This document appears to be a set of architectural drawings and details for the Construct Primary Care/Mental Health Building Minor Construction Project at the VA Medical Center in Boise, ID, solicitation number 36C77624R0096. The project involves constructing a new building that will include various patient exam rooms, a procedure room, a women's health room, a clean supply room, staff and public restrooms, a staff lounge, and other support spaces. The drawings provide detailed floor plans, reflected ceiling plans, enlarged room layouts, interior elevations, and equipment schedules for the proposed building. Additionally, the document includes details for two add alternates - the construction of a coffee shop area and the installation of solar panels on the building. The federal agency involved is the Department of Veterans Affairs Technology Acquisition Center Austin.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4
B
C
D
E
1.1 3.9
A.1
2.5
B.8
A
118 SF
ELEC
108 SF
OFFICE
108 SF
OFFICE
104 SF
SOILED MED
EQUIP
67 SF
STAFF TLT
178 369 SF
STAFF LOUNGE
107 SF
OIT SERVER
229 SF
MECH
29 SF
STAFF LOCKERS
28 SF
STAFF LOCKERS
41 SF
STAFF LOCKERS
153 29 SF
STAFF LOCKERS
124 SF
EXAM ROOM 07
124 SF
EXAM ROOM 06
124 SF
EXAM ROOM 05
124 SF
EXAM ROOM 04
124 SF
EXAM ROOM 14
124 SF
EXAM ROOM 13
124 SF
EXAM ROOM 12
124 SF
EXAM ROOM 11
65 SF
PUBLIC TLT
25 SF
ALCOVE
/1 A-405 /1 A-405
10' - 6" 8' - 11" 9' - 0" 9' - 0" 7' - 4" 15' - 0" 6' - 6" 11' - 3" 44' - 3" 6"
/8
/8
/8
/8
67 SF
STAFF TLT
W3
W1
W1
W1
W1
W1W1
W1
W1
W1
W1
.1
.1 1
.2
.2
.2
.1
.1
.2
.2
.1
.2
.1
.2
.1
.1
.2
C .3
C13.1
C
C15.2C15.1
C
B
R
IC
K S
B
R
IC
K S
.5
B R
IC
K
S
44' - 9" 32' - 9" 44' - 9"
122' - 3"
6"
MATCH LINE A-A
A A
FACE OF STUDS, TYP UON
6' - 7" 12' - 10 1/8" 25' - 4" 13' - 4" 6' - 1" 13' - 4" 25' - 4" 12' - 10" 6' - 7"
ALIGN ALIGN
ALIGN ALIGN
13' - 4" 6' - 1" 13' - 4"
679 SF
CORRIDOR
C13
FOR CONTINUATION
SEE
0 1
48F
48F
67F
48F
48F
48F
48F
48F
48F
44F
44F
48F
/8
/8
/8
/8
48F
48F
48F
/8
48F
A-2
A-2
67F
48F
48F
A-2
67F
48F
67F
48F
48F
48F
62 62
69F
67 SF
STAFF TLT
68 SF
STAFF TLT
968 SF
CORRIDOR
C15
.1
10 3/4" 8' - 0" 6" 8' - 0" 7' - 11 1/4" 1' - 4 1/2" 8' - 0" 6" 8' - 0" 6" 4' - 0" 21' - 10 1/2"
45 45
454545
W5 W5 W5 W5
W4 W4
.2
S5BS5AS5AS5AS5A
2427 SF
PACT TEAM
FOR CONTINUATION
SEE
48F
48F
48F
48F
48F
6" 6"
6" 6" 1' - 0"
1' - 2"
8 5/8"
1' - 0" 1' - 0"
4' - 7"
3 3/8" 10"
6"
/8
6"
/8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-404
PARTIAL FLOOR PLAN - EAST -
DIMENSIONS
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 064 OF 206
1/4" = 1'-0"1
PARTIAL DIMENSION PLAN - EAST
PROJECT
NORTH
Revisions: Date:
E
F
G
H
I
1.1 3.92.1 2.92.5
124 SF
EXAM ROOM 03
124 SF
EXAM ROOM 02
124 SF
EXAM ROOM 01
124 SF
WOMEN'S
HEALTH 01
124 SF
EXAM ROOM 10
124 SF
EXAM ROOM 09
124 SF
EXAM ROOM 08
180 SF
PROCEDURE
ROOM 01
2427 SF
PACT TEAM
223 SF
CLEAN SUPPLY
79 SF
ALCOVE, H/W
/1 A-404
/1 A-404
/1 A-406
/1 A-406
/8
W1
W1
W1
W1 W1
W1
W1
W1
.1
.1
.2
.2
.2
.2 1
.1
.2
.2
.1
.2
.1
C
.2
C
.1
MATCH LINE A-A
A A
MATCH LINE B-B
B B
ALIGN ALIGN
ALIGN ALIGN
13' - 4" 6' - 1" 13' - 4"
6' - 7" 6' - 4 1/2"
FOR CONTINUATION
SEE
79 SF
ALCOVE, H/W
48F
67F
48F
ALIGN ALIGN
/8 "64
45 45
48F
48F
48F
48F
67F 48F
48F
48F
48F
48F
41 41
A-2
48F
779 SF
CORRIDOR
C11
608 SF
CORRIDOR
C12
609 SF
CORRIDOR
C14
679 SF
CORRIDOR
C13
5064 SF
PACT TEAM
SHELL
.1
.2
FOR CONTINUATION
SEE
FOR CONTINUATION
SEEFOR CONTINUATION
SEE
A
66 SF
WOMEN'S
HEALTH TLT
118A
W1
48F
44F
48F
779 SF
CORRIDOR
C11
.1
.1
1' - 5 1/2"
4' - 0"
6"
T Y
P
0' - 6"
19' - 4 1/2"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-405
PARTIAL FLOOR PLAN - CENTER -
DIMENSIONS
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 065 OF 206
1/4" = 1'-0"1
PARTIAL DIMENSION PLAN - CENTER
PROJECT
I
J
K
L
M
N
1.1 3.9
L.2
2.1 2.92.5
41 SF
STORAGE
100 SF
STORAGE
107A
467 SF
GROUP ROOM
173 SF
MSA & BUSINESS
SERVICES
110 160 SF
HOUSEKEEPING
AND LADDER
87 SF
POLICE
80 SF
FAMILY TLT
106 74 SF
PUBLIC TLT
84 SF
LACTATION
317 SF
RECEPTION
603 SF
VESTIBULE
/1 A-405 /1 A-405
/8
/8
11' - 5" 5' - 6" 6' - 3 1/8" 7' - 11 1/2" 8' - 0 1/2" 6' - 4" 15' - 7 1/2" 15' - 7 1/2" 5' - 10 5/8" 9' - 11 3/8" 10' - 5" 9' - 5" 9' - 4" 6"
EQ EQ
10" 12' - 5"
1' - 1"
12' - 5"
1' - 1"
12' - 5" 8" 8" 12' - 5"
1' - 1"
12' - 5"
1' - 1"
12' - 5" 10"
.3
.2
A
.2
2 1
101.1
.1
16' - 4 1/2" 15' - 7 1/2" 9"
MATCH LINE B-B
B B
6" 44' - 3" 44' - 3" 6"
LOBBY
9"
9"
OPEN
CEILING
44' - 9" 32' - 9" 44' - 9"
121' - 3"
45' - 0" 31' - 3" 45' - 0"
4148F
48F
70F
48F
70F
70F
70F
65F
70F
86F
86F
85F
85F
86F
65F
48F
48F
70F
48F
70F 70F
48F
UON
3" TYP
81 62
70F
6' - 9 5/8"
/2
S1
S2
S2
W6
W6
FOR CONTINUATION
SEE
FOR CONTINUATION
SEE
.1
CHECK IN CHECK IN
ALIGN
ALIGN
FACE OF
STUDS &
COLUMNS
/2
/2
/2
/2
S3A S3B S3A S3A S3B S3A
118 SF
CORRIDOR
C10
SHIPS
LADDER
75 SF
PUBLIC TLT
74 SF
PUBLIC TLT
70F
48F
.2
S4B
S4E
S4C
S4A
DRINKING FOUNTAIN /
BOTTLE FILL STATION
FUTURE SECURITY
SCREENING
EQUIPMENT
S4D
S4B
70F
70F
102.4
F1
4' - 9 5/8"
2' - 6"
6"
6"
6" 1' - 0" 6"
6"
6"
6" 6"
6" 6"
5' - 3 1/2" 6' - 2" 5' - 3 1/2"
/8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-406
PARTIAL FLOOR PLAN - WEST -
DIMENSIONS
MEDICAL CENTER DIRECTOR
07/23/2021 Checker Author 066 OF 206
1/4" = 1'-0"1
PARTIAL DIMENSION PLAN - WEST
PROJECT
C
D
E
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
GWB-1
11' - 0"
GWB-1
11' - 0"
GWB-1
9' - 0"
GWB-1
9' - 0"
OPENOPEN
ELEC
OIT SERVER
OFFICE
OFFICE
STAFF TLT
SOILED MED
EQUIP
STAFF TLT
STAFF LOUNGE
MECH
EXAM ROOM 07
EXAM ROOM 06
EXAM ROOM 05
EXAM ROOM 04
PUBLIC TLT
EXAM ROOM 11
EXAM ROOM 12
EXAM ROOM 13
EXAM ROOM 14
PACT TEAM
SHELL
/1 AC402 /1 AC402
1.1 3.9
A.1
MATCH LINE A-A
A A
2.5
B.8
2x4 ACT
9' - 0"
68 SF
STAFF TLT
67 SF
STAFF TLT
A
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
GWB-1
11' - 0"
2x4 ACT
12' - 0"
2x4 ACT
11' - 0"
2x4 ACT
11' - 0"
OPEN
GWB-1
8' - 10"
GWB-1
8' - 10"
GWB-1
8' - 10"
GWB-1
6' - 6"
GWB-1
6' - 6"
GWB-1
11' - 0"
GWB-1
11' - 0"
GWB-1
6' - 6"
2x4 ACT
10' - 0"
2x4 ACT
10' - 0"
679 SF
CORRIDOR
C13
25 SF
ALCOVE
VARIES
BLAST
BLAST
26' - 10"
VARIES
BLAST
VARIES
BLAST
BLAST
26' - 10"
VARIES
BLAST
12' - 5" 4' - 6 1/2" 12' - 1" 12' - 1" 4' - 10" 12' - 2"
2x4 ACT
11' - 0"
2x4 ACT
11' - 0"
FOR CONTINUATION
SEE
FOR CONTINUATION
SEE
ACOUSTIC
CEILING
CANOPY
ACC1
SKYLIGHT, TYP
SKYLIGHT, TYP
SKYLIGHT, TYP
ACOUSTIC
CEILING
CANOPY
ACC1
ACOUSTIC
CEILING
CANOPY
ACC1
GWB-1
6' - 6"
CORRIDOR
C15
CORRIDOR
C14
PACT TEAM
CORRIDOR
C15
2x4 ACT
10' - 4"
2x4 ACT
12' - 0"
10' - 2"
GWB-1
7' - 8"
GWB-1
7' - 8"
GWB-1
7' - 8"
GWB-1
9' - 0"
2x4 ACT
10' - 0"
OPEN
LIGHTING
ACT 2X4
GWB
OPEN TO
STRUCTURE
EXHAUST
RETURN GRILL
SUPPLY DIFFUSER
CEILING
MECHANICAL
WD-1 WOOD
CEILING SYSTEM
ACCESS PANEL
24" x 24"
ACCESS PANEL
12" x 12"
RECESSED DOWNLIGHT
RECESSED WALL WASHER
RECESSED TROFFER, 2X2
RECESSED TROFFER, 2X4
PENDANT LINEAR
PENDANT ROUND
SURFACE MOUNT LINEAR
SURFACE MOUNT ROUND
SURFACE MOUNT STRIP
FRONT/BACK BLDG WALL
SCONCE
UNDER CABINET
SIDE BLDG WALL SCONCE
HANGING TROFFER, 2X2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AC401
PARTIAL REFLECTED CEILING PLAN -
EAST
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 067 OF 206
1/4" = 1'-0"1
PARTIAL CEILING PLAN - EAST
PROJECT
NORTH
LEGEND
F
G
H
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
10' - 0"
GWB-1
9' - 0"
GWB-1
9' - 0"
GWB-1
9' - 0"
GWB-1
9' - 0"
GWB-1
9' - 0"
GWB-1
9' - 0"
GWB-1
9' - 0"
2x4 ACT
10' - 0"
2x4 ACT
10' - 0"
2x4 ACT
10' - 0"
2x4 ACT
9' - 0"
EXAM ROOM 03
EXAM ROOM 02
EXAM ROOM 01
WOMEN'S
HEALTH TLT
118A
WOMEN'S
HEALTH 01
CLEAN SUPPLY
ALCOVE, H/W
PROCEDURE
ROOM 01
EXAM ROOM 08
EXAM ROOM 09
EXAM ROOM 10
PACT TEAM
/1 AC401 /1 AC401
/1 AC403/1 AC403
MATCH LINE A-A
A A
MATCH LINE B-BB B
2.5
608 SF
CORRIDOR
C12 679 SF
CORRIDOR
C13
779 SF
CORRIDOR
C11
609 SF
CORRIDOR
C14
2x4 ACT
12' - 0"
79 SF
ALCOVE, H/W
2x4 ACT
11' - 0"
2x4 ACT
11' - 0"
8' - 10"
8' - 10"
IN-15.52-01
IN-15.52-03
VARIES
BLAST
BLAST
26' - 10"
VARIES
BLAST
VARIES
BLAST
VARIES
BLAST
BLAST
26' - 10"
2' - 0" 2' - 9" 4' - 10" 2' - 9" 2' - 0"
2' - 0" 2' - 9" 4' - 10" 2' - 9" 2' - 0"
IN-15.52-02
FOR CONTINUATION
SEE
FOR CONTINUATION
SEE
FOR CONTINUATION
SEE
FOR CONTINUATION
SEE
ACOUSTIC
CEILING
CANOPY
ACC12x4 ACT
9' - 0"
SKYLIGHT, TYP
2x4 ACT
10' - 0"
SKYLIGHT, TYP
8' - 10"
IN-15.52-02
LIGHTING
ACT 2X4
GWB
OPEN TO
STRUCTURE
EXHAUST
RETURN GRILL
SUPPLY DIFFUSER
CEILING
MECHANICAL
WD-1 WOOD
CEILING SYSTEM
ACCESS PANEL
24" x 24"
ACCESS PANEL
12" x 12"
RECESSED DOWNLIGHT
RECESSED WALL WASHER
RECESSED TROFFER, 2X2
RECESSED TROFFER, 2X4
PENDANT LINEAR
PENDANT ROUND
SURFACE MOUNT LINEAR
SURFACE MOUNT ROUND
SURFACE MOUNT STRIP
FRONT/BACK BLDG WALL
SCONCE
UNDER CABINET
SIDE BLDG WALL SCONCE
HANGING TROFFER, 2X2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AC402
PARTIAL REFLECTED CEILING PLAN -
CENTER
MEDICAL CENTER DIRECTOR
07/23/2021 MA AJ 068 OF 206
1/4" = 1'-0"1
PARTIAL CEILING PLAN - CENTER
PROJECT
NORTH
I
J
K
L
M
N
GWB-1
9' - 11"
2x4 ACT
11' - 3"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0"
2x4 ACT
9' - 0" 2x4 ACT
11' - 0"
GWB-1
9' - 11"
4' - 0" 9' - 2 1/2"
GWB-1
9' - 0"
GWB-1
9' - 0"
GWB-1
9' - 3"
GWB-1
9' - 3"
COVE LIGHTING
LWC3
10' - 0"
STORAGE
107A
STORAGE
GROUP ROOM
LOBBY
VESTIBULE
RECEPTION
MSA & BUSINESS
SERVICES
PUBLIC TLT
PUBLIC TLT
HOUSEKEEPING
AND LADDER
POLICE
FAMILY TLT
PUBLIC TLT
LACTATION
2x4 ACT
10' - 11"2x4 ACT
10' - 11"
/1 AC402 /1 AC402
GWB-1
9' - 11"
1.1 3.9
L.2
MATCH LINE B-BB B
2.1 2.92.5
GWB-1
9' - 6"
LWC1
10' - 0"
GWB-1
9' - 6"
779 SF
CORRIDOR
C11
VARIES
LWC3
118 SF
CORRIDOR
C10
OPEN
GWB-1
9' - 11"
GWB-1
9' - 11"
HIGH CEILING NEAR UPPER ROOF PER BUILDING SECTIONS
(CONTINUE CEILING MATERIAL THROUGHOUT PORTION OF
UPPER ROOF THAT WILL BE VISIBLE FROM BELOW)
4' - 0"
/2
4' - 0"
4' - 0"
FOR CONTINUATION
SEE
FOR CONTINUATION
SEE
OPEN
A-511
OPEN
LIGHTING
ACT 2X4
GWB
OPEN TO
STRUCTURE
EXHAUST
RETURN GRILL
SUPPLY DIFFUSER
CEILING
MECHANICAL
WD-1 WOOD
CEILING SYSTEM
ACCESS PANEL
24" x 24"
ACCESS PANEL
12" x 12"
RECESSED DOWNLIGHT
RECESSED WALL WASHER
RECESSED TROFFER, 2X2
RECESSED TROFFER, 2X4
PENDANT LINEAR
PENDANT ROUND
SURFACE MOUNT LINEAR
SURFACE MOUNT ROUND
SURFACE MOUNT STRIP
FRONT/BACK BLDG WALL
SCONCE
UNDER CABINET
SIDE BLDG WALL SCONCE
HANGING TROFFER, 2X2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AC403
PARTIAL REFLECTED CEILING PLAN -
WEST
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 069 OF 206
1/4" = 1'-0"1
PARTIAL CEILING PLAN - WEST
PROJECT
NORTH
GFI
G F
I
AE430 2
124 SF
EXAM ROOM 07
.1 1 .2
PATIENT SIDE
A5109
GRAB BAR
A5108
SHARPS
DISPOSAL
A5107
GLOVE
DISPENSER
A5075
SOAP
DISPENSER
STAFF SIDE
A5145
GARMENT
HOOKA5109
GRAB BAR
/2
9" 1' - 8" 3' - 6"
A5180
PRIVACY
CURTAIN
TRACK
A5180
PRIVACY
CURTAIN
TRACK
M4100
SPHYGMOMANOMETER
M1803
WORKSTATION
A5082
PAPER
TOWEL
DISPENSER
M4040
SCALE
4' - 0"
MONITOR
VITAL SIGNS
M4117
/2
M1804
DUAL
MONITOR
MOUNT
M9025
EXAM BED
AE431
223 SF
CLEAN SUPPLY
E0903
OMNICELL
E0903
OMNICELL
U0002
OXYGEN
TANK
M3110
BLANKET
WARMER
M3150
DISPENSING
SYSTEM
M7710
ELECTROCARDIOGRAPH
A5082
PAPER
TOWEL
DISPENSER
A5108
SHARPS
DISPOSAL
A5075
SOAP
DISPENSER
1' - 3 1/2"1' - 10 1/2"
6"
11" 2' - 3"
5' - 2"
A5107
GLOVE
DISPENSER
I
J
K
L
AE433 2
F0435
MEDIA
CABINET
M1801
COMPUTER
M1801
COMPUTER
10' - 10 1/2"
5' - 1"
100 SF
STORAGE
107A
41 SF
STORAGE
467 SF
GROUP ROOM
/4
17' - 2"
6' - 9 1/2"
A
1.1
L.2
A-509
10' - 4 1/2"
/8
B
AE4338
369 SF
STAFF LOUNGE
A.1
M0506
TV
A5210
TV BRACKET
A5145
GARMENT
HOOK
A
TV WALL BACKING
.2
.1
R7250
FRIDGE
K4665
MICROWAVE
/2
/2
A-509
F3065
WHITEBOARD
A5075
SOAP
DISPENSER
A5082
PAPER
TOWEL
DISPENSER
UPPER CABINETS
A-509
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE410
EXAM ROOM, CLEAN SUPPLY, STAFF
LOUNGE, GROUP ROOM - ENLARGED
FLOOR PLAN 127
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 070 OF 206
1/2" = 1'-0"2
EXAM ROOM - ENLARGED FLOOR PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/2" = 1'-0"3
CLEAN SUPPLY - ENLARGED FLOOR PLAN
1/2" = 1'-0"1
GROUP ROOM - ENLARGED FLOOR PLAN
1/2" = 1'-0"4
STAFF LOUNGE - ENLARGED FLOOR PLAN
PROJECT
NORTH
1. SEE SHEETS A-601 THROUGH A-612 FOR DOOR
SCHEDULES, WINDOW SCHEDULES/DETAILS, EQUIPMENT
SCHEDULE, AND WALL/FLOOR/ROOF TYPES.
2. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA
INSTALLED REQUIRING POWER/DATA OR FURNITURE
SUPPORTING SAID EQUIPMENT. ONLY USE FOR
REFERENCE. COORDINATE POWER/DATA WITH
ELECTRICAL.
GENERAL NOTES
GFI
H
AE4316
M3072
INFECTIOUS
WASTE BAG
A5107
GLOVE
DISPENSER
180 SF
PROCEDURE
ROOM 01
/8
1' - 5"
.1
.2
M1803
WORKSTATION
STAFF SIDE
PATIENT SIDE
/8
M7401
EXAM LIGHT
M4100
SPHYGMOMANOMETER
A1132
RAIL
A1011
TELEPHONE
A5082
PAPER
TOWEL
DISPENSER
M3072
INFECTIOUS
WASTE BAG
A5180
PRIVACY
CURTAIN
TRACK
A5180
PRIVACY
CURTAIN
TRACK
A5145
GARMENT
HOOK
MONITOR
VITAL SIGNS
M4117
/4
A5108
SHARPS
DISPOSAL
M1804
DUAL
MONITOR
MOUNT
A5075
SOAP
DISPENSER
/4
/2
/2
3' - 11 7/8"
H
PROCEDURE
ROOM 01
2x4 ACT
9' - 0"
A5180
PRIVACY
CURTAIN
TRACK
A5180
PRIVACY
CURTAIN
TRACK
U0004
PATIENT LIFT
H
AE430
124 SF
WOMEN'S
HEALTH 01
118PATIENT SIDE
STAFF SIDE
M4100
SPHYGMOMANOMETER
MONITOR
VITAL SIGNS
M4117 M1803
WORKSTATION
M1804
DUAL
MONITOR
MOUNT
A5145
GARMENT
HOOK
M4040
SCALE
A5109
GRAB BAR
A5109
GRAB BAR
M0925
GYN EXAM
TABLE
A5180
PRIVACY
CURTAIN
TRACK
A5075
SOAP
DISPENSER
A5082
PAPER
TOWEL
DISPENSER
A5108
SHARPS
DISPOSAL
M3072
INFECTIOUS
WASTE BAG
A4995
BABY
CHANGING
STATION
A5109
GRAB BAR
A5109
GRAB BAR
A5200
TOILET
TISSUE DISP
A5090
SANITARY
NAPKIN
DISPOSAL
A5075
SOAP
DISPENSER
A5082
PAPER
TOWEL
DISPENSER
A1066
MIRROR
A5091
FEMININE
NAPKIN
DISPENSER
A5145
GARMENT
HOOK
A1080
POSTURE
MIRROR
.2
.1
A
U0001
SEAT COVER
DISPENSER
1' - 0" 2' - 0" 6"
/8
1' - 8 1/8"
/2
/8
2' - 6 5/8" 2' - 4 1/8" 3' - 11 1/2"
/4
5' - 2 3/8"
/8
/8
AE438
66 SF
WOMEN'S
HEALTH TLT
118A
H
WOMEN'S
HEALTH TLT
118A
WOMEN'S
HEALTH 01
2x4 ACT
9' - 0"
U0004
PATIENT LIFT
A5180
PRIVACY
CURTAIN
TRACK
A5180
PRIVACY
CURTAIN
TRACK
TASK LIGHT,
SEE ELECTRICAL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE411
WOMEN'S HEALTH & PROCEDURE
ROOM - ENLARGED FLOOR PLAN &
RCP 127
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 071 OF 206
1/2" = 1'-0"1
TYP PROCEDURE ROOM - ENLARGED FLOOR PLAN
1/2" = 1'-0"2
TYP PROCEDURE ROOM - ENLARGED REFLECTED CEILING PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/2" = 1'-0"3
WMN'S HEALTH EXAM ROOM AND TOILET - ENLARGED FLOOR PLAN
1/2" = 1'-0"4
WMN'S HEALTH EXAM ROOM AND TOILET - REFLECTED CEILING PLAN
1. SEE SHEETS A-601 THROUGH A-612 FOR DOOR
SCHEDULES, WINDOW SCHEDULES/DETAILS, EQUIPMENT
SCHEDULE, AND WALL/FLOOR/ROOF TYPES.
2. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA
INSTALLED REQUIRING POWER/DATA OR FURNITURE
SUPPORTING SAID EQUIPMENT. ONLY USE FOR
REFERENCE. COORDINATE POWER/DATA WITH
ELECTRICAL.
I G
F I
G F
I
G F
I G
F I
G F
I
C
AE432
4 2
.2
.2
.2
.2
.2
.2
B.8
DESK, TYP
AE3012 3
J
K
317 SF
RECEPTION
2.1 2.92.5
GWB-1
9' - 6"
LWC1
10' - 0"
GWB-1
9' - 6"
VARIES
LWC3
VARIES
LWC3
AT UPPER ROOF
J
AE432
RECEPTION
2.1 2.92.5
A-509
AE432
M1801
COMPUTER
AE432 10 AE43211
C
D
7' - 8 1/2" 2' - 0"
B.8
LIGHTS, SEE ELECTRICAL
ACOUSTIC
CEILING
CANOPY
ACC1
ACOUSTIC
CEILING
CANOPY
ACC1
ACOUSTIC
CEILING
CANOPY
ACC1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE412
TYP PACT TEAM & RECEPTION-
ENLARGED FLOOR PLANS & RCP
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 072 OF 206
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"1
TYP PACT TEAM WORK STATIONS - ENLARGED FLOOR PLAN
1/4" = 1'-0"4
RECEPTION - ENLARGED REFLECTED CEILING PLAN
1/4" = 1'-0"3
RECEPTION - ENLARGED FLOOR PLAN
1/4" = 1'-0"2
TYP PACT TEAM WORK STATIONS - ENLARGED REFLECTED CEILING PLAN
PROJECT
NORTH
PROJECT
NORTH
1. SEE SHEETS A-601 THROUGH A-612 FOR DOOR
SCHEDULES, WINDOW SCHEDULES/DETAILS, EQUIPMENT
SCHEDULE, AND WALL/FLOOR/ROOF TYPES.
2. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA
INSTALLED REQUIRING POWER/DATA OR FURNITURE
SUPPORTING SAID EQUIPMENT. ONLY USE FOR
REFERENCE. COORDINATE POWER/DATA WITH
ELECTRICAL.
I
GFI
I
J
2.1
AE434
M1801
COMPUTER
M1840
PRINTER
A1011
TELEPHONE
M1801
COMPUTER
173 SF
MSA & BUSINESS
SERVICES
.1
.2
2.5
A1011
TELEPHONE
DESK TYP
IN-99.01-01
I
J
2.9
160 SF
HOUSEKEEPING
AND LADDER
AE434
SHIPS LADDER TO
MECH PENTHOUSE
EYEWASH STATION
EYEWASH VALVE
A5082
PAPER
TOWEL
DISPENSER
1' - 8"
F0500
HK CART
A5135
MOP RACK
MOP SINK
A5107
GLOVE
DISPENSER
A5135
MOP RACK
I
3.9
AE430 10
84 SF
LACTATION
A4995
BABY
CHANGING
STATION
/8
A5180
PRIVACY
CURTAIN
TRACK
A5082
PAPER
TOWEL
DISPENSER
A5075
SOAP
DISPENSER
E
25 SF
ALCOVE
AE4357
M1840
PRINTER
79 SF
ALCOVE, H/W
AE435
M4020
BARIATRIC
SCALE
I
AE43712 10
87 SF
POLICE
M1801
COMPUTER
M1801
COMPUTER
DESK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE413
MSA, POLICE, ALCOVE HW,
HOUSEKEEPING, LACTATION,
ALCOVE - ENLARGED FLOOR PLANS 127
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 073 OF 206
1/2" = 1'-0"1
MSA/BUS. SERVICES - ENLARGED FLOOR PLAN
1/2" = 1'-0"4
HOUSEKEEPING & LADDER - ENLARGED FLOOR PLAN
PROJECT
NORTH
PROJECT
NORTH
1/2" = 1'-0"5
LACTATION ROOM - ENLARGED FLOOR PLAN
1/2" = 1'-0"6
ALCOVE - ENLARGED FLOOR PLAN
1/2" = 1'-0"3
ALCOVE, HW - ENLARGED FLOOR PLAN
1. SEE SHEETS A-601 THROUGH A-612 FOR DOOR
SCHEDULES, WINDOW SCHEDULES/DETAILS, EQUIPMENT
SCHEDULE, AND WALL/FLOOR/ROOF TYPES.
2. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA
INSTALLED REQUIRING POWER/DATA OR FURNITURE
SUPPORTING SAID EQUIPMENT. ONLY USE FOR
REFERENCE. COORDINATE POWER/DATA WITH
ELECTRICAL.
GENERAL NOTES
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/2" = 1'-0"2
POLICE OFFICE - ENLARGED FLOOR PLAN
AE434
12 10
67 SF
STAFF TLT
A.1
A5109
GRAB BAR
A5109
GRAB BAR
1' - 6"
/8
A
6" 1' - 0" 2' - 0"
A5082
PAPER
TOWEL
DISPENSER
A5145
GARMENT
HOOK
A5200
TOILET
TISSUE DISP
A5090
SANITARY
NAPKIN
DISPOSAL
A5075
SOAP
DISPENSER
U0001
SEAT COVER
DISPENSER
A1066
MIRROR
A-509
B
A.1
AE43112 10
M3072
INFECTIOUS
WASTE BAG
A5107
GLOVE
DISPENSER
104 SF
SOILED MED
EQUIP
/2
A5082
PAPER
TOWEL
DISPENSER
A5075
SOAP
DISPENSER
UPPER CABINET
ABOVE TYP
BASE CABINET
BELOW TYP
I
A5145
GARMENT
HOOK
3' - 0"
9' - 0 1/8"
AE436
74 SF
PUBLIC TLT
A5090
SANITARY
NAPKIN
DISPOSAL
A5200
TOILET
TISSUE DISP
A5109
GRAB BAR
1' - 3" 1' - 0"
A5109
GRAB BAR
2' - 6" 6" 1' - 0"
A5091
FEMININE
NAPKIN
DISPENSER
A4995
BABY
CHANGING
STATION
U0001
SEAT COVER
DISPENSER
A5075
SOAP
DISPENSER
A1066
MIRROR
A5082
PAPER
TOWEL
DISPENSER
I
74 SF
PUBLIC TLT
AE4364 2
A5109
GRAB BAR
A5145
GARMENT
HOOK
A5090
SANITARY
NAPKIN
DISPOSAL
1' - 11 3/4"
1' - 0" 6" 2' - 6"
3' - 0"
A5200
TOILET
TISSUE DISP
A4995
BABY
CHANGING
STATION
U0001
SEAT COVER
DISPENSER
A5082
PAPER
TOWEL
DISPENSER
A5075
SOAP
DISPENSER
A5091
FEMININE
NAPKIN
DISPENSER
A1066
MIRROR
A5109
GRAB BAR
I
75 SF
PUBLIC TLT
AE436
A5109
GRAB BAR
A5200
TOILET
TISSUE DISP
A5090
SANITARY
NAPKIN
DISPOSAL
A5082
PAPER
TOWEL
DISPENSER
9"
1' - 0" 6" 2' - 6"
A5145
GARMENT
HOOK
A5091
FEMININE
NAPKIN
DISPENSER
A4995
BABY
CHANGING
STATION
A5075
SOAP
DISPENSER
A5109
GRAB BAR
U0001
SEAT COVER
DISPENSER
A1066
MIRROR
E
AE4377
2' - 0" 1' - 0" 6"
A5200
TOILET
TISSUE DISP
A5082
PAPER
TOWEL
DISPENSER
A5109
GRAB BAR
A5091
FEMININE
NAPKIN
DISPENSER
A5145
GARMENT
HOOK
65 SF
PUBLIC TLT
A4995
BABY
CHANGING
STATION
U0001
SEAT COVER
DISPENSER
A5109
GRAB BAR
A5090
SANITARY
NAPKIN
DISPOSAL
A5075
SOAP
DISPENSER
A1066
MIRROR
B
A.1
AE4374
A1011
TELEPHONE
M1801
COMPUTER
A5145
GARMENT
HOOK
108 SF
OFFICE
A
A5145
GARMENT
HOOK
DESKI
AE435
80 SF
FAMILY TLT
A5145
GARMENT
HOOK
A5109
GRAB BAR
A5109
GRAB BAR
A5200
TOILET
TISSUE DISP
A5090
SANITARY
NAPKIN
DISPOSAL
A5082
PAPER
TOWEL
DISPENSER
1' - 5" 2' - 6" 6" 1' - 0"
/8
3' - 6 3/4" 1' - 6"
A4995
BABY
CHANGING
STATION
A5091
FEMININE
NAPKIN
DISPENSER
2' - 6"
U0001
SEAT COVER
DISPENSER
A5075
SOAP
DISPENSER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE414
TOILETS, SOILED MED EQUIP, &
OFFICE - ENRLAGED FLOOR PLANS
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 074 OF 206
1/2" = 1'-0"1
STAFF TOILET - ENLARGED FLOOR PLAN
PROJECT
NORTH
PROJECT
NORTH
1/2" = 1'-0"7
SOILED MED EQUIPMENT - ENLARGED FLOOR PLAN
PROJECT
NORTH
PROJECT
NORTH
1/2" = 1'-0"2
PUBLIC TOILET 112 - ENLARGED FLOOR PLAN
1/2" = 1'-0"3
PUBLIC TOILET 104 - ENLARGED FLOOR PLAN
1/2" = 1'-0"4
PUBLIC TOILET 109 - ENLARGED FLOOR PLAN
1/2" = 1'-0"5
PATIENT TOILET - ENLARGED FLOOR PLAN
1/2" = 1'-0"8
OFFICE - ENLARGED FLOOR PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1. SEE SHEETS A-601 THROUGH A-612 FOR DOOR
SCHEDULES, WINDOW SCHEDULES/DETAILS, EQUIPMENT
SCHEDULE, AND WALL/FLOOR/ROOF TYPES.
2. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA
INSTALLED REQUIRING POWER/DATA OR FURNITURE
SUPPORTING SAID EQUIPMENT. ONLY USE FOR
REFERENCE. COORDINATE POWER/DATA WITH
ELECTRICAL.
GENERAL NOTES
1/2" = 1'-0"6
FAMILY TLT - ENLARGED FLOOR PLAN
PROJECT
LEVEL 1
0' - 0"
A5107
GLOVE
DISPENSER
A5082
PAPER
TOWEL
DISPENSER
A5075
SOAP
DISPENSER
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
PLAM 1
S1
A5180
PRIVACY
CURTAIN
TRACK3' - 0"
BLOCKING
1' - 9" 3' - 0"
/2
ALIGN
L
LLOCK, TYP
LEVEL 1
0' - 0"
M1803
WORKSTATION
M4100
SPHYGMOMANOMETER
A5108
SHARPS
DISPOSAL
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
A5180
PRIVACY
CURTAIN
TRACK
M9025
EXAM BED
BLOCKING
MONITOR
VITAL SIGNS
M4117
M1804
DUAL
MONITOR
MOUNT
M4040
SCALE
LEVEL 1
0' - 0"
A5109
GRAB BAR
A5145
GARMENT
HOOK
A5108
SHARPS
DISPOSAL
A5109
GRAB BAR
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
1' - 10"
1' - 3"
F3200
CLOCK
M4040
SCALE
BLOCKING TYP.
PLAM 1
S1
PLAM 1
/2
A-509
LEVEL 1
0' - 0"
M1803
WORKSTATION
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
M9025
EXAM BED
M4100
SPHYGMOMANOMETER
A5180
PRIVACY
CURTAIN
TRACK
BLOCKING TYP MONITOR
VITAL SIGNS
M4117
M1804
DUAL
MONITOR
MOUNT
LEVEL 1
0' - 0"
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
BLOCKING TYP
M0925
GYN EXAM
TABLE
A5109
GRAB BAR
M4040
SCALE
MONITOR
VITAL SIGNS
M4117
M1803
WORKSTATION
M1804
DUAL
MONITOR
MOUNT
1' - 10"
" 3
U0004
PATIENT LIFT
PLAM 1
S1
PLAM 1
1' - 3"
/2
A5180
PRIVACY
CURTAIN
TRACK
LEVEL 1
0' - 0"
H
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
BLOCKING
M1804
DUAL
MONITOR
MOUNT
M1803
WORKSTATION
A5075
SOAP
DISPENSER
A5107
GLOVE
DISPENSER
A5082
PAPER
TOWEL
DISPENSER
A5180
PRIVACY
CURTAIN
TRACK
M3072
INFECTIOUS
WASTE BAG 4
U0004
PATIENT LIFT
PLAM 1
PLAM 1
S1
/2
3' - 0" 1' - 9"
3' - 0"
ALIGN
L
L
LOCK, TYP
LEVEL 1
0' - 0"
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
BLOCKING TYP
F3200
CLOCK
M3072
INFECTIOUS
WASTE BAG
A5180
PRIVACY
CURTAIN
TRACK
A5108
SHARPS
DISPOSAL
A5075
SOAP
DISPENSER
1' - 3"
PLAM 1
PLAM 1
S1
/2
BLOCKING TYP
LEVEL 1
0' - 0"
H
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
BLOCKING
A5109
GRAB BAR
MONITOR
VITAL SIGNS
M4117
A5145
GARMENT
HOOK
A5180
PRIVACY
CURTAIN
TRACK
F3200
CLOCK
M0925
GYN EXAM
TABLE
U0004
PATIENT LIFT
A5108
SHARPS
DISPOSAL
LEVEL 1
0' - 0"
WALL BASE AS SCHEDULED
PLAM 1
S1
A5075
SOAP
DISPENSER
A5082
PAPER
TOWEL
DISPENSER
ALIGN BOTTOM OF GWB
CEILING WITH TOP OF
ADJACENT MULLION
ONE SIDED GYP SOFFIT
LEVEL 1
0' - 0"
A4995
BABY
CHANGING
STATION
A5180
PRIVACY
CURTAIN
TRACK
WALL BASE AS SCHEDULED
BOTTOM OF ACT CEILING
BOTTOM OF GWB CEILING
AND TOP OF MULLION
LEVEL 1
0' - 0"
WALL BASE AS SCHEDULED
A5180
PRIVACY
CURTAIN
TRACK
A4995
BABY
CHANGING
STATION
BLOCKING
PLAM 1
S1
LEVEL 1
0' - 0"
WALL BASE AS SCHEDULED
A5180
PRIVACY
CURTAIN
TRACK
A5075
SOAP
DISPENSER
A5082
PAPER
TOWEL
DISPENSER
PLAM 1
S1
BLOCKING
/2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE430
EXAM ROOM & WOMEN'S HEALTH &
LACTATION ROOM - INTERIOR
ELEVATIONS 127
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 075 OF 206
1/2" = 1'-0"2
TYP EXAM ROOM - SOUTH INTERIOR ELEV
1/2" = 1'-0"4
TYP EXAM ROOM - NORTH INTERIOR ELEV
1/2" = 1'-0"1
TYP EXAM ROOM - EAST INTERIOR ELEV
1/2" = 1'-0"3
TYP EXAM ROOM - WEST INTERIOR ELEV
1/2" = 1'-0"5
WMN'S HEALTH EXAM RM - EAST INTERIOR ELEV
1/2" = 1'-0"6
WMN'S HEALTH EXAM RM - SOUTH INTERIOR ELEV
1/2" = 1'-0"7
WMN'S HEALTH EXAM RM - WEST INTERIOR ELEV
1/2" = 1'-0"8
WMN'S HEALTH EXAM RM - NORTH INTERIOR ELEV
GENERAL NOTES
1. INSTALL WALL BLOCKING WHERE NOTED TO NEAREST
WALL FRAMING MEMBER.
2. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE
BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR
WALL MOUNTED DOOR STOPS. ASSURE THAT ALL
REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO
INSTALLING DRYWALL.
3. SEE SHEETS A-601 - A-612 FOR DOOR SCHEDULES,
WINDOW SCHEDULES/DETAILS, EQUIPMENT SCHEDULE,
AND WALL/FLOOR/ROOF TYPES.
4. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA
INSTALLED REQUIRING POWER/DATA OR FURNITURE
SUPPORTING SAID EQUIPMENT. ONLY USE FOR
REFERENCE. COORDINATE POWER/DATA WITH
ELECTRICAL.
5. ALL EXPOSED SURFACES OF CABINETS AND CASEWORK
ARE TO BE FINISHED WITH DECORATIVE PLASTIC
LAMINATE. EXPOSED SURFACES ARE ANYTHING THAT
CAN BE SEEN WITH THE DOORS AND DRAWERS CLOSED.
THIS INCLUDES THE UNDERSIDE AND TOP OF WALL
MOUNTED CABINETS (INCLUDING SCRIBES AND FILLER
PANELS), ALL SURFACES OF COUNTER SUPPORTS, AND
ALL OPEN CABINET SHELVES AND SURFACES. IN ADDITION,
ALL SIX SURFACES OF ALL CABINET DOORS AND ALL SIX
SURFACES OF OPEN ADJUSTABLE SHELVES ARE TO BE
FINISHED IN DECORATIVE PLASTIC LAMINATE. THE FRONT
AND FOUR EDGES OF ALL DRAWER FRONTS ARE TO
RECEIVE DECORATIVE PLASTIC LAMINATE. THE SEMI-
EXPOSED INTERIOR SURFACES OF DRAWERS AND
CABINETS (THOSE SURFACES THAT CAN ONLY BE SEEN
WHEN THE DRAWER OR DOOR IS OPEN) ARE TO BE
MELAMINE WITH VINYL EDGES, EXCEPT AS NOTED
OTHERWISE ABOVE. THE FOUR EDGES OF ALL MELAMINE
ADJUSTABLE SHELVES WITHIN CLOSED CABINETS ARE TO
BE FINISHED WITH VINYL EDGING. THE UNDERSIDES OF
ALL COUNTER TOPS ARE TO RECEIVE LAMINATE BACKING
SHEET.
6. ALL FILE DRAWERS MUST HAVE A MINIMUM CLEAR INSIDE
HEIGHT OF 10-1/2" AND A MINIMUM CLEAR INSIDE WIDTH OF
13".
1/2" = 1'-0"9
LACTATION RM EAST INTERIOR ELEV
1/2" = 1'-0"10
LACTATION RM - SOUTH INTERIOR ELEV
1/2" = 1'-0"11
LACTATION RM - WEST INTERIOR ELEV
1/2" = 1'-0"12
LACTATION RM- NORTH INTERIOR ELEV
H
M3072
INFECTIOUS
WASTE BAG
S1
PLAM 1
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
A5107
GLOVE
DISPENSER
A1011
TELEPHONE
A5082
PAPER
TOWEL
DISPENSER
A5180
PRIVACY
CURTAIN
TRACK
BLOCKING TYP
PATIENT LIFT
A5108
SHARPS
DISPOSAL
3' - 0" 1' - 6" 1' - 6"
A5075
SOAP
DISPENSER
3' - 0" 3' - 0"
LL
L
LOCK, TYP
LEVEL 1
0' - 0"
M3072
INFECTIOUS
WASTE BAG
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
A5180
PRIVACY
CURTAIN
TRACK
A5180
PRIVACY
CURTAIN
TRACK
A5145
GARMENT
HOOK
BLOCKING
LEVEL 1
0' - 0"
H
PAINT AS SCHEDULED WALL BASE AS SCHEDULED
A5180
PRIVACY
CURTAIN
TRACK
M7401
EXAM LIGHT
M4100
SPHYGMOMANOMETER
BLOCKING
MONITOR
VITAL SIGNS
M4117
M3072
INFECTIOUS
WASTE BAG
A5145
GARMENT
HOOK
M1804
DUAL
MONITOR
MOUNT
U0004
PATIENT LIFT
LEVEL 1
0' - 0"
M1803
WORKSTATION
M3072
INFECTIOUS
WASTE BAG
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
M7401
EXAM LIGHT
M4100
SPHYGMOMANOMETER
BLOCKING
A5108
SHARPS
DISPOSAL
M1804
DUAL
MONITOR
MOUNT
A5075
SOAP
DISPENSER
MONITOR
VITAL SIGNS
M4117
U0004
PATIENT LIFT
PLAM 1
S1
LEVEL 1
0' - 0"
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
E0903
OMNICELL
E0903
OMNICELL
E0903
OMNICELL
E0903
OMNICELL
E0903
OMNICELL
E0903
OMNICELL
RWC AS SCHEDULED
LEVEL 1
0' - 0"
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
R6200
UTILITY
FRIDGE
A5108
SHARPS
DISPOSAL
E0903
OMNICELL
A5082
PAPER
TOWEL
DISPENSER
M7710
ELECTROCARDIOGRAPH
S1
RWC AS SCHEDULED
LEVEL 1
0' - 0"
PAINT AS SCHEDULED
WALL BASE AS SCHEDULEDU0002
OXYGEN
TANK
M3110
BLANKET
WARMER
A5107
GLOVE
DISPENSER
A5082
PAPER
TOWEL
DISPENSER
A5108
SHARPS
DISPOSAL
M3150
DISPENSING
SYSTEM
R6200
UTILITY
FRIDGE
A5075
SOAP
DISPENSER
M7710
ELECTROCARDIOGRAPH
BLOCKING
S1
RWC AS SCHEDULED
LEVEL 1
0' - 0"
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
M3150
DISPENSING
SYSTEM
M3110
BLANKET
WARMER
E0903
OMNICELL
RWC AS SCHEDULED
LEVEL 1
0' - 0"
PAINT AS
SCHEDULED
WALL BASE AS
SCHEDULED
3' - 0"3' - 6"1' - 0"
BLOCKING
PLAM 1
PLAM 1
S1
2' - 0"
/2
/2
LEVEL 1
0' - 0"
PAINT AS
SCHEDULED
WALL BASE AS
SCHEDULED
M3072
INFECTIOUS
WASTE BAG
S1
PLAM 1
1' - 0"
RWC AS
SCHEDULED
LEVEL 1
0' - 0"
PAINT AS
SCHEDULED
WALL BASE AS
SCHEDULED
A5082
PAPER
TOWEL
DISPENSER
BLOCKING
PLAM 1
S1
PLAM 1
1' - 0"
2' - 0"
RWC AS SCHEDULED
LEVEL 1
0' - 0"
A5107
GLOVE
DISPENSER
PAINT AS
SCHEDULED
WALL BASE AS SCHEDULED
BLOCKING
A5082
PAPER
TOWEL
DISPENSER
2' - 11 3/8" 3' - 9" 3' - 0"
A5075
SOAP
DISPENSER
PLAM 1
S1
PLAM 1
/2
/2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE431
PROCEDURE ROOM, CLEAN SUPPLY &
SOILED MED EQUIP ROOM -
INTERIOR ELEVATIONS 127
MEDICAL CENTER DIRECTOR
07/23/2021 MK JP 076 OF 206
1/2" = 1'-0"6
TYP PROCEDURE RM - SOUTH INTERIOR ELEV
1/2" = 1'-0"5
PROCEDURE RM - EAST INTERIOR ELEV
1/2" = 1'-0"8
PROCEDURE RM - NORTH INTERIOR ELEV
1/2" = 1'-0"7
PROCEDURE ROOM - WEST INTERIOR ELEV
1/2" = 1'-0"1
CLEAN SUPPLY - EAST INTERIOR ELEV
1/2" = 1'-0"4
CLEAN SUPPLY - NORTH INTERIOR ELEV
1/2" = 1'-0"3
CLEAN SUPPLY - WEST INTERIOR ELEV
1/2" = 1'-0"2
CLEAN SUPPLY - SOUTH INTERIOR ELEV
GENERAL NOTES
1. INSTALL WALL BLOCKING WHERE NOTED TO NEAREST
WALL FRAMING MEMBER.
2. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE
BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR
WALL MOUNTED DOOR STOPS. ASSURE THAT ALL
REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO
INSTALLING DRYWALL.
3. SEE SHEETS A-601 - A-612 FOR DOOR SCHEDULES,
WINDOW SCHEDULES/DETAILS, EQUIPMENT SCHEDULE,
AND WALL/FLOOR/ROOF TYPES.
4. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA
INSTALLED REQUIRING POWER/DATA OR FURNITURE
SUPPORTING SAID EQUIPMENT. ONLY USE FOR
REFERENCE. COORDINATE POWER/DATA WITH
ELECTRICAL.
5. ALL EXPOSED SURFACES OF CABINETS AND CASEWORK
ARE TO BE FINISHED WITH DECORATIVE PLASTIC
LAMINATE. EXPOSED SURFACES ARE ANYTHING THAT
CAN BE SEEN WITH THE DOORS AND DRAWERS CLOSED.
THIS INCLUDES THE UNDERSIDE AND TOP OF WALL
MOUNTED CABINETS (INCLUDING SCRIBES AND FILLER
PANELS), ALL SURFACES OF COUNTER SUPPORTS, AND
ALL OPEN CABINET SHELVES AND SURFACES. IN
ADDITION, ALL SIX SURFACES OF ALL CABINET
DOORS AND ALL SIX SURFACES OF OPEN ADJUSTABLE
SHELVES ARE TO BE FINISHED IN DECORATIVE PLASTIC
LAMINATE. THE FRONT AND FOUR EDGES OF ALL DRAWER
FRONTS ARE TO RECEIVE DECORATIVE PLASTIC
LAMINATE. THE SEMI-EXPOSED INTERIOR SURFACES OF
DRAWERS AND CABINETS (THOSE SURFACES THAT CAN
ONLY BE SEEN WHEN THE DRAWER OR DOOR IS OPEN)
ARE TO BE MELAMINE WITH VINYL EDGES, EXCEPT AS
NOTED OTHERWISE ABOVE. THE FOUR EDGES OF ALL
MELAMINE ADJUSTABLE SHELVES WITHIN CLOSED
CABINETS ARE TO BE FINISHED WITH VINYL EDGING. THE
UNDERSIDES OF ALL COUNTER TOPS ARE TO RECEIVE
LAMINATE BACKING SHEET.
6. ALL FILE DRAWERS MUST HAVE A MINIMUM CLEAR INSIDE
HEIGHT OF 10-1/2" AND A MINIMUM CLEAR INSIDE WIDTH
OF 13".
1/2" = 1'-0"9
SOILED MED EQUIP - EAST INTERIOR ELEV
1/2" = 1'-0"10
SOILED MED EQUIP - SOUTH INTERIOR ELEV
1/2" = 1'-0"11
SOILED MED EQUIP - WEST INTERIOR ELEV
1/2" = 1'-0"12
SOILED MED EQUIP - NORTH INT ELEV
WALL BASE AS SCHEDULED
LIGHTS, SEE ELECTRICAL
DESK, TYP
ACOUSTIC
CEILING
CANOPY
ACC1
W4 W4
LEVEL 1
0' - 0"
LIGHTS, SEE ELECTRICAL
DESK, TYP
ACOUSTIC
CEILING
CANOPY
ACC1
LEVEL 1
0' - 0"
CB.8
WALL BASE AS SCHEDULED
DESK, TYP
ACOUSTIC
CEILING
CANOPY
ACC1
LEVEL 1
0' - 0"
CD B.8
WALL BASE AS SCHEDULED
LIGHTS, SEE ELECTRICAL
DESK, TYP
ACOUSTIC
CEILING
CANOPY
ACC1
LEVEL 1
0' - 0"
2 32.1 2.92.5
2" GAP IN LWC1 AROUND
COUNTER, EXTEND TO BASE.
PAINT AS SCHEDULED
LWC2
LWC1
VA SEAL PLAQUE, TYP
VINYL BASE BELOW WOOD PANELS
PLAM1
QZ1 COUNTERTOP
2"
3' - 0"
1' - 9"1' - 9"
3' - 0"
/2
RECEPTION
DESK
RECEPTION
DESK
*SEE AW SHEETS FOR
SIGNAGE DIMENSIONS.
LEVEL 1
0' - 0"
RES1 DIVIDER PANEL
(TYP)
RECEPTION DESK
2.12.9 2.5
/2
A-509
ADA ACCESSIBLE
COUNTERTOP, TYP
M1801
COMPUTER
QZ1 TRANSACTION COUNTER
TO COUNTERTOP EDGE
31' - 3"
PLAM2 (TYP)
LEVEL 1
0' - 0"
K
RES1 DIVIDER PANEL
RECEPTION DESK
M1801
COMPUTER
" PLAM
1' - 10"
QZ1 COUNTERTOP
LEVEL 1
0' - 0"
J K
RECEPTION DESK
RES1 DIVIDER PANEL
CABINET
M1801
COMPUTER
FLIP UP COUNTER
AND SWINGING
PANEL (BEYOND)
LEVEL 1
0' - 0"
CURVED RES2 PANELS
INSTALLED ON STANDOFFS
A-509
PLAM1
M1801
COMPUTER
M1801
COMPUTER
QZ1 COUNTERTOP
QZ1 COUNTERTOP
QZ1 COUNTERTOP
QZ1 COUNTERTOP
LEVEL 1
0' - 0"
J
LEVEL 1
0' - 0"
J
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE432
TYP PACT TEAM & RECEPTION-
INTERIOR ELEVATIONS
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 077 OF 206
1/4" = 1'-0"1
TYP PACT TEAM - NORTH INTERIOR ELEV
1/4" = 1'-0"3
TYP PACT TEAM - SOUTH INTERIOR ELEV
1/4" = 1'-0"2
TYP PACT TEAM - EAST INTERIOR ELEV
1/4" = 1'-0"4
TYP PACT TEAM - WEST INTERIOR ELEV
1/4" = 1'-0"5
RECEPTION - EAST INTERIOR ELEV
1/4" = 1'-0"7
RECEPTION - WEST INTERIOR ELEV
1/4" = 1'-0"8
RECEPTION - NORTH INTERIOR ELEV
1/4" = 1'-0"6
RECEPTION - SOUTH INTERIOR ELEV
1/4" = 1'-0"9
RECEPTION - FRONT ELEV
GENERAL NOTES
1. INSTALL WALL BLOCKING WHERE NOTED TO NEAREST
WALL FRAMING MEMBER.
2. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE
BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR
WALL MOUNTED DOOR STOPS. ASSURE THAT ALL REQUIRED
BACKING IS INSTALLED IN WALLS PRIOR TO INSTALLING
DRYWALL.
3. SEE SHEETS A-601 - A-612 FOR DOOR SCHEDULES, WINDOW
SCHEDULES/DETAILS, EQUIPMENT SCHEDULE, AND
WALL/FLOOR/ROOF TYPES.
4. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA INSTALLED
REQUIRING POWER/DATA OR FURNITURE SUPPORTING SAID
EQUIPMENT. ONLY USE FOR REFERENCE. COORDINATE
POWER/DATA WITH ELECTRICAL.
6. ALL EXPOSED SURFACES OF CABINETS AND CASEWORK ARE
TO BE FINISHED WITH DECORATIVE PLASTIC LAMINATE.
EXPOSED SURFACES ARE ANYTHING THAT CAN BE SEEN WITH
THE DOORS AND DRAWERS CLOSED. THIS INCLUDES THE
UNDERSIDE AND TOP OF WALL MOUNTED CABINETS
(INCLUDING SCRIBES AND FILLER PANELS), ALL SURFACES OF
COUNTER SUPPORTS, AND ALL OPEN CABINET SHELVES AND
SURFACES. IN ADDITION, ALL SIX SURFACES OF ALL
CABINET DOORS AND ALL SIX SURFACES OF OPEN
ADJUSTABLE SHELVES ARE TO BE FINISHED IN DECORATIVE
PLASTIC LAMINATE. THE FRONT AND FOUR EDGES OF ALL
DRAWER FRONTS ARE TO RECEIVE DECORATIVE PLASTIC
LAMINATE. THE SEMI-EXPOSED INTERIOR SURFACES OF
DRAWERS AND CABINETS (THOSE SURFACES THAT CAN ONLY
BE SEEN WHEN THE DRAWER OR DOOR IS OPEN) ARE TO BE
MELAMINE WITH VINYL EDGES, EXCEPT AS NOTED
OTHERWISE ABOVE. THE FOUR EDGES OF ALL MELAMINE
ADJUSTABLE SHELVES WITHIN CLOSED CABINETS ARE TO BE
FINISHED WITH VINYL EDGING. THE UNDERSIDES OF ALL
COUNTER TOPS ARE TO RECEIVE LAMINATE BACKING SHEET.
7. ALL FILE DRAWERS MUST HAVE A MINIMUM CLEAR INSIDE
HEIGHT OF 10-1/2" AND A MINIMUM CLEAR INSIDE WIDTH OF
13".
1/4" = 1'-0"10
RECEPTION - SIDE ELEV
1/4" = 1'-0"11
RECEPTION - SIDE ELEV 2
WALL BASE AS SCHEDULED
S3B S3A
BOTTOM OF ACT, TYP
BOTTOM OF GWB SOFFIT
LEVEL 1
0' - 0"
K
M1801
COMPUTER
E0945
COMP. CART
M1801
COMPUTER
E0945
COMP. CART
WALL BASE AS SCHEDULED
F3200
CLOCK
BLOCKING
LEVEL 1
0' - 0"
JK
WALL BASE AS SCHEDULED
S4B S4A S4D
BOTTOM OF
ACT, TYP
BOTTOM OF
GWB SOFFIT
LEVEL 1
0' - 0"
WALL BASE AS SCHEDULED
ALIGN BOTTOM OF GWB
CEILING WITH TOP OF
ADJACENT MULLION
ONE SIDED GYP SOFFIT
LEVEL 1
0' - 0"
A5210
TV BRACKET
R7250
FRIDGE
K4665
MICROWAVE WALL BASE AS
SCHEDULED
M0506
TV
A-509
BOTTOM OF ACT, TYP
PLAM 1
PLAM 1
S1
1' - 3"
S5A S5A S5B
BOTTOM OF GWB SOFFIT (BEYOND)
A5075
SOAP
DISPENSER
LEVEL 1
0' - 0"
A.1
A5145
GARMENT
HOOK
BLOCKING TYP.
WALL BASE AS
SCHEDULED
F3200
CLOCK
M0506
TV
EQ EQ
F3065
WHITEBOARD
ALIGN BOTTOM OF GWB
CEILING WITH TOP OF
ADJACENT MULLION
ONE SIDED GYP SOFFIT
LEVEL 1
0' - 0"
WALL BASE AS SCHEDULED
1' - 3"
1' - 10"
A-509
PLAM 1
PLAM 1
S1
W5 W5 W5 W5
LEVEL 1
0' - 0"
WALL BASE AS SCHEDULED
S1
BLOCKING
R7250
FRIDGE
K4665
MICROWAVE
7' - 0"
3' - 0" 3' - 0"
/2
A5082
PAPER
TOWEL
DISPENSER
A5075
SOAP
DISPENSER
PLAM 1
2' - 0" 3' - 0" 2' - 0"
PLAM 1
ALIGN
A-509
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE433
GROUP ROOM & STAFF LOUNGE-
INTERIOR ELEVATIONS
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 078 OF 206
1/4" = 1'-0"3
GROUP ROOM - WEST INTERIOR ELEV
1/4" = 1'-0"2
GROUP ROOM - SOUTH INTERIOR ELEV
1/4" = 1'-0"4
GROUP ROOM - NORTH INTERIOR ELEV
1/4" = 1'-0"1
GROUP ROOM - EAST INTERIOR ELEV
1/4" = 1'-0"5
STAFF LOUNGE - EAST INTERIOR ELEV
1/4" = 1'-0"6
STAFF LOUNGE - SOUTH INTERIOR ELEV
1/4" = 1'-0"7
STAFF LOUNGE - WEST INTERIOR ELEV
1/4" = 1'-0"8
STAFF LOUNGE - NORTH INTERIOR ELEV
GENERAL NOTES
1. INSTALL WALL BLOCKING WHERE NOTED TO NEAREST
WALL FRAMING MEMBER.
2. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE
BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR
WALL MOUNTED DOOR STOPS. ASSURE THAT ALL
REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO
INSTALLING DRYWALL.
3. SEE SHEETS A-601 - A-612 FOR DOOR SCHEDULES,
WINDOW SCHEDULES/DETAILS, EQUIPMENT SCHEDULE,
AND WALL/FLOOR/ROOF TYPES.
4. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA
INSTALLED REQUIRING POWER/DATA OR FURNITURE
SUPPORTING SAID EQUIPMENT. ONLY USE FOR
REFERENCE. COORDINATE POWER/DATA WITH
ELECTRICAL.
6. ALL EXPOSED SURFACES OF CABINETS AND CASEWORK
ARE TO BE FINISHED WITH DECORATIVE PLASTIC
LAMINATE. EXPOSED SURFACES ARE ANYTHING THAT CAN
BE SEEN WITH THE DOORS AND DRAWERS CLOSED. THIS
INCLUDES THE UNDERSIDE AND TOP OF WALL MOUNTED
CABINETS (INCLUDING SCRIBES AND FILLER PANELS), ALL
SURFACES OF COUNTER SUPPORTS, AND ALL OPEN
CABINET SHELVES AND SURFACES. IN ADDITION, ALL SIX
SURFACES OF ALL CABINET DOORS AND ALL SIX
SURFACES OF OPEN ADJUSTABLE SHELVES ARE TO BE
FINISHED IN DECORATIVE PLASTIC LAMINATE. THE FRONT
AND FOUR EDGES OF ALL DRAWER FRONTS ARE TO
RECEIVE DECORATIVE PLASTIC LAMINATE. THE SEMI-
EXPOSED INTERIOR SURFACES OF DRAWERS AND
CABINETS (THOSE SURFACES THAT CAN ONLY BE SEEN
WHEN THE DRAWER OR DOOR IS OPEN) ARE TO BE
MELAMINE WITH VINYL EDGES, EXCEPT AS NOTED
OTHERWISE ABOVE THE FOUR EDGES OF ALL MELAMINE
ADJUSTABLE SHELVES WITHIN CLOSED CABINETS ARE TO
BE FINISHED WITH VINYL EDGING. THE UNDERSIDES OF
ALL COUNTER TOPS ARE TO RECEIVE LAMINATE BACKING
SHEET.
7. ALL FILE DRAWERS MUST HAVE A MINIMUM CLEAR INSIDE
HEIGHT OF 10-1/2" AND A MINIMUM CLEAR INSIDE WIDTH OF
13".
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
EYEWASH STATION
EYEWASH VALVE
BLOCKING
F0500
HK CART
RWC AS SCHEDULED
A5135
MOP RACK
LEVEL 1
0' - 0"
F0500
HK CART
SHIP'S LADDER
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
RWC AS SCHEDULED
A5135
MOP RACK
LEVEL 1
0' - 0"
A5107
GLOVE
DISPENSER
SHIP'S LADDER
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
A5082
PAPER
TOWEL
DISPENSER
MOP SINK
BLOCKING TYP
A5135
MOP RACK
RWC AS SCHEDULED
A5135
MOP RACK
LEVEL 1
0' - 0"
SHIP'S LADDER
PAINT AS SCHEDULED
WALL BASE AS SCHEDULED
EYEWASH STATION
EYEWASH VALVE
A5107
GLOVE
DISPENSER
A5082
PAPER
TOWEL
DISPENSER
BLOCKING TYP
A5135
MOP RACK
RWC AS SCHEDULED
MOP SINK
LEVEL 1
0' - 0"
2.5
WALL BASE AS SCHEDULED
M1801
COMPUTER
A1011
TELEPHONE
M1840
PRINTER
F3200
CLOCK
LEVEL 1
0' - 0"
WALL BASE AS SCHEDULED
M1840
PRINTER
M1801
COMPUTER
A1011
TELEPHONE
F3200
CLOCK
BLOCKING
LEVEL 1
0' - 0"
2.5
WALL BASE AS SCHEDULED
M1801
COMPUTER
A1011
TELEPHONE
LEVEL 1
0' - 0"
WALL BASE AS SCHEDULED
M1801
COMPUTER
M1840
PRINTER
LEVEL 1
0' - 0"
A5109
GRAB BAR
A5090
SANITARY
NAPKIN
DISPOSAL
PAINT AS
SCHEDULED
BULLNOSE
TILE, PT-5
ACCENT WALL
TILE, PT-3
COVE TILE BASE
AS SCHEDULED
BLOCKING TYP
TASK LIGHT, SEE
ELECTRICAL
U0001
SEAT COVER
DISPENSER
LEVEL 1
0' - 0"
A5082
PAPER
TOWEL
DISPENSER
PAINT AS
SCHEDULED
BULLNOSE
TILE, PT-5
ACCENT WALL
TILE, PT-3
COVE TILE BASE
AS SCHEDULED
BLOCKING
TASK LIGHT, SEE ELECTRICAL
A5075
SOAP
DISPENSER
A1066
MIRROR
LEVEL 1
0' - 0"
PAINT AS
SCHEDULED
BULLNOSE
TILE, PT-5
ACCENT WALL
TILE, PT-3
COVE TILE BASE AS SCHEDULED
LEVEL 1
0' - 0"
A5109
GRAB BAR
A5090
SANITARY
NAPKIN
DISPOSAL
A5200
TOILET
TISSUE DISP
PAINT AS
SCHEDULED
BULLNOSE
TILE, PT-5
ACCENT WALL
TILE, PT-3
COVE TILE
BASE AS
SCHEDULED
BLOCKING
" 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE434
MSA/BUS SERVICES &
HOUSEKEEPING & STAFF TOILET -
INTERIOR ELEVATIONS 127
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 079 OF 206
1/2" = 1'-0"5
HOUSEKEEPING & LADDER - EAST INTERIOR ELEV
1/2" = 1'-0"6
HOUSEKEEPING & LADDER - SOUTH INTERIOR ELEV
1/2" = 1'-0"7
HOUSEKEEPING & LADDER - WEST INTERIOR ELEV
1/2" = 1'-0"8
HOUSEKEEPING & LADDER - NORTH INTERIOR ELEV
1/2" = 1'-0"1
MSA/BUS. SERVICES - EAST INTERIOR ELEV
1/2" = 1'-0"2
MSA/BUS. SERVICES - SOUTH INTERIOR ELEV
1/2" = 1'-0"3
MSA/BUS. SERVICES - WEST INTERIOR ELEV
1/2" = 1'-0"4
MSA/ BUS. SERVICES - NORTH INTERIOR ELEV
GENERAL NOTES
1. INSTALL WALL BLOCKING WHERE NOTED TO NEAREST
WALL FRAMING MEMBER.
2. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE
BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR
WALL MOUNTED DOOR STOPS. ASSURE THAT ALL
REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO
INSTALLING DRYWALL.
3. SEE SHEETS A-601 - A-612 FOR DOOR SCHEDULES,
WINDOW SCHEDULES/DETAILS, EQUIPMENT SCHEDULE,
AND WALL/FLOOR/ROOF TYPES.
4. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA
INSTALLED REQUIRING POWER/DATA OR FURNITURE
SUPPORTING SAID EQUIPMENT. ONLY USE FOR
REFERENCE. COORDINATE POWER/DATA WITH
ELECTRICAL.
1/2" = 1'-0"9
STAFF TOILET - EAST INTERIOR ELEV
1/2" = 1'-0"10
STAFF TOILET - SOUTH INTERIOR ELEV
1/2" = 1'-0"11
STAFF TOILET - WEST INTERIOR ELEV
1/2" = 1'-0"12
STAFF TOILET - NORTH INTERIOR ELEV
A5109
GRAB BAR
A5109
GRAB BAR
"4
A5090
SANITARY
NAPKIN
DISPOSAL
PAINT AS SCHEDULED
BULLNOSE TILE, PT-5
ACCENT WALL TILE, PT-3
WALL TILE AS SCHEDULED
COVE TILE BASE
AS SCHEDULED
A4995
BABY
CHANGING
STATION
A5145
GARMENT
HOOK
BLOCKING TYP.
U0001
SEAT COVER
DISPENSER
LEVEL 1
0' - 0"
A5109
GRAB BAR
A5109
GRAB BAR
A5090
SANITARY
NAPKIN
DISPOSAL
A5200
TOILET
TISSUE DISP
A5082
PAPER
TOWEL
DISPENSER
PAINT AS SCHEDULED
BULLNOSE TILE, PT-5
ACCENT WALL TILE, PT-3
WALL TILE AS SCHEDULED
COVE TILE BASE
AS SCHEDULED
A5091
FEMININE
NAPKIN
DISPENSER
BLOCKING, TYP
TASK LIGHT, SEE ELECTRICAL
A1066
MIRROR
A5075
SOAP
DISPENSER
LEVEL 1
0' - 0"
A5109
GRAB BAR
A5090
SANITARY
NAPKIN
DISPOSAL
PAINT AS
SCHEDULED
BULLNOSE
TILE, PT-5
ACCENT WALL
TILE, PT-3
WALL TILE AS
SCHEDULED
COVE TILE BASE
AS SCHEDULED
A5091
FEMININE
NAPKIN
DISPENSER
BLOCKING
BLOCKING TYP.
A1066
MIRROR
A5075
SOAP
DISPENSER
TASK LIGHT, SEE
ELECTRICAL
LEVEL 1
0' - 0"
A5145
GARMENT
HOOK
PAINT AS SCHEDULED
BULLNOSE
TILE, PT-5
ACCENT WALL
TILE, PT-3
WALL TILE AS
SCHEDULED
COVE TILE BASE
AS SCHEDULED
A4995
BABY
CHANGING
STATION
TASK LIGHT, SEE ELECTRICAL
LEVEL 1
0' - 0"
PAINT AS SCHEDULED
RWC AS SCHEDULED
WALL BASE AS SCHEDULED
M1840
PRINTER
10' - 2"
GYP HEADER PER CEILING PLAN
LEVEL 1
0' - 0"
E
PAINT AS SCHEDULED
RWC AS SCHEDULED
WALL BASE AS SCHEDULED
M1840
PRINTER
LEVEL 1
0' - 0"
PAINT AS SCHEDULED
RWC AS SCHEDULED
WALL BASE AS SCHEDULED
10' - 2"
LEVEL 1
0' - 0"
2.1
PAINT AS SCHEDULED
RWC AS SCHEDULED
WALL BASE AS SCHEDULED
F3200
CLOCK
M4020
BARIATRIC
SCALE
LEVEL 1
0' - 0"
PAINT AS SCHEDULED
RWC AS SCHEDULED
WALL BASE AS SCHEDULED
F3200
CLOCK
BLOCKING
M4020
BARIATRIC
SCALE
8' - 10"
LEVEL 1
0' - 0"
PAINT AS SCHEDULED
RWC AS SCHEDULED
WALL BASE AS SCHEDULED M4020
BARIATRIC
SCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE435
FAMILY TLT, ALCOVE, AND ALCOVE,
HW - INTERIOR ELEVATIONS
MEDICAL CENTER DIRECTOR
07/23/2021 MK AJ 080 OF 206
1/2" = 1'-0"1
FAMILY TOILET - EAST INTERIOR ELEV
1/2" = 1'-0"2
FAMILY TOILET - SOUTH INTERIOR ELEV
1/2" = 1'-0"3
FAMILY TOILET - WEST INTERIOR ELEV
1/2" = 1'-0"4
FAMILY TOILET - NORTH INTERIOR ELEV
GENERAL NOTES
1. INSTALL WALL BLOCKING WHERE NOTED TO NEAREST
WALL FRAMING MEMBER
2. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE
BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR
WALL MOUNTED DOOR STOPS. ASSURE THAT ALL
REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO
INSTALLING DRYWALL..
3. IN FAMILY TOILET ROOM, WHERE WALL MOUNTED ITEM IS
INSTALLED PARTIALLY OVER WALL TILE, PROVIDE
STAINLESS STEEL FILLER BEHIND MIRRORS AND WALL
MOUNTED ACCESSORIES TO ENSURE A FLUSH FINISH.
4. SEE SHEETS A-601 - A-612 FOR DOOR SCHEDULES,
WINDOW SCHEDULES/DETAILS, EQUIPMENT SCHEDULE,
AND WALL/FLOOR/ROOF TYPES.
5. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA
INSTALLED REQUIRING POWER/DATA OR FURNITURE
SUPPORTING SAID EQUIPMENT. ONLY USE FOR
REFERENCE. COORDINATE POWER/DATA WITH
ELECTRICAL.
1/2" = 1'-0"5
ALCOVE - EAST INTERIOR ELEV
1/2" = 1'-0"7
ALCOVE - NORTH INTERIOR ELEV
1/2" = 1'-0"6
ALCOVE - WEST INTERIOR ELEV
1/2" = 1'-0"8
ALCOVE, HW - EAST INTERIOR ELEV
1/2" = 1'-0"9
ALCOVE, HW - NORTH INTERIOR ELEV
1/2" = 1'-0"10
ALCOVE, HW - SOUTH INTERIOR ELEV
A5109
GRAB BAR
A5090
SANITARY
NAPKIN
DISPOSAL
A5109
GRAB BAR
WALL TILE AS
SCHEDULED
COVE TILE BAS AS SCHEDULED
BLOCKING TYP
PAINT AS
SCHEDULED
BULLNOSE TILE, PT-5
ACCENT WALL TILE, PT-3
TASK LIGHT, SEE ELECTRICAL
A5091
FEMININE
NAPKIN
DISPENSER
U0001
SEAT COVER
DISPENSER
A4995
BABY
CHANGING
STATION
A1066
MIRROR
LEVEL 1
0' - 0"
A5082
PAPER
TOWEL
DISPENSER
PAINT AS SCHEDULED
BULLNOSE TILE, PT-5
ACCENT WALL TILE, PT-3
WALL TILE AS SCHEDULED
COVE TILE BASE
AS SCHEDULED
A5109
GRAB BAR
BLOCKING TYP
"3
TASK LIGHT, SEE ELECTRICAL
A4995
BABY
CHANGING
STATION
A5075
SOAP
DISPENSER
A1066
MIRROR
A5145
GARMENT
HOOK
LEVEL 1
0' - 0"
A5145
GARMENT
HOOK
PAINT AS SCHEDULED
BULLNOSE TILE, PT-5
ACCENT WALL TILE, PT-3
WALL TILE AS SCHEDULED
COVE TILE BASE AS SCHEDULED
BLOCKING
TASK LIGHT, SEE ELECTRICAL
A5091
FEMININE
NAPKIN
DISPENSER
A1066
MIRROR
A5075
SOAP
DISPENSER
LEVEL 1
0' - 0"
A5109
GRAB BAR
A5200
TOILET
TISSUE DISP
A5090
SANITARY
NAPKIN
DISPOSAL
A5109
GRAB BAR
/2
PAINT AS SCHEDULED
BULLNOSE TILE, PT-5
ACCENT WALL TILE, PT-3
WALL TILE AS SCHEDULED
COVE TILE BASE AS SCHEDULED
BLOCKING TYP
A5091
FEMININE
NAPKIN
DISPENSER
"3
LEVEL 1
0' - 0"
A5109
GRAB BAR
A5109
GRAB BAR
A5090
SANITARY
NAPKIN
DISPOSAL
PAINT AS SCHEDULED
BULLNOSE TILE, PT-5
ACCENT WALL TILE, PT-3
WALL TILE AS
SCHEDULED
COVE TILE
BASE AS SCHEDULED
BLOCKING TYP
"3
TASK LIGHT, SEE ELECTRICAL
U0001
SEAT COVER
DISPENSER
A4995
BABY
CHANGING
STATION
/8
LEVEL 1
0' - 0"
A5109
GRAB BAR
A5109
GRAB BAR
A5200
TOILET
TISSUE DISP
/2
A5090
SANITARY
NAPKIN
DISPOSAL
PAINT AS SCHEDULED
BULLNOSE TILE, PT-5
ACCENT WALL TILE, PT-3
WALL TILE AS
SCHEDULED
COVE TILE BASE
AS SCHEDULED
BLOCKING TYP
A5091
FEMININE
NAPKIN
DISPENSER
/8
"1
U0001
SEAT COVER
DISPENSER
LEVEL 1
0' - 0"
A5082
PAPER
TOWEL
DISPENSER
PAINT AS SCHEDULED
BULLNOSE TILE, PT-5
ACCENT WALL TILE, PT-3
WALL TILE AS SCHEDULED
COVE TILE BASE
AS SCHEDULED
BLOCKING TYP
A5109
GRAB BAR
TASK LIGHT, SEE ELECTRICAL
A4995
BABY
CHANGING
STATION
A1066
MIRROR
A5075
SOAP
DISPENSER
A5145
GARMENT
HOOK
LEVEL 1
0' - 0"
A5145
GARMENT
HOOK
A5090
SANITARY
NAPKIN
DISPOSAL
PAINT AS SCHEDULED
BULLNOSE TILE, PT-5
ACCENT WALL TILE, PT-3
WALL TILE AS SCHEDULED
COVE TILE BASE AS SCHEDULED
BLOCKING
"2
TASK LIGHT, SEE ELECTRICAL
A5075
SOAP
DISPENSER
A1066
MIRROR
A5109
GRAB BAR
A5091
FEMININE
NAPKIN
DISPENSER
LEVEL 1
0' - 0"
PAINT AS
SCHEDULED
BULLNOSE
TILE, PT-5
COVE TILE BASE AS SCHEDULED
ACCENT WALL
TILE, PT-3
WALL TILE AS
SCHEDULED
A5091
FEMININE
NAP…