531-325 - Drawings-07-A2.pdf

PDF 9 MB Posted

Attached to
Y1DZ--TIERED EVALS - Construct Primary Care/Mental Health Building Minor Construction - Boise 531-325
Solicitation number
36C77624R0096
Issued by

About this file

This document appears to be a set of architectural drawings and details for the Construct Primary Care/Mental Health Building Minor Construction Project at the VA Medical Center in Boise, ID, solicitation number 36C77624R0096. The project involves constructing a new building that will include various patient exam rooms, a procedure room, a women's health room, a clean supply room, staff and public restrooms, a staff lounge, and other support spaces. The drawings provide detailed floor plans, reflected ceiling plans, enlarged room layouts, interior elevations, and equipment schedules for the proposed building. Additionally, the document includes details for two add alternates - the construction of a coffee shop area and the installation of solar panels on the building. The federal agency involved is the Department of Veterans Affairs Technology Acquisition Center Austin.

View the file

Other files

File Type Posted
0005 - Tech Questions Tracker - Boise PCMH - 8-7-24.pdf PDF
36C77624R0096 0005.pdf PDF
36C77624R0096 0004.pdf PDF
0004 - Tech Questions Tracker - Boise PCMH - 8-5-24.pdf PDF
0004 - Brand Name Justification.pdf PDF
36C77624R0096 0003.pdf PDF
0003 - Tech Questions Tracker - Boise PCMH - 8-1-24.pdf PDF
36C77624R0096 0002.pdf PDF
0001 - Site Visit Sign-in - 7-16-24.pdf PDF
36C77624R0096 0001.pdf PDF
531-325 - Drawings-14-E3.pdf PDF
531-325 - SOW 4-15-24.pdf PDF
531-325 - Drawings-05-S1.pdf PDF
531-325 - Specs-Vol-1.pdf PDF
Small Business Subcontracting Plan Model.docx DOCX document
531-325 - Drawings-09-A4.pdf PDF
531-325 - Drawings-03-C2.pdf PDF
Division Cost Breakdown.xlsx XLSX spreadsheet
531-325 - Drawings-15-E4.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
Site Visit Instructions.pdf PDF
531-325 - Drawings-16-E5.pdf PDF
531-325 - Specs-Appx-B.pdf PDF
531-325 - Drawings-04-L1.pdf PDF
531-325 - Specs-Vol-2.pdf PDF
531-325 - Drawings-10-M1.pdf PDF
531-325 - Specs-Appx-A.pdf PDF
Site Visit Map.pdf PDF
531-325 - Drawings-01-G1.pdf PDF
RFP 36C77624R0096.docx DOCX document
531-325 - Drawings-06-A1.pdf PDF
531-325 - Drawings-02-C1.pdf PDF
531-325 - Drawings-11-P1.pdf PDF
531-325 - Drawings-13-E2.pdf PDF
531-325 - Drawings-08-A3.pdf PDF
531-325 - Specs-Appx-C.pdf PDF
531-325 - Specs-Appx-E.pdf PDF
DBA Wage Rates - Ada County - 01-12-24.pdf PDF
531-325 - Drawings-12-E1.pdf PDF
531-325 - Specs-Appx-F.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4

B

C

D

E

1.1 3.9

A.1

2.5

B.8

A

118 SF

ELEC

108 SF

OFFICE

108 SF

OFFICE

104 SF

SOILED MED

EQUIP

67 SF

STAFF TLT

178 369 SF

STAFF LOUNGE

107 SF

OIT SERVER

229 SF

MECH

29 SF

STAFF LOCKERS

28 SF

STAFF LOCKERS

41 SF

STAFF LOCKERS

153 29 SF

STAFF LOCKERS

124 SF

EXAM ROOM 07

124 SF

EXAM ROOM 06

124 SF

EXAM ROOM 05

124 SF

EXAM ROOM 04

124 SF

EXAM ROOM 14

124 SF

EXAM ROOM 13

124 SF

EXAM ROOM 12

124 SF

EXAM ROOM 11

65 SF

PUBLIC TLT

25 SF

ALCOVE

/1 A-405 /1 A-405

10' - 6" 8' - 11" 9' - 0" 9' - 0" 7' - 4" 15' - 0" 6' - 6" 11' - 3" 44' - 3" 6"

/8

/8

/8

/8

67 SF

STAFF TLT

W3

W1

W1

W1

W1

W1W1

W1

W1

W1

W1

.1

.1 1

.2

.2

.2

.1

.1

.2

.2

.1

.2

.1

.2

.1

.1

.2

C .3

C13.1

C

C15.2C15.1

C

B

R

IC

K S

B

R

IC

K S

.5

B R

IC

K

S

44' - 9" 32' - 9" 44' - 9"

122' - 3"

6"

MATCH LINE A-A

A A

FACE OF STUDS, TYP UON

6' - 7" 12' - 10 1/8" 25' - 4" 13' - 4" 6' - 1" 13' - 4" 25' - 4" 12' - 10" 6' - 7"

ALIGN ALIGN

ALIGN ALIGN

13' - 4" 6' - 1" 13' - 4"

679 SF

CORRIDOR

C13

FOR CONTINUATION

SEE

0 1

48F

48F

67F

48F

48F

48F

48F

48F

48F

44F

44F

48F

/8

/8

/8

/8

48F

48F

48F

/8

48F

A-2

A-2

67F

48F

48F

A-2

67F

48F

67F

48F

48F

48F

62 62

69F

67 SF

STAFF TLT

68 SF

STAFF TLT

968 SF

CORRIDOR

C15

.1

10 3/4" 8' - 0" 6" 8' - 0" 7' - 11 1/4" 1' - 4 1/2" 8' - 0" 6" 8' - 0" 6" 4' - 0" 21' - 10 1/2"

45 45

454545

W5 W5 W5 W5

W4 W4

.2

S5BS5AS5AS5AS5A

2427 SF

PACT TEAM

FOR CONTINUATION

SEE

48F

48F

48F

48F

48F

6" 6"

6" 6" 1' - 0"

1' - 2"

8 5/8"

1' - 0" 1' - 0"

4' - 7"

3 3/8" 10"

6"

/8

6"

/8

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-404

PARTIAL FLOOR PLAN - EAST -

DIMENSIONS

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 064 OF 206

1/4" = 1'-0"1

PARTIAL DIMENSION PLAN - EAST

PROJECT

NORTH

Revisions: Date:

E

F

G

H

I

1.1 3.92.1 2.92.5

124 SF

EXAM ROOM 03

124 SF

EXAM ROOM 02

124 SF

EXAM ROOM 01

124 SF

WOMEN'S

HEALTH 01

124 SF

EXAM ROOM 10

124 SF

EXAM ROOM 09

124 SF

EXAM ROOM 08

180 SF

PROCEDURE

ROOM 01

2427 SF

PACT TEAM

223 SF

CLEAN SUPPLY

79 SF

ALCOVE, H/W

/1 A-404

/1 A-404

/1 A-406

/1 A-406

/8

W1

W1

W1

W1 W1

W1

W1

W1

.1

.1

.2

.2

.2

.2 1

.1

.2

.2

.1

.2

.1

C

.2

C

.1

MATCH LINE A-A

A A

MATCH LINE B-B

B B

ALIGN ALIGN

ALIGN ALIGN

13' - 4" 6' - 1" 13' - 4"

6' - 7" 6' - 4 1/2"

FOR CONTINUATION

SEE

79 SF

ALCOVE, H/W

48F

67F

48F

ALIGN ALIGN

/8 "64

45 45

48F

48F

48F

48F

67F 48F

48F

48F

48F

48F

41 41

A-2

48F

779 SF

CORRIDOR

C11

608 SF

CORRIDOR

C12

609 SF

CORRIDOR

C14

679 SF

CORRIDOR

C13

5064 SF

PACT TEAM

SHELL

.1

.2

FOR CONTINUATION

SEE

FOR CONTINUATION

SEEFOR CONTINUATION

SEE

A

66 SF

WOMEN'S

HEALTH TLT

118A

W1

48F

44F

48F

779 SF

CORRIDOR

C11

.1

.1

1' - 5 1/2"

4' - 0"

6"

T Y

P

0' - 6"

19' - 4 1/2"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-405

PARTIAL FLOOR PLAN - CENTER -

DIMENSIONS

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 065 OF 206

1/4" = 1'-0"1

PARTIAL DIMENSION PLAN - CENTER

PROJECT

I

J

K

L

M

N

1.1 3.9

L.2

2.1 2.92.5

41 SF

STORAGE

100 SF

STORAGE

107A

467 SF

GROUP ROOM

173 SF

MSA & BUSINESS

SERVICES

110 160 SF

HOUSEKEEPING

AND LADDER

87 SF

POLICE

80 SF

FAMILY TLT

106 74 SF

PUBLIC TLT

84 SF

LACTATION

317 SF

RECEPTION

603 SF

VESTIBULE

/1 A-405 /1 A-405

/8

/8

11' - 5" 5' - 6" 6' - 3 1/8" 7' - 11 1/2" 8' - 0 1/2" 6' - 4" 15' - 7 1/2" 15' - 7 1/2" 5' - 10 5/8" 9' - 11 3/8" 10' - 5" 9' - 5" 9' - 4" 6"

EQ EQ

10" 12' - 5"

1' - 1"

12' - 5"

1' - 1"

12' - 5" 8" 8" 12' - 5"

1' - 1"

12' - 5"

1' - 1"

12' - 5" 10"

.3

.2

A

.2

2 1

101.1

.1

16' - 4 1/2" 15' - 7 1/2" 9"

MATCH LINE B-B

B B

6" 44' - 3" 44' - 3" 6"

LOBBY

9"

9"

OPEN

CEILING

44' - 9" 32' - 9" 44' - 9"

121' - 3"

45' - 0" 31' - 3" 45' - 0"

4148F

48F

70F

48F

70F

70F

70F

65F

70F

86F

86F

85F

85F

86F

65F

48F

48F

70F

48F

70F 70F

48F

UON

3" TYP

81 62

70F

6' - 9 5/8"

/2

S1

S2

S2

W6

W6

FOR CONTINUATION

SEE

FOR CONTINUATION

SEE

.1

CHECK IN CHECK IN

ALIGN

ALIGN

FACE OF

STUDS &

COLUMNS

/2

/2

/2

/2

S3A S3B S3A S3A S3B S3A

118 SF

CORRIDOR

C10

SHIPS

LADDER

75 SF

PUBLIC TLT

74 SF

PUBLIC TLT

70F

48F

.2

S4B

S4E

S4C

S4A

DRINKING FOUNTAIN /

BOTTLE FILL STATION

FUTURE SECURITY

SCREENING

EQUIPMENT

S4D

S4B

70F

70F

102.4

F1

4' - 9 5/8"

2' - 6"

6"

6"

6" 1' - 0" 6"

6"

6"

6" 6"

6" 6"

5' - 3 1/2" 6' - 2" 5' - 3 1/2"

/8

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-406

PARTIAL FLOOR PLAN - WEST -

DIMENSIONS

MEDICAL CENTER DIRECTOR

07/23/2021 Checker Author 066 OF 206

1/4" = 1'-0"1

PARTIAL DIMENSION PLAN - WEST

PROJECT

C

D

E

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

GWB-1

11' - 0"

GWB-1

11' - 0"

GWB-1

9' - 0"

GWB-1

9' - 0"

OPENOPEN

ELEC

OIT SERVER

OFFICE

OFFICE

STAFF TLT

SOILED MED

EQUIP

STAFF TLT

STAFF LOUNGE

MECH

EXAM ROOM 07

EXAM ROOM 06

EXAM ROOM 05

EXAM ROOM 04

PUBLIC TLT

EXAM ROOM 11

EXAM ROOM 12

EXAM ROOM 13

EXAM ROOM 14

PACT TEAM

SHELL

/1 AC402 /1 AC402

1.1 3.9

A.1

MATCH LINE A-A

A A

2.5

B.8

2x4 ACT

9' - 0"

68 SF

STAFF TLT

67 SF

STAFF TLT

A

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

GWB-1

11' - 0"

2x4 ACT

12' - 0"

2x4 ACT

11' - 0"

2x4 ACT

11' - 0"

OPEN

GWB-1

8' - 10"

GWB-1

8' - 10"

GWB-1

8' - 10"

GWB-1

6' - 6"

GWB-1

6' - 6"

GWB-1

11' - 0"

GWB-1

11' - 0"

GWB-1

6' - 6"

2x4 ACT

10' - 0"

2x4 ACT

10' - 0"

679 SF

CORRIDOR

C13

25 SF

ALCOVE

VARIES

BLAST

BLAST

26' - 10"

VARIES

BLAST

VARIES

BLAST

BLAST

26' - 10"

VARIES

BLAST

12' - 5" 4' - 6 1/2" 12' - 1" 12' - 1" 4' - 10" 12' - 2"

2x4 ACT

11' - 0"

2x4 ACT

11' - 0"

FOR CONTINUATION

SEE

FOR CONTINUATION

SEE

ACOUSTIC

CEILING

CANOPY

ACC1

SKYLIGHT, TYP

SKYLIGHT, TYP

SKYLIGHT, TYP

ACOUSTIC

CEILING

CANOPY

ACC1

ACOUSTIC

CEILING

CANOPY

ACC1

GWB-1

6' - 6"

CORRIDOR

C15

CORRIDOR

C14

PACT TEAM

CORRIDOR

C15

2x4 ACT

10' - 4"

2x4 ACT

12' - 0"

10' - 2"

GWB-1

7' - 8"

GWB-1

7' - 8"

GWB-1

7' - 8"

GWB-1

9' - 0"

2x4 ACT

10' - 0"

OPEN

LIGHTING

ACT 2X4

GWB

OPEN TO

STRUCTURE

EXHAUST

RETURN GRILL

SUPPLY DIFFUSER

CEILING

MECHANICAL

WD-1 WOOD

CEILING SYSTEM

ACCESS PANEL

24" x 24"

ACCESS PANEL

12" x 12"

RECESSED DOWNLIGHT

RECESSED WALL WASHER

RECESSED TROFFER, 2X2

RECESSED TROFFER, 2X4

PENDANT LINEAR

PENDANT ROUND

SURFACE MOUNT LINEAR

SURFACE MOUNT ROUND

SURFACE MOUNT STRIP

FRONT/BACK BLDG WALL

SCONCE

UNDER CABINET

SIDE BLDG WALL SCONCE

HANGING TROFFER, 2X2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AC401

PARTIAL REFLECTED CEILING PLAN -

EAST

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 067 OF 206

1/4" = 1'-0"1

PARTIAL CEILING PLAN - EAST

PROJECT

NORTH

LEGEND

F

G

H

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

10' - 0"

GWB-1

9' - 0"

GWB-1

9' - 0"

GWB-1

9' - 0"

GWB-1

9' - 0"

GWB-1

9' - 0"

GWB-1

9' - 0"

GWB-1

9' - 0"

2x4 ACT

10' - 0"

2x4 ACT

10' - 0"

2x4 ACT

10' - 0"

2x4 ACT

9' - 0"

EXAM ROOM 03

EXAM ROOM 02

EXAM ROOM 01

WOMEN'S

HEALTH TLT

118A

WOMEN'S

HEALTH 01

CLEAN SUPPLY

ALCOVE, H/W

PROCEDURE

ROOM 01

EXAM ROOM 08

EXAM ROOM 09

EXAM ROOM 10

PACT TEAM

/1 AC401 /1 AC401

/1 AC403/1 AC403

MATCH LINE A-A

A A

MATCH LINE B-BB B

2.5

608 SF

CORRIDOR

C12 679 SF

CORRIDOR

C13

779 SF

CORRIDOR

C11

609 SF

CORRIDOR

C14

2x4 ACT

12' - 0"

79 SF

ALCOVE, H/W

2x4 ACT

11' - 0"

2x4 ACT

11' - 0"

8' - 10"

8' - 10"

IN-15.52-01

IN-15.52-03

VARIES

BLAST

BLAST

26' - 10"

VARIES

BLAST

VARIES

BLAST

VARIES

BLAST

BLAST

26' - 10"

2' - 0" 2' - 9" 4' - 10" 2' - 9" 2' - 0"

2' - 0" 2' - 9" 4' - 10" 2' - 9" 2' - 0"

IN-15.52-02

FOR CONTINUATION

SEE

FOR CONTINUATION

SEE

FOR CONTINUATION

SEE

FOR CONTINUATION

SEE

ACOUSTIC

CEILING

CANOPY

ACC12x4 ACT

9' - 0"

SKYLIGHT, TYP

2x4 ACT

10' - 0"

SKYLIGHT, TYP

8' - 10"

IN-15.52-02

LIGHTING

ACT 2X4

GWB

OPEN TO

STRUCTURE

EXHAUST

RETURN GRILL

SUPPLY DIFFUSER

CEILING

MECHANICAL

WD-1 WOOD

CEILING SYSTEM

ACCESS PANEL

24" x 24"

ACCESS PANEL

12" x 12"

RECESSED DOWNLIGHT

RECESSED WALL WASHER

RECESSED TROFFER, 2X2

RECESSED TROFFER, 2X4

PENDANT LINEAR

PENDANT ROUND

SURFACE MOUNT LINEAR

SURFACE MOUNT ROUND

SURFACE MOUNT STRIP

FRONT/BACK BLDG WALL

SCONCE

UNDER CABINET

SIDE BLDG WALL SCONCE

HANGING TROFFER, 2X2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AC402

PARTIAL REFLECTED CEILING PLAN -

CENTER

MEDICAL CENTER DIRECTOR

07/23/2021 MA AJ 068 OF 206

1/4" = 1'-0"1

PARTIAL CEILING PLAN - CENTER

PROJECT

NORTH

I

J

K

L

M

N

GWB-1

9' - 11"

2x4 ACT

11' - 3"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0" 2x4 ACT

11' - 0"

GWB-1

9' - 11"

4' - 0" 9' - 2 1/2"

GWB-1

9' - 0"

GWB-1

9' - 0"

GWB-1

9' - 3"

GWB-1

9' - 3"

COVE LIGHTING

LWC3

10' - 0"

STORAGE

107A

STORAGE

GROUP ROOM

LOBBY

VESTIBULE

RECEPTION

MSA & BUSINESS

SERVICES

PUBLIC TLT

PUBLIC TLT

HOUSEKEEPING

AND LADDER

POLICE

FAMILY TLT

PUBLIC TLT

LACTATION

2x4 ACT

10' - 11"2x4 ACT

10' - 11"

/1 AC402 /1 AC402

GWB-1

9' - 11"

1.1 3.9

L.2

MATCH LINE B-BB B

2.1 2.92.5

GWB-1

9' - 6"

LWC1

10' - 0"

GWB-1

9' - 6"

779 SF

CORRIDOR

C11

VARIES

LWC3

118 SF

CORRIDOR

C10

OPEN

GWB-1

9' - 11"

GWB-1

9' - 11"

HIGH CEILING NEAR UPPER ROOF PER BUILDING SECTIONS

(CONTINUE CEILING MATERIAL THROUGHOUT PORTION OF

UPPER ROOF THAT WILL BE VISIBLE FROM BELOW)

4' - 0"

/2

4' - 0"

4' - 0"

FOR CONTINUATION

SEE

FOR CONTINUATION

SEE

OPEN

A-511

OPEN

LIGHTING

ACT 2X4

GWB

OPEN TO

STRUCTURE

EXHAUST

RETURN GRILL

SUPPLY DIFFUSER

CEILING

MECHANICAL

WD-1 WOOD

CEILING SYSTEM

ACCESS PANEL

24" x 24"

ACCESS PANEL

12" x 12"

RECESSED DOWNLIGHT

RECESSED WALL WASHER

RECESSED TROFFER, 2X2

RECESSED TROFFER, 2X4

PENDANT LINEAR

PENDANT ROUND

SURFACE MOUNT LINEAR

SURFACE MOUNT ROUND

SURFACE MOUNT STRIP

FRONT/BACK BLDG WALL

SCONCE

UNDER CABINET

SIDE BLDG WALL SCONCE

HANGING TROFFER, 2X2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AC403

PARTIAL REFLECTED CEILING PLAN -

WEST

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 069 OF 206

1/4" = 1'-0"1

PARTIAL CEILING PLAN - WEST

PROJECT

NORTH

GFI

G F

I

AE430 2

124 SF

EXAM ROOM 07

.1 1 .2

PATIENT SIDE

A5109

GRAB BAR

A5108

SHARPS

DISPOSAL

A5107

GLOVE

DISPENSER

A5075

SOAP

DISPENSER

STAFF SIDE

A5145

GARMENT

HOOKA5109

GRAB BAR

/2

9" 1' - 8" 3' - 6"

A5180

PRIVACY

CURTAIN

TRACK

A5180

PRIVACY

CURTAIN

TRACK

M4100

SPHYGMOMANOMETER

M1803

WORKSTATION

A5082

PAPER

TOWEL

DISPENSER

M4040

SCALE

4' - 0"

MONITOR

VITAL SIGNS

M4117

/2

M1804

DUAL

MONITOR

MOUNT

M9025

EXAM BED

AE431

223 SF

CLEAN SUPPLY

E0903

OMNICELL

E0903

OMNICELL

U0002

OXYGEN

TANK

M3110

BLANKET

WARMER

M3150

DISPENSING

SYSTEM

M7710

ELECTROCARDIOGRAPH

A5082

PAPER

TOWEL

DISPENSER

A5108

SHARPS

DISPOSAL

A5075

SOAP

DISPENSER

1' - 3 1/2"1' - 10 1/2"

6"

11" 2' - 3"

5' - 2"

A5107

GLOVE

DISPENSER

I

J

K

L

AE433 2

F0435

MEDIA

CABINET

M1801

COMPUTER

M1801

COMPUTER

10' - 10 1/2"

5' - 1"

100 SF

STORAGE

107A

41 SF

STORAGE

467 SF

GROUP ROOM

/4

17' - 2"

6' - 9 1/2"

A

1.1

L.2

A-509

10' - 4 1/2"

/8

B

AE4338

369 SF

STAFF LOUNGE

A.1

M0506

TV

A5210

TV BRACKET

A5145

GARMENT

HOOK

A

TV WALL BACKING

.2

.1

R7250

FRIDGE

K4665

MICROWAVE

/2

/2

A-509

F3065

WHITEBOARD

A5075

SOAP

DISPENSER

A5082

PAPER

TOWEL

DISPENSER

UPPER CABINETS

A-509

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE410

EXAM ROOM, CLEAN SUPPLY, STAFF

LOUNGE, GROUP ROOM - ENLARGED

FLOOR PLAN 127

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 070 OF 206

1/2" = 1'-0"2

EXAM ROOM - ENLARGED FLOOR PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1/2" = 1'-0"3

CLEAN SUPPLY - ENLARGED FLOOR PLAN

1/2" = 1'-0"1

GROUP ROOM - ENLARGED FLOOR PLAN

1/2" = 1'-0"4

STAFF LOUNGE - ENLARGED FLOOR PLAN

PROJECT

NORTH

1. SEE SHEETS A-601 THROUGH A-612 FOR DOOR

SCHEDULES, WINDOW SCHEDULES/DETAILS, EQUIPMENT

SCHEDULE, AND WALL/FLOOR/ROOF TYPES.

2. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA

INSTALLED REQUIRING POWER/DATA OR FURNITURE

SUPPORTING SAID EQUIPMENT. ONLY USE FOR

REFERENCE. COORDINATE POWER/DATA WITH

ELECTRICAL.

GENERAL NOTES

GFI

H

AE4316

M3072

INFECTIOUS

WASTE BAG

A5107

GLOVE

DISPENSER

180 SF

PROCEDURE

ROOM 01

/8

1' - 5"

.1

.2

M1803

WORKSTATION

STAFF SIDE

PATIENT SIDE

/8

M7401

EXAM LIGHT

M4100

SPHYGMOMANOMETER

A1132

RAIL

A1011

TELEPHONE

A5082

PAPER

TOWEL

DISPENSER

M3072

INFECTIOUS

WASTE BAG

A5180

PRIVACY

CURTAIN

TRACK

A5180

PRIVACY

CURTAIN

TRACK

A5145

GARMENT

HOOK

MONITOR

VITAL SIGNS

M4117

/4

A5108

SHARPS

DISPOSAL

M1804

DUAL

MONITOR

MOUNT

A5075

SOAP

DISPENSER

/4

/2

/2

3' - 11 7/8"

H

PROCEDURE

ROOM 01

2x4 ACT

9' - 0"

A5180

PRIVACY

CURTAIN

TRACK

A5180

PRIVACY

CURTAIN

TRACK

U0004

PATIENT LIFT

H

AE430

124 SF

WOMEN'S

HEALTH 01

118PATIENT SIDE

STAFF SIDE

M4100

SPHYGMOMANOMETER

MONITOR

VITAL SIGNS

M4117 M1803

WORKSTATION

M1804

DUAL

MONITOR

MOUNT

A5145

GARMENT

HOOK

M4040

SCALE

A5109

GRAB BAR

A5109

GRAB BAR

M0925

GYN EXAM

TABLE

A5180

PRIVACY

CURTAIN

TRACK

A5075

SOAP

DISPENSER

A5082

PAPER

TOWEL

DISPENSER

A5108

SHARPS

DISPOSAL

M3072

INFECTIOUS

WASTE BAG

A4995

BABY

CHANGING

STATION

A5109

GRAB BAR

A5109

GRAB BAR

A5200

TOILET

TISSUE DISP

A5090

SANITARY

NAPKIN

DISPOSAL

A5075

SOAP

DISPENSER

A5082

PAPER

TOWEL

DISPENSER

A1066

MIRROR

A5091

FEMININE

NAPKIN

DISPENSER

A5145

GARMENT

HOOK

A1080

POSTURE

MIRROR

.2

.1

A

U0001

SEAT COVER

DISPENSER

1' - 0" 2' - 0" 6"

/8

1' - 8 1/8"

/2

/8

2' - 6 5/8" 2' - 4 1/8" 3' - 11 1/2"

/4

5' - 2 3/8"

/8

/8

AE438

66 SF

WOMEN'S

HEALTH TLT

118A

H

WOMEN'S

HEALTH TLT

118A

WOMEN'S

HEALTH 01

2x4 ACT

9' - 0"

U0004

PATIENT LIFT

A5180

PRIVACY

CURTAIN

TRACK

A5180

PRIVACY

CURTAIN

TRACK

TASK LIGHT,

SEE ELECTRICAL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE411

WOMEN'S HEALTH & PROCEDURE

ROOM - ENLARGED FLOOR PLAN &

RCP 127

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 071 OF 206

1/2" = 1'-0"1

TYP PROCEDURE ROOM - ENLARGED FLOOR PLAN

1/2" = 1'-0"2

TYP PROCEDURE ROOM - ENLARGED REFLECTED CEILING PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1/2" = 1'-0"3

WMN'S HEALTH EXAM ROOM AND TOILET - ENLARGED FLOOR PLAN

1/2" = 1'-0"4

WMN'S HEALTH EXAM ROOM AND TOILET - REFLECTED CEILING PLAN

1. SEE SHEETS A-601 THROUGH A-612 FOR DOOR

SCHEDULES, WINDOW SCHEDULES/DETAILS, EQUIPMENT

SCHEDULE, AND WALL/FLOOR/ROOF TYPES.

2. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA

INSTALLED REQUIRING POWER/DATA OR FURNITURE

SUPPORTING SAID EQUIPMENT. ONLY USE FOR

REFERENCE. COORDINATE POWER/DATA WITH

ELECTRICAL.

I G

F I

G F

I

G F

I G

F I

G F

I

C

AE432

4 2

.2

.2

.2

.2

.2

.2

B.8

DESK, TYP

AE3012 3

J

K

317 SF

RECEPTION

2.1 2.92.5

GWB-1

9' - 6"

LWC1

10' - 0"

GWB-1

9' - 6"

VARIES

LWC3

VARIES

LWC3

AT UPPER ROOF

J

AE432

RECEPTION

2.1 2.92.5

A-509

AE432

M1801

COMPUTER

AE432 10 AE43211

C

D

7' - 8 1/2" 2' - 0"

B.8

LIGHTS, SEE ELECTRICAL

ACOUSTIC

CEILING

CANOPY

ACC1

ACOUSTIC

CEILING

CANOPY

ACC1

ACOUSTIC

CEILING

CANOPY

ACC1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE412

TYP PACT TEAM & RECEPTION-

ENLARGED FLOOR PLANS & RCP

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 072 OF 206

PROJECT

NORTH

PROJECT

NORTH

1/4" = 1'-0"1

TYP PACT TEAM WORK STATIONS - ENLARGED FLOOR PLAN

1/4" = 1'-0"4

RECEPTION - ENLARGED REFLECTED CEILING PLAN

1/4" = 1'-0"3

RECEPTION - ENLARGED FLOOR PLAN

1/4" = 1'-0"2

TYP PACT TEAM WORK STATIONS - ENLARGED REFLECTED CEILING PLAN

PROJECT

NORTH

PROJECT

NORTH

1. SEE SHEETS A-601 THROUGH A-612 FOR DOOR

SCHEDULES, WINDOW SCHEDULES/DETAILS, EQUIPMENT

SCHEDULE, AND WALL/FLOOR/ROOF TYPES.

2. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA

INSTALLED REQUIRING POWER/DATA OR FURNITURE

SUPPORTING SAID EQUIPMENT. ONLY USE FOR

REFERENCE. COORDINATE POWER/DATA WITH

ELECTRICAL.

I

GFI

I

J

2.1

AE434

M1801

COMPUTER

M1840

PRINTER

A1011

TELEPHONE

M1801

COMPUTER

173 SF

MSA & BUSINESS

SERVICES

.1

.2

2.5

A1011

TELEPHONE

DESK TYP

IN-99.01-01

I

J

2.9

160 SF

HOUSEKEEPING

AND LADDER

AE434

SHIPS LADDER TO

MECH PENTHOUSE

EYEWASH STATION

EYEWASH VALVE

A5082

PAPER

TOWEL

DISPENSER

1' - 8"

F0500

HK CART

A5135

MOP RACK

MOP SINK

A5107

GLOVE

DISPENSER

A5135

MOP RACK

I

3.9

AE430 10

84 SF

LACTATION

A4995

BABY

CHANGING

STATION

/8

A5180

PRIVACY

CURTAIN

TRACK

A5082

PAPER

TOWEL

DISPENSER

A5075

SOAP

DISPENSER

E

25 SF

ALCOVE

AE4357

M1840

PRINTER

79 SF

ALCOVE, H/W

AE435

M4020

BARIATRIC

SCALE

I

AE43712 10

87 SF

POLICE

M1801

COMPUTER

M1801

COMPUTER

DESK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE413

MSA, POLICE, ALCOVE HW,

HOUSEKEEPING, LACTATION,

ALCOVE - ENLARGED FLOOR PLANS 127

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 073 OF 206

1/2" = 1'-0"1

MSA/BUS. SERVICES - ENLARGED FLOOR PLAN

1/2" = 1'-0"4

HOUSEKEEPING & LADDER - ENLARGED FLOOR PLAN

PROJECT

NORTH

PROJECT

NORTH

1/2" = 1'-0"5

LACTATION ROOM - ENLARGED FLOOR PLAN

1/2" = 1'-0"6

ALCOVE - ENLARGED FLOOR PLAN

1/2" = 1'-0"3

ALCOVE, HW - ENLARGED FLOOR PLAN

1. SEE SHEETS A-601 THROUGH A-612 FOR DOOR

SCHEDULES, WINDOW SCHEDULES/DETAILS, EQUIPMENT

SCHEDULE, AND WALL/FLOOR/ROOF TYPES.

2. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA

INSTALLED REQUIRING POWER/DATA OR FURNITURE

SUPPORTING SAID EQUIPMENT. ONLY USE FOR

REFERENCE. COORDINATE POWER/DATA WITH

ELECTRICAL.

GENERAL NOTES

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1/2" = 1'-0"2

POLICE OFFICE - ENLARGED FLOOR PLAN

AE434

12 10

67 SF

STAFF TLT

A.1

A5109

GRAB BAR

A5109

GRAB BAR

1' - 6"

/8

A

6" 1' - 0" 2' - 0"

A5082

PAPER

TOWEL

DISPENSER

A5145

GARMENT

HOOK

A5200

TOILET

TISSUE DISP

A5090

SANITARY

NAPKIN

DISPOSAL

A5075

SOAP

DISPENSER

U0001

SEAT COVER

DISPENSER

A1066

MIRROR

A-509

B

A.1

AE43112 10

M3072

INFECTIOUS

WASTE BAG

A5107

GLOVE

DISPENSER

104 SF

SOILED MED

EQUIP

/2

A5082

PAPER

TOWEL

DISPENSER

A5075

SOAP

DISPENSER

UPPER CABINET

ABOVE TYP

BASE CABINET

BELOW TYP

I

A5145

GARMENT

HOOK

3' - 0"

9' - 0 1/8"

AE436

74 SF

PUBLIC TLT

A5090

SANITARY

NAPKIN

DISPOSAL

A5200

TOILET

TISSUE DISP

A5109

GRAB BAR

1' - 3" 1' - 0"

A5109

GRAB BAR

2' - 6" 6" 1' - 0"

A5091

FEMININE

NAPKIN

DISPENSER

A4995

BABY

CHANGING

STATION

U0001

SEAT COVER

DISPENSER

A5075

SOAP

DISPENSER

A1066

MIRROR

A5082

PAPER

TOWEL

DISPENSER

I

74 SF

PUBLIC TLT

AE4364 2

A5109

GRAB BAR

A5145

GARMENT

HOOK

A5090

SANITARY

NAPKIN

DISPOSAL

1' - 11 3/4"

1' - 0" 6" 2' - 6"

3' - 0"

A5200

TOILET

TISSUE DISP

A4995

BABY

CHANGING

STATION

U0001

SEAT COVER

DISPENSER

A5082

PAPER

TOWEL

DISPENSER

A5075

SOAP

DISPENSER

A5091

FEMININE

NAPKIN

DISPENSER

A1066

MIRROR

A5109

GRAB BAR

I

75 SF

PUBLIC TLT

AE436

A5109

GRAB BAR

A5200

TOILET

TISSUE DISP

A5090

SANITARY

NAPKIN

DISPOSAL

A5082

PAPER

TOWEL

DISPENSER

9"

1' - 0" 6" 2' - 6"

A5145

GARMENT

HOOK

A5091

FEMININE

NAPKIN

DISPENSER

A4995

BABY

CHANGING

STATION

A5075

SOAP

DISPENSER

A5109

GRAB BAR

U0001

SEAT COVER

DISPENSER

A1066

MIRROR

E

AE4377

2' - 0" 1' - 0" 6"

A5200

TOILET

TISSUE DISP

A5082

PAPER

TOWEL

DISPENSER

A5109

GRAB BAR

A5091

FEMININE

NAPKIN

DISPENSER

A5145

GARMENT

HOOK

65 SF

PUBLIC TLT

A4995

BABY

CHANGING

STATION

U0001

SEAT COVER

DISPENSER

A5109

GRAB BAR

A5090

SANITARY

NAPKIN

DISPOSAL

A5075

SOAP

DISPENSER

A1066

MIRROR

B

A.1

AE4374

A1011

TELEPHONE

M1801

COMPUTER

A5145

GARMENT

HOOK

108 SF

OFFICE

A

A5145

GARMENT

HOOK

DESKI

AE435

80 SF

FAMILY TLT

A5145

GARMENT

HOOK

A5109

GRAB BAR

A5109

GRAB BAR

A5200

TOILET

TISSUE DISP

A5090

SANITARY

NAPKIN

DISPOSAL

A5082

PAPER

TOWEL

DISPENSER

1' - 5" 2' - 6" 6" 1' - 0"

/8

3' - 6 3/4" 1' - 6"

A4995

BABY

CHANGING

STATION

A5091

FEMININE

NAPKIN

DISPENSER

2' - 6"

U0001

SEAT COVER

DISPENSER

A5075

SOAP

DISPENSER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE414

TOILETS, SOILED MED EQUIP, &

OFFICE - ENRLAGED FLOOR PLANS

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 074 OF 206

1/2" = 1'-0"1

STAFF TOILET - ENLARGED FLOOR PLAN

PROJECT

NORTH

PROJECT

NORTH

1/2" = 1'-0"7

SOILED MED EQUIPMENT - ENLARGED FLOOR PLAN

PROJECT

NORTH

PROJECT

NORTH

1/2" = 1'-0"2

PUBLIC TOILET 112 - ENLARGED FLOOR PLAN

1/2" = 1'-0"3

PUBLIC TOILET 104 - ENLARGED FLOOR PLAN

1/2" = 1'-0"4

PUBLIC TOILET 109 - ENLARGED FLOOR PLAN

1/2" = 1'-0"5

PATIENT TOILET - ENLARGED FLOOR PLAN

1/2" = 1'-0"8

OFFICE - ENLARGED FLOOR PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1. SEE SHEETS A-601 THROUGH A-612 FOR DOOR

SCHEDULES, WINDOW SCHEDULES/DETAILS, EQUIPMENT

SCHEDULE, AND WALL/FLOOR/ROOF TYPES.

2. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA

INSTALLED REQUIRING POWER/DATA OR FURNITURE

SUPPORTING SAID EQUIPMENT. ONLY USE FOR

REFERENCE. COORDINATE POWER/DATA WITH

ELECTRICAL.

GENERAL NOTES

1/2" = 1'-0"6

FAMILY TLT - ENLARGED FLOOR PLAN

PROJECT

LEVEL 1

0' - 0"

A5107

GLOVE

DISPENSER

A5082

PAPER

TOWEL

DISPENSER

A5075

SOAP

DISPENSER

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

PLAM 1

S1

A5180

PRIVACY

CURTAIN

TRACK3' - 0"

BLOCKING

1' - 9" 3' - 0"

/2

ALIGN

L

LLOCK, TYP

LEVEL 1

0' - 0"

M1803

WORKSTATION

M4100

SPHYGMOMANOMETER

A5108

SHARPS

DISPOSAL

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

A5180

PRIVACY

CURTAIN

TRACK

M9025

EXAM BED

BLOCKING

MONITOR

VITAL SIGNS

M4117

M1804

DUAL

MONITOR

MOUNT

M4040

SCALE

LEVEL 1

0' - 0"

A5109

GRAB BAR

A5145

GARMENT

HOOK

A5108

SHARPS

DISPOSAL

A5109

GRAB BAR

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

1' - 10"

1' - 3"

F3200

CLOCK

M4040

SCALE

BLOCKING TYP.

PLAM 1

S1

PLAM 1

/2

A-509

LEVEL 1

0' - 0"

M1803

WORKSTATION

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

M9025

EXAM BED

M4100

SPHYGMOMANOMETER

A5180

PRIVACY

CURTAIN

TRACK

BLOCKING TYP MONITOR

VITAL SIGNS

M4117

M1804

DUAL

MONITOR

MOUNT

LEVEL 1

0' - 0"

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

BLOCKING TYP

M0925

GYN EXAM

TABLE

A5109

GRAB BAR

M4040

SCALE

MONITOR

VITAL SIGNS

M4117

M1803

WORKSTATION

M1804

DUAL

MONITOR

MOUNT

1' - 10"

" 3

U0004

PATIENT LIFT

PLAM 1

S1

PLAM 1

1' - 3"

/2

A5180

PRIVACY

CURTAIN

TRACK

LEVEL 1

0' - 0"

H

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

BLOCKING

M1804

DUAL

MONITOR

MOUNT

M1803

WORKSTATION

A5075

SOAP

DISPENSER

A5107

GLOVE

DISPENSER

A5082

PAPER

TOWEL

DISPENSER

A5180

PRIVACY

CURTAIN

TRACK

M3072

INFECTIOUS

WASTE BAG 4

U0004

PATIENT LIFT

PLAM 1

PLAM 1

S1

/2

3' - 0" 1' - 9"

3' - 0"

ALIGN

L

L

LOCK, TYP

LEVEL 1

0' - 0"

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

BLOCKING TYP

F3200

CLOCK

M3072

INFECTIOUS

WASTE BAG

A5180

PRIVACY

CURTAIN

TRACK

A5108

SHARPS

DISPOSAL

A5075

SOAP

DISPENSER

1' - 3"

PLAM 1

PLAM 1

S1

/2

BLOCKING TYP

LEVEL 1

0' - 0"

H

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

BLOCKING

A5109

GRAB BAR

MONITOR

VITAL SIGNS

M4117

A5145

GARMENT

HOOK

A5180

PRIVACY

CURTAIN

TRACK

F3200

CLOCK

M0925

GYN EXAM

TABLE

U0004

PATIENT LIFT

A5108

SHARPS

DISPOSAL

LEVEL 1

0' - 0"

WALL BASE AS SCHEDULED

PLAM 1

S1

A5075

SOAP

DISPENSER

A5082

PAPER

TOWEL

DISPENSER

ALIGN BOTTOM OF GWB

CEILING WITH TOP OF

ADJACENT MULLION

ONE SIDED GYP SOFFIT

LEVEL 1

0' - 0"

A4995

BABY

CHANGING

STATION

A5180

PRIVACY

CURTAIN

TRACK

WALL BASE AS SCHEDULED

BOTTOM OF ACT CEILING

BOTTOM OF GWB CEILING

AND TOP OF MULLION

LEVEL 1

0' - 0"

WALL BASE AS SCHEDULED

A5180

PRIVACY

CURTAIN

TRACK

A4995

BABY

CHANGING

STATION

BLOCKING

PLAM 1

S1

LEVEL 1

0' - 0"

WALL BASE AS SCHEDULED

A5180

PRIVACY

CURTAIN

TRACK

A5075

SOAP

DISPENSER

A5082

PAPER

TOWEL

DISPENSER

PLAM 1

S1

BLOCKING

/2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE430

EXAM ROOM & WOMEN'S HEALTH &

LACTATION ROOM - INTERIOR

ELEVATIONS 127

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 075 OF 206

1/2" = 1'-0"2

TYP EXAM ROOM - SOUTH INTERIOR ELEV

1/2" = 1'-0"4

TYP EXAM ROOM - NORTH INTERIOR ELEV

1/2" = 1'-0"1

TYP EXAM ROOM - EAST INTERIOR ELEV

1/2" = 1'-0"3

TYP EXAM ROOM - WEST INTERIOR ELEV

1/2" = 1'-0"5

WMN'S HEALTH EXAM RM - EAST INTERIOR ELEV

1/2" = 1'-0"6

WMN'S HEALTH EXAM RM - SOUTH INTERIOR ELEV

1/2" = 1'-0"7

WMN'S HEALTH EXAM RM - WEST INTERIOR ELEV

1/2" = 1'-0"8

WMN'S HEALTH EXAM RM - NORTH INTERIOR ELEV

GENERAL NOTES

1. INSTALL WALL BLOCKING WHERE NOTED TO NEAREST

WALL FRAMING MEMBER.

2. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE

BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR

WALL MOUNTED DOOR STOPS. ASSURE THAT ALL

REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO

INSTALLING DRYWALL.

3. SEE SHEETS A-601 - A-612 FOR DOOR SCHEDULES,

WINDOW SCHEDULES/DETAILS, EQUIPMENT SCHEDULE,

AND WALL/FLOOR/ROOF TYPES.

4. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA

INSTALLED REQUIRING POWER/DATA OR FURNITURE

SUPPORTING SAID EQUIPMENT. ONLY USE FOR

REFERENCE. COORDINATE POWER/DATA WITH

ELECTRICAL.

5. ALL EXPOSED SURFACES OF CABINETS AND CASEWORK

ARE TO BE FINISHED WITH DECORATIVE PLASTIC

LAMINATE. EXPOSED SURFACES ARE ANYTHING THAT

CAN BE SEEN WITH THE DOORS AND DRAWERS CLOSED.

THIS INCLUDES THE UNDERSIDE AND TOP OF WALL

MOUNTED CABINETS (INCLUDING SCRIBES AND FILLER

PANELS), ALL SURFACES OF COUNTER SUPPORTS, AND

ALL OPEN CABINET SHELVES AND SURFACES. IN ADDITION,

ALL SIX SURFACES OF ALL CABINET DOORS AND ALL SIX

SURFACES OF OPEN ADJUSTABLE SHELVES ARE TO BE

FINISHED IN DECORATIVE PLASTIC LAMINATE. THE FRONT

AND FOUR EDGES OF ALL DRAWER FRONTS ARE TO

RECEIVE DECORATIVE PLASTIC LAMINATE. THE SEMI-

EXPOSED INTERIOR SURFACES OF DRAWERS AND

CABINETS (THOSE SURFACES THAT CAN ONLY BE SEEN

WHEN THE DRAWER OR DOOR IS OPEN) ARE TO BE

MELAMINE WITH VINYL EDGES, EXCEPT AS NOTED

OTHERWISE ABOVE. THE FOUR EDGES OF ALL MELAMINE

ADJUSTABLE SHELVES WITHIN CLOSED CABINETS ARE TO

BE FINISHED WITH VINYL EDGING. THE UNDERSIDES OF

ALL COUNTER TOPS ARE TO RECEIVE LAMINATE BACKING

SHEET.

6. ALL FILE DRAWERS MUST HAVE A MINIMUM CLEAR INSIDE

HEIGHT OF 10-1/2" AND A MINIMUM CLEAR INSIDE WIDTH OF

13".

1/2" = 1'-0"9

LACTATION RM EAST INTERIOR ELEV

1/2" = 1'-0"10

LACTATION RM - SOUTH INTERIOR ELEV

1/2" = 1'-0"11

LACTATION RM - WEST INTERIOR ELEV

1/2" = 1'-0"12

LACTATION RM- NORTH INTERIOR ELEV

H

M3072

INFECTIOUS

WASTE BAG

S1

PLAM 1

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

A5107

GLOVE

DISPENSER

A1011

TELEPHONE

A5082

PAPER

TOWEL

DISPENSER

A5180

PRIVACY

CURTAIN

TRACK

BLOCKING TYP

PATIENT LIFT

A5108

SHARPS

DISPOSAL

3' - 0" 1' - 6" 1' - 6"

A5075

SOAP

DISPENSER

3' - 0" 3' - 0"

LL

L

LOCK, TYP

LEVEL 1

0' - 0"

M3072

INFECTIOUS

WASTE BAG

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

A5180

PRIVACY

CURTAIN

TRACK

A5180

PRIVACY

CURTAIN

TRACK

A5145

GARMENT

HOOK

BLOCKING

LEVEL 1

0' - 0"

H

PAINT AS SCHEDULED WALL BASE AS SCHEDULED

A5180

PRIVACY

CURTAIN

TRACK

M7401

EXAM LIGHT

M4100

SPHYGMOMANOMETER

BLOCKING

MONITOR

VITAL SIGNS

M4117

M3072

INFECTIOUS

WASTE BAG

A5145

GARMENT

HOOK

M1804

DUAL

MONITOR

MOUNT

U0004

PATIENT LIFT

LEVEL 1

0' - 0"

M1803

WORKSTATION

M3072

INFECTIOUS

WASTE BAG

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

M7401

EXAM LIGHT

M4100

SPHYGMOMANOMETER

BLOCKING

A5108

SHARPS

DISPOSAL

M1804

DUAL

MONITOR

MOUNT

A5075

SOAP

DISPENSER

MONITOR

VITAL SIGNS

M4117

U0004

PATIENT LIFT

PLAM 1

S1

LEVEL 1

0' - 0"

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

E0903

OMNICELL

E0903

OMNICELL

E0903

OMNICELL

E0903

OMNICELL

E0903

OMNICELL

E0903

OMNICELL

RWC AS SCHEDULED

LEVEL 1

0' - 0"

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

R6200

UTILITY

FRIDGE

A5108

SHARPS

DISPOSAL

E0903

OMNICELL

A5082

PAPER

TOWEL

DISPENSER

M7710

ELECTROCARDIOGRAPH

S1

RWC AS SCHEDULED

LEVEL 1

0' - 0"

PAINT AS SCHEDULED

WALL BASE AS SCHEDULEDU0002

OXYGEN

TANK

M3110

BLANKET

WARMER

A5107

GLOVE

DISPENSER

A5082

PAPER

TOWEL

DISPENSER

A5108

SHARPS

DISPOSAL

M3150

DISPENSING

SYSTEM

R6200

UTILITY

FRIDGE

A5075

SOAP

DISPENSER

M7710

ELECTROCARDIOGRAPH

BLOCKING

S1

RWC AS SCHEDULED

LEVEL 1

0' - 0"

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

M3150

DISPENSING

SYSTEM

M3110

BLANKET

WARMER

E0903

OMNICELL

RWC AS SCHEDULED

LEVEL 1

0' - 0"

PAINT AS

SCHEDULED

WALL BASE AS

SCHEDULED

3' - 0"3' - 6"1' - 0"

BLOCKING

PLAM 1

PLAM 1

S1

2' - 0"

/2

/2

LEVEL 1

0' - 0"

PAINT AS

SCHEDULED

WALL BASE AS

SCHEDULED

M3072

INFECTIOUS

WASTE BAG

S1

PLAM 1

1' - 0"

RWC AS

SCHEDULED

LEVEL 1

0' - 0"

PAINT AS

SCHEDULED

WALL BASE AS

SCHEDULED

A5082

PAPER

TOWEL

DISPENSER

BLOCKING

PLAM 1

S1

PLAM 1

1' - 0"

2' - 0"

RWC AS SCHEDULED

LEVEL 1

0' - 0"

A5107

GLOVE

DISPENSER

PAINT AS

SCHEDULED

WALL BASE AS SCHEDULED

BLOCKING

A5082

PAPER

TOWEL

DISPENSER

2' - 11 3/8" 3' - 9" 3' - 0"

A5075

SOAP

DISPENSER

PLAM 1

S1

PLAM 1

/2

/2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE431

PROCEDURE ROOM, CLEAN SUPPLY &

SOILED MED EQUIP ROOM -

INTERIOR ELEVATIONS 127

MEDICAL CENTER DIRECTOR

07/23/2021 MK JP 076 OF 206

1/2" = 1'-0"6

TYP PROCEDURE RM - SOUTH INTERIOR ELEV

1/2" = 1'-0"5

PROCEDURE RM - EAST INTERIOR ELEV

1/2" = 1'-0"8

PROCEDURE RM - NORTH INTERIOR ELEV

1/2" = 1'-0"7

PROCEDURE ROOM - WEST INTERIOR ELEV

1/2" = 1'-0"1

CLEAN SUPPLY - EAST INTERIOR ELEV

1/2" = 1'-0"4

CLEAN SUPPLY - NORTH INTERIOR ELEV

1/2" = 1'-0"3

CLEAN SUPPLY - WEST INTERIOR ELEV

1/2" = 1'-0"2

CLEAN SUPPLY - SOUTH INTERIOR ELEV

GENERAL NOTES

1. INSTALL WALL BLOCKING WHERE NOTED TO NEAREST

WALL FRAMING MEMBER.

2. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE

BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR

WALL MOUNTED DOOR STOPS. ASSURE THAT ALL

REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO

INSTALLING DRYWALL.

3. SEE SHEETS A-601 - A-612 FOR DOOR SCHEDULES,

WINDOW SCHEDULES/DETAILS, EQUIPMENT SCHEDULE,

AND WALL/FLOOR/ROOF TYPES.

4. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA

INSTALLED REQUIRING POWER/DATA OR FURNITURE

SUPPORTING SAID EQUIPMENT. ONLY USE FOR

REFERENCE. COORDINATE POWER/DATA WITH

ELECTRICAL.

5. ALL EXPOSED SURFACES OF CABINETS AND CASEWORK

ARE TO BE FINISHED WITH DECORATIVE PLASTIC

LAMINATE. EXPOSED SURFACES ARE ANYTHING THAT

CAN BE SEEN WITH THE DOORS AND DRAWERS CLOSED.

THIS INCLUDES THE UNDERSIDE AND TOP OF WALL

MOUNTED CABINETS (INCLUDING SCRIBES AND FILLER

PANELS), ALL SURFACES OF COUNTER SUPPORTS, AND

ALL OPEN CABINET SHELVES AND SURFACES. IN

ADDITION, ALL SIX SURFACES OF ALL CABINET

DOORS AND ALL SIX SURFACES OF OPEN ADJUSTABLE

SHELVES ARE TO BE FINISHED IN DECORATIVE PLASTIC

LAMINATE. THE FRONT AND FOUR EDGES OF ALL DRAWER

FRONTS ARE TO RECEIVE DECORATIVE PLASTIC

LAMINATE. THE SEMI-EXPOSED INTERIOR SURFACES OF

DRAWERS AND CABINETS (THOSE SURFACES THAT CAN

ONLY BE SEEN WHEN THE DRAWER OR DOOR IS OPEN)

ARE TO BE MELAMINE WITH VINYL EDGES, EXCEPT AS

NOTED OTHERWISE ABOVE. THE FOUR EDGES OF ALL

MELAMINE ADJUSTABLE SHELVES WITHIN CLOSED

CABINETS ARE TO BE FINISHED WITH VINYL EDGING. THE

UNDERSIDES OF ALL COUNTER TOPS ARE TO RECEIVE

LAMINATE BACKING SHEET.

6. ALL FILE DRAWERS MUST HAVE A MINIMUM CLEAR INSIDE

HEIGHT OF 10-1/2" AND A MINIMUM CLEAR INSIDE WIDTH

OF 13".

1/2" = 1'-0"9

SOILED MED EQUIP - EAST INTERIOR ELEV

1/2" = 1'-0"10

SOILED MED EQUIP - SOUTH INTERIOR ELEV

1/2" = 1'-0"11

SOILED MED EQUIP - WEST INTERIOR ELEV

1/2" = 1'-0"12

SOILED MED EQUIP - NORTH INT ELEV

WALL BASE AS SCHEDULED

LIGHTS, SEE ELECTRICAL

DESK, TYP

ACOUSTIC

CEILING

CANOPY

ACC1

W4 W4

LEVEL 1

0' - 0"

LIGHTS, SEE ELECTRICAL

DESK, TYP

ACOUSTIC

CEILING

CANOPY

ACC1

LEVEL 1

0' - 0"

CB.8

WALL BASE AS SCHEDULED

DESK, TYP

ACOUSTIC

CEILING

CANOPY

ACC1

LEVEL 1

0' - 0"

CD B.8

WALL BASE AS SCHEDULED

LIGHTS, SEE ELECTRICAL

DESK, TYP

ACOUSTIC

CEILING

CANOPY

ACC1

LEVEL 1

0' - 0"

2 32.1 2.92.5

2" GAP IN LWC1 AROUND

COUNTER, EXTEND TO BASE.

PAINT AS SCHEDULED

LWC2

LWC1

VA SEAL PLAQUE, TYP

VINYL BASE BELOW WOOD PANELS

PLAM1

QZ1 COUNTERTOP

2"

3' - 0"

1' - 9"1' - 9"

3' - 0"

/2

RECEPTION

DESK

RECEPTION

DESK

*SEE AW SHEETS FOR

SIGNAGE DIMENSIONS.

LEVEL 1

0' - 0"

RES1 DIVIDER PANEL

(TYP)

RECEPTION DESK

2.12.9 2.5

/2

A-509

ADA ACCESSIBLE

COUNTERTOP, TYP

M1801

COMPUTER

QZ1 TRANSACTION COUNTER

TO COUNTERTOP EDGE

31' - 3"

PLAM2 (TYP)

LEVEL 1

0' - 0"

K

RES1 DIVIDER PANEL

RECEPTION DESK

M1801

COMPUTER

" PLAM

1' - 10"

QZ1 COUNTERTOP

LEVEL 1

0' - 0"

J K

RECEPTION DESK

RES1 DIVIDER PANEL

CABINET

M1801

COMPUTER

FLIP UP COUNTER

AND SWINGING

PANEL (BEYOND)

LEVEL 1

0' - 0"

CURVED RES2 PANELS

INSTALLED ON STANDOFFS

A-509

PLAM1

M1801

COMPUTER

M1801

COMPUTER

QZ1 COUNTERTOP

QZ1 COUNTERTOP

QZ1 COUNTERTOP

QZ1 COUNTERTOP

LEVEL 1

0' - 0"

J

LEVEL 1

0' - 0"

J

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE432

TYP PACT TEAM & RECEPTION-

INTERIOR ELEVATIONS

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 077 OF 206

1/4" = 1'-0"1

TYP PACT TEAM - NORTH INTERIOR ELEV

1/4" = 1'-0"3

TYP PACT TEAM - SOUTH INTERIOR ELEV

1/4" = 1'-0"2

TYP PACT TEAM - EAST INTERIOR ELEV

1/4" = 1'-0"4

TYP PACT TEAM - WEST INTERIOR ELEV

1/4" = 1'-0"5

RECEPTION - EAST INTERIOR ELEV

1/4" = 1'-0"7

RECEPTION - WEST INTERIOR ELEV

1/4" = 1'-0"8

RECEPTION - NORTH INTERIOR ELEV

1/4" = 1'-0"6

RECEPTION - SOUTH INTERIOR ELEV

1/4" = 1'-0"9

RECEPTION - FRONT ELEV

GENERAL NOTES

1. INSTALL WALL BLOCKING WHERE NOTED TO NEAREST

WALL FRAMING MEMBER.

2. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE

BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR

WALL MOUNTED DOOR STOPS. ASSURE THAT ALL REQUIRED

BACKING IS INSTALLED IN WALLS PRIOR TO INSTALLING

DRYWALL.

3. SEE SHEETS A-601 - A-612 FOR DOOR SCHEDULES, WINDOW

SCHEDULES/DETAILS, EQUIPMENT SCHEDULE, AND

WALL/FLOOR/ROOF TYPES.

4. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA INSTALLED

REQUIRING POWER/DATA OR FURNITURE SUPPORTING SAID

EQUIPMENT. ONLY USE FOR REFERENCE. COORDINATE

POWER/DATA WITH ELECTRICAL.

6. ALL EXPOSED SURFACES OF CABINETS AND CASEWORK ARE

TO BE FINISHED WITH DECORATIVE PLASTIC LAMINATE.

EXPOSED SURFACES ARE ANYTHING THAT CAN BE SEEN WITH

THE DOORS AND DRAWERS CLOSED. THIS INCLUDES THE

UNDERSIDE AND TOP OF WALL MOUNTED CABINETS

(INCLUDING SCRIBES AND FILLER PANELS), ALL SURFACES OF

COUNTER SUPPORTS, AND ALL OPEN CABINET SHELVES AND

SURFACES. IN ADDITION, ALL SIX SURFACES OF ALL

CABINET DOORS AND ALL SIX SURFACES OF OPEN

ADJUSTABLE SHELVES ARE TO BE FINISHED IN DECORATIVE

PLASTIC LAMINATE. THE FRONT AND FOUR EDGES OF ALL

DRAWER FRONTS ARE TO RECEIVE DECORATIVE PLASTIC

LAMINATE. THE SEMI-EXPOSED INTERIOR SURFACES OF

DRAWERS AND CABINETS (THOSE SURFACES THAT CAN ONLY

BE SEEN WHEN THE DRAWER OR DOOR IS OPEN) ARE TO BE

MELAMINE WITH VINYL EDGES, EXCEPT AS NOTED

OTHERWISE ABOVE. THE FOUR EDGES OF ALL MELAMINE

ADJUSTABLE SHELVES WITHIN CLOSED CABINETS ARE TO BE

FINISHED WITH VINYL EDGING. THE UNDERSIDES OF ALL

COUNTER TOPS ARE TO RECEIVE LAMINATE BACKING SHEET.

7. ALL FILE DRAWERS MUST HAVE A MINIMUM CLEAR INSIDE

HEIGHT OF 10-1/2" AND A MINIMUM CLEAR INSIDE WIDTH OF

13".

1/4" = 1'-0"10

RECEPTION - SIDE ELEV

1/4" = 1'-0"11

RECEPTION - SIDE ELEV 2

WALL BASE AS SCHEDULED

S3B S3A

BOTTOM OF ACT, TYP

BOTTOM OF GWB SOFFIT

LEVEL 1

0' - 0"

K

M1801

COMPUTER

E0945

COMP. CART

M1801

COMPUTER

E0945

COMP. CART

WALL BASE AS SCHEDULED

F3200

CLOCK

BLOCKING

LEVEL 1

0' - 0"

JK

WALL BASE AS SCHEDULED

S4B S4A S4D

BOTTOM OF

ACT, TYP

BOTTOM OF

GWB SOFFIT

LEVEL 1

0' - 0"

WALL BASE AS SCHEDULED

ALIGN BOTTOM OF GWB

CEILING WITH TOP OF

ADJACENT MULLION

ONE SIDED GYP SOFFIT

LEVEL 1

0' - 0"

A5210

TV BRACKET

R7250

FRIDGE

K4665

MICROWAVE WALL BASE AS

SCHEDULED

M0506

TV

A-509

BOTTOM OF ACT, TYP

PLAM 1

PLAM 1

S1

1' - 3"

S5A S5A S5B

BOTTOM OF GWB SOFFIT (BEYOND)

A5075

SOAP

DISPENSER

LEVEL 1

0' - 0"

A.1

A5145

GARMENT

HOOK

BLOCKING TYP.

WALL BASE AS

SCHEDULED

F3200

CLOCK

M0506

TV

EQ EQ

F3065

WHITEBOARD

ALIGN BOTTOM OF GWB

CEILING WITH TOP OF

ADJACENT MULLION

ONE SIDED GYP SOFFIT

LEVEL 1

0' - 0"

WALL BASE AS SCHEDULED

1' - 3"

1' - 10"

A-509

PLAM 1

PLAM 1

S1

W5 W5 W5 W5

LEVEL 1

0' - 0"

WALL BASE AS SCHEDULED

S1

BLOCKING

R7250

FRIDGE

K4665

MICROWAVE

7' - 0"

3' - 0" 3' - 0"

/2

A5082

PAPER

TOWEL

DISPENSER

A5075

SOAP

DISPENSER

PLAM 1

2' - 0" 3' - 0" 2' - 0"

PLAM 1

ALIGN

A-509

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE433

GROUP ROOM & STAFF LOUNGE-

INTERIOR ELEVATIONS

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 078 OF 206

1/4" = 1'-0"3

GROUP ROOM - WEST INTERIOR ELEV

1/4" = 1'-0"2

GROUP ROOM - SOUTH INTERIOR ELEV

1/4" = 1'-0"4

GROUP ROOM - NORTH INTERIOR ELEV

1/4" = 1'-0"1

GROUP ROOM - EAST INTERIOR ELEV

1/4" = 1'-0"5

STAFF LOUNGE - EAST INTERIOR ELEV

1/4" = 1'-0"6

STAFF LOUNGE - SOUTH INTERIOR ELEV

1/4" = 1'-0"7

STAFF LOUNGE - WEST INTERIOR ELEV

1/4" = 1'-0"8

STAFF LOUNGE - NORTH INTERIOR ELEV

GENERAL NOTES

1. INSTALL WALL BLOCKING WHERE NOTED TO NEAREST

WALL FRAMING MEMBER.

2. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE

BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR

WALL MOUNTED DOOR STOPS. ASSURE THAT ALL

REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO

INSTALLING DRYWALL.

3. SEE SHEETS A-601 - A-612 FOR DOOR SCHEDULES,

WINDOW SCHEDULES/DETAILS, EQUIPMENT SCHEDULE,

AND WALL/FLOOR/ROOF TYPES.

4. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA

INSTALLED REQUIRING POWER/DATA OR FURNITURE

SUPPORTING SAID EQUIPMENT. ONLY USE FOR

REFERENCE. COORDINATE POWER/DATA WITH

ELECTRICAL.

6. ALL EXPOSED SURFACES OF CABINETS AND CASEWORK

ARE TO BE FINISHED WITH DECORATIVE PLASTIC

LAMINATE. EXPOSED SURFACES ARE ANYTHING THAT CAN

BE SEEN WITH THE DOORS AND DRAWERS CLOSED. THIS

INCLUDES THE UNDERSIDE AND TOP OF WALL MOUNTED

CABINETS (INCLUDING SCRIBES AND FILLER PANELS), ALL

SURFACES OF COUNTER SUPPORTS, AND ALL OPEN

CABINET SHELVES AND SURFACES. IN ADDITION, ALL SIX

SURFACES OF ALL CABINET DOORS AND ALL SIX

SURFACES OF OPEN ADJUSTABLE SHELVES ARE TO BE

FINISHED IN DECORATIVE PLASTIC LAMINATE. THE FRONT

AND FOUR EDGES OF ALL DRAWER FRONTS ARE TO

RECEIVE DECORATIVE PLASTIC LAMINATE. THE SEMI-

EXPOSED INTERIOR SURFACES OF DRAWERS AND

CABINETS (THOSE SURFACES THAT CAN ONLY BE SEEN

WHEN THE DRAWER OR DOOR IS OPEN) ARE TO BE

MELAMINE WITH VINYL EDGES, EXCEPT AS NOTED

OTHERWISE ABOVE THE FOUR EDGES OF ALL MELAMINE

ADJUSTABLE SHELVES WITHIN CLOSED CABINETS ARE TO

BE FINISHED WITH VINYL EDGING. THE UNDERSIDES OF

ALL COUNTER TOPS ARE TO RECEIVE LAMINATE BACKING

SHEET.

7. ALL FILE DRAWERS MUST HAVE A MINIMUM CLEAR INSIDE

HEIGHT OF 10-1/2" AND A MINIMUM CLEAR INSIDE WIDTH OF

13".

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

EYEWASH STATION

EYEWASH VALVE

BLOCKING

F0500

HK CART

RWC AS SCHEDULED

A5135

MOP RACK

LEVEL 1

0' - 0"

F0500

HK CART

SHIP'S LADDER

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

RWC AS SCHEDULED

A5135

MOP RACK

LEVEL 1

0' - 0"

A5107

GLOVE

DISPENSER

SHIP'S LADDER

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

A5082

PAPER

TOWEL

DISPENSER

MOP SINK

BLOCKING TYP

A5135

MOP RACK

RWC AS SCHEDULED

A5135

MOP RACK

LEVEL 1

0' - 0"

SHIP'S LADDER

PAINT AS SCHEDULED

WALL BASE AS SCHEDULED

EYEWASH STATION

EYEWASH VALVE

A5107

GLOVE

DISPENSER

A5082

PAPER

TOWEL

DISPENSER

BLOCKING TYP

A5135

MOP RACK

RWC AS SCHEDULED

MOP SINK

LEVEL 1

0' - 0"

2.5

WALL BASE AS SCHEDULED

M1801

COMPUTER

A1011

TELEPHONE

M1840

PRINTER

F3200

CLOCK

LEVEL 1

0' - 0"

WALL BASE AS SCHEDULED

M1840

PRINTER

M1801

COMPUTER

A1011

TELEPHONE

F3200

CLOCK

BLOCKING

LEVEL 1

0' - 0"

2.5

WALL BASE AS SCHEDULED

M1801

COMPUTER

A1011

TELEPHONE

LEVEL 1

0' - 0"

WALL BASE AS SCHEDULED

M1801

COMPUTER

M1840

PRINTER

LEVEL 1

0' - 0"

A5109

GRAB BAR

A5090

SANITARY

NAPKIN

DISPOSAL

PAINT AS

SCHEDULED

BULLNOSE

TILE, PT-5

ACCENT WALL

TILE, PT-3

COVE TILE BASE

AS SCHEDULED

BLOCKING TYP

TASK LIGHT, SEE

ELECTRICAL

U0001

SEAT COVER

DISPENSER

LEVEL 1

0' - 0"

A5082

PAPER

TOWEL

DISPENSER

PAINT AS

SCHEDULED

BULLNOSE

TILE, PT-5

ACCENT WALL

TILE, PT-3

COVE TILE BASE

AS SCHEDULED

BLOCKING

TASK LIGHT, SEE ELECTRICAL

A5075

SOAP

DISPENSER

A1066

MIRROR

LEVEL 1

0' - 0"

PAINT AS

SCHEDULED

BULLNOSE

TILE, PT-5

ACCENT WALL

TILE, PT-3

COVE TILE BASE AS SCHEDULED

LEVEL 1

0' - 0"

A5109

GRAB BAR

A5090

SANITARY

NAPKIN

DISPOSAL

A5200

TOILET

TISSUE DISP

PAINT AS

SCHEDULED

BULLNOSE

TILE, PT-5

ACCENT WALL

TILE, PT-3

COVE TILE

BASE AS

SCHEDULED

BLOCKING

" 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE434

MSA/BUS SERVICES &

HOUSEKEEPING & STAFF TOILET -

INTERIOR ELEVATIONS 127

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 079 OF 206

1/2" = 1'-0"5

HOUSEKEEPING & LADDER - EAST INTERIOR ELEV

1/2" = 1'-0"6

HOUSEKEEPING & LADDER - SOUTH INTERIOR ELEV

1/2" = 1'-0"7

HOUSEKEEPING & LADDER - WEST INTERIOR ELEV

1/2" = 1'-0"8

HOUSEKEEPING & LADDER - NORTH INTERIOR ELEV

1/2" = 1'-0"1

MSA/BUS. SERVICES - EAST INTERIOR ELEV

1/2" = 1'-0"2

MSA/BUS. SERVICES - SOUTH INTERIOR ELEV

1/2" = 1'-0"3

MSA/BUS. SERVICES - WEST INTERIOR ELEV

1/2" = 1'-0"4

MSA/ BUS. SERVICES - NORTH INTERIOR ELEV

GENERAL NOTES

1. INSTALL WALL BLOCKING WHERE NOTED TO NEAREST

WALL FRAMING MEMBER.

2. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE

BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR

WALL MOUNTED DOOR STOPS. ASSURE THAT ALL

REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO

INSTALLING DRYWALL.

3. SEE SHEETS A-601 - A-612 FOR DOOR SCHEDULES,

WINDOW SCHEDULES/DETAILS, EQUIPMENT SCHEDULE,

AND WALL/FLOOR/ROOF TYPES.

4. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA

INSTALLED REQUIRING POWER/DATA OR FURNITURE

SUPPORTING SAID EQUIPMENT. ONLY USE FOR

REFERENCE. COORDINATE POWER/DATA WITH

ELECTRICAL.

1/2" = 1'-0"9

STAFF TOILET - EAST INTERIOR ELEV

1/2" = 1'-0"10

STAFF TOILET - SOUTH INTERIOR ELEV

1/2" = 1'-0"11

STAFF TOILET - WEST INTERIOR ELEV

1/2" = 1'-0"12

STAFF TOILET - NORTH INTERIOR ELEV

A5109

GRAB BAR

A5109

GRAB BAR

"4

A5090

SANITARY

NAPKIN

DISPOSAL

PAINT AS SCHEDULED

BULLNOSE TILE, PT-5

ACCENT WALL TILE, PT-3

WALL TILE AS SCHEDULED

COVE TILE BASE

AS SCHEDULED

A4995

BABY

CHANGING

STATION

A5145

GARMENT

HOOK

BLOCKING TYP.

U0001

SEAT COVER

DISPENSER

LEVEL 1

0' - 0"

A5109

GRAB BAR

A5109

GRAB BAR

A5090

SANITARY

NAPKIN

DISPOSAL

A5200

TOILET

TISSUE DISP

A5082

PAPER

TOWEL

DISPENSER

PAINT AS SCHEDULED

BULLNOSE TILE, PT-5

ACCENT WALL TILE, PT-3

WALL TILE AS SCHEDULED

COVE TILE BASE

AS SCHEDULED

A5091

FEMININE

NAPKIN

DISPENSER

BLOCKING, TYP

TASK LIGHT, SEE ELECTRICAL

A1066

MIRROR

A5075

SOAP

DISPENSER

LEVEL 1

0' - 0"

A5109

GRAB BAR

A5090

SANITARY

NAPKIN

DISPOSAL

PAINT AS

SCHEDULED

BULLNOSE

TILE, PT-5

ACCENT WALL

TILE, PT-3

WALL TILE AS

SCHEDULED

COVE TILE BASE

AS SCHEDULED

A5091

FEMININE

NAPKIN

DISPENSER

BLOCKING

BLOCKING TYP.

A1066

MIRROR

A5075

SOAP

DISPENSER

TASK LIGHT, SEE

ELECTRICAL

LEVEL 1

0' - 0"

A5145

GARMENT

HOOK

PAINT AS SCHEDULED

BULLNOSE

TILE, PT-5

ACCENT WALL

TILE, PT-3

WALL TILE AS

SCHEDULED

COVE TILE BASE

AS SCHEDULED

A4995

BABY

CHANGING

STATION

TASK LIGHT, SEE ELECTRICAL

LEVEL 1

0' - 0"

PAINT AS SCHEDULED

RWC AS SCHEDULED

WALL BASE AS SCHEDULED

M1840

PRINTER

10' - 2"

GYP HEADER PER CEILING PLAN

LEVEL 1

0' - 0"

E

PAINT AS SCHEDULED

RWC AS SCHEDULED

WALL BASE AS SCHEDULED

M1840

PRINTER

LEVEL 1

0' - 0"

PAINT AS SCHEDULED

RWC AS SCHEDULED

WALL BASE AS SCHEDULED

10' - 2"

LEVEL 1

0' - 0"

2.1

PAINT AS SCHEDULED

RWC AS SCHEDULED

WALL BASE AS SCHEDULED

F3200

CLOCK

M4020

BARIATRIC

SCALE

LEVEL 1

0' - 0"

PAINT AS SCHEDULED

RWC AS SCHEDULED

WALL BASE AS SCHEDULED

F3200

CLOCK

BLOCKING

M4020

BARIATRIC

SCALE

8' - 10"

LEVEL 1

0' - 0"

PAINT AS SCHEDULED

RWC AS SCHEDULED

WALL BASE AS SCHEDULED M4020

BARIATRIC

SCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE435

FAMILY TLT, ALCOVE, AND ALCOVE,

HW - INTERIOR ELEVATIONS

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 080 OF 206

1/2" = 1'-0"1

FAMILY TOILET - EAST INTERIOR ELEV

1/2" = 1'-0"2

FAMILY TOILET - SOUTH INTERIOR ELEV

1/2" = 1'-0"3

FAMILY TOILET - WEST INTERIOR ELEV

1/2" = 1'-0"4

FAMILY TOILET - NORTH INTERIOR ELEV

GENERAL NOTES

1. INSTALL WALL BLOCKING WHERE NOTED TO NEAREST

WALL FRAMING MEMBER

2. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE

BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR

WALL MOUNTED DOOR STOPS. ASSURE THAT ALL

REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO

INSTALLING DRYWALL..

3. IN FAMILY TOILET ROOM, WHERE WALL MOUNTED ITEM IS

INSTALLED PARTIALLY OVER WALL TILE, PROVIDE

STAINLESS STEEL FILLER BEHIND MIRRORS AND WALL

MOUNTED ACCESSORIES TO ENSURE A FLUSH FINISH.

4. SEE SHEETS A-601 - A-612 FOR DOOR SCHEDULES,

WINDOW SCHEDULES/DETAILS, EQUIPMENT SCHEDULE,

AND WALL/FLOOR/ROOF TYPES.

5. GRAYED OUT EQUIPMENT IS VA PROVIDED AND VA

INSTALLED REQUIRING POWER/DATA OR FURNITURE

SUPPORTING SAID EQUIPMENT. ONLY USE FOR

REFERENCE. COORDINATE POWER/DATA WITH

ELECTRICAL.

1/2" = 1'-0"5

ALCOVE - EAST INTERIOR ELEV

1/2" = 1'-0"7

ALCOVE - NORTH INTERIOR ELEV

1/2" = 1'-0"6

ALCOVE - WEST INTERIOR ELEV

1/2" = 1'-0"8

ALCOVE, HW - EAST INTERIOR ELEV

1/2" = 1'-0"9

ALCOVE, HW - NORTH INTERIOR ELEV

1/2" = 1'-0"10

ALCOVE, HW - SOUTH INTERIOR ELEV

A5109

GRAB BAR

A5090

SANITARY

NAPKIN

DISPOSAL

A5109

GRAB BAR

WALL TILE AS

SCHEDULED

COVE TILE BAS AS SCHEDULED

BLOCKING TYP

PAINT AS

SCHEDULED

BULLNOSE TILE, PT-5

ACCENT WALL TILE, PT-3

TASK LIGHT, SEE ELECTRICAL

A5091

FEMININE

NAPKIN

DISPENSER

U0001

SEAT COVER

DISPENSER

A4995

BABY

CHANGING

STATION

A1066

MIRROR

LEVEL 1

0' - 0"

A5082

PAPER

TOWEL

DISPENSER

PAINT AS SCHEDULED

BULLNOSE TILE, PT-5

ACCENT WALL TILE, PT-3

WALL TILE AS SCHEDULED

COVE TILE BASE

AS SCHEDULED

A5109

GRAB BAR

BLOCKING TYP

"3

TASK LIGHT, SEE ELECTRICAL

A4995

BABY

CHANGING

STATION

A5075

SOAP

DISPENSER

A1066

MIRROR

A5145

GARMENT

HOOK

LEVEL 1

0' - 0"

A5145

GARMENT

HOOK

PAINT AS SCHEDULED

BULLNOSE TILE, PT-5

ACCENT WALL TILE, PT-3

WALL TILE AS SCHEDULED

COVE TILE BASE AS SCHEDULED

BLOCKING

TASK LIGHT, SEE ELECTRICAL

A5091

FEMININE

NAPKIN

DISPENSER

A1066

MIRROR

A5075

SOAP

DISPENSER

LEVEL 1

0' - 0"

A5109

GRAB BAR

A5200

TOILET

TISSUE DISP

A5090

SANITARY

NAPKIN

DISPOSAL

A5109

GRAB BAR

/2

PAINT AS SCHEDULED

BULLNOSE TILE, PT-5

ACCENT WALL TILE, PT-3

WALL TILE AS SCHEDULED

COVE TILE BASE AS SCHEDULED

BLOCKING TYP

A5091

FEMININE

NAPKIN

DISPENSER

"3

LEVEL 1

0' - 0"

A5109

GRAB BAR

A5109

GRAB BAR

A5090

SANITARY

NAPKIN

DISPOSAL

PAINT AS SCHEDULED

BULLNOSE TILE, PT-5

ACCENT WALL TILE, PT-3

WALL TILE AS

SCHEDULED

COVE TILE

BASE AS SCHEDULED

BLOCKING TYP

"3

TASK LIGHT, SEE ELECTRICAL

U0001

SEAT COVER

DISPENSER

A4995

BABY

CHANGING

STATION

/8

LEVEL 1

0' - 0"

A5109

GRAB BAR

A5109

GRAB BAR

A5200

TOILET

TISSUE DISP

/2

A5090

SANITARY

NAPKIN

DISPOSAL

PAINT AS SCHEDULED

BULLNOSE TILE, PT-5

ACCENT WALL TILE, PT-3

WALL TILE AS

SCHEDULED

COVE TILE BASE

AS SCHEDULED

BLOCKING TYP

A5091

FEMININE

NAPKIN

DISPENSER

/8

"1

U0001

SEAT COVER

DISPENSER

LEVEL 1

0' - 0"

A5082

PAPER

TOWEL

DISPENSER

PAINT AS SCHEDULED

BULLNOSE TILE, PT-5

ACCENT WALL TILE, PT-3

WALL TILE AS SCHEDULED

COVE TILE BASE

AS SCHEDULED

BLOCKING TYP

A5109

GRAB BAR

TASK LIGHT, SEE ELECTRICAL

A4995

BABY

CHANGING

STATION

A1066

MIRROR

A5075

SOAP

DISPENSER

A5145

GARMENT

HOOK

LEVEL 1

0' - 0"

A5145

GARMENT

HOOK

A5090

SANITARY

NAPKIN

DISPOSAL

PAINT AS SCHEDULED

BULLNOSE TILE, PT-5

ACCENT WALL TILE, PT-3

WALL TILE AS SCHEDULED

COVE TILE BASE AS SCHEDULED

BLOCKING

"2

TASK LIGHT, SEE ELECTRICAL

A5075

SOAP

DISPENSER

A1066

MIRROR

A5109

GRAB BAR

A5091

FEMININE

NAPKIN

DISPENSER

LEVEL 1

0' - 0"

PAINT AS

SCHEDULED

BULLNOSE

TILE, PT-5

COVE TILE BASE AS SCHEDULED

ACCENT WALL

TILE, PT-3

WALL TILE AS

SCHEDULED

A5091

FEMININE

NAP…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .