 #148
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 16 #147
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 15 #146
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
PROCEDURE RM 02
#145
(180 SF)
PRESSURE(+)
SUPPLY 450
RETURN 350
TRANSFER 0
AIR CHANGE 16.7
REQ. AC 15
EXAM RM 14 #129
(124 SF)
PRESSURE (0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 13 #130
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 12 #131
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 11 #132
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 10 #133
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 09 #134
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
EXAM RM 08 #135
(124 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 6.7
REQ. AC 6
PROCEDURE RM 01
#136
(180 SF)
PRESSURE(+)
SUPPLY 450
RETURN 350
TRANSFER 0
AIR CHANGE 16.7
REQ. AC 15
CLEAN SUPPLY #164
(222 SF)
PRESSURE(0)
SUPPLY 135
RETURN 135
TRANSFER 0
AIR CHANGE 4
REQ. AC 4
CLEAN SUPPLY #138
223 SF
PRESSURE(0)
SUPPLY 135
RETURN 135
TRANSFER 0
AIR CHANGE 4
REQ. AC 4
LACTATION #117
(84 SF)
PRESSURE(-)
SUPPLY 270
RETURN 270
TRANSFER 0
AIR CHANGE 21.4
REQ. AC 6
MSA & BUSINESS
SERVICES #109
(173 SF)
PRESSURE(0)
SUPPLY 115
RETURN 115
TRANSFER 0
AIR CHANGE 4.4
REQ. AC 4
OFFICE #173
(109 SF)
PRESSURE(0)
SUPPLY 150
RETURN 150
TRANSFER 0
AIR CHANGE 9.2
REQ. AC 4
SOILED MED EQUIP
#176 104 SF
PRESSURE(- -)
SUPPLY 0
EXHAUST 160
TRANSFER 160
AIR CHANGE 10
REQ. AC 10
STAFF LOUNGE #179
370 SF
PRESSURE(0)
SUPPLY 600
RETURN 600
TRANSFER 0
AIR CHANGE 10.8
REQ. AC 6
STAFF TOILET #174
(68 SF)
PRESSURE(-)
SUPPLY 30
EXHAUST 105
TRANSFER 75
AIR CHANGE 10
REQ. AC 10
ELEC 170
119 SF
PRESSURE(0)
SUPPLY 150
RETURN 150
TRANSFER
AIR CHANGE 8.4
REQ. AC 6
MECH RM #201
229 SF
PRESSURE(-)
SUPPLY 215
RETURN 0
EXHAUST 490
AIR CHANGE 10
REQ. AC 10
HOUSEKEEPING &
LADDER #110
(160 SF)
PRESSURE(-)
SUPPLY 0
EXHAUST 245
TRANSFER 245
AIR CHANGE 10.2
REQ. AC 10
STAFF TOILET #178
67 SF
PRESSURE(-)
SUPPLY 30
EXHAUST 105
TRANSFER 75
AIR CHANGE 10
REQ. AC 10
VESTIBULE #101
(489 SF)
PRESSURE(+)
SUPPLY 975
RETURN 0
TRANSFER 0
AIR CHANGE 0
LOBBY #102
(1694 SF)
PRESSURE(+)
SUPPLY 2045
RETURN 0
TRANSFER 0
AIR CHANGE 0
WHEEL CHAIR
ALCOVE #101A
(69 SF)
PRESSURE(+)
SUPPLY 325
RETURN 0
TRANSFER 0
AIR CHANGE 0
WAITING #105
(417 SF)
PRESSURE(+)
SUPPLY 1820
RETURN 0
TRANSFER 0
AIR CHANGE 0
WAITING #104
(414 SF)
PRESSURE(+)
SUPPLY 1820
RETURN 0
TRANSFER 0
AIR CHANGE 0
STAFF TOILET #175
(68 SF)
PRESSURE(-)
SUPPLY 30
EXHAUST 105
TRANSFER 75
AIR CHANGE 10
REQ. AC 10
STAFF TOILET #177
67 SF
PRESSURE(-)
SUPPLY 30
EXHAUST 105
TRANSFER 75
AIR CHANGE 10
REQ. AC 10
PACT TEAM #165
(832 SF)
PRESSURE(0)
SUPPLY 1005
RETURN 1005
TRANSFER 0
AIR CHANGE 6
REQ. AC 6
EXT TEAM #166
(920 SF)
PRESSURE(0)
SUPPLY 1095
RETURN 1095
TRANSFER 0
AIR CHANGE 6
REQ. AC 6
PACT TEAM #169
(758 SF)
PRESSURE(0)
SUPPLY 1440
RETURN 1440
TRANSFER 0
AIR CHANGE 9.4
REQ. AC 6
PACT TEAM #143
(758 SF)
PRESSURE(0)
SUPPLY 1560
RETURN 1560
TRANSFER 0
AIR CHANGE 10.3
REQ. AC 6
EXT TEAM #140
(920 SF)
PRESSURE(0)
SUPPLY 1095
RETURN 1095
TRANSFER 0
AIR CHANGE 6
REQ. AC 6
PACT TEAM #139
(832 SF)
PRESSURE(0)
SUPPLY 1080
RETURN 1080
TRANSFER 0
AIR CHANGE 6.4
REQ. AC 6
CORRIDOR #C13
(679 SF)
PRESSURE(0)
SUPPLY 505
RETURN 505
TRANSFER 0
AIR CHANGE 4.4
REQ. AC 0
OFFICE #172
(109 SF)
PRESSURE(0)
SUPPLY 150
RETURN 150
TRANSFER 0
AIR CHANGE 9.2
REQ. AC 4
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
M-107
AIR FLOW & PRESSURE DIAGRAM
JCJ DLO
SCALE: 1/8" = 1'-0"
PROJECT
NORTH
AIR FLOW & PRESSURE DIAGRAM
Revisions: Date: 135 OF 206
AV
AV
HWHS
HWHS
PGr
HWHS
HWHR
HWHR
PENTHOUSE
HWHS
HWHR
H W
H S
H W
H R
P G
S
P G
R
PGS
PGR
P-HWHS
P-HWHS
P-HWHS
P-HWHS
3/4" FILL LINE FROM
BACKFLOW. SEE
PLUMBING DRAWINGS
3" CAMPUS HWS & HWR
2-1/2"
2-1/2"
2-1/2"
3/4"
2-1/2"
1"
1-1/4"
1-1/4"
1-1/2"
1-1/2"
2-1/2"
1"
3/4"
1/2"
2"
1"
3/4"
1/2"
3/4" 1"
2-1/2"
1"
2"
3/4"
1/2"
3/4"
1/2"
2"
1-1/2"
2"
2-1/2"
1-1/4"
1"
1-1/2"
3/4"
3/4"
1-1/4"
2-1/2"
HWHS
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H S
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
H W
H R
HWHS HWHS
HWHS
HWHS
HWHSHWHSHWHSHWHS
HWHS
HWHR HWHR
HWHR HWHR HWHR HWHR
HWHR
HWHR
HWHR
H W
H S
H W
H R
DIFFERENTIAL
PRESSURE SENSOR
2-1/2"
PRESSURE REDUCING
VALVE SET AT 12 PSI.
2-1/2"
H W
H R
H W
H S
PGS
MECH RM
VAV
HX
HX
VAV
UH
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
VAV
AHU
AS
AS
EXP
EXP
UH
GF
AA
A.1 A.1
BB
MECH
AS
EXP
DDC CONTROL
PANEL
2 1/2"
2 1/2"
1"
2 1/2"
2 1/2"
H W
S
H W
S
2 1/2" BUILDING HEATING WATER.
SEE MP104 FOR CONTINUATION.
2 1/2" CAMPUS HEATING WATER.
SEE MP104 FOR CONTINUATION.
DOMESTIC WATER HEATER
AND PUMPS. SEE PLUMBING
PLANS FOR PIPING.
3" CAMPUS HEATING WATER
SUPPLY AND RETURN TO
BELOW SLAB. SEE CIVIL
PLANS FOR CONTINUATION.
FIRE SERVICE
DOMESTIC
WATER SERVICE
HX
P-HWHS
P-HWHS
2-1/2" CAMPUS HEATING SUPPLY & RETURN
AND BUILDING HEATING SUPPLY &
RETURN DOWN TO HEAT EXCHANGER.
M-501
M-502
M-502
HWHS
HWHR
H W
H S
H W
H R
HWHS
HWHR
HWHS
HWHS
HWHR
H W
H S
H W
H R
H W
H S
H W
H R
HWHS
PGS
P G
S
P G
R
HWHS
HWHR HWHR
HWHS
HWHS
HWHR
H W
H S
H W
H R
H W
H R
H W
H R
H W
H S
H W
H S
HWHS
HWHR
HWHS
HWHR
HWHS
HWHR
HWHS
HWHR
H W
H R
H W
H S
H W
H S
H W
H S
H W
H R
H W
H R
HWHS
HWHR
HWHS
HWHSR
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
MP401
ENLARGED MECHANICAL ROOM &
RISER - MECH PIPING
JCJ DLO
SCALE: 1/4" = 1'-0"
PROJECT
NORTH
ENLARGED MECHANICAL ROOM PLAN - MECHANICAL PIPING
GENERAL NOTES
KEY NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.
CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE
AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT
INTERNATIONAL MECHANICAL CODE.
3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING
STANDARDS AS APPROVED BY THE OWNER.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF DUCTWORK WITH
EQUIPMENT, LIGHTING, PIPING, ETC..
6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT
ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING
OF THE FLOOR, CEILING, OR WALL.
NOT TO SCALE
PROJECT
NORTH
HYDRONIC RISER DIAGRAM
Revisions: Date: 136 OF 206
2.5 3 4
EE
FF
GG
HH
II
12"ø 12"x12"
32"x28"
"x
14"x12"
14"x12"
8"ø
14"ø
"ø 6
"ø
"ø
12"x12"
10"ø
6"ø
16"ø
10"ø
"ø
"ø
5"ø
8"ø
8"ø
12"ø
"ø
"x
"x
6"ø
12"ø
"x
"x
16"x16"
12"ø 12"ø
"ø
8"ø
8"x8"
16"ø
"x
12"ø
8"ø
72"x60"
46"x28"
"ø
10"ø14"x14"
8"ø
10"x10"
8"ø
"ø
"ø
12"ø
"x
27"/18" ø8"
8"ø
"x
16"ø16"x16"
8"x6"
12"ø14"x14"
10"ø
"x
10"ø
"x
"x
"ø
12"x10"
18"x14"
12"ø
VD
VD
VD
VD
VD
VDVD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VDVD
VD
VD VD
VD
VD
VAV
VAV
VAV
VAV
VAV
VAV
VAV
PUBLIC
TLT
EXAM
ROOM 24
ALCOVE
EXAM
ROOM 23
EXAM
ROOM 22
CLEAN
SUPPLY
PROCEDURE
ROOM 01
EXAM
ROOM 15
EXAM
ROOM 16
EXAM
ROOM 17
PAC TEAM
MED 2
WOMEN'S
HEALTH 02
WOMEN'S
HEALTH
TLT
163A
22X10[3]100
22X10[3]TG (TYP 2)
22X22[3]925
22X10[3]115
(TYP 4)
22X22[3]925
22X10[3]TG
(TYP 2)
8X8[1]115
(TYP 4)
12X12[1]485
(TYP 3)
22X10[3]100
8X8[1]135
22X10[3]135
12X12[1]330
12X12[1]450
22X22[3]350
22X10[3]115
(TYP 3)
8X8[1]115
(TYP 3)
12X12[1]335
(TYP 2)
22X22[3]1180
8"ø
12X12[1]365
(TYP 2)
VAV -19T
VAV -18T
VAV -12T
VAV -34T
VAV -11 T
VAV -10 T
16"ø
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
MH402
ENLARGED FLOOR PLAN - PACT
(WEST) - ADD ALT 3 - HVAC
JCJ DLO
GENERAL NOTES
KEY NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.
CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE
AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT
INTERNATIONAL MECHANICAL CODE.
3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING
STANDARDS AS APPROVED BY THE OWNER.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF DUCTWORK WITH
EQUIPMENT, LIGHTING, PIPING, ETC..
6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT
ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING
OF THE FLOOR, CEILING, OR WALL.
7. SEE MECHANICAL PIPING PLANS FOR ROOM SENSOR
LOCATIONS.
DUCT CLASSIFICATION SCHEDULE
DUCT LOCATION
SUPPLY DUCT
BETWEEN AIR
HANDLER AND
TERMINAL
UNIT
RETURN DUCT
FROM AIR
OUTLET TO
AIR
HANDLER
DOWNSTREAM
OF TERMINAL
UNITS
EXHAUST
DUCT
DUCT
CONSTRUCTION
CLASS
4" 1" 1" 1"
STATIC
PRESSURE
RATING
ABOVE 3" 1/2" TO 2" 1/2" TO 2" 1/2" TO 2"
PRESSURE POSITIVE POS OR NEG POS OR NEG
POS OR
NEG
SMACNA SEAL
CLASS
A B B B
SMACNA
LEAKAGE CLASS 6 12 12 12
VELOCITY
4000 FPM OR
LESS
2500 FPM OR
LESS
2500 FPM OR
LESS
2500 FPM
OR LESS
SCALE: 1/4" = 1'-0"
PROJECT
NORTH
ENLARGED FLOOR PLAN - PACT (WEST) - HVAC
AREA OF WORK
KEY PLAN
Revisions: Date: 137 OF 206
2.5 3 4
B.8B.8
CC
DD
EE
16"ø
"ø
"x
12"ø14"x14"
10"ø
"x
10"ø
"x
"x
"x
8"ø
8"ø
"ø
"ø
18"x14"
"ø
8"ø
"ø
"ø
"x
12"ø
16"ø
"x
"x
"12"ø
"x
"x
8"ø
"x
8"ø
8"ø
16"x16"
"ø
12"ø
18"x12"
"ø
"ø
14"ø
28"x16"
16"ø
"ø
"ø
"ø
"ø
24"/18"31"/18"
8"ø
8"ø
8"ø
18"x14"
"ø
"x
14"ø
"ø
10"ø14"x12"
8"ø
10"x10"
8"ø
8"ø
8"ø
8"x8"
8"ø
8"x8"
10"x10"
"ø
"ø
12"x10"
VD
VD
VD
VD
VD
VD
VD
VD VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VDVD
VD
VD
VD
VD
VD
VD
VDVD
VAV
VAV
VAV
VAV
VAV
VAV
VAV
"ø
PACT TEAM
EXAM
ROOM 18
EXAM
ROOM 19
EXAM
ROOM 20
EXAM
ROOM 21
EXAM
ROOM 28
EXAM
ROOM 26
EXAM
ROOM 27
EXAM
ROOM 25
CORRIDOR
C15
STAFF LOCKERS
22X10[3]700
(TYP 4)
12X12[1]550
22X10[3]115
(TYP 4)
8X8[1]115
(TYP 4)
22X22[3]1180 12X12[1]370
22X22[3]1180
12X12[1]480
(TYP 3)
"ø
12X12[1]380
(TYP 3)
8X8[1]125
(TYP 4)
22X10[3]105
22X10[3]125
(TYP 4)
VAV -30T
VAV -28
T
VAV -19T
VAV -21T
VAV
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
MH403
ENLARGED FLOOR PLAN - PACT
(EAST) - ADD ALT 4 - HVAC
JCJ DLO
GENERAL NOTES
KEY NOTES
1. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY,
DRAWINGS ARE DIAGRAMMATIC AND FOR DESIGN INTENT ONLY.
CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD
MEASUREMENT BEFORE BEGINNING ANY FABRICATION OR
CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE STATE
AND LOCAL CODES IN ACCORDANCE WITH THE CURRENT
INTERNATIONAL MECHANICAL CODE.
3. ALL NEW MATERIAL, METHODS, AND EQUIPMENT SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE BUILDING
STANDARDS AS APPROVED BY THE OWNER.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF DUCTWORK WITH
EQUIPMENT, LIGHTING, PIPING, ETC..
6. PENETRATIONS THROUGH FLOORS, CEILINGS, OR WALLS THAT
ARE RATED SHALL BE SEALED TO MAINTAIN THE FIRE RATING
OF THE FLOOR, CEILING, OR WALL.
7. SEE MECHANICAL PIPING PLANS FOR ROOM SENSOR
LOCATIONS.
DUCT CLASSIFICATION SCHEDULE
DUCT LOCATION
SUPPLY DUCT
BETWEEN AIR
HANDLER AND
TERMINAL
UNIT
RETURN DUCT
FROM AIR
OUTLET TO
AIR
HANDLER
DOWNSTREAM
OF TERMINAL
UNITS
EXHAUST
DUCT
DUCT
CONSTRUCTION
CLASS
4" 1" 1" 1"
STATIC
PRESSURE
RATING
ABOVE 3" 1/2" TO 2" 1/2" TO 2" 1/2" TO 2"
PRESSURE POSITIVE POS OR NEG POS OR NEG
POS OR
NEG
SMACNA SEAL
CLASS
A B B B
SMACNA
LEAKAGE CLASS 6 12 12 12
VELOCITY
4000 FPM OR
LESS
2500 FPM OR
LESS
2500 FPM OR
LESS
2500 FPM
OR LESS
SCALE: 1/4" = 1'-0"
PROJECT
NORTH
ENLARGED FLOOR PLAN - PACT (EAST) - HVAC
AREA OF WORK
KEY PLAN
Revisions: Date: 138 OF 206 m m
M A
X
NOTE:
SEE SPECIFER FOR DETAILED HANGER
REQUIREMENTS
COIL
WATER RETURN
WATER SUPPLY
MV
NOTES:
1. SEE EXPANSION TANK SYSTEM
SCHEDULE FOR COMPONENT SIZES.
2. FOR HOT WATER SYSTEMS 50mm [2"] AND
SMALLER USE IN-LINE AIR PURGER IN
LIEU OF AIR SEPARATOR.
3. SET PRESSURE REDUCING VALVE SO
PRESSURE AT HIGHEST POINT IN SYSTEM
HAS A MINIMUM OF 28kPa [4 PSIG].
4. PROVIDE STRAINER IN AIR SEPARATOR IF
INDICATED IN EXPANSION TANK
SCHEDULE.
DRAIN
DRAIN
TO PUMP
SUCTION
NCD
AV
PI
BUTTERFLY OR
BALL ISOLATION
VALVE
AIR SEPARATOR,
SEE NOTES 1 & 2
HANGER RODS
(TYP)
CONNECTOR PIPE
AUTO AIR VENT TO
DRAIN
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED
ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON
PIPE RISER DIAGRAMS AND/OR PLANS
LOCATE DRAIN AT BOTTOM OF SCALE
POCKET.
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE
DISCHARGE TO DRAIN.
MV
OR
AV
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4"[20mm] BALL VALVE
ADAPTER TO 3/4"[20mm]
HOSE THREAD. PROVIDE
HOSE CAP NUT
1/4"[8mm] COPPER
TUBING
1/2"[15mm] x 4"[100mm]
NIPPLE
AIR VENT
1/2"[15mm] BALL VALVE
CIRCULATING WATER PIPING
VANE VANE
NOTES:
1. THE INTERIOR SURFACE OF ALL RADIUS
ELBOWS SHALL BE MADE ROUND.
2. ALL STANDARD RADIUS ELBOWS CAN
BE SUBSTITUTED WITH SHORT RADIUS
ELBOWS. ALL SHORT RADIUS ELBOWS
SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED, SUPPORTED AND
FASTENED AS RECOMMENDED BY
SMACNA.
R SHALL
EQUAL
OR BE
GREATER
THAN W.
R SHALL
EQUAL
OR BE
GREATER
THAN
1/3W.
W
R
R
2/3W 1 /3
W
R SHALL
EQUAL
OR BE
GREATER
THAN
1/6W.
STANDARD
RADIUS OR LONG
RADIUS ELBOW
SHORT RADIUS
ELBOW WITH ONE
VANE
SHORT RADIUS
ELBOW WITH TWO
VANES
1/2W 1 /3
W
1/6W
R
NOTE:
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.
M A X
M A
X
E Q
U
IP
M E
N T
AIR
FLOW
AIR
FLOW
TYPICAL DUCTWORK TRANSITION
PLAN OR SIDE VIEWTYPICAL DUCTWORK TRANSITION WITH
EQUIPMENT MOUNTED IN DUCT
PLAN OR SIDE VIEW
M A X
M A
X
M A
X
M A
X
MAIN SUPPLY
PLAN VIEW
FLOW
F L
O W
SMACNA FIGURE 4-6 45° LEED IN
RIGID DUCT TO AIR TERMINAL UNIT.
SIDE VIEW TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 - SEE SPECIFICATIONS ADJUSTABLE CLEVIS HANGER TYPE 43 - SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
mm
[IN]
mm
[FT]
mm
[FT]
THRU 20
[THRU 3/4]
[7]
[5]
[1]
[7]
[6]
[11/4]
[7]
[7]
[11/2]
[9]
[8]
[2]
[10]
[8]
[21/2]
[11]
[9]
[3]
[12]
[10]
[4]
[14]
[12]
[5]
[16]
[13]
[6]
[17]
[14]
[8]
[19]
[16]
[10]
[22]
[12]
[23]
[14]
[25]
[16]
[27]
[18]
[28]
[20]
[30]
[24]
[32]
NOTE:
1.
2.
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR
MULTI-BLADE DAMPERS & ROUND DAMPERS.
SIDE ELEVATION SECTION
12"
NOTE:
THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR
THE DEDICATED AHU SERVING THE SURGICAL SUITE.
NOTE:
1. RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A
MINIMUM OF 3 TIMES THE DIAMETER OF INLET
2. A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX, BUT ALLOWED TO
ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH 3'-0" [900mm].
3. A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE BOX INLET, PROVIDED THE
EQUIVALENT LENGTH OF THE BRANCH DUCT, AS SHOWN, DOES NOT EXCEED 10 FEET (3 METERS). FOR
LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A DUCT TRANSITION TO MAINTAIN THE DUCT
STATIC PRESSURE DROP AT OR BELOW 0.2"/100' [1.64Pa/m].
4. FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0" [1500mm]. USE RIGID ELBOWS FOR CHANGE OF DIRECTION GREATER THAN 45°.
5. COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE
INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.
6. USE OF THE FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE DEDICATED AHU SERVING
THE SURGICAL SUITE.
S E
E N
O T
E
SEE NOTE 3
SEE NOTE 2
SEE NOTE 1
T
ISOLATION VALVE (BALL)
CALIBRATED BALANCING VALVE
3-WAY MODULATING
CONTROL VALVE
REDUCER, IF REQUIRED (TYP)
TEMPERATURE SENSOR (TYP)
MANUAL AIR VENT
BALL DRAIN VALVE WITH
HOSE CONNECTION AND
CAP (TYP) STRAINER WITH BALL
DRAIN VALVE AND HOSE
CONNECTION WITH CAP
UNION (TYP)
T
P&T TEST PORT
COIL
WATER RETURN
WATER SUPPLY
MV
T
ISOLATION VALVE (BALL)
CALIBRATED BALANCING VALVE
2-WAY MODULATING
CONTROL VALVE
REDUCER, IF REQUIRED (TYP)
TEMPERATURE SENSOR (TYP)
MANUAL AIR VENT
BALL DRAIN VALVE WITH
HOSE CONNECTION AND
CAP (TYP) STRAINER WITH BALL
DRAIN VALVE AND HOSE
CONNECTION WITH CAP
UNION (TYP)
T
P&T TEST PORT
NOTES:
1. PROVIDE LOW WATER LEVEL ALARM. PROVIDE A LOW
WATER LEVEL AT ECC. RELIEF VALVE DRAIN SHALL RETURN
TO TANK AS SHOWN ON THIS DETAIL.
2. SET REGULATING VALVE TO MAINTAIN MAKE-UP PRESSURE
AT 15 PSIG [103 kPa] ABOVE HIGHEST SYSTEM PRV SETTING.
3. MAKE-UP PIPING SYSTEM DOES NOT REQUIRE INSULATION.
4. OPERATE PUMP MANUALLY AS REQUIRED TO FILL.
D
PUMP
SUCTION
LOW WATER LEVEL ALARM
(SEE NOTE 1)
HANGER ROD
DIFFUSER (TYP.)
FLEXIBLE AIR DUCT CONNECTOR.
SEE DETAIL
SOUND ATTENUATOR. SEE
EQUIPMENT SCHEDULE
REHEAT COIL
SEE NOTE 5
AIR TERMINAL
UNIT (CV OR VAV)SEE SPECIFICATIONS FOR
CLAMPS AND SEALANT (TYP.)
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
43mm[1-5/8"] 12 GAUGE CHANNEL OR 50X50X6.4mm [2"X2"X1/4"] ANGLE
BAND
15mm [1/2"] DIA. HANGER RODS WITH 900mm [36"]
MAX. SPACING ON EACH
CHANNEL
SADDLE
WELD
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9
PSF MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION SHIELD
AT HANGER
PROVIDE INSULATION
SHIELD & INSERT FOR ALL
PIPING (200mm [8"] MIN.)
OMIT PRESSURE GAUGE
LINE IF STRAINER IS NOT
INCLUDED.
FROM SYSTEM
REDUCED PRESSURE ZONE
BACKFLOW PREVENTER
RUN DRAIN LINE
TO NEAREST FD
COLD WATER FILL LINE.
SEE EXPANSION TANK
SCHEDULE FOR SIZE
AIR CHARGING
SCHRADER VALVE
BLADDER
EXPANSION
TANK
150mm [6"]
HOUSEKEEPING
PAD
FLOOR MOUNTING BASE RING
WITH DRAIN ACCESS OPENING
SHOWN. ANGLE IRON LEGS MAY
BE USED AS AN OPTION.
THERMAL INSULATION
SEE SPECIFICATIONS
CONICAL OUTLET
BRANCH DUCT
SEE SPECIFICATIONS FOR
CLAMPS AND SEALANT (TYP.)
SUPPORT SADDLE
FROM STRUCTURE
FLEXIBLE DUCT SIZE SAME AS
DIFFUSER INLET: 5'-0" MAX
LENGTH
USE RIGID ELBOWS FOR
CHANGE OF DIRECTION
GREATER THAN 45°
VOLUME DAMPER W/
LOCKING QUAD
SHEET
METAL
SADDLE
[300mm]
CEILINGTYPICAL DIFFUSER OR
REGISTER IN LAY-IN CLG.
AIR SEPARATOR
BACK PRESSURE
REGULATING VALVE
SEE NOTE NO. 2
55 GALLON [208L]
GLYCOL-WATER
STORAGE TANK
FLOOR
3/4" [20mm]
WALL MOUNTED "ON-OFF"
MOTOR CONTROL -
SEE NOTE NO. 4
GLYCOL-WATER
MAKE-UP PUMP
5 GPM @ 30 PSIG
[18 LPM @ 206 kPa]
3/4" [20mm]
INSULATION
SEE
SPECIFICATIONSTIFFEN BLADE
AS REQUIRED 1/2" [15mm]
ROUND ROD PIN
OUTSIDE END
BEARING
1/8" [6mm]
CLEARANCE
ALL AROUND
INSIDE END BEARING
DUCT
DAMPER BLADE
HANDLE WITH
LOCKING
QUADRANT
INSULATION
STAND-OFF
DRAINAIR CHARGING
SCHRADER VALVE
BLADDER
EXPANSION
TANK
150mm [6"]
HOUSEKEEPING
PAD
FLOOR MOUNTING BASE RING
WITH DRAIN ACCESS OPENING
SHOWN. ANGLE IRON LEGS MAY
BE USED AS AN OPTION.
TERMINAL UNIT - PIPING CONNECTIONS
SCALE: NOT TO SCALE
TWO-WAY VALVE
THREE-WAY VALVE
FLOOR MOUNTED EXPANSION TANK - PIPING CONNECTIONS
SCALE: NOT TO SCALE
TYPICAL MANUAL AIR VENT
TYPICAL HOT WATER PIPING DRAIN
VALVE CONNECTIONS
DRAIN VALVE AND AIR VENT CONNECTIONS (HYDRONIC SYSTEMS)
SCALE: NOT TO SCALE
DUCTWORK RADIUS ELBOWS
SCALE: NOT TO SCALE
DUCTWORK TRANSITION (WITH EQUIPMENT MOUNTED IN DUCT)
SCALE: NOT TO SCALE
SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS
SCALE: NOT TO SCALE
VOLUME DAMPER DETAIL
SCALE: NOT TO SCALE
FLEXIBLE AIR DUCT CONNECTOR
SCALE: NOT TO SCALE
DUCT CONNECTIONS - AIR TERMINAL UNITS
SCALE: NOT TO SCALE
PIPE HANGERS
SCALE: NOT TO SCALE
INDIRECT GLYCOL MAKE-UP SYSTEM DIAGRAM
SCALE: NOT TO SCALE
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
M-501
MECHANICAL DETAILS
Revisions: Date: 139 OF 206
C C
CC
AIR
FLOWAD
AD
FAN
INLINE
NOTE: REFER TO CONSTRUCTION SPECIFICATIONS FOR MATERIALS,
EQUIPMENT, AND INSTALLATION REQUIREMENTS.
M
MOTORIZED DAMPER AT
CONNECTION TO LOUVER
TO OPEN WHEN FAN IS
ENERGIZED
24"X24" ACCESS DOOR
(BOTH SIDES) FOR ALL FANS
WITH DUCT CONNECTIONS LARGER
THAN 36" (ROUND OR SQUARE)
WASHER (TYP.)
3/16" THICK FRAME W/EYELET
WELDED TO FAN HOUSING,
PRIMED AND PAINTED (TYP.)
2"X2"X1/8" ANGLE
REINFORCEMENT
CONN TO DUCT
FLEX CONNECTION (TYP)
VIBRATION ISOLATOR
SPRING ASSEMBLY
SUPPORT ROD
HUNG FROM CEILING
DUCT SUPPORT
(TYP)
NUT (TYP)
ROD
RUBBER GROMMET (TYP.)
ANCHOR DUCT
TO PREVENT
LATERAL
MOVEMENT
PIPE SUPPORT (TYP)
SHUTOFF VALVE (TYP)
SILENT CHECK VALVE
CALIBRATED
BALANCING
VALVE
PRESSURE TUBE AND
VALVES (TYP)
DRAIN VALVE W/
HOSE CONNECTION
& CAP
THERMOMETER
PIPE SUPPORT (TYP)
NEOPRENE PAD (TYP)
PRESSURE
GAUGE
PUMP
HOUSEKEEPING
PAD
SUCTION DIFFUSER
WATER COIL
WATER COIL
MV
MV
MV
TI
MV
NOTES:
1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE
FIRST 2 HANGERS FOR EACH PIPE SHALL BE SPRING & NEOPRENE TYPE. TYPE "H"
FOR 100mm [4"]∅ PIPE & SMALLER. TYPE "H-P" FOR 125mm [5"]∅ PIPE & LARGER.
2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE
SWING OR USE OF ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE
SERVICING OF FILTERS, VALES, OR EQUIPMENT.
3. THE FLOW ELEMENT MAY BE INSTALLED IN THE SUPPLY PIPING IF THE REQUIRED
MINIMUM UPSTREAM AND DOWNSTREAM DIMENSIONS CANNOT BE OBTAINED IN
THE RETURN PIPING.
REDUCER (IF REQUIRED)
CALIBRATED BALANCING
VALVE (TYP)
DRAIN
DRAIN WHEN COIL IS
NOT SELF-DRAINING
PIPE HANGER SHALL SUPPORT
PIPING INDEPENDENT OF COIL
TEST PLUG
(TYP)
AIR VENT WHEN COIL
IS NOT SELF-VENTING
TEMPERATURE INDICATION TO
ECC, SEE CONTROL DIAGRAM
ELEVATION
PLAN VIEW
473"
.7
A T
P E
A K
16" (406 )
MAX
8" (203 )
MAX
WALL: STEEL OR WOOD
STUD OR MASONRY
GRILL (BY OTHER) OPTIONAL
FASTENERS
1/4" (6) THICK
INSULATION(FACTORY
INSTALLED)
DUCT SLEEVE
CONNECTION
DAMPER
RETURN AIR OPENING
RETURN FAN ARRAY FANS (QTY 3)
RELIEF DAMPER
RELIEF HOOD
SERVICE ACCESS DOOR
SERVICE LIGHT
RETURN DAMPER
INTAKE HOOD
INTAKE DAMPER
PRE FILTER MERV 8
FINAL FILTER MERV 11
HOT WATER HEATING COIL (2)
DX COOLING COIL (2)
SUPPLY FAN ARRAY (QTY 4)
ELECTRICAL PANEL
FINAL FILTER MERV 14
SUPPLY OPENING WITH GRATE
CONDENSING UNIT
FILTER BANK MAGNAHELIC
KEY NOTES:
131415161718
55555
19 1920
AIR HANDLER DETAIL
SCALE: NOT TO SCALE
INLINE EXHAUST FAN DETAIL
SCALE: NOT TO SCALE
PUMP DETAIL
SCALE: NOT TO SCALE
AIR HANDLER GLYCOL HEATING COIL PIPING DETAIL
SCALE: NOT TO SCALE
OUT OF WALL FIRE DAMPER DETAIL
SCALE: NOT TO SCALE
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
M-502
MECHANICAL DETAILS
Revisions: Date: 140 OF 206
POINTS LIST
TYPE OF EQUIPMENT:
CONTROL GRAPHIC DISPLAYS
NOTES
VAV REHEAT BOX
ITEMS TO CONTROL AN MONITOR: POINT ID
S T
A R
T /S
T O
P
O P
E N
/C L O
S E
M O
D U
L A
T
IN
G /V
A R
Y
IN
G
S T
A T
U S
W A
T E
R P
R E
S S
U R
E
A
IR
P R
E S
S U
R E
T E
M P
E R
A T
U R
E
F L
O W
C
F M
H U
M
ID
IT
Y
S P
E E
D P
E R
C E
N T
A G
E
P O
S
IT
IO
N
A L A
R M
P E
R C
E N
T
SPACE TEMPERATURE SENSOR AI-01 - - - - - - ● - - - - - - - -
SUPPLY AIR TEMPERATURE AI-02 - - - - - - ● - - - - - - - -
HEATING WATER VALVE CONTROL BO-01 - - ● - - - - - - - ● - - - -
POSITION CONTROL AIR…
This is the start of the file's text. The full file is on GovTribe.